building a low carbon economy/media/files/a/atkins-corporate/grou… · source: marks and spencer ....

32
Building a low carbon economy Chinese media delegation briefing

Upload: others

Post on 07-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Building a low carbon economy

Chinese media delegation briefing

Page 2: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Sean Lockie, director of

sustainability, Faithful+Gould

11 October 2013

Page 3: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

A framework for sustainability

Energy

Carbon

Waste

Water

Ecology

Comfort

Page 4: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Drivers

Cost Compliance

CSR Customer

Sustainability

Page 5: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Drivers - Cost

● Energy costs 25 per cent of total business cost

● Energy costs increasing

● Internal Rate of Return (IRR) of circa 40 per cent on some projects

● Changing business case (valuations, rentals, voids)

● Costs of techs coming down.

Cost Compliance

CSR Customer

Sustainability

Page 6: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Drivers - Compliance

● Energy Act 80 per cent by 2050

● Carbon budgets

● Carbon Reduction Commitment

● Mandatory reporting

● 2016 / 2019

● Faithful+Gould rated buildings 2018.

Cost Compliance

CSR Customer

Sustainability

Page 7: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Risks - unsustainable traits

Page 8: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Savings are available

Hospital Office Restaurant

Hotel Shopping Centre School

Source: Siemens Building Technologies 2012

Page 9: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Drivers - CSR

● Productivity

● Health

● Carbon footprint

● CSR strategies required certain investment funds

● Local jobs

● Voluntary reporting – CDP, GRI, GRESB etc.

Cost Compliance

CSR Customer

Sustainability

Page 10: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

The business case is there

Source: WGBC 2013

Page 11: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

And it’s not just a label

Valuations > rental > demand > voids > brown discount > green premium

Page 12: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Drivers - Customer demand

● Increasing amount of labelling

● Leading players aggressive targets

● Labelling of products.

Cost Compliance

CSR Customer

Sustainability

Page 13: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou
Page 14: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Atkins' turnkey energy

efficiency solution How it works

Page 15: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Client advantages

● Atkins designs, finances, installs and maintains the systems

● Atkins’ costs are repaid through the energy savings

● Reduce overall client operation cost

● Risks and responsibilities are rested on Atkins

● No upfront costs or investment for the client.

Page 16: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Identification of opportunities

Full investment grade proposal

Detailed design

Agree M&V strategy

Install & PM energy conservation

measures

Implement M&V

Ongoing guarantee of energy savings

Survey

Funding

Design

Maintenance

‘Energy

performance

contract’

Installation

The process

Page 17: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

How can we be certain

technologies will pay back?

Page 18: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

saved per year

34,000tCO2

Salix finance

£750m

9000

143 funds established

saved over project lifetimes

projects in 662 organisations

“A government fund

for the public sector ”

Page 19: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Technology Typical payback

LED lighting – lamp retrofit 4 to 5 years

LED lighting – complete luminaire upgrade 6 to 7 years

Building fabric insulation 3 to 10 years

Building management system upgrades 3 to 4 years

Combined heat & power (cogeneration) 5 years

Boiler replacements 4 to 5 years

Heating zoning and controls 3 years

Free cooling 4 years

Motor variable speed drives 3 years

Technologies and paybacks / Salix

Page 20: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

UK case study - Frimley Park hospital

3.5 £3m

£900k loan for 17 EE projects

years payback

lifetime savings

Page 21: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

UK case study – Marks & Spencer

Faithful+Gould is undertaking an in-depth Post Occupancy Evaluation (POE) of

Marks & Spencer’s (M&S) second largest store at Cheshire Oaks near Chester.

This prestigious new study is part of an extensive £8 million programme funded by the

Technology Strategy Board (TSB) designed to deliver more efficient, better performing buildings.

Page 22: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Post occupancy evaluation

Source: Marks and Spencer

Page 23: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Post occupancy evaluation

Source: Marks and Spencer

Page 24: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Post occupancy evaluation

Source: Marks and Spencer

Page 25: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

China case study Confidential technology company

Page 26: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Production facility in Suzhou

2,500m² production area

24 hour operation

Injection machines

High-speed stamping.

Page 27: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

• Poor HVAC design for production

area with insufficient cooling

capacity and distribution

• High energy consuming metal

halide lighting

• No use of free heating energy

from production waste heat for

heating offices in winter

• No energy monitoring system

• No effective maintenance

programme.

Problems

Page 28: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

• New chillers and free cooling

• Re-design of HVAC System in

production & office areas

• Implementation of power meter

monitoring system (PMMS) to

improve equipment reliability and

energy consumption efficiency

• New lighting

• China and UK skills and products

used.

What we did

Page 29: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

15% 36

£300k savings in 3 years

energy saving

The results

month ROI

Page 30: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Concluding themes

● Business case is changing

● Regulation and targets are getting tougher

● Importance of good data (evidence)

● New technologies.

Page 31: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

For more information contact

Sean Lockie

[email protected]

Page 32: Building a low carbon economy/media/Files/A/Atkins-Corporate/grou… · Source: Marks and Spencer . China case study Confidential technology company . Production facility in Suzhou

Celebrating 75 years of

design, engineering and

project management

excellence.

www.atkinsglobal.com