DESCRIPTION
Building capacity for River basin management Flood risk management. Environmental objectives... (WFD) Water balance modelling...(permits) Flood risk planning ...(awareness). Pilot projects. Location of Pilot project. Groundwater body status Biology : surface water body - PowerPoint PPT PresentationTRANSCRIPT
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Building capacity for River basin managementFlood risk management
Environmental objectives... (WFD)
Water balance modelling...(permits)
Flood risk planning ...(awareness)
Quality classBoundaries values
High >0,72Good >0,52Moderate >0,36Bad >0,18Very bad 0-0,18
Flow measurement
Chemical sampling
Fish sampling
Macro-invertebrates sampling
Kilometers
2 40
KS0112h
KS0112g
KS0112f
KS0112e
KS0112b
KS0112d
KS
0112c
3MZ01
12a
Test of Intercalibration indexes
0
0,2
0,4
0,6
0,8
1
Station 1 Station 2 Station 3 Station 4 Station 5
Final Note (East)
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Istok alluvial aquifer
Peja 2008 – Prizren 2009 sub-basin
Radoniqi area - Decani river basin
Skenderaj flooding area
Water Department
Hydro-Meteorological Inst.
Pristina University
Kosovo Env. Prot. Agency
Muncipalities
Irrigation Companies
Participants
Groundwater body status
Biology : surface water body
Water allocation : WEAP model
Flood risk mapping
Activities in summer 2009
Measurement in 99 wells (piezometry, permeability)Water analyses ( 22 sampling)Biological sampling and analyses ( 3 sites)Electrofishing ( 3 sites)
Irrigation looses, flow measurement, Estimhab method ( 3 sites)
Topograhic survey, interview flooding zone
Pilot projects Location of Pilot project
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Test of Intercalibration indexes
0
0,2
0,4
0,6
0,8
1
Station 1 Station 2 Station 3
Final Note (East)
Values of intercalibration
index for 3 stations
Sampling of macro
invertebrates
Electro-fishing
River Lumbhardi I prizrenit, 2009
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Irrigation system performance – measurement of flow
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Study tour at Nimes
Measurement E-flow
Trainees
Equipment for high flow
Use of information for flood risk warning
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Measurements for E-flow calculation
Use of the softwareEstimhab
Flow stones measurements
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Groundwater pilot project
Calibration GPS In Klina
Record on field forms of the measurements in Istog
alluvial aquifer
Measurement of the depth and of the
permeability by slug test
Analyse of results producing maps –
training for replication
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Project products
for this reporting period
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Information SystemData base – GIS – web
- Training on web portal, WD staff can download files and update it - Paul HAENER
- Production of a data base and forms for recording monitoring data – Visar URUQI
- Production of the web site for project visibility
- Data acquisition through
4 pilot projects
Main issues
- Active web portal administrator required
to upload files, to insure accessibility to manage private/public access
- The links and codification of database have to be improved, staff need to improve their level in Excel and database
- Access to the project output is possible through password or registration. Who will give the right to the users after the end of the project ?
Result 1 :Web portalPjt web site
Data catalogue
databases
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Monitoring system
- Bidding Document for Drilling Contract
(Annex 10) Malcolm ASHWORTH
- Ground Water monitoring programme, resources needed
(Annex 13) Jurgen DOMEROESE
- Mission Report on WFD compatible biological classification
(Annex 18) Antonin CARREY
- leadership for monitoring system improvement is needed
- decision has to be taken on which institution will continue monitoring activities
- organise light external assistance, ( several weeks per year).
-Need of support for project implementation to check the proper application of methodologies
Main issuesResult 2 :
Quality classBoundaries values
High >0,72Good >0,52Moderate >0,36Bad >0,18Very bad 0-0,18
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Modelling RB management
- Report on the pilot field work on the irrigation performance and
Environmental flow (E-flow). (Annex 15) by Kujtim ZENA and Wilfried
HUNDERTMARK
- Preparation of mission for water demand and water balance methodologies and WEAP modelling ( October 2009)
- Preparation for a Water management plan in the Pilot area Decani Radoniqi water system
Result 3 :
- Other measurements are needed in high water conditions to calculate the E-flow;
- The use of models has to be supported by external assistance;
- Concrete options of water management resulting from the modelling outputs to be discussed.
Main issues
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Result 4 : ToR Water Supply and Sanitation Investment Plan
Flood risk management
- Terms of reference Kosovo
urban water supply and sanitation investment plan and credit facility(Annex 9) Jan- David
MUELLER-VOLLMER
- Topographic survey of the flooding zone of Skenderaj, compulsory for modelling risk sub-contracted,
quality control by JSTE
Ibrahim LEKAJ
Comments
- Report delivered to ECLO taking into account comments form donors,
- the first draft of the topographic survey was not sufficient, additional surveying was needed,
Modelling of flood risk is possible for October 2009
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Result 5 : Institution and Legislation
- Assessment of the different options
for the establishment of the River Basin District Authorities (RBDA)
(Annex 11) Jacques SIRONNEAU
- Analytic report on water and other legislation related to water planning and administration
(Annex 12) by Selvete DEBIANI
- clarification of the position of the MESP about RBDA establishment and development
- process of writing a better water law and subsidiary acts (permit) to launch for better approximation of WFD and remove unnecessary details
Main issues
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Outputs / project ToR
Outputs/Deliverabl
e
Info. systemGIS-database
Monitoringsystem
Water balance, water demand
WSSinvest Plan
Flood risk Plans
InstitutionsLegislation
Tech. reports
Current status reportForms for data capture
Surf. Monit (ToR)Groundwater (ToR)Bidding document
Hydrology incl.Water demandWater balance
TORWSS
Plan zone SkenderajPlan for Drini
Instit. Analysis
Options RBDA
Additional Quality management procedure
Water management plan
Legislation Review
Manuals Data catalogue ( metadata)
Sampling Macro.Analysis Macro.
WEAP Hydrology
Flood risk mapping method.
Additional Web portal Add. report on Sub basins WB status
Mapping flood
E-filesModel
Data catalogueMaps, GIS files, databases
Monitoring network MapsWB Charact. Maps
WEAP model Drini River BasinWater allocation
Maps of categories of towns
Flood Maps, ISIS/ Oasis model
Maps of river Basin
Additional Project WebsiteWD web portal
Files of new data acquired,
WB : water bodies PP : Pilot projectRBDA : River Basin District Authorities
WD : Water Department
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Responsibilities and capacity for continuation
Who is responsible for continuation ? Allocation of resources needed ?
Skills required ( internal, external) ?
Condition of employment ?
The project ends in January 2010, extension possible to February : How to efficiently use methods and tools ?
How to replicate in other zones ?
Data catalogue, web portal
Databases : WISKI, permits, monitoring, Water Bodies related data
Modelling for Water Management (WEAP) Mapping methods for Flood risk
Use of computer tools ?
How to raise project positive impact ?
How to insure sustainability ?
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Activities to complete
- Flood risk mapping and flood risk plan- Hydrological study- Management Plan
Period
October
Productions of manuals
November - Production of final report
- Work on Radoniqi management plan
- Finalisation of technical reports and manuals
- Work on database
- Content of website and other visibility activities
December Training and study tour
Planning
Institutional Support to Ministry of Environment and Spatial Planning (MESP) & River Basin Authorities
An EU project managed by the European Commission Liaison Office
Extension up to end of February 2009
Objective : a) to better disseminate the project achievement
b) to insure political support for continuation of activities
- Water conference in January
- Municipalities events to present achievements
- training on project identification and promotion
- Additional technical training
- Support in the process of law and subsidiary act writing
- Visibility activities – editing of document, interview, documentary
(JSTE , journalist - event manager)
Activities