  • Editors Note

    Pidilite Industries Ltd.

    Murgesh BhustaliHead - TrainingConstruction Chemicals Division

    2

    Pidilite Industries Ltd.

    MUMBAI

    AHMEDABAD

    BANGALORE

    CHENNAI

    COCHIN

    DELHI

    HYDERABAD

    KOLKATA

    Ramkrishna Mandir Road, P.O.Box No.17411,Andheri (East) MUMBAI - 400 059.Ph : (022) 2835 7000

    Paritosh 4th Floor, Near Darpan Academy,Usmanpura, AHMEDABAD - 380 013Ph :

    H.V.S. Apar tments, Edward Road, BANGALORE - 560 052.Ph :

    306 (Old No. 244), Llyods Road, Gopalpuram,CHENNAI-600 086.Ph :

    Cochin - 682 0 .

    6th Floor, Vikas Deep, Laxmi Nagar, District Centre,Vikas Marg, DELHI - 110 092Ph :

    Sunrise Apar tment, Flat No.101,102 & 103,183, Dwarkapuri Colony,Panjagutta, HYDERABAD - 500 082.Ph :

    Everest House, 10th Floor, 46/ C, Chowringhee Road,KOLKATA - 700 071.Ph :

    Ellikkal Estate, N.H. 47, Pathadipalam,Edappally P.O, Ernakulam, 24Ph :

    (079) 27552043 / 1483

    (044) 28350338 / 1614

    (0484) 2543978 / 3979

    (011) 22440890, 22541970

    (040) 23351250 / 1308

    (080) 22204238 / 4239

    (033) 22888844 / 7610

    MUMBAI

    AHMEDABAD

    BANGALORE

    CHENNAI

    COCHIN

    DELHI

    HYDERABAD

    KOLKATA

    Pidilite Industries Ltd.

    PUBLISHED BY

    Murgesh BhustaliMurgesh Bhustali

    EDITOR

    Dipika Shetty

    SUB-EDITOR

    Parag Chinchkar, Better Communications Pvt. Ltd.Better Communications Pvt. Ltd.

    DESIGNED BY

    Cover page by Ogilvy & Mather Pvt. Ltd.Ogilvy & Mather Pvt. Ltd.

    Dear Friend,

    olumn

    The monsoon is around the corner, and we need to take care and get prepared for

    the onslaught of rains. Pre-monsoon preparations like proper cleaning of terrace

    and rainwater outlets needs to be done to ensure proper flow of water and avoid

    ponding

    This issue of focuses on solving the common problem of leakages in

    bathrooms and toilets. It provides a set of complete solution for dealing with

    leakages in bathroom and toilets, on long-term basis. Mr. K. Padmakar and

    Mr. Dhananjay Kulkarni have written in a lucid manner how to tackle problem related

    to new and old bathroom constructions.

    The common problems in waterproofing and on rising dampness are answered in the

    ASK THE EXPERT c

    In the other regular columns, we have highlighted on our recent initiatives like new

    product launches, the opening of additional Dr. Fixit Service Centre. We are also

    out-lining the schedule of various types of engineer, architect, contractor & dealer

    meets.

    We hope you will enjoy reading this issue and give your feedback to enable us make

    still more interesting for your reading.

    Building Blocks

    Building Blocks

    s

    Building Blocks

    Building Blocks

  • Previous Issue

    Contents

    Some encouraging responses ...

    The previous issue of carried an article on terrace waterproofing by

    - G. M- Products & Services which was in continuation to the 8th issue of

    Building Blocks.

    It also carried details of our new products launched in the coatings range

    Building Blocks

    K. Padmakar

    Building Blocks

    K. Padmakar

    3

    5 NEWS

    1 FROM THE COVER

    Leak Free Bathrooms

    (New & Old construction)

    We received you latest issue of , being a professional civil engineer and working as a contractor for building

    construction & repairing work, I liked it very much. I have found it very informative and useful in my day-to-day work.

    - (Trinity Group, Borivali)

    Keep it up ! I have been reading your magazine regularly right since its first issue. I appreciate the effor ts

    taken in coming out with this magazine. I must say the total magazine as a package is informative and well

    summarized. Please keep the effor ts going. - By mail (Mumbai)

    I would like to congratulate your team on your well-researched magazine. Your ar ticle on terrace waterproofing

    using Dr. Fixit New coat and Dr. Fixit Heat shield was really of great interest. The ar ticle carried valuable inputs which we have

    considered while getting our society repaired. By mail (Bank Employee, Ajmer)

    Building Blocks

    Jayesh Shah

    Vishal Akila

    - Ashok Sharma

    e

    e

    Building Blocks

    Jayesh Shah

    Vishal Akila

    - Ashok Sharma

    4 DR FIXIT INSTITUTE

    Programs conducted by Dr. Fixit Institute

    Some of our recent projects

    Training Programs conducted for

    Contractors, Painters, Dealer,

    & Site Engineers

    Exhibition & Trade Fairs conducted

    Dr. Fixit Service Centre inaugurations

    Level II Applicator Training Program

    New Product Launches

    3 ASK THE EXPERT

    2 INDUSTRY PROFESSIONAL SPEAKS

    Kurian Philip - An &

    his association with Pidilite

    experienced applicatorKurian Philip

    You ask your doubts, we will clarify them

  • Cover Story

    4

    K. Padmakar & D.K. KulkarniConstruction Chemicals DivisionPidilite Industries Limited

    Leak Free Bathrooms

    Bathroom waterproofing, whether new or old is alwaysa subject during seminars & workshopsIn new construction, although is only identified with only

    doing a brick-bat-coba treatment in the sunken por tion,

    there is much more to be done, than just this treatment.

    By having a look at what are the areas that definitely need

    waterproofing treatment, one will be surprised to the extent, one

    needs to detail into for a bathroom-toilet

    Waterproof treatment to base slab

    Tiling

    All the plumbing and sanitary joints

    Sealing gaps around wash basin / bath tubs

    Lets look at all the above areas in detail now

    The base slab of bathrooms and toilets shall be treated with

    , a flexible, heavy duty, impermeable, seamless,

    2 component, Cementitous polymer modified coating

    Surfaces to be applied upon, must be clean, reasonably dry, free from

    dir t and loose material, and be as smooth as possible. Pre-wet the

    surface with water and allow surface water to evaporate.

    Apply by brush or roller a coat of after mixing

    2 components mechanically over the prepared surface at a rate of

    12-14 square meters per kg at a thickness of 500 600 microns and

    allow to dry for 4 -6 hours. Apply second coat in the opposite direction

    properly waterproofed .

    Dr. Fixit

    Pidifin 2K

    -

    Dr. Fixit Pidifin 2K

    -

    -

    .

    LEAK FREE BATHROOMS IN NEW CONSTRUCTION

    WATERPROOFING TREATMENT TO BASE SLAB

    Surface Preparation

    Application

    LEAK FREE BATHROOMS IN NEW CONSTRUCTION

    properly waterproofed .

    Dr. Fixit

    Pidifin 2K

    -

    Dr. Fixit Pidifin 2K

    -

    -

    WATERPROOFING TREATMENT TO BASE SLAB

    Surface Preparation

    Application

    W A T E R P R O O F I N G S O L U T I O N S

    TM

    at the same rate. After application of second coat of

    it gives the total thickness of

    1 1.2 mm. The treatment is left as it is for 72 hours for

    air cure before carrying out ponding test. Ponding

    test shall be carried out at a depth of 50 mm to

    determine water tightness.

    The waterproofing shall be carried at least 300 mm on

    ver tical surfaces, or at least 150 mm above the floor finish level. The

    membrane shall be applied to the internals of the down pipes before

    laying of the tiles, bedding and floor traps. Upon successful

    completion of the onding test, a layer of 10mm Cement and (Ratio

    1:4) protective screed, using Integral

    Waterproofing Compound @ 200ml/ 50 kg bag of cement, shall be

    applied on top of the membrane. Care shall be taken w il laying the

    protective screed so as not to damage the waterproofing membrane

    below.

    The tiling in wet areas like bathrooms / toilets etc shall be done with

    waterproof, non shrinking, ready to use polymerized tile adhesive

    and the tile joints shall

    be filled with waterproof, non cracking, coloured, ready-to-use tile

    joint material

    Once the leveling screed (PCC) is laid in wet areas, it shall be cured for

    a minimum 7 days. Remove all water & clean surface to receive the tile

    adhesive.

    / is mixed with potable

    water at the propor tion of 3:1 (Powder : water) with trowel / slow

    speed drill (50-100 rpm) until a homogenous lump free paste is

    obtained. Care should be taken that the quantity, which can be

    consumed within 2hrs at 30C, should only be mixed. Adhesive is then

    Dr. Fixit Pidifin 2K

    -

    the

    p -s

    Dr. Fixit Pidiproof LW

    Dr. Fixit Fevimate XL/ ROFF Non-Skid Adhesive

    Dr Fixit Fevimate TG/ ROFF Rainbow Tile Mate.

    Dr Fixit Fevimate XL ROFF Non-Skid Adhesive

    h e

    TILING

    Surface Preparation

    Application

    Dr. Fixit Pidifin 2K

    -

    the

    p -s

    Dr. Fixit Pidiproof LW

    Dr. Fixit Fevimate XL/ ROFF Non-Skid Adhesive

    Dr Fixit Fevimate TG/ ROFF Rainbow Tile Mate.

    Dr Fixit Fevimate XL ROFF Non-Skid Adhesive

    TILING

    Surface Preparation

    Application

  • spread to a thickness of approx, 3-6 mm and comb with a notched

    trowel. The tiles are placed on the surface to be tiled and tapped

    properly for ensuring complete coverage of the backside of tiles

    without any air voids. The joints between two-tiles is kept with the

    2 mm spacers provided with /

    bag. The tiling is allowed to set for 24 hours before

    application of waterproof tile grout /

    .

    All the tile joints shall be filled with polymer based tile grout

    which is available in different

    colours

    / is mixed with water in

    ratio of 2.5:1 / RTM : Water) until a homogenous and

    desired consistency is achieved. The prepared paste is then filled into

    the gaps and excess material is removed by tooling.

    All the plumbing and sanitary joints with polymer modified cement

    mortar. For this all the joints must be cleaned and made dry. Prepare

    polymer modified mortar by adding 6 to 8 % by

    weight of cement.

    Dr. Fixit Fevimate XL ROFF Non-Skid

    Adhesive

    Dr Fixit Fevimate TG ROFF

    Rainbow Tile Mate

    Dr. Fixit

    Fevimate TG/ ROFF Rainbow Tile Mate

    .

    Dr Fixit Fevimate TG ROFF Rainbow Tile Mate

    (Fevimate TG

    Dr. Fixit Pidicrete URP

    PLUMBING & SANITARY JOINTS

    Dr. Fixit Fevimate XL ROFF Non-Skid

    Adhesive

    Dr Fixit Fevimate TG ROFF

    Rainbow Tile Mate

    Dr. Fixit

    Fevimate TG/ ROFF Rainbow Tile Mate

    .

    Dr Fixit Fevimate TG ROFF Rainbow Tile Mate

    (Fevimate TG

    Dr. Fixit Pidicrete URP

    PLUMBING & SANITARY JOINTS

    SEALING GAPS AROUND WASHBASIN / BATHTUBS

    NEGLIGENT WORK IN PLUMBING AND SANITATION

    Gaps around washbasin and bathtubs require special sealant that

    should withstand the temperature variations and movement. The

    ordinary sealant / cement filled joints will crack and leak with the

    passage of time. The joints look ugly and spoil the aesthetics.

    Such gaps / joints should be filled with non-shrinking, crack free

    acrylic based sealant . Available in easy to use tubes of

    200 ml, one can clean the joint surface and apply manually into the

    joint. After application of , tooling should be done

    immediately with the help of suitable tooling knife. This will ensure the

    required compaction and adhesion with the surface. The joints applied

    with Dr. Fixit Gapfill will remain intact for a long time without showing a

    sign of deterioration.

    Bathrooms & toilets can leak due to the following reasons:

    1. Negligent work in plumbing and sanitation

    2. Conventional tiling methods that actually do not waterproof

    3. Through joints sealed with white cement.

    4. Through joints between ceramic sanitary units such as wash

    basins / bath tubs.

    5. Poor quality of construction and concrete with age or honeycombs

    & voids

    6. Renovation of these areas without proper advice.

    require some fore thought while

    planning for a leak free bathroom. But often on sites, the works are

    done in isolation, i.e. no co-ordination between the waterproofing

    contractor. This results in dampness and leakage, much after the

    owner has moved in. Since plumbing pipes are nowadays concealed,

    leakage in the joints show up as dampness in walls.

    Dr. Fixit Gapfill

    Dr. Fixit Gapfill

    Plumbing and sanitary fittings

    REPAIRING BATHROOMS FOR A LEAK FREE SITUATION

    SEALING GAPS AROUND WASHBASIN / BATHTUBS

    NEGLIGENT WORK IN PLUMBING AND SANITATION

    Dr. Fixit Gapfill

    Dr. Fixit Gapfill

    Plumbing and sanitary fittings

    REPAIRING BATHROOMS FOR A LEAK FREE SITUATION

    Skipting

    Boards &

    Covings

    Bathtubs

    &

    Washbasins

    Kitchen sinks

    & UPVC down

    pipes

    5

  • 6Cover StoryW A T E R P R O O F I N G S O L U T I O N STM

    Reiterating treatment of 'rising damp' in Walls of stone masonry and concrete

    Plumbing lines must be checked by a plumber for leakage through

    joints or elbows / bends in the pipes.

    It may require breaking open to expose the exact point of leakage.

    Fix up the joints, elbows or nipples with an effective caulking

    material. (Check for its ability to withstand high temperatures of

    the geysers, in case of hot water lines.)

    Nahani traps must be inspected for leakages. Fill up all the gaps

    around the pipes in the traps with an effective material ike

    Traditionally tiling does not use waterproofing materials. It is done

    with grey or white cement, which will shrink and crack. The tiling

    fixing material comprises of a neat cement paste made with water,

    which is applied par tially on the back of a tile. This practice does

    not give a 100 % waterproof tiling solution.

    It is therefore impor tant to COMPULSORILY user a tile adhesive like

    for this.

    Tile joints are still being grouted with white cement mixed with

    colour to match tiles. White cement shrinks and is a potential

    source of leakage to the gaps behind the tiles and the walls of the

    bathrooms.

    Rake out all the existing tile joints with a paste made with

    added with

    that ensures a water-tight grouting system

    Dr. Fixit Pidicrete

    URP MPB

    l M-Seal

    Wet Set.

    Roff NSA/ Fevimate XL

    Roff

    Rainbow Tile Mate/ Dr, Fixit Fevimate TG Dr. Fixit

    Pidicrete MPB .

    If the pipeline is being put back into the walls and re-concealed,

    use a polymer modified mortar made with either

    or to seal it back. This will ensure water-tightness.

    LEAKAGE THROUGH CONVENTIONALLY TILED SURFACES

    THROUGH JOINTS SEALED WITH WHITE CEMENT

    Dr. Fixit Pidicrete

    URP MPB

    l M-Seal

    Wet Set.

    Roff NSA/ Fevimate XL

    Roff

    Rainbow Tile Mate/ Dr, Fixit Fevimate TG Dr. Fixit

    Pidicrete MPB .

    LEAKAGE THROUGH CONVENTIONALLY TILED SURFACES

    THROUGH JOINTS SEALED WITH WHITE CEMENT

    JOINTS BETWEEN CERAMIC SANITARY UNITS

    DOWNTAKE PIPES ON THE EXTERIOR WALLS

    TOILETS DRIPPING WITH WATER FROM THE ROOF SLAB

    Joints between ceramic sanitary units like wash basin, bathtub etc. are

    traditionally grouted with white cement, which crack and allow

    seepage of water. Besides white cement star ts looking shabby and

    often show up collection of dust / bacteria.

    Such joints can raked out, and re-filled with , a

    acrylic based sealant that is eas . The product comes in

    a tube that can be pressed into the gaps and finished / tooled with a

    spatula or a metallic scale

    Downtake pipes often leak at the joints allowing water to seep into the

    interior of the bathroom / toilet, resulting in dampness internally.

    These points can be re-done with a polymerised cement-sand mortar

    prepared with that will ensure no leakage. This

    joint will be waterproof joint that is now effect due to the use of the

    polymer, .

    If dripping from the upper side (roof slab) is persistent, drill hole to fix

    nozzles as advised by Dr. Fixit team, and grout

    with a user-friendly pump. This injection will expand on

    contact with the water bearing cracks and permanently seal the

    leakage.

    Over a period of time the entire roof slab will become dry.

    be n

    y in application

    Dr. Fixit Gapfill

    .

    Dr. Fixit Pidicrete MPB

    Dr. Fixit Pidicrete MPB

    Dr. Fixit PU Foam

    Injection 150

    JOINTS BETWEEN CERAMIC SANITARY UNITS

    Dr. Fixit Gapfill

    .

    Dr. Fixit Pidicrete MPB

    Dr. Fixit Pidicrete MPB

    Dr. Fixit PU Foam

    Injection 150

    DOWNTAKE PIPES ON THE EXTERIOR WALLS

    To summarise, if all the necessary care is taken during construction of bathrooms and toilets, the bathrooms will remain

    waterproof for a longer time saving all the hassles of rectification at a later stage. And one achieve this with a negligible

    additional cost by using high performance modern materials.

  • W A T E R P R O O F I N G S O L U T I O N S

    TM

    7

    OBSERVATIONS:

    SITE INSPECTION RESULTS:

    PRODUCTS RECOMMENDED

    METHODOLOGY

    - The Church was built approximately 20 years ago in the heart of Thiruvalla Town in Pathanamthitta district.

    - For the last 8 years the building was continuing in a dilapidated stage and it was leaking all over.

    - The entire front area was dripping from inside during rain & fungal growth formations were seen throughout the structure.

    - Vegetation growth was seen above the porch slab and Sunshade

    - Lot of methods had been applied to stop the problem of leakage at the church

    Joint inspection was conducted by the applicator and by the company sales in charge, the below mentioned points were noticed during theinspection:

    -

    - Some weak areas in the structure were identified

    - Drawbacks in the design itself which enhanced the possibility of water to get trapped in between the walls

    - Plastering was not done properly

    - It was a critical area and workers were helpless to do anything there. The only possible way was to cover it up from the top.

    - The bottom face was plastered by modified mortar over 2 coats of.

    - The external areas were treated with Dr. after removing all the plaster. Afterapplication of key coat of with Cement in the prescribed ratio; the entireexternal vertical walls were replastered.

    - The roof of porch was also applied with and plastered.

    - From the inside, all the honeycombs in the un-plastered area were filled with modified mortar and then plastered by using.

    - The damp patches which were caused due to water seepage through the sunshade were treated with f and the cracks werefilled up with .

    - After giving required time for the treatment to cure the entire church was re-painted.

    Dr. Fixit Pidicrete URPDr. Fixit Pidifin 2K

    Dr. Fixit Pidifin 2KDr. Fixit Pidicrete MPB

    Dr. Fixit Pidifin 2K

    Dr. Fixit Pidicrete URPDr. Fixit Pidiproof LW

    Dr. Fixit DampguardDr. Fixit Crack-X paste

    1. Dr. Fixit Pidifin 2K

    2. Dr. Fixit Pidicrete URP

    3. Dr. Fixit Pidicrete MPB

    4. Dr. Fixit Pidiproof LW

    OBSERVATIONS:

    SITE INSPECTION RESULTS:

    PRODUCTS RECOMMENDED

    METHODOLOGY

    Dr. Fixit Pidicrete URPDr. Fixit Pidifin 2K

    Dr. Fixit Pidifin 2KDr. Fixit Pidicrete MPB

    Dr. Fixit Pidifin 2K

    Dr. Fixit Pidicrete URPDr. Fixit Pidiproof LW

    Dr. Fixit DampguardDr. Fixit Crack-X paste

    Mr. Kurian Philip Says,

    After we repaired the structure we have not noticed any kind of leakage or dampness at the site, this had made me even more confident on the

    usage and recommendation of Dr. Fixit range of products.

    Mr. Kurian Philip Says,

    After we repaired the structure we have not noticed any kind of leakage or dampness at the site, this had made me even more confident on the

    usage and recommendation of Dr. Fixit range of products.

    OBJECTIVE :

    SITE DETAILS :

    NAME OF APPLICATOR :

    NAME OF FIRM :

    QUALIFICATION :

    SPECIALISATION :

    Restoration of St. Thomas Marthema Church, Thiruvalla to stop leakage & restore the beauty of the church

    St. Thomas Marthema Church, Thiruvalla

    Kurian Philip

    Blooms Engineers & Contractors

    Diploma in Civil Engineering

    Construction & Repair

    OBJECTIVE :

    SITE DETAILS :

    NAME OF APPLICATOR :

    NAME OF FIRM :

    QUALIFICATION :

    SPECIALISATION :

    Applicator SpeaksAn expert at structural repairs & his association with Pidilite

    Site:

    Applicator:

    Product used:

    St. Thomas Marthoma Church, Thiruvalla

    Blooms Engineers & Contractors

    Dr. Fixit Pidifin 2K, URP, MPB,

    Crack-X & Dampguard

  • 8Dr. Fixit InstituteLaunch Program of Dr. Fixit Institute Some of our recent projects

    Some of our recent projectsSome of our recent projects

    Program conducted

    for IICM Engineers, RanchiProgram conducted

    for LIC Engineers-Akurdi, Pune

    Program conducted

    for DFS Dealers, Kolkata Program conducted for

    BMC Engineers, Borivali-Mumbai

    Before After

    Site:

    Applicator:

    Product used:

    Lord Datta Temple", At Post Bambawadi, Kolhapur District

    Prassana Shah

    Dr Fixit Elastomeric ,

    Crack X + URP , MPB and internal treatment by

    Dr. Fixit Dampguard

    Site:

    Applicator:

    Product used:

    State Bank of Saurastra

    Hareshbhai Chavda

    Dr. Fixit Fevimate XL

  • Ask the expert

    Your problem is our problem. Feel free to write to us at [email protected] orPidlite Industries Ltd., Construction Chemicals Division, Ramakrishna Mandir Road, Andheri (E), Mumbai 400 059.

    1

    2

    3

    Can your product Dr. Fixit Pidifin 2K replace brick bat coba in toilets ?

    How does one arrest leakage from the underside of toilet slab with your system?

    Why do you say that use of tile adhesive is beneficial and effective in bathrooms

    and toilets?

    Your DAMPFREE has worked well in may of our brick masonry walls however, we

    could not fix rising dampness problem in old lime and stone masonry walls. What do

    you suggest for it?

    Ans.

    Ans.

    Ans.

    Ans.

    is a high performance impermeable coating and suitable for wet

    areas. The sunken por tion in toilets can be filled with normal PCC to match the final floor

    finish level. Since the coating of is applied on the slab directly, it ensures

    complete water tightness unlike brickbat coba, which is laid just below the floor level after

    laying all the concealed plumbing lines.

    There are instances where top floor is not accessible or cannot be accessed due to

    various reasons for inspection and carrying out necessary treatment. In situations like this,

    the treatment from underside becomes inevitable.

    You can solve the problem by injection low viscous from the

    underside of the slab. This foam type injection will spread into the slab due to its low

    viscosity and block all the pores / capillaries.

    Use special 'packers' available for this work as the grouting is done against gravity. These

    packers have non-return valve, which will not allow material to flow back.

    One should always ensure that wet areas are 100% waterproof. Tiles adhesives apar t

    from fixing the tiles, provides waterproofing due to its proper ties. They are specially

    designed for tile fixing which does not require curing unlike normal cement. Tile adhesives

    and grouts are made from cement and special polymers that offer good waterproofing

    proper ties. The leakage through tile joints is most common cause in the wet areas. Tile

    grouts when applied into the tile joints do not crack and leave the surface and makes joints

    waterproof.

    Dr. Fixit Dampfree works well in brick masonry walls. But for lime and stone masonry

    walls one should use very low viscous highly reactive PU based injections.

    is low viscous plane injection which, when injected, travels into the fine

    capillaries of masonry there by cutting / blocking it.

    For method of drilling and locations of packers, please refer our figures in current issue.

    Dr. Fixit Pidifin 2K

    Dr. Fixit Pidifin 2K

    Dr. Fixit PU Foam Injection 150

    Dr. Fixit PU

    Injection 1403

    Can your product Dr. Fixit Pidifin 2K replace brick bat coba in toilets ?

    How does one arrest leakage from the underside of toilet slab with your system?

    Why do you say that use of tile adhesive is beneficial and effective in bathrooms

    and toilets?

    Your DAMPFREE has worked well in may of our brick masonry walls however, we

    could not fix rising dampness problem in old lime and stone masonry walls. What do

    you suggest for it?

    Ans.

    Ans.

    Ans.

    Ans.

    Dr. Fixit Pidifin 2K

    Dr. Fixit Pidifin 2K

    Dr. Fixit PU Foam Injection 150

    Dr. Fixit PU

    Injection 1403

    9

    You ask your doubts, we will clarify them

    W A T E R P R O O F I N G S O L U T I O N S

    TM

    Injection Grouting

    4

    Brickbat Coba

  • News

    If you wish to recommend someone to whom we should mail this copy or if you have any suggestions, please feel free to contact us at

    Pidilite Industries Ltd., Construction Chemicals Division, Ramkrishna Mandir Road, P.O.Box No.17411, Andheri (East), Mumbai-400 059.

    Phone : 2835 7000, 2835 7111 Fax : (022) 2835 7008 Website: www.doctor-fixit.com email: [email protected]

    Inauguration of Dr. Fixit Centre Training programs organised roduct Launches Service New P

    Inauguration of Dr. Fixit Service Centre

    Level II Applicator Training Program - Chennai, Tamilnadu

    New Product Launches

    Those interested in this Dr. Fixit Service Centre venture,

    may get touch with us on 022-2835 7000 or email at [email protected] with complete profile

    Those interested in this Dr. Fixit Service Centre venture,

    may get touch with us on 022-2835 7000 or email at [email protected] with complete profile

    Dr. Fixit Krystalline & Dampfree Launch - Guwahati Dr. Fixit Krystalline Launch - Ahmedabad

    Post Launch Placement CampaignKarickal Hardwares, Vyttila, CochinDr. Fixit Krystalline Launch - Surat

    Medit Renotech, Trichy Evershinne Traders, Coimbatore

  • News

    10

    For Contractors, Dealers, Painters & Masons

    Petty Contractors Meet Mallapally, CochinDealer Meet Abott Hotel, Vashi-Mumbai Paint Contractor Meet Tamarassery, Calicut

    Dealer Meet GCC Club, Mira Road-MumbaiRanny, CochinContractors Meet Vadakara, CalicutEngineers Meet

    CochinProject Site Managers Meet Petty Contractors Meet Kuttoor, Cochin

    Training programmes organised Exhibition & Trade Fairs

    Exhibition & Trade Fairs

    Sthapatya Exhibition 05-06 Architech Thailand 2006ICON 2006, Noida

    Dealer Meet Juhu Gymkhana, Andheri-MumbaiCement Dealer Meet Aluva, Cochin Vadarappally, CochinDealers Meet