builders bulletin - ccbademo, concrete, waterproofing, painting & coating, earthwork, asphalt...

42
June 5, 2017 #72 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business The Genuine. The Original. “We’re Not The Best Because We’re the Oldest... We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901 Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Expressway • Sunnyvale, CA 94089 Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098 Bidding This Week... Builders Bulletin 6/5/17 * Nipomo Nipomo High School Ag Shop/Classroom Grading/Foundation/Utilities Rebid 2:00 PM 6/5/17 Nipomo Dana Electrical Upgrade Project 2:00 PM 6/5/17 Arroyo Grande Branch Main Electric Upgrade At Branch Elementary School 2:00 PM 6/5/17 Arroyo Grande Aghs Window Replacement At Arroyo Grande High School 2:00 PM 6/5/17 Milpitas Daniel Court Water Main & Service Replacement 2:00 PM 6/5/17 Campbell Annual Centerline Traffic Striping 2:00 PM 6/5/17 Campbell Thermoplastic Traffic Striping 2:30 PM 6/6/17 Sunnyvale and Mountain View Dot 04-4g8304 Sb-Dir Polyester Concrete And Nb-Dir Structural Concrete Deck 2:00 PM 6/6/17 Arroyo Grande Drops Grant Storm Water Improvements At Ocean View Elementary School And Harloe Elementary School 2:00 PM 6/6/17 * Palo Alto Neighborhood Traffic Safety & Bicycle Boulevard Project (Online) 3:00 PM 6/6/17 Palo Alto Parking Counter System Structure #1 - Veterans Affairs Palo Alto Health Care System (Vapahcs) (Online) 1:00 PM 6/6/17 Monterey Lower Historic Park Improvements 2:00 PM 6/6/17 Cupertino Storm Drain Improvements - Foothill Boulevard & Cupertino Road 2:00 PM 6/6/17 Santa Clara Nob Hill #636 Ti (Online) 2:00 PM 6/6/17 Watsonville Hampton Inn & Suites - Watsonville 3:00 PM 6/7/17 San Jose Dot 04-4g9904 Pave Narrow Areas From Edge Of Shoulders To Soundwalls 2:00 PM 6/7/17 Santa Cruz Campus Re-Roofing At Bayview Elementary School 2:00 PM 6/7/17 San Jose Evergreen Valley High School Classroom Refurbish Plumbing Upgrades A230 & A232 - Esuhsd (Online) 2:00 PM 6/7/17 Palo Alto Apron Reconstruction Phase 1 (Bid Set A) Re-Bid (Online) 3:00 PM 6/7/17 San Luis Obispo California Men's Colony Central Kitchen Replacement 2:00 PM 6/7/17 Mountain View Cuesta Tennis Courts Resurfacing 2:00 PM 6/7/17 Palo Alto Open Space Trails Maintenance-Boronda Lake Weed Removal 3:00 PM 6/7/17 * Santa Cruz Development Of The Wastewater Treatment Facility Infrastructure And Major Equipment Study 2:00 PM 6/8/17 San Jose Z0490 Transportation Phase 1 San Jose Unified School District (Sjusd) (Online) 2:00 PM 6/8/17 San Jose Andrew Hill High School Gymnasium Windows Replacement - East Side Union High School District (Online) 2:00 PM 6/8/17 San Jose Andrew Hill & James Lick High School Erp Hvac-Mechanical - East Side Union High School District (Esuhsd) (Online) 3:30 PM 6/8/17 Palo Alto Expand Emergency Department Facilities Va Palo Alto Health Care System (Online) 1:00 PM 6/8/17 * San Jose 7620-Arcadia Softball Facility (Online) 3:00 PM 6/9/17 Santa Cruz Bay Reservoir Tank Site Landscaping 2:00 PM 6/9/17 Watsonville General Construction Projects (Ceiling Insulation, Facility Re-Key, Flooring, Water Heater) 2:00 PM 6/9/17 Capitola Skate Park Mural 12:00 PM 6/9/17 Nipomo Engineering Services For Nipomo Community Park Skate Park 3:00 PM

Upload: others

Post on 07-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

June 5, 2017 #72

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

The Genuine. The Original.

“We’re Not The Best Because We’re the Oldest...We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley1266 Lawrence Expressway • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728Lic. #215098

Bidding This Week...

Builders Bulletin

Bid Time Project NameLocationBid Date

6/5/17* Nipomo Nipomo High School Ag Shop/Classroom Grading/Foundation/Utilities Rebid

2:00 PM

6/5/17 Nipomo Dana Electrical Upgrade Project 2:00 PM

6/5/17 Arroyo Grande Branch Main Electric Upgrade At Branch Elementary School2:00 PM

6/5/17 Arroyo Grande Aghs Window Replacement At Arroyo Grande High School2:00 PM

6/5/17 Milpitas Daniel Court Water Main & Service Replacement2:00 PM

6/5/17 Campbell Annual Centerline Traffic Striping2:00 PM

6/5/17 Campbell Thermoplastic Traffic Striping2:30 PM

6/6/17 Sunnyvale andMountain View

Dot 04-4g8304 Sb-Dir Polyester Concrete And Nb-Dir Structural Concrete Deck

2:00 PM

6/6/17 Arroyo Grande Drops Grant Storm Water Improvements At Ocean View Elementary School And Harloe Elementary School

2:00 PM

6/6/17* Palo Alto Neighborhood Traffic Safety & Bicycle Boulevard Project (Online)3:00 PM

6/6/17 Palo Alto Parking Counter System Structure #1 - Veterans Affairs Palo Alto Health Care System (Vapahcs) (Online)

1:00 PM

6/6/17 Monterey Lower Historic Park Improvements2:00 PM

6/6/17 Cupertino Storm Drain Improvements - Foothill Boulevard & Cupertino Road2:00 PM

6/6/17 Santa Clara Nob Hill #636 Ti (Online)2:00 PM

6/6/17 Watsonville Hampton Inn & Suites - Watsonville3:00 PM

6/7/17 San Jose Dot 04-4g9904 Pave Narrow Areas From Edge Of Shoulders To Soundwalls

2:00 PM

6/7/17 Santa Cruz Campus Re-Roofing At Bayview Elementary School2:00 PM

6/7/17 San Jose Evergreen Valley High School Classroom Refurbish Plumbing Upgrades A230 & A232 - Esuhsd (Online)

2:00 PM

6/7/17 Palo Alto Apron Reconstruction Phase 1 (Bid Set A) Re-Bid (Online)3:00 PM

6/7/17 San Luis Obispo California Men's Colony Central Kitchen Replacement2:00 PM

6/7/17 Mountain View Cuesta Tennis Courts Resurfacing2:00 PM

6/7/17 Palo Alto Open Space Trails Maintenance-Boronda Lake Weed Removal3:00 PM

6/7/17* Santa Cruz Development Of The Wastewater Treatment Facility Infrastructure And Major Equipment Study

2:00 PM

6/8/17 San Jose Z0490 Transportation Phase 1 San Jose Unified School District (Sjusd) (Online)

2:00 PM

6/8/17 San Jose Andrew Hill High School Gymnasium Windows Replacement - East Side Union High School District (Online)

2:00 PM

6/8/17 San Jose Andrew Hill & James Lick High School Erp Hvac-Mechanical - East Side Union High School District (Esuhsd) (Online)

3:30 PM

6/8/17 Palo Alto Expand Emergency Department Facilities Va Palo Alto Health Care System (Online)

1:00 PM

6/8/17* San Jose 7620-Arcadia Softball Facility (Online)3:00 PM

6/9/17 Santa Cruz Bay Reservoir Tank Site Landscaping2:00 PM

6/9/17 Watsonville General Construction Projects (Ceiling Insulation, Facility Re-Key, Flooring, Water Heater)

2:00 PM

6/9/17 Capitola Skate Park Mural12:00 PM

6/9/17 Nipomo Engineering Services For Nipomo Community Park Skate Park3:00 PM

Page 2: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey

(831) 758-6203 Fax

[email protected]

Board of Directors

President: Clifford Fasnacht, Dougherty Pump & Drill Oscar Grijalva, OCG Plumbing, Inc

Vice President: Ken Steen, Steen Ass. Consulting Serv. Anka Hepper, WM. B Saleh Painting

Secretary/Treasurer: Kevin McIntosh, Blach Constuction Kate Rueter, AON Risk Services

Past President: Kristine O’Dell, Absolute HR Edwin Sargenti, PSC

Gabriel Torres, CCRB/CHISPA

John Vorwerck, Otto Construction

CCBA STAFFChristie Cromeenes

Executive Director

Amanda Young FInance/Office Mgr Ingrid Vierra Planroom Coordinator Shelly Verba SR. Planroom Coordinator Rikki Montejano Public Relations

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 4: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 5: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To Bid

Weekly Projects Bidding 6/1/2017

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Bidders:

Plan Issuer:

Monterey $472,900

In general, the work consists of, but is not limited to, clearing and grubbing, sawcutting, demolition of existing improvements, grading,curb and gutter, concrete parking stalls, asphalt conforms, Decomposed Granite walkway, pavement markings, erosion control, rampsand handrails, and construction of new colored concrete walking paths. Work also includes stormwater control, tree protection,benches, and picnic table.

PREVAILING WAGE

Project Contact: Jaci AbadillaTel: [email protected]

5/23 @ 2pm- Lower Presidio Park adjacent to Serra Monument, Monterey

17-01215

1

2:00 PM6/6/17

Addenda:LOWER HISTORIC PARK IMPROVEMENTS

Prebid Conf:

City Of Monterey 831-646-3877 831-646-3405

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

Bidders:

Plan Issuer:

Monterey $641,000

Scope for Base Bid, in general, consists of: demolition of the existing glass roof and installation of a new roof in the lobby area withskylights, interior demolition, new metal stud framed walls, drywall, modifications to fire sprinklers, interior painting, ceramic tile, doorsand hardware, acoustical ceiling, finish flooring, toilet partitions and accessories, plumbing, HVAC, electrical, fire alarm in the Lobbyand Toilet Rooms. Work to be done for Additive Alternate #1 consists of: Board Room improvements which includes demolition of theexisting raised platform and installation of new sound treatments, new metal stud framed walls, drywall, modifications to fire sprinklers,interior painting, doors and hardware. Work to be done for Additive Alternate #2 consists of: improvements in the Closed SessionBoard Room and Remaining Offices. Lowest responsible and responsive bidder will be determined for the project based upon thelowest responsible and responsive Base Bid. Engineer’s Estimate for construction of base bid elements is $641,000. Work isscheduled to begin June 27, 2017, with final completion anticipated by December 13, 2017.

PREVAILING WAGE

All questions regarding the project during bidding process must be made in writing to the attention of the District’s ConstructionManager via E-mail, postal mail, or via facsimile (fax).Construction Manager Contact Info:

Roger MillerEagle Project Management LLC798 Lighthouse Ave. #319Monterey, CA 93940Phone (831) 521-9360Fax (831) 603-3058E-mail: [email protected]

MAND 5/12 @ 10am- site

17-01173

2

2:00 PM6/13/17

Addenda:DISTRICT HEADQUARTERS THIRD FLOOR RENOVATIONS

BID NO. 01

Prebid Conf:

Eagle Project Managament [email protected] 831-521-9360 831-603-3058

General Contractor Fax: 831-275-4188Office: 831-275-2103California Premier Restoration

General Contractor Fax: 925-790-0134Office: 510-775-9068Federal Solutions Group

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Page 6: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Greenfield

Project consists of: Selective Demo; Signage; Electrical; Telecommunications System; Fire Alarm System; Site Clearing; Earthwork;Trenching; Asphalt Paving; Chain Link Fences and Gates.

PREVAILING WAGE

MAND 5/23 @ 11am- site

17-01284

0

2:00 PM6/13/17

Addenda:GREENFIELD HIGH SCHOOL RELOCATABLE CLASSROOM BUILDINGS

16-10284

Prebid Conf:

Teter, LLP 559-437-0887 559-438-7554

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Plan Issuer:

Monterey

*** Appendix A-C are too large to post. Contact the Builders Exchange ***

MRWPCA is seeking proposals from qualified firms to provide Construction Management Services for the Advanced Water PurificationFacility and Product Water Pump Station Project. The qualified firm will provide construction management services using ourConstruction Management Software Procore (www.procore.com), and inspection services during construction of this project.

MAND 5/22 @ 10am- 14811 Del Monte Blvd, Marina

17-01338

2

2:30 PM6/19/17

Addenda:CONSTRUCTION MANAGEMENT SERVICES FOR THE ADVANCED WATER PURIFICATION FACILITYAND PRODUCT WATER PUMP STATION PROJECT

Prebid Conf:

Monterey Regional Water Pollution Control [email protected]

831-645-4605 831-656-0637

Plan Issuer:

Pebble Beach

Furnish any & all plant, labor, services, material, tools, equipment, sup[lies, transportation, utilities, skills, and all other items andfacilities necessary for the construction completion of the project. Demo, concrete, waterproofing, painting & coating, earthwork,asphalt concrete paving, and utilities.

PREVAILING WAGE

MAND 6/6 10 am @ 3101 Forest Lake Rd., Conference Room

17-01379

0

2:00 PM6/20/17

Addenda:2017 LODGE AREA SEWER IMPROVEMENT PROJECT

Prebid Conf:

Pebble Beach Community Services District 831-373-1274 831-373-2357

Plan Issuer:

Soledad $211,000

In general, the project consists of rehabilitation efforts for Municipal Water Well #6 including removal of the existing pump, pipe columnand motor, rehabbing the existing motor, wire brushing, open-end pipe airlifting, dual swab airlifting, air/water jetting, bailing to removesediment, well pump development including but not limited to surging, step drawdown, constant rate pumping tests, installation of anew pump and column pipe and obtaining a video of the well upon completion and all appurtenances and work to the satisfaction ofthe City as shown on the drawings in complete working condition.

PREVAILING WAGE

Project Contact: Frank Lopez ([email protected])

6/14 @ 10:30am- site

17-01438

0

11:00 AM6/21/17

Addenda:WELL #6 REHABILITATION PROJECT

Prebid Conf:

Harris & Associates 831-789-8667

NEW

Bidders:

Plan Issuer:

Marina

The Project consists of constructing approximately 40,000 linear feet of 24-inch transmission main pipeline in paved and non-pavedroadways and easements, connecting to existing facilities, pipeline valves and appurtenances, two bore and jack roadway crossings, a2.0 MG welded steel reservoir with potable water backup pumping system and associated appurtenances and electrical and SCADAimprovements, for a complete in-place operational system.

The point of contact for all questions related to the project is Jon Marshall, Ph. (925)977-3057 or email [email protected].

MAND 5/15 @ 10am- 2840 4th Avenue, Marina

17-01181

1

2:00 PM6/27/17

Addenda:REGIONAL URBAN WATER AUGMENTATION PROJECT-RECYCLED WATER PIPELINE ANDBLACKHORSE RECYCLED WATER RESERVOIR

CIP # RW-0156

Prebid Conf:

Marina Coast Water District - Engineering Office [email protected] 831-883-5929

General Contractor Fax: 702-456-7746Office: 702-458-6004Contri Construction

Page 7: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Marina

*** Contact the Exchange to view Appendix A-C ***

Project consists of: Demolition; Concrete; Metals; Fiberglass Fabrications; Thermal and Moisture Protection; Hollow Metal Work;Overhead Coiling Doors; Finish Hardware; Louvers; Metal Support Systems; Gypsum Board; Painting; High-Performance Coatings;Identifying Devices; Building Specialties; Welded Steel Tanks; Metal Building Systems; Wet Pipe Fire-Suppression Sprinkler System;Clean Agent Fire-Suppression System; Plumbing; HVAC Distribution; FRP Duct and Accessories; HVAC Equipment; Commissioningof HVAC Systems; Electrical; Electronic Access Control and Intrusion Detection; Fire Alarm Control System; Earthwork; AsphaltPaving; Concrete Curbs, Gutters and Sidewalks; Irrigation System; Planting; Precast Concrete Utility Vaults; Precast ConcreteSectional Manholes; Drainage; Process Piping and Integration; Process Gas and Liquid Handling, Purification and Storage Equipment;Water Equipment.

PREVAILING WAGE

Project Contact: Yohana Vargas [email protected]

MAND 5/31 @ 10am- 14811 Del Monte Blvd, Marina

17-01318

0

3:00 PM6/29/17

Addenda:PURE WATER MONTEREY GROUNDWATER REPLENISHMENT-ADVANCED WATER PURIFICATIONFACILITY AND PRODUCT WATER PUMP STATION

Prebid Conf:

Plan Issuer:

Visit

Monterey $750,000

In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalkcrossings (driveway approach) and curb ramps, storm drainage, signage and striping, isolated street and driveway surface repairs,pavement grinding, street reconstruction and Hot Mix Asphalt pavement.

PREVAILING WAGE

6/15 10 am @ 601 Wave St.

17-01425

0

2:00 PM7/11/17

Addenda:CITYWIDE ADA RAMPS AND STREET RECONSTRUCTION, PHASE 5

Prebid Conf:

non-mandatory

City of Monterey-PW/Engineering [email protected] 831-646-3997 831-646-5686

NEW

San Benito County

Bidders:

Plan Issuer:

Hollister

A Building Remodel (Tenant Improvement) of an existing shop building and converting it into a Homeless Services Center for theCounty of Benito.

PREVAILING WAGE

Project Contact: Adam Goldstone [email protected]

6/2 @ 10am- site

17-01380

0

2:00 PM6/13/17

Addenda:HOMELESS SERVICES CENTER BUILDING IMPROVEMENTS

PWB-1706

Prebid Conf:

County of San Benito 831-636-4170 831-636-4176

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Sub-Contractor/SpecialtyContractor

Fax: 559-528-6703Office: 559-528-6705Garcia Window Screens

Bidders:

Plan Issuer:

Hollister

Open to Prequalified bidders only.This project is for the construction of a 25,000 sf expansion of the existing San Benito County Jail. This addition will be constructedimmediately east of the existing facility and will include new inmate housing for 72 beds, program space, medical area, intake/releasefunctions, and administrative offices.

MAND 5/22 @ 10am- 481 Fourth St, Hollister

17-01242

2

2:00 PM6/20/17

Addenda:SAN BENITO COUNTY JAIL ADDITION - AB900 PHASE II - OPEN TO PREQUALIFIED BIDDERS ONLY

PWB-1605

Prebid Conf:

County of San Benito 831-636-4170 831-636-4176

Prequalified Fax: 530-666-5723Office: 530-666-5635Bernards Bros. Inc

Prequalified Fax: 530-666-5723Office: 530-666-5635Broward Builders, Inc.

Prequalified Fax: 951-289-7112Office: 951-788-0703Hal Hays Construction, Inc

Prequalified Fax: 619-447-4192Office: 619-593-3527Halbert Construction Co Inc.

Prequalified Fax: 702-739-9932Office: 702-739-8770Sletten Construction Company

Page 8: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Prequalified Fax: 951-684-3813Office: 951-684-9303Stronghold Engineering

San Luis Obispo County

Plan Issuer:

Nipomo

Project consists of: Site Work; Concrete; Concrete Sealer and Finish; Metal Fabrications; Wet-Pipe Sprinkler Systems; Electrical;Intercommunication Systems; Integrated Electronic Communications System; Fire Alarm Detection Systems.

PREVAILING WAGE

MAND 5/19 @ 9am- site

17-01273

2

2:00 PM6/5/17

Addenda:NIPOMO HIGH SCHOOL AG SHOP/CLASSROOM GRADING/FOUNDATION/UTILITIES REBID

16-12

Prebid Conf:

ASAP Reprographics 805-772-6921

Plan Issuer:

Nipomo

Preparation, trenching, connections, cross-over, coordination with PG&E energizing new service, clean up and all related itemsnecessary to complete work.

PREVAILING WAGE

MAND 5/22 9 am @ site

17-01333

1

2:00 PM6/5/17

Addenda:DANA ELECTRICAL UPGRADE PROJECT

16-14

Prebid Conf:

Lucia Mar Unified School District 805-474-3000 805-473-5594

Plan Issuer:

Arroyo Grande

The work will consist of all preparation, trenching, connections, cross-over, coordination with PG&E, energizing new service, clean upand all related items necessary to complete work.Installation of new Main Electrical Service, Multiple power and communication distribution vaults, pads for PG&E transformer and mainservice gear, connection of existing electrical systems to new and associated conduit and wire.

PREVAILING WAGE

MAND 5/30 @ 9am- site

17-01383

1

2:00 PM6/5/17

Addenda:BRANCH MAIN ELECTRIC UPGRADE AT BRANCH ELEMENTARY SCHOOL

16-16

Prebid Conf:

ASAP Reprographics 805-772-6921

Plan Issuer:

Arroyo Grande

Remove operable sash from existing single hung windows at Arroyo Grande High School Rooms 205-209, 305-309, 401-409, 604-608and install new Milgard Tuscany Series Vinyl replacement windows.

PREVAILING WAGE

Project Contact: Michael Dixon [email protected]

MAND 5/31 @ 9am- site

17-01404

0

2:00 PM6/5/17

Addenda:AGHS WINDOW REPLACEMENT AT ARROYO GRANDE HIGH SCHOOL

16-18

Prebid Conf:

Lucia Mar Unified School District 805-474-3000 805-473-5594

Plan Issuer:

Arroyo Grande

Lucia Mar Unified School District will receive up to, but no later than 2:00 p.m. on Tuesday, June 6, 2017 sealed bids for the award of:Bid No. 16-15 DROPS Grant Storm Water Improvements at Ocean View Elementary School and Harloe Elementary School ProjectNo. 17199.

PREVAILING WAGE

MAND 5/30 @ 9am- site

17-01314

1

2:00 PM6/6/17

Addenda:DROPS GRANT STORM WATER IMPROVEMENTS AT OCEAN VIEW ELEMENTARY SCHOOL ANDHARLOE ELEMENTARY SCHOOL

Bid No. 16-15/Project No.17199

Prebid Conf:

ASAP Reprographics 805-772-6921

Page 9: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

San Luis Obispo

The Food Service Equipment Contractor (FSEC) shall provide all labor, design, materials, parts, tools, licenses, permits, insurance,inspection, and travel, and per diem, necessary to procure and install all food service equipment for the Central Services KitchenReplacement project, located at the California Department of Corrections and Rehabilitation (CDCR), Inmate/Ward Labor Program(IWL), at the California Men's Colony, Highway 1, San Luis Obispo, Ca 93409. DVBE Participation.

Project Contact: Denise Anderson [email protected]

17-01405

0

2:00 PM6/7/17

Addenda:CALIFORNIA MEN'S COLONY CENTRAL KITCHEN REPLACEMENT

FPCM-CMC-P000215-058-DA

Nipomo

The County of San Luis Obispo (County) is currently soliciting proposals for Engineering Services for the provision of design,construction documents, environmental review, and permits, for the Nipomo Community Park Skate Park ("RFP").

The County of San Luis Obispo has established a 5% Local Vendor Preference. Vendors wishing to claim the Local VendorPreference should download and complete the attached document and upload it with their bid.

Bid Contact: Andrea Madrigal-Ramsey(805) [email protected]

17-01258

1

3:00 PM6/9/17

Addenda:ENGINEERING SERVICES FOR NIPOMO COMMUNITY PARK SKATE PARK

1427

Bidders:

Plan Issuer:

San Luis Obispo $200,000

The Contractor shall provide all labor, equipment, parts, materials, tools, licenses, permits, bonds, insurance, supervision, installation,inspection, including travel and per diem, necessary to perform Jacking and Casing Pipe Installation for the Central Services KitchenReplacement project, located at the California Department of Corrections and Rehabilitation Inmate/Ward Labor Program at theCalifornia Men’s Colony.

PREVAILING WAGE

MAND 5/18 1 pm @ site, for those potential bidders who attended the “first” Mandatory Walk-Through, the “Rebid 1”Mandatory Walk-Through is “optional.”

17-01254

0

10:30 AM6/12/17

Addenda:JACKING AND CASING PIPE INSTALLATION - RE-BID

C5606821-D, Re-bid #1

Prebid Conf:

CA State Dept. of Corrections & Rehabilitation 916-255-5666 916-255-6187

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Paso Robles

Provide HVAC Equipment:Heating Equipment (except warm air furnaces) ManufacturingAir-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration EquipmentWarm Air Heating and Air-Conditioning Equipment and Supplies Merchant Wholesalers

Project Contact: Christina Bennett - 805-769-1100 [email protected]

17-01344

0

2:00 PM6/12/17

Addenda:HVAC EQUIPMENT: ROOFTOP PACKAGE UNITS

B14-16-17

Paso Robles

Electrical Equipment: Interior and Exterior LED Light Fixtures:Residential Electric Lighting Fixture ManufacturingCommercial, Industrial, and Institutional Electric Lighting Fixture ManufacturingOther Lighting Equipment Manufacturing

Project Contact: Christina Bennett - 805-769-1100 [email protected]

17-01345

0

2:00 PM6/12/17

Addenda:ELECTRICAL EQUIPMENT: INTERIOR AND EXTERIOR LED LIGHT FIXTURES

B16-16-17

Page 10: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Paso Robles

Electrical Equipment: Transformers:Residential Electric Lighting Fixture ManufacturingCommercial, Industrial, and Institutional Electric Lighting Fixture ManufacturingOther Lighting Equipment ManufacturingIndustrial Machinery and Equipment Merchant Wholesalers

Project Contact: Christina Bennett - 805-769-1100 [email protected]

17-01346

0

2:00 PM6/12/17

Addenda:ELECTRICAL EQUIPMENT: TRANSFORMERS

B15-16-17

Paso Robles

Solar Equipment: Solar Panels and Inverters:All Other Miscellaneous Electrical Equipment and Component Manufacturing

Project Contact: Christina Bennett - 805-769-1100 [email protected]

17-01347

0

2:00 PM6/12/17

Addenda:SOLAR EQUIPMENT: SOLAR PANELS AND INVERTERS

B13-16-17

Nipomo

The work involves adjusting the District's utilities to grade following asphalt overlay work performed by the County of San Luis Obispo.Utilities to be adjusted include but are not limited to: sewer manhole frames and covers, sewer cleanout covers and water valvecovers.

PREVAILING WAGE

Project Contact: Peter V. Sevcik, P.E. [email protected]

MAND 5/31 @ 10am- 509 Southland St, Nipomo

17-01365

0

2:00 PM6/13/17

Addenda:NCSD 2017 UTILITY ADJUSTMENT PROJECT

Prebid Conf:

Atascadero $1,250,000 $1,400,000

Pavement rehabilitation, including full depth reclamation, reconstruction, overlay, and minor drainage improvements of roadways.

PREVAILING WAGE

17-01207

0

2:00 PM6/14/17

Addenda:MEASURE F14 PMP 2016/2017 REHABILITATION

2017-004 to

Plan Issuer:

Avila Beach

Replace valves at the following locations;Area 1: San Rafael St., 150 feet north of 1st StreetArea 2: Intersection of San Rafael St. & San Luis St.Area 2: Intersection of San Luis St. & Laurel St.Area 4: Intersection of San Luis St. & Second St.The valves shall be installed as designated on the Contract Drawings and as specified herein. The valves are located within publicroads or public easements.

PREVAILING WAGE

17-01401

0

2:00 PM6/15/17

Addenda:WATER VALVE REPLACEMENT

Avila Beach Community Services District Avilasd@gmai;.com 808-595-2664 805-595-7623

Page 11: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Los Osos $598,034

This project will place new hot mix asphalt at various roads in Los Osos, Tract 130, County of San Luis Obispo. These roads willreceive new hot mix asphalt pavement overlay. Work includes cold plane asphalt concrete road surfaces, placing hot mix asphaltoverlay, digout repairs, placing shoulder backing, installing hma dike, and other such items or detail work not mentioned herein that arerequired by the Plans, the Standard Specifications, Standard Plans, or these Special Provisions.

PREVAILING WAGE

Bid Contact: Carl Spier(805) [email protected]

17-01402

0

3:00 PM6/15/17

Addenda:2016-17 ASPHALT OVERLAY VARIOUS ROADS LOS OSOS

300590

Plan Issuer:

San Luis Obispo $245,000 $315,000

Removal and disposal of sand, grit, screenings, sludge, floatables, and macrofauna including snails and fly larvae from Digester 1 andhose washing of interior surfaces including walls, ceiling, floor, and appurtenances.

PREVAILING WAGE

17-01437

0

2:00 PM6/16/17

Addenda:SSLOCSD WWTP 2017 DIGESTER NO.1 CLEANING PROJECT

to

ASAP Reprographics 805-772-6921

NEW

Plan Issuer:

San Luis Obispo

RESPONSES THROUGH PUBLIC PURCHASE ONLY.COMPLETION OF VENDOR REGISTRATION PROCESS CAN TAKE 24 HOURS.

The County of San Luis Obispo is currently soliciting proposals for Design Services for the Bob Jones Pathway Project.

17-01311

0

3:00 PM6/20/17

Addenda:BOB JONES PATHWAY DESIGN SERVICES

1429

County of San Luis Obispo 805-781-5200 805-781-1074

Plan Issuer:

San Luis Obispo

A Job Order Contract is a competitively bid, firm-fixed-price indefinite-quantity contract. It includes a collection of detailed repair andremodel tasks and specifications that have established unit prices. It is placed with a Contractor for the accomplishment of repair,alteration, modernization, rehabilitation, etc., of buildings, structures, or other real property. Ordering is accomplished by means ofissuance of a Job Order against the Contract. The Job Order will reference the Detailed Scope of Work and set forth the Job OrderCompletion Time and the Job Order Price. The Contractor, under the JOC Contract, furnishes management, labor, materials,equipment and engineering support needed to perform the work unless stated otherwise.

The JOC Contract includes a Construction Task Catalog®. This CTC is based on the use of experienced labor and high qualitymaterials. All of the unit prices incorporate prevailing local wage, equipment and materials cost data. The CTC is work segment based.The CTC also incorporates local activity, climate and geographic features.

The County selected The Gordian Group's Job Order Contracting Solution for their JOC Program. The Gordian JOC Solution includesproprietary eGordian® JOC Applications and Construction Task Catalog®, which shall be used by the Contractor to prepare andsubmit Job Order Proposals, subcontractor lists and other requirements specified by the County.

MAND 6/7 1:30 pm @ 1055 Monterey Street, Room D361 (3rd Floor)

17-01313

0

3:00 PM6/22/17

Addenda:2017 JOB ORDER CONTRACT FACILITIES JOC 17-A AND FACILITIES JOC 17-B

113R09JOC17

Prebid Conf:

County of San Luis Obispo [email protected] 805-781-4776

Atascadero $150,000 $175,000

Concrete sidewalk infill, ADA ramps, driveways and associated grading, and paveback for ADA pathway.

PREVAILING WAGE

MAND 6/13 @ 10am- Meet on site at Atascadero Mall High School parking lot.

17-01356

0

2:00 PM6/22/17

Addenda:CDBG BARRIER REMOVAL / ATASCADERO MALL SIDEWALK ACCESSIBILITY PEDESTRIAN RAMP

2017-005 to

Prebid Conf:

Page 12: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo $2,137,270

This work will widen South Higuera to install a left turn lane in the southbound direction at the entrance to the Octagon Barn. The workconsists of grinding and overlaying existing PCC pavement, removing existing pavement, constructing new shoulders and a left turnlane, extending an existing CMP culvert, installing fencing, and grading. The work also includes improvements to the Octagon Barnsite. The Site work consists of site grading, construction of a basin, asphalt concrete paving, concrete sidewalks, and trenching forutilities. Street, Site and such other items or detail work not mentioned herein that are required by the Plans, the StandardSpecifications, Standard Plans, or these Special Provisions.

PREVAILING WAGE

17-01396

0

3:00 PM6/22/17

Addenda:LEFT-TURN LANE ON SOUTH HIGUERA STREET AND OCTAGON BARN SITE IMPROVEMENTS

300020

County of San Luis Obispo [email protected] 805-781-4776

Plan Issuer:

Paso Robles $100,000

The scope of work is as described in these bid documents and includes, but is not limited to, demolition of the existing playground andreplacement with new equipment and safety surfacing (play area sand and poured-in-place resilient surfacing).

PREVAILING WAGE

MAND 6/13 @ 10am- site

17-01403

0

2:00 PM6/29/17

Addenda:BARNEY SCHWARTZ PARK LOWER PLAYGROUND REPLACEMENT

DPW 17-08

Prebid Conf:

City of Paso Robles 805-237-3861 805-237-3904

Creston

DESIGN AND INSTALLATION OF A MINIMUM 16 KW SOLAR PANEL ARRAY AND ASSOCIATED WORK INCLUDING GROUNDMOUNTED PHOTOVOLTAIC SOLAR PANELS ON STEEL ANGLED RACKING SYSTEM, DATA COMMUNICATION EQUIPMENTAND SOFTWARE FOR SYSTEM MONITORING FROM THE INVERTER TO THE DATA COMMUNICATIONS CLOSET AT THE FIRESTATION. CONTRACTOR IS RESPONSIBLE FOR PG&E PERMIT AND INTERFACE, COUNTY PLANNING AND BUILDINGPERMIT APPLICATION AND PERMIT FEES, INCLUDING FINAL DESIGN AND CALCULATIONS FOR A COMPLETE SYSTEM.

PREVAILING WAGE

Bid Contact: Jeff Lee(805) [email protected]

6/13 @ 10am- site

17-01439

0

3:00 PM6/29/17

Addenda:CDF - CRESTON - CONSTRUCT SOLAR FIELD

320008.02

Prebid Conf:

NEW

San Luis Obispo

The Contractor shall provide all labor, including travel, per diem, parts, materials, supplies, transportation, equipment, tools and everyother item of expense necessary to perform scheduled maintenance, repair, emergency repair and source test services to includeinspections, calibrations, mechanical and electrical repairs, adjustments with tuning and instrument components associated with theoperation of the boilers for the specified herein for the California Department of Corrections and Rehabilitation (CDCR), CaliforniaMen's Colony (CMC) located at Highway 1, San Luis Obispo, Ca. DVBE Participation.

17-01182

0

2:00 PM6/30/17

Addenda:BOILER INSPECTION, CALIBRATIONS, MAINTENANCE, REPAIRS AND SOURCE TESTING REBID

6000001892 REBID #1

Plan Issuer:

Paso Robles

The City of Paso Robles invites qualification statements and competitive proposals to provide professional assessment engineeringconsulting services for the Paso Robles Landscape and Lighting District No. 1 and Drainage Maintenance District No. 2008-1. Theselected Consultant shall provide all assessment engineering services required for this project under the supervision of the City ofPaso Robles.

17-01388

0

4:00 PM7/7/17

Addenda:ASSESSMENT ENGINEERING SERVICES LANDSCAPE AND LIGHTING DISTRICT NO. 1 AND DRAINAGEMAINTENANCE DISTRICT NO. 2008-1

City of Paso Robles 805-237-3861 805-237-3904

Page 13: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Morro Bay

One of the City of Morro Bay’s top goals is to establish a full-service boatyard/marine services facility, with do-it-yourself capabilities,on city-owned land in order to ensure the community has the physical resources and services to support resilient, independent andeconomically productive commercial, recreational, research and safety/security marine-dependent activities. The Project is intended toservice local and transient commercial and recreational vessels for short- and long-term maintenance, repair and overhaul needs,including emergency haul-out and repair. Also, the Project is to provide a safe means to remove derelict vessels from the water tominimize negative environmental and other impacts, and to create new and improved economic opportunities in the local and regionaleconomies. An additional objective is to assist, augment and provide an area for installation of a maritime museum facility. TheProject would also be expected to become a point of interest for visitors and locals alike.

To meet that goal this Request for Qualifications is seeking submittals from fully qualified parties for the economically feasible design,installation and operation of the Project.

17-01393

0

5:00 PM7/14/17

Addenda:RFQ TO DESIGN/BUILD/OPERATE A MARINE SERVICES FACILITY/BOATYARD IN MORRO BAY

MB-2017-HRFQ1

City of Morro Bay - Harbor Director [email protected] 805-772-6254 805-772-6528

Santa Clara County

Plan Issuer:

Campbell

Thermoplastic treatment for repainting traffic striping and may include any of the following, 12" crosswalk lines, lanelines, no passingzones in two directions, two-way left turn lanes, right edgelines, and channelizing lines, bike lane lines, bike lane intersection lines, leftedge lines, lane drops, as well as providing traffic control for all striping work.

Project Contact: Ron Taormina 408-866-2734Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

17-01323

0

2:30 PM6/5/17

Addenda:THERMOPLASTIC TRAFFIC STRIPING

City of Campbell [email protected] 408-866-2150 408-376-0958

Plan Issuer:

Campbell

Repainting traffic striping, including centerlines, lane lines, no passing zones in two directions, two-way left turn lanes, right edge lines,and channelizing lines, bike lane lines, bike lane intersection left edge lines, lane drops, as well as providing traffic control for allstriping work.

Project Contact: Ron Taormina 408-866-2145Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

17-01362

1

2:00 PM6/5/17

Addenda:ANNUAL CENTERLINE TRAFFIC STRIPING

City of Campbell, DPW 408-866-2150

Plan Issuer:

Milpitas

Water main and service replacement.

Project Contact: Michael Silveira 408-586-3303

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 5/24 at 9AM & 5/30 at 2PM (455 E. Calaveras Blvd)

17-01399

0

2:00 PM6/5/17

Addenda:DANIEL COURT WATER MAIN & SERVICE REPLACEMENT

7110 & 7131

Prebid Conf:

City of Milpitas - DPW 408-586-3300

Page 14: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Sunnyvale AndMountain View

$2,930,000

SB-dir polyester concrete and NB-dir structural concrete deck In Santa Clara County In Sunnyvale And Mountain View From FremontAvenue Undercrossing To 0.2 Mile North Of Stevens Creek BridgeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12.

17-00200

2

2:00 PM6/6/17

Addenda:DOT 04-4G8304 SB-DIR POLYESTER CONCRETE AND NB-DIR STRUCTURAL CONCRETE DECK

04-SCl-85-R19.9/ R20.2

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Plan Issuer:

Palo Alto

Construct curb extensions, concrete medians, raised crosswalks, raised intersections, traffic circles and mini-roundabouts; provideasphalt concrete milling; placing asphalt concrete overlay; microsurfacing; Portland cement concrete road base repair, removal andreplacement of sidewalk, curb, gutter and driveways; installing or replacing curb ramps; installing truncated domes; installing streetlights, installing drainage catch basins, installing landscaping; tree trimming; traffic control; surveying; signage; striping; placinglegends and pavement markers; site preparation; adjusting manholes, catch basins, utility boxes and vaults.

Project Contact: Chris CorraoEmail: [email protected]

Available ONLINE ONLY

5/15 at 2PM (250 Hamilton Avenue)

17-01210

2

3:00 PM6/6/17

Addenda:NEIGHBORHOOD TRAFFIC SAFETY & BICYCLE BOULEVARD PROJECT (ONLINE)

168185

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Palo Alto

Procure and install a parking counter system for Parking Structure #1 (PS1).

Project Contact: Perdee Gawaran 925-372-2314

Available ONLINE ONLY

17-01212

0

1:00 PM6/6/17

Addenda:PARKING COUNTER SYSTEM STRUCTURE #1 - VETERANS AFFAIRS PALO ALTO HEALTH CARESYSTEM (VAPAHCS) (ONLINE)

VA261-17-B-0375

Department of Veterans Affairs

General Contractor Fax: 000-000-0000Office: 805-620-1705BVB Construction

General Contractor Fax: 559-274-1555Office: 559-277-8555Cable Links Construction Group, Inc.

General Contractor Fax: 334-532-3105Office: 334-532-3100Coburn Contractors, LLC

General Contractor Fax: 503-650-1902Office: 503-650-1720Glen Mar Construction

General Contractor Fax: 619-447-4192Office: 619-593-3527Halbert Construction Co Inc.

General Contractor Fax: 970-252-1487Office: 970-252-1477Hawk Contracting

General Contractor Fax: 858-277-7100Office: 858-277-7100Herman Construction Group, Inc.

General Contractor Fax: 916-783-8820Office: 916-783-3277J.R. Conkey & Associates, Inc.

General Contractor Fax: 760-432-0317Office: 760-432-0307Kevcon Inc.

General Contractor Fax: 000-000-0000Office: 707-642-6832Mar Nes, Inc.

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

General Contractor Fax: 000-000-0000Office: 808-853-2441Talion Construction

Plan Issuer:

Cupertino

Installation of approximately 1,000 feet of 18 inch reinforced concrete pipe, eight manholes, and drain inlets.

Plans and specs also available for review at Santa Clara Builders Exchange

5/17 at 10AM (Instersection of Cupertino/Foothill)

17-01233

0

2:00 PM6/6/17

Addenda:STORM DRAIN IMPROVEMENTS - FOOTHILL BOULEVARD & CUPERTINO ROAD

2017-10

Prebid Conf:

City of Cupertino 408-777-3354 408-777-3333

Page 15: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Clara

Tenant Improvement for new Nob Hill Food Store on ground floor of existing 4 story mixed use apartment complex. TI = 24,019 sf withnew 1,308 sf mezzanine. Construction to start 6-12-2017.

17-01343

1

2:00 PM6/6/17

Addenda:NOB HILL #636 TI (ONLINE)

#636

Tilton Pacific Construction 916-630-7200 916-630-4982

General Contractor Fax: 916-630-4982Office: 916-630-7200Tilton Pacific Construction

Bidders:

San Jose $1,700,000

PAVE NARROW AREAS FROM EDGE OF SHOULDERS TO SOUNDWALLS In Santa Clara County In San Jose At VariousLocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-8, C-27.

17-00214

2

2:00 PM6/7/17

Addenda:DOT 04-4G9904 PAVE NARROW AREAS FROM EDGE OF SHOULDERS TO SOUNDWALLS

04-SCl-85-2.0/4.6

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Plan Issuer:

Palo Alto

Remove submerged aquatic vegetation from Boronda Lake and remove cattails in selected areas in order to improve conditions forrecreational fishing and boating while providing aquatic habitat for wildlife. Target species for removal include, but are not limited to,the common cattail (Typha latifolia), Pondweed (Elodea Canadensis), and Water Lilies.

Project Contact: Curt DunnEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

5/24 at 8AM (3300 Page Mill Rd, Los Altos Hills)

17-01247

0

3:00 PM6/7/17

Addenda:OPEN SPACE TRAILS MAINTENANCE-BORONDA LAKE WEED REMOVAL

168100

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

Mountain View $98,000 $138,000

Resurfacing of twelve (12) tennis courts at Cuesta Park complex.

Project Contact: Fred FallahEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

17-01324

0

2:00 PM6/7/17

Addenda:CUESTA TENNIS COURTS RESURFACING

17-26 to

City Of Mountain View, DPW 650-903-6311

Plan Issuer:

San Jose $45,000

Upgrades to existing plumbing in rooms A230 & A232 will include work on existing gas valves, installation of eyewash/safety-showerand associated demo, electrical & patch-back.

Project Contact: Kelli Jurgenson, Van PeltEmail: [email protected]

Available ONLINE ONLY

5/31 at 11:30AM (Admin Bldg)

17-01414

0

2:00 PM6/7/17

Addenda:EVERGREEN VALLEY HIGH SCHOOL CLASSROOM REFURBISH PLUMBING UPGRADES A230 & A232 -ESUHSD (ONLINE)

IB-14-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Page 16: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Palo Alto

Remove and replace approximately 57,000 SY of asphalt concrete pavement, lighting, striping, tie-downs.

Project Contact: James WadleighEmail: [email protected]

Available ONLINE ONLY

MAND 6/1 at 11AM (Terminal Building)

17-01415

0

3:00 PM6/7/17

Addenda:APRON RECONSTRUCTION PHASE 1 (BID SET A) RE-BID (ONLINE)

167808B

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Bidders:

Plan Issuer:

Palo Alto $5,000,000 $10,000,000

Prepare site for construction operations, including demolition & removal of existing structure, landscapes, site improvements.Renovation to expand Emergency Facilities Department.

Project Contact: Ferdee Gawaran 925-372-2314

Available ONLINE ONLY

5/11 at 12:30PM

17-01013

2

1:00 PM6/8/17

Addenda:EXPAND EMERGENCY DEPARTMENT FACILITIES VA PALO ALTO HEALTH CARE SYSTEM (ONLINE)

VA261-17-B-0330 to

Prebid Conf:

Department of Veterans Affairs

Communications / TechnologyContractor

Fax: 209-239-6290Office: 209-239-6290Video Image Security

General Contractor Fax: 253-473-1008Office: 253-203-7020Advanced Technology Construction

General Contractor Fax: 916-303-2319Office: 916-303-2318Anthem Builders Ic.

General Contractor Fax: 000-000-0000Office: 805-620-1705BVB Construction

General Contractor Fax: 888-543-8500Office: 520-748-9371D Square Construction

General Contractor Fax: 503-650-1902Office: 503-650-1720Glen Mar Construction

General Contractor Fax: 619-447-4192Office: 619-593-3527Halbert Construction Company, Inc.

General Contractor Fax: 970-252-1487Office: 970-252-1477Hawk Contracting

General Contractor Fax: 858-277-7100Office: 858-277-7100Herman Construction Group, Inc.

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

General Contractor Fax: 000-000-0000Office: 808-853-2441Talion Construction

Sub-Contractor/SpecialtyContractor

Fax: 559-528-6703Office: 559-528-6705Garcia Window Screens

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Sub-Contractor/SpecialtyContractor

Fax: 650-359-6354Office: 650-738-9920Rockaway Construction

Bidders:

Plan Issuer:

San Jose

Demolition, clearing and grubbing, tree removal, earthwork and grading, storm drainage, utilities, rigid and flexible paving, irrigation,landscaping, play area with resilient surfacing and synthetic turf, concession/restroom/staff building, maintenance building, securitylighting, sports field lighting, PA system, netted backstops, spectator areas, fencing, natural turf planting, landscape, irrigation, andmiscellaneous site amenities.

Project Contact: Jose Balingit

Available ONLINE ONLY

MAND 5/8 at 10AM (200 E. Santa Clara St., 6th Fl, Rm T644

17-01124

3

3:00 PM6/8/17

Addenda:7620-ARCADIA SOFTBALL FACILITY (ONLINE)

7620

Prebid Conf:

City of San Jose - DPW 408-535-8300

General Contractor Fax: 916-797-7400Office: 916-757-1000Flint Builders, Inc.

Page 17: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 209-835-9956Office: 209-835-9956Goodland Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 510-562-5209Office: 510-632-7676McGuire & Hester

General Contractor Fax: 510-526-0990Office: 510-526-3424O.C. Jones & Sons Inc

General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman., Inc.

General Contractor Fax: 510-782-6065Office: 510-782-6065Suarez & Munoz Construction, Inc.

General Contractor Fax: 000-000-0000Office: 408-985-7200Verde Design

Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Plan Issuer:

San Jose

Addition of new elevator for access to second floor offices, remodel of main restrooms, new and relocated equipment and heaters innew workshops, upgrades to existing electrical system at workshops and offices, accessible parking and ramp installation at mainentry, regrading for new workshop doors.

Project Contact: Eric Berger, Van Pelt 303-502-6700Email: [email protected]

Available ONLINE ONLY

5/25 at 9AM

17-01363

0

2:00 PM6/8/17

Addenda:Z0490 TRANSPORTATION PHASE 1 SAN JOSE UNIFIED SCHOOL DISTRICT (SJUSD) (ONLINE)

3012C

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

Bidders:

Plan Issuer:

San Jose $345,000

Refurbish existing window frames. Replacement of existing glazing and associated cleaning and painting. Includes protection ofinterior finishes as needed while building is exposed.

Project Contact: Kellie Jurgenson, Van PeltEmail: [email protected]

Available ONLINE ONLY

5/25 at 11AM (Admin Office)

17-01367

0

2:00 PM6/8/17

Addenda:ANDREW HILL HIGH SCHOOL GYMNASIUM WINDOWS REPLACEMENT - EAST SIDE UNION HIGHSCHOOL DISTRICT (ONLINE)

B-38-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

Sub-Contractor/SpecialtyContractor

Fax: 559-528-6703Office: 559-528-6705Garcia Window Screens

Bidders:

Plan Issuer:

San Jose $1,100,000

Disconnect, removal and disposal of the existing HVAC units and associated parts; Furnish and install like in-kind units, including alllisted accessories and parts. The Contractor shall be responsible to install the HVAC units per attachment A and provide a completeand functional system, which includes start-up, balancing, connecting to existing controls. The Contractor shall be responsible to makeall mechanical, electrical, low voltage, and plumbing connections. The Contractor shall be responsible to provide all accessories toinstall new units to existing curbs.

Project Contact: Tuyen Nguyen 408-613-7268Email: [email protected]

Available ONLINE ONLY

5/30 at 3PM (57 N. White Road, Admin Bldg)

17-01413

0

3:30 PM6/8/17

Addenda:ANDREW HILL & JAMES LICK HIGH SCHOOL ERP HVAC-MECHANICAL - EAST SIDE UNION HIGHSCHOOL DISTRICT (ESUHSD) (ONLINE)

B-34-16-17

Prebid Conf:

East Side Union High School District (ESUHSD) 408-347-5100

General Contractor Office: 510-233-7000Bay City Mechanical Inc

Page 18: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

This project is a 6 story building, with 5-stories of metal framed construction above a 1 story above ground cast-in-place, post-tensioned podium garage, and 135 units consisting of: 118 ea studio apartments, 16 ea one bedroom, and 1 ea two-bedroomManager’s suite. The building will have stucco exteriors, cement fiber panel siding, storefront glass systems, vinyls windows, TPOroofing, green living roof and associated podium and onsite improvements. This is a tight site with restricted staging areas and noparking.

Competitive bids from qualified DVBE subcontractors and suppliers are requested for all trades. NOTE: Plumbing, Electrical, HVAC,Fire Sprinklers, Photovoltaic and Solar Hot Water are design build and are not being bid out.

Project Contact: Steve DavisEmail: [email protected]

Available ONLINE ONLY

17-01392

0

5:00 PM6/12/17

Addenda:NORTH SAN PEDRO STUDIOS (ONLINE)

L & D Construction 408-491-7786 408-993-1511

Plan Issuer:

Mountain View

Installation of a new traffic signal with protected left turns from all directions, lane reconfiguration, installation of bike lanes, and on-street parking changes at Rengstorff Avenue, Stanford Avenue, and the new Mountain View Community Center (MVCC) driveway;traffic signal modification at Leland Avenue/ Rengstorff Avenue by eliminating left turn out of Leland Avenue and constructing newraised median islands (Leland Avenue will be right in and right out only); and installation of MVCC utilities, sewer, and water utilityreplacement work, and Rengstorff Park electric utility connection.

Project Contact: Darwin Galang

Plans and specs also available for review at Santa Clara Builders Exchange

17-01409

0

2:00 PM6/12/17

Addenda:MOUNTAIN VIEW COMMUNITY CENTER UTILITIES, NEW DRIVEWAY INTERSECTION & TRAFFICSIGNAL IMPROVEMENTS

15-43A

City Of Mountain View, DPW 650-903-6311

Bidders:

Plan Issuer:

San Jose

Build and erect new building facility that includes a new gymnasium, an administration office and twenty-first century classroom withaccessible lift. The Scope of Work for the new Multi-Purpose Building includes selective site demolition, scarifying, grubbing, siteexcavation and off-haul of soil material, installation of concrete footing and foundations, site excavation for underground utilities,structural steel erection, masonry wall installations, engineered truss-systems, storefront systems, civil work, landscaping andirrigation, site accessibility, mechanical work scopes, electrical work scopes, plumbing work scopes, low voltage and data systems,and a fire alarm system.

Project Contact: Joe Stam, Del Terra GroupEmail: [email protected]

Available ONLINE ONLY

MAND 5/11 at 10AM

17-01334

1

3:00 PM6/13/17

Addenda:NEW MULTI-PURPOSE BUILDING FISCHER MIDDLE SCHOOL - ALUM ROCK UNION ELEMENTARYSCHOOL DISTRICT (ONLINE)

B1617-Bond013

Prebid Conf:

Alum Rock Union Elementary School District [email protected] 408-928-6860

General Contractor Fax: 650-364-8141Office: 650-364-8141Beals Martin

General Contractor Fax: 707-643-4581Office: 707-643-4580BHM Construction

General Contractor Fax: 916-253-9377Office: 916-253-9373BRCO Constructors, Inc.

General Contractor Fax: 510-887-6501Office: 510-887-6500D.L. Falk Construction, Inc.

General Contractor Fax: 310-215-3098Office: 310-215-3099Fast Track Construction

General Contractor Fax: 650-802-2972Office: 650-802-2960Gonzalves & Stronck

General Contractor Fax: 916-939-4027Office: 916-939-1110Roebbelen Contracting, Inc.

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction, Inc

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp

General Contractor Fax: 510-236-4979Office: 510-236-9111Vila Construction Co

General Contractor Fax: 000-000-0000Office: 415-819-7925WestCal Design and Build, Inc.

Page 19: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Plan Issuer:

Saratoga

Adding a light gage roof top mechanical screen system around the +/-60,000 square foot roof structure perimeter, patching and repairof built-up roof system to maintain warranty and adding one split system unit to the electrical room121C, and extending mechanicalsupply to roof 1408.

Available ONLINE ONLY

MAND 6/1 at 11AM (Facilities Office)

17-01440

1

2:30 PM6/13/17

Addenda:APPLIED ARTS & SCIENCES ROOF SCREEN WEST VALLEY COLLEGE (ONLINE)

#25-1617

Prebid Conf:

West Valley Mission College, Facilities 408-741-2187

NEW

Plan Issuer:

Palo Alto

Restoration of the Lucie Stern Community Center brick pathways.

Project Contact: Lam DoEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/10 at 9AM

17-01158

3

3:00 PM6/14/17

Addenda:LUCIE STERN BRICK PATHWAY RENOVATION

159138

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

Santa Clara

Installation of electric utility substructures and aerial fiber optic cable and associated site work.

Project Contact: Deborah Barry 408-615-6607Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

5/31 at 10AM (881 Martin Ave)

17-01303

0

3:00 PM6/14/17

Addenda:ELECTRIC UTILITY SUBSTRUCTURE & AERIAL FIBER OPTIC CABLE MASTER CONSTRUCTIONAGREEMENT (ONLINE)

2004D

Prebid Conf:

City of Santa Clara - Silicon Valley Power 408-615-6604

Plan Issuer:

San Jose

Providing and installing a digital marquee sign with associated electrical and telecommunication support at the San Felipe /Paseo deArboles entrance.

Project Contact: Michael Latham 408-221-4661Email: [email protected]

Available ONLINE ONLY

MAND 6/1 at 10AM (Gilbane Office)

17-01351

1

2:00 PM6/14/17

Addenda:EVERGREEN VALLEY COLLEGE (EVC) MARQUEE SIGN @ SAN FELIPE & PASEO DE ARBOLES(ONLINE)

#G2010.0175

Prebid Conf:

San Jose Evergreen Community College [email protected]

408-270-6431 408-239-8807

Page 20: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Sunnyvale

Constructing the stormwater flow diversion system including: demolition, sealing, trenching and shoring, dewatering, piping, junctionstructures, diversion structures, sampling ports, roof drain connections, pump station, wet well, flow meter and sampling vault and allassociated appurtenances, curb drop inlet, HDPE piping (force main and gravity), electrical conduits, control devices, wiring, SCADAsystem installation and testing, and repairing all disturbed paved and unpaved areas ready for use.

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/5 at 2PM (Conference Room)

17-01424

0

3:00 PM6/14/17

Addenda:SMART STATION STORMWATER MANAGEMENT SYSTEM UPGRADE

UY-15-01

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

NEW

Plan Issuer:

Santa Clara County

Pavement marking removal, Restriping, Microsurfacing (Type 2), sign Installation, installation of bike detection, Lighting and flashingbeacon installation. Minor excavation, construction of bike cut through.

Project Contact: Paul Pascoal 408-573-2485Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/9 at 9:30AM (101 Skyport Dr, SJ)

17-01155

2

2:00 PM6/15/17

Addenda:BICYCLE IMPROVEMENTS ON I-280/PAGE MILL ROAD

Prebid Conf:

County of Santa Clara - Roads & Airports 408-573-2440

Bidders:

Plan Issuer:

Cupertino

Renovations to the E-2 Building, including wall removal and additions, installation of observation windows, modifying mechanical andelectrical systems and adding to the existing electrical distribution, adding data and distribution, and some new finishes.

Available ONLINE ONLY

MAND 5/24 at 1PM

17-01274

1

2:00 PM6/15/17

Addenda:E2/HAAS GRANT DE ANZA COLLEGE - FDACCD (ONLINE)

#1772

Prebid Conf:

Foothill De Anza College District (De Anza) 408-864-5888

Electrical Contractor Fax: 408-326-2603Office: 408-508-9797Ibarra Wiring Systems, Inc

Page 21: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Clara County

BID SCHEDULE 1 - REID· HILL VIEW AIRPORT~Preparation of the pavement surface by cleaning.~Removal of paint markings and rubber build-up.~Crack cleaning, herbicide application, and sealing.~Asphalt pavement removal and replacement with new asphalt pavement.~Installation of retroreflective marker.~Application of asphalt pavement microsurfacing.~Applying pavement markings.

BID SCHEDULE 2 -SAN MARTIN AIRPORT

~Preparation of the pavement surface by cleaning.~Removal of paint markings and rubber buildup.~Crack cleaning, herbicide application, and sealing.~Asphalt pavement removal and replacement with new asphalt pavement.~Shoulder stabilization of southern most section at the intersection of TaxiwayWand .~Application of asphalt pavement micro-surfacing~Applying pavement markings.

Project Contact: Christine Li 408-573-2488Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 5/19 at 10AM (2500 Cunningham Ave, SJ)

17-01335

1

2:00 PM6/15/17

Addenda:REID-HILLVIEW AIRPORT PAVEMENT REHABILITATION RUNWAYS 13L-31R & 13R-31L, TAXIWAYS;SAN MARTIN ARIPRORT PAVEMENT RUNWAY 14-32, PARALLEL TAXIWAYS

Prebid Conf:

County of Santa Clara - Roads & Airports 408-573-2440

General Contractor Fax: 209-408-0427Office: 209-522-2277American Pavement Systems Inc

General Contractor Fax: 408-293-3633Office: 408-293-9516Graham Contractors, Inc.

General Contractor Fax: 916-714-9868Office: 775-385-1355Intermountain Slurry Seal

General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction

General Contractor Fax: 916-383-4084Office: 916-383-1756Telfer Pavement Technologies, LLC

Bidders:

Plan Issuer:

Los Altos

Design of a new community center.

Project Contact: Christopher LammEmail: [email protected]

Available ONLINE ONLY

17-01358

0

5:00 PM6/15/17

Addenda:RFP FOR HILLVIEW COMMUNITY CENTER REDEVELOPMENT (ONLINE)

City of Los Altos - Engineering 650-947-2780

Sub-Contractor/SpecialtyContractor

Fax: 559-528-6703Office: 559-528-6705Garcia Window Screens

Bidders:

Plan Issuer:

San Jose

5 Story Hotel: Hybrid stick-built modular construction.

This facility is a hybrid product wherein the first floor is assembled onsite in typical stick built fashion while floors 2-5 are modular unitsassembled in Boise, transported to the site and craned into place after first floor structural elements are completed.

Project Contact: Tony Buettner 775-753-5449 & Angela Matthes 970-318-0313

Available ONLINE ONLY

17-01378

0

2:00 PM6/16/17

Addenda:HAMPTON INN HOTEL (ONLINE)

Proset Construction [email protected] 970-626-3114 000-000-0000

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Page 22: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose $130,000

Renovate space for Adaptive PE program, includes accessibility, finishes, and electrical.

Project Contact: Sandy LottEmail: [email protected]

Available ONLINE ONLY

MAND 5/25 at 9AM (Building K)

17-01315

0

2:00 PM6/19/17

Addenda:RELOCATE ADAPTIVE PE SAN JOSE CITY COLLEGE (SJCC) (ONLINE)

G2010.0177

Prebid Conf:

San Jose Evergreen Community College [email protected]

408-270-6431 408-239-8807

Plan Issuer:

Sunnyvale

Demolition, erosion control, grading, drainage, utilities, irrigation, pavement, curbs, flatwork, asphalt pavement, prefabricated building,CMU trash enclosure, fencing, gates, soil preparation, and planting and other miscellaneous work.

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

6/6 at 10AM

17-01426

0

3:00 PM6/21/17

Addenda:ORCHARD HERITAGE PARK

PR 15/04-16

Prebid Conf:

City of Sunnyvale DPW 408-730-7403

NEW

Plan Issuer:

Palo Alto $270,000 $330,000

1. Provide dewatering of each cell of the tide gate;2. Repair spalled concrete surfaces;3. Epoxy injection for cracks in concrete;4. Place a polyester concrete overlay on the deck;5. Remove existing 36” chain link railing and construct a new 48” chain link railing at each side on deck; and6. Provide and install custom fabricated steel bulkheads.

Project Contact: Russell Chen 408-630-2259Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

6/7 at 10AM (Byxbee Park Parking lot)

17-01429

1

2:00 PM6/21/17

Addenda:PALO ALTO FLOOD BASIN TIDE GATE STRUCTURE IMPROVEMENTS - SCVWD

10394001 to

Prebid Conf:

SCVWD (Reprographics Dept) 408-630-3088

NEW

Plan Issuer:

Santa Clara County

Street improvements, pedestrian crossing at east–west direction at Capitol Expressway/Eastridge Loop Drive intersection, fence atmedian, lighting improvements and traffic signal modification.

Project Contact: Ehab AzabEmail: [email protected]

Available ONLINE ONLY

5/30 at 10AM (3331 North First St, Bldg A, Rm 109, SJ)

17-01384

0

2:00 PM6/26/17

Addenda:REBID - CAPITOL EXPRESSWAY PEDESTRIAN CONNECTION TO EASTRIDGE TRANSIT CENTER(ONLINE)

C17131F

Prebid Conf:

Santa Clara Valley Transportation Authority 408-321-7131 408-955-9729

Page 23: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To Bid

Did you know that we offer free Notary

Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Sunnyvale $2,700,000 $3,200,000

1. Compliance with the Stream Maintenance Program 2 (SMP-2) Permit requirements, including installation of BMP’s;2. Site, noise and vibration monitoring;3. Traffic control for the project upon approval by the City of Santa Clara4. Clearing and grubbing within the project limits, including the removal of wooden fences, vegetation, rock riprap, sacked concrete andother miscellaneous items;5. Control of water; including proper diversion of upstream drainage and channel flows; proper handling and disposal of groundwaterflows that are byproducts of the required construction; proper handling and diversion of storm drain runoff from outfalls;6. Channel excavation in compliance with CalOSHA, including excavation, testing and disposal of unsuitable materials; excavation anddisposal of existing channel materials;7. Channel embankment, including proper compaction of import fill; replacement of unsuitable materials, if appropriate and approvedby the Engineer;8. Grading of the existing channel bottom invert with rock lining;9. Implementation of proper and adequate shoring for construction of the slope protection elements in compliance with safetyrequirements;10. Demolition and disposal of asphalt-concrete pavement;11. Installation and re-surfacing of asphalt-concrete pavement;12. Reconstruction of driveways, sidewalks, and curb and gutters and other pertinent existing facilities impacted by constructionactivities;13. Installation of Geotextile Fabric, Geogrid, Pyramat, Rock Slope Protection, Rock Grading, Rock Grouting, and Wooden Fences;14. Working adjacent to, Delineating of and Demarcating of Existing Utility Facilities (including fiber optic lines, overhead utility lines,Caltrain Railroad facility, etc.);15. Installation of Erosion Control Blankets and Mats;16. Protection of existing residential fences during construction;17. Potholing and protection of existing utilities within and immediately adjacent to the project limits, as needed;18. Three (3)-year hydroseed establishment period;19. Construction and removal of temporary access ramps and dewatering system(s)

Project Contact: Ted Ibarra 408-630-2067Email: [email protected]

Available ONLINE ONLY

6/6 at 10AM (Agate Dr & French St )

17-01430

1

2:00 PM6/28/17

Addenda:EL CAMINO STORM DRAIN EROSION REPAIR PROJECT - SCVWD (ONLINE)

62084001 to

Prebid Conf:

SCVWD (Reprographics Dept) 408-630-3088

NEW

Bidders:

Plan Issuer:

San Jose

5 Story Hotel: Hybrid stick-built modular construction.

This facility is a hybrid product wherein the first floor is assembled onsite in typical stick built fashion while floors 2-5 are modular unitsassembled in Boise, transported to the site and craned into place after first floor structural elements are completed.

Project Contact: Tony Buettner 775-753-5449 & Angela Matthes 970-318-0313

Available ONLINE ONLY

17-01378

0

2:00 PM6/30/17

Addenda:HAMPTON INN HOTEL (ONLINE)

Proset Construction [email protected] 970-626-3114 000-000-0000

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Santa Cruz County

Bidders:

Plan Issuer:

Watsonville

Ground up 112 Room 70,000 sq ft 4 story wood frame hotel. Includes site work, parking lot, and landscaping. All trades bidding.

Project Contact: Sean Anderson [email protected]

17-01354

0

3:00 PM6/6/17

Addenda:HAMPTON INN & SUITES - WATSONVILLE

Stoer Construction 408-593-5276 408-600-0818

General Contractor Office: 000-000-0000!!!There may be other GC's bidding thisproject that we are unaware of

General Contractor Fax: 408-600-0818Office: 408-593-5276Stoer Construction

Page 24: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz

Submit qualifications to perform an onsite condition survey of the Wastewater Treatment Facility infrastructure and major equipment.Document and analyze asset condition data in detailed asset database. Apply asset risk management strategies to develop long termCapital Improvement and maintenance programs.

17-01110

1

2:00 PM6/7/17

Addenda:DEVELOPMENT OF THE WASTEWATER TREATMENT FACILITY INFRASTRUCTURE AND MAJOREQUIPMENT STUDY

City of Santa Cruz [email protected] 831-420-5425 831-420-5161

Bidders:

Plan Issuer:

Santa Cruz

Removal and replacement of approximately 24,000 sq ft of roofing and associated components.

PREVAILING WAGE

5/24 @ 1:30pm- site

17-01366

1

2:00 PM6/7/17

Addenda:CAMPUS RE-ROOFING AT BAYVIEW ELEMENTARY SCHOOL

2017-03

Prebid Conf:

MADI Group [email protected] 800-725-0571

Asbestos Abatement /Hazardous Materials Contract

Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Fax: 510-777-1102Office: 510-777-1100Andy's Roofing Co., Inc.

General Contractor Fax: 510-886-7322Office: 510-886-7240Best Contracting Services

General Contractor Fax: 925-371-0277Office: 925-735-3000Joseph Murphy Construction, Inc.

General Contractor Fax: 000-000-0000Office: 408-467-0150Legacy Roofing & Waterproofing

General Contractor Fax: 510-487-8246Office: 510-487-8363Stronger Bldg Services

General Contractor Fax: 650-965-9005Office: 650-937-1299Waterproofing Associates

General Contractor Fax: 415-648-5164Office: 415-648-6472Western Roofing Service

Plan Issuer:

Capitola

The Capitola Art & Cultural Commission is requesting qualifications from muralists who will be selected to design and produce a muralat the McGregor Multi Use Park. The mural will be painted on the exterior walls of half pipe portion of the Monte Family Skate Park.This park is located on McGregor Road as you enter Capitola and adjacent to New Brighton State Beach Park.

17-01174

0

12:00 PM6/9/17

Addenda:SKATE PARK MURAL

City of Capitola 831-475-7300 831-479-8879

Plan Issuer:

Santa Cruz $600,000 $700,000

The work consists of construction of landscaping and other site improvements at the Bay Reservoir Tank Site, including, but not limitedto:1. Utility potholing2. Provide temporary traffic controls, fencing, and site security during construction3. Provide pollution controls4. Demolition5. Tree removal6. Backfill of abandoned underground vault7. Sorting demolition and grading materials8. Relocation of clean soil, rock, and concrete rubble around site9. Off haul and recycling or disposal of trash, debris, and other misc. materials not to be reused in the finished work.10. Concrete sidewalk, driveway and curb construction11. Asphalt conform repairs12. Furnish and install complete fence system13. Furnish and install irrigation system14. Furnish and install plantings15. Maintain landscape during warranty period

MAND 5/26 @ 1pm- 200 Cardiff Place, Santa Cruz

17-01271

1

2:00 PM6/9/17

Addenda:BAY RESERVOIR TANK SITE LANDSCAPING

2011-001 to

Prebid Conf:

City of Santa Cruz - Water Department 831-420-5211 831-420-5201

Page 25: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Watsonville

The California Conservation Corps (CCC), Monterey Bay Center is requesting proposals from experienced and qualified GeneralContractors to install new Ceiling Insulation, new Flooring, Water Heater, Restroom Fixtures, and replace its existing lock and keysystems at its Watsonville Armory building.

Project Contact: Paul Miles [email protected]

MAND 5/25 @ 9am- site

17-01361

0

2:00 PM6/9/17

Addenda:GENERAL CONSTRUCTION PROJECTS (CEILING INSULATION, FACILITY RE-KEY, FLOORING, WATERHEATER)

C6607ACM

Prebid Conf:

Bidders:

Plan Issuer:

Scotts Valley

In general, the work to be done under this contract consists of, but not be limited to: Lengthening a westbound left-turn lane, modifyingsignal phasing; installation of bicycle loop detectors, bicycle boxes, Pedestrian signal faces, Accessible Pedestrian Signals (APS),anda Rectangular Rapid Flashing Beacon (RRFB); Reconstruction of a curb return; all other work shown on the Plans, Standard Plans oras required by the Special Provisions and the Standard Specifications. The area of work is: The intersection of Mount Hermon Road,Scotts Valley Drive and Whispering Pines Drive.

PREVAILING WAGE

17-01272

1

10:00 AM6/22/17

Addenda:SCOTTS VALLEY DRIVE/MOUNT HERMON ROAD INTERSECTION IMPROVEMENTS

City of Scotts Valley 831-438-5854 831-439-9748

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

Bidders:

Plan Issuer:

Santa Cruz

TRADES: Hard Demo, Rough Carpentry, Insulation, Waterproofing, Doors Frames & Hardware, Drywall, Tile, Acoustical Ceilings,Painting, FRP (Stainless Backsplash @ Kitchen), Toilet Accessories, Plumbing, HVAC, Electrical, Electrical Demolition.TYPE: REMODEL TO EXISTINGSF: 58,898

SUBMIT BIDS TO (909) 993-9364 OR [email protected] Questions submit to Dennis Frietze (909) 993-9333

17-01387

0

5:00 PM6/28/17

Addenda:SEARS #2308 - SANTA CRUZ

JG Construction 909-993-9342 909-993-9364

Demolition Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech, Inc.

General Contractor Office: 000-000-0000!!!There may be other GC's bidding thisproject that we are unaware of

General Contractor Fax: 909-993-9364Office: 909-993-9342JG Construction

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Plan Issuer:

Santa Cruz

The County of Santa Cruz invites sealed proposals from fully licensed, insured, bonded, certified CONTRACTORS to furnish all labor,tools, equipment, and incidentals required to provide Landscape Maintenance Services for Sheriff’s Office Headquarters.

Contact Person: Phil Santaluce, Senior BuyerEmail: [email protected] (831) 454-2723Fax (831) 454-2710

MAND 6/7 @ 9am- site

17-01417

0

5:00 PM6/28/17

Addenda:RFP - LANDSCAPE MAINTENANCE SERVICES FOR SHERIFF'S OFFICE HEADQUARTERS

16P2-007

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

NEW

Page 26: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Cruz $115,000

Perform vegetation management in San Lorenzo River and Branciforte Creek.

Project Contact: Tony Lau [email protected]

MAND 6/14 @ 9am- 1125 River Street, Santa Cruz

17-00624

0

2:00 PM7/5/17

Addenda:ANNUAL SAN LORENZO RIVER FLOOD CONTROL MAINTENANCE

Prebid Conf:

City of Santa Cruz 831-420-5160 831-420-5161

Santa Cruz

The California Department of Fish and Wildlife, Office of Spill Prevention and Response is soliciting bids for janitorial services. Theservices will take place at our Marine Wildlife Veterinary Care and Research Center located in Santa Cruz, CA.

Project Contact: Heather Sironen [email protected]

MAND 6/14 @ 10am- 151 McAllister Way, Santa Cruz

17-01359

0

3:00 PM7/7/17

Addenda:JANITORIAL SERVICES MARINE WILDLIFE VETERINARY CARE AND RESEARCH CENTER

P1775025

Prebid Conf:

Bidders:

Santa Cruz

Opportunity to develop a mixed-use infill site owned by the Santa Cruz County Redevelopment Successor Agency (RSA).Development of this approximately 3.7 acres site aims to strengthen the local tax base and enhance economic vitality and quality of lifein the County while meeting community needs, which may include residential and neighborhood-serving commercial uses. QualifiedDevelopment Teams must have substantial experience developing mixed-use commercial projects.The County desires to negotiate and execute a Disposition and Development Agreement (DDA) with the selected Developer thatspecifies the scope of development, public benefits, business terms, and performance requirements, as well as a timeline for securingentitlements and purchasing the property from the RSA. The Developer will lead the engagement of the community while incorporatingthe visioning process established in Appendix A in the project.The selection process involves the submittal of qualifications and a preliminary vision for the Site. County staff will select qualifiedDevelopment Teams for interviews, rank selected teams and make recommendations to enter into an exclusive negotiation agreementwith selected Development Team.

Bid Contact: Kevin Bratcher(831) [email protected]

17-01419

0

5:00 PM8/4/17

Addenda:MIXED-USE COMMERCIAL DEVELOPMENT OPPORTUNITY

16Q1-007

NEW

General Contractor Fax: 831-393-9229Office: 408-380-4234Hauser Construction

Page 27: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Projects Out To Bid

Be part of the solut ion, serve

on the Board

Board Openings

There are multiple positions available on the CCBA Board of Directors. If you are interested in serving, please send a letter of intent explaining why you think you would be a good candidate to [email protected] no later than April 30th

Page 28: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Your Local Plan Room Just Got Better!! STATEWIDE ACCESS

Introducing the Golden State Plan Service

Single Statewide Plan Room - You choose the counties you want to see. No more searching multiple Plan Rooms for projects

Mobile Device Accessible - Take your plan room with you

Your local, community based Exchange has always been the best resource for the local con-struction industry. Now your local exchange just got BETTER and STRONGER. This new

plan room combines 14 of the best exchanges in the state, decades of local plan room experi-ence with our local relationship and resources to bring you the most comprehensive plan

room available. Our plans aren’t uploaded from one central location, rather each exchange cultivates its local relationships to bring the best projects from each region to our contractors.

LOCALLY GROUNDED - STATE POWERED

Keep the Plan Room You Know & Use Your company bidding history & saved projects are preserved Updated Plan Room Platform 2.0 - Increased functionality, ease of use & updated search options. You told us what you wanted - WE IMPROVED

More Private Projects- Our collaboration means more cultivation of private work

Page 29: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Your Local Plan Room Just Got Better!! STATEWIDE ACCESS

Introducing the Golden State Plan Service

Single Statewide Plan Room - You choose the counties you want to see. No more searching multiple Plan Rooms for projects

Mobile Device Accessible - Take your plan room with you

Your local, community based Exchange has always been the best resource for the local con-struction industry. Now your local exchange just got BETTER and STRONGER. This new

plan room combines 14 of the best exchanges in the state, decades of local plan room experi-ence with our local relationship and resources to bring you the most comprehensive plan

room available. Our plans aren’t uploaded from one central location, rather each exchange cultivates its local relationships to bring the best projects from each region to our contractors.

LOCALLY GROUNDED - STATE POWERED

Keep the Plan Room You Know & Use Your company bidding history & saved projects are preserved Updated Plan Room Platform 2.0 - Increased functionality, ease of use & updated search options. You told us what you wanted - WE IMPROVED

More Private Projects- Our collaboration means more cultivation of private work

Page 30: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 31: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

We ‘partner’ with contractors on questions and answers here. We find an ‘affiliate’ relationship to guide a license applicant in Nevada and recall former First Lady Nancy Reagan in having to ‘just say no’ to another contractor…

Q: I am currently working on getting an application together for our company to obtain a Contractor’s license in Nevada. Our financial statement includes several of our subsidiaries. Will each of our subsidiary companies need to complete indemnification paperwork?

A: No, the subsidiaries do not need to indemnify. If the companies were “Affiliates” as opposed to subsidiaries, then the Nevada Board would require indemnification paperwork.

Q: We currently have two LP (Limited Partnership) licenses that we want to transfer to Member managed LLC’s. The “Partners” (which will now become Members) will remain the same. I see on the paperwork they mention transferring a corporate license to an LLC, but there is no mention of an LP transferring a license number. Is this going to be doable?

A: No, a Limited Partnership license is not transferrable. You will be required to obtain new license numbers for the newly formed LLC’s.

Q: Due to a past judgment, the CSLB is requiring that I obtain a Disciplinary Bond for my new Contractor’s License. Will the Disciplinary Bond show up on my license for the public and my customers to see?

A: Yes, all Bond information, including Disciplinary ones, are reflected on your license and available for the public to see when they look your license up online.

Q: I currently have a “C-7” contractors licensed issued to me individually and I am operating a Sole Proprietorship in CA with a ‘dba’ name. I am interested in forming a ‘S’ Corporation for my business. What are the costs and requirements? Will I be able to keep my license number?

A: First, you will be required to file Articles of Incorporation with the California Secretary of State (SOS). The fee to register with the SOS is $115.00. You will then need to apply with the CSLB for a new license. The CSLB fee for a new license is currently $480 and goes up to $530 after July 1, 2017. If you own at least 51% of the Corporation, you have the option to transfer your Sole Owner license number to the corporation. Keep in mind that if you transfer the license number to the corporation, you can never get it back as a Sole Proprietor in the future. Also, I am not a tax or legal advisor and suggest you get expert guidance there as well. Thanks for asking!

Q: I have a Low Voltage (“C-2d”) Contractor’s License in Nevada and I need to get licensed in California. What would the equivalent license be in CA and would I qualify for reciprocity and be able to waive the exams?

A: The “C-7”( Low Voltage) classification in California is the equivalent to your Nevada license. If you have been actively licensed in Nevada for five out of the last seven years and you passed the trade exam in Nevada, you should qualify for reciprocity. Reciprocity grants you a Waiver of the trade exam, however you are still required to take the Law Exam.

Contractor’s Note: Application fees rise on July 1, 2017, so save money by using the time now and give us a call if you need assistance to beat the clock!

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

Page 32: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 33: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

City Building PermitsSalinas

NONE THIS WEEK

Page 34: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 35: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Bid ResultsBid Results 6/5BB

Carmel 5/9 Nurse's Office Improvements at Carmel River School Property Restoration Services apparent low SLO 5/11 Teach Elementary Campus Wide New Fire Alarm Electricraft, Inc. $199,199 Newton Construction $228,000 Primoris Electric $283,297 SLO 5/12 CSD Apartment Remodel - #114 Yosemite and #113 Sierra Madre Dorms Newton Construction $161,000 R.F. Koerber Inc $254,802 Maino Construction $351,597 Seaside 5/16 7th Avenue Parking Lot Improvements Monterey Peninsula Engineering $3,700,000 Granite Construction $3,813,319 Teichert Construction $4,060,000 Salinas 5/16 Mission Trails ROP Center Welding Shop Modifications Tombleson Inc. $638,875 Dilbeck & Sons, Inc. $664,000 Santa Cruz 5/17 Wastewater Treatment Facility Ferric Chloride Tank Replacement SilMan Construction $112,435 GSE Construction Co. $138,820 Fort Bragg Electric $140,400 Salinas 5/18 Salinas Valley Memorial Hospital Pyxis Project Safe-T-Proof Disaster Preparedness Co. apparent low Santa Cruz 5/18 Wastewater Treatment Facility Secondary Clarifier #1 Coating TRB Industrial Coatings $199,100 Simpson Sandblasting & Special Coatings Inc. $239,525 Brand Energy Services of CA $244,200 Soledad 5/22 Soledad Regional Recharge Specialty Construction $2,249,821 Graniterock Co. $3,551,733 Whitaker Construction Group $3,589,224 SLO 5/25 Madonna - Los Osos Valley Rd. Rehabilitation Granite Construction $2,611,360 Papich Construction $2,636,975 Souza Construction $2,654,160

Page 36: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 37: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Notice of Completion

Mechanic’s Liens

Release of Lien

DATE CREDITOR DEBTOR AMOUNT 05/23 GARAGE UNLIMITED KIWI 2 CONSTRUCTION $195,334.3005/24 THE SHERWIN WILLIAMS MERRILL GARDENS MONT. $52,596.0905/24 337 EL DORADO SERRANO ELECTRIC $13,172

DATE GRANTOR GRANTEE CITY 05/23 NORTHRIDGE PACIFIC SHORES CON. SALINAS 05/24 CULLIGAN WATER CINDERELLA CARPET SALINAS 05/25 ROBINSON GLENN HAYWARD LUMBER CO PEBBLE BEACH

DATE GRANTOR GRANTEE CITY 05/23 BMC EG BUNGALOW SAME EAST GARRISON 05/23 SOLEDAD 93 SAME SOLEDAD 05/24 MONTEREY PEN USD AVILA CO. MONTEREY 05/24 MONTEREY PEN USD AVILA CO. MARINA 05/24 MONTEREY PEN USD ABACHERLI FENCE SEASIDE 05/24 MONTEREY PEN USD AMERICAN ASPHALT SEASIDE/MTRY 05/24 MONTEREY PEN USD CM CONSTRUCTION SEASIDE/MTRY 05/24 MONTEREY PEN USD CONTRAX FURNISHING SEASIDE 05/24 MONTEREY PEN USD DON CHAPIN SEASIDE 05/24 MONTEREY PEN USD EARTHWORKS PAVING CO. SEASIDE 05/24 MONTEREY PEN USD K&D LANDSCAPE SEASIDE 05/24 MONTEREY PEN USD K&D LANDSCAPE MARINA 05/24 MONTEREY PEN USD MIRACLE PLAYSYS MARINA 05/24 MONTEREY PEN USD MOORE TWINING ASS. SEASIDE 05/24 MONTEREY PEN USD QUATTROCCHI KWOK ARCH SEASIDE 05/24 MONTEREY PEN USD PAVEMENT ENG. SEASIDE 05/24 MONTEREY PEN USD RIDER CONCRETE MARINA 05/24 MONTEREY PEN USD SILICON VALLEY PAVING MARINA 05/24 MONTEREY PEN USD RIDER CONCRETE SEASIDE 05/24 MONTEREY PEN USD RIDER TERRY MARINA

Page 38: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 39: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,
Page 40: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Classified Ads

Page 41: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

Safety Tip of the WeekSEAT BELTS

According to the National Safety Council, motor vehicle accidents in 1988 were the leading cause of accidental death overall, and the leading cause of death from birth to age 78. In 1980 there were more than 52,000 deaths on our highways. By 1991 we had reduced that figure to 43,500. Obviously the campaigns to use seat belts and against drunk driving are helping, but we still have a long way to go.

It is estimated that 51 percent of the drivers of motor vehicles in the United States use their seat belts. What about the other 49 percent? They have chosen not to protect themselves from injury should they be involved in a vehicle accident. Which category are you in?

The National Highway Transportation Safety Administration has done studies showing that manual lap and shoulder belts are 45 percent effective in preventing fatalities and furthermore, that they are 50 percent effective in preventing critical injuries.

You can help eliminate vehicle accidents by driving defensively. But most of all we can limit our injuries by remembering to buckle up each time we get behind the wheel. Encourage each of your passengers to wear their seat belts as well. The split second decision to buckle up could mean the difference between life and death should you be involved in an accident. Here is a statistic that mayconvince you to buckle up -- the forward force of an individual weighing 200 pounds involved in an accident at a speed of 45 m.p.h. is 8550 pounds!

Seat belts go even further -- remember that most heavy equipment comes with a seat belt. Each employee who operates this equipment must understand the OSHA requirement that if you are seated and running the equipment, you must wear the seat belt that has been provided.

BUCKLE UP -- IT'S THE LAW. THE LIFE YOU SAVE MAY BE YOUR OWN

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_______________________________________________________________________________________

Attended By:

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

Page 42: Builders Bulletin - CCBADemo, concrete, waterproofing, painting & coating, earthwork, asphalt concrete paving, and utilities. PREVAILING WAGE MAND 6/6 10 am @ 3101 Forest Lake Rd.,

The Flyers Fuel Program offers member discounts of 2-5 cents per gallon at over 240,000 gas stations throughout the United States. In addition, you can utilize their Fleet Management System that helps members control costs, set limits on fuel services, and streamline reporting. Contact Irish Chapman to sign up today to sign up or to get your free fuel cost analysis.

• 5 cents per gallon discount at CFN sites

• 2 cents at gas stations everywhere

Discount Fuel Program for CCBA Members

CONTROL YOUR FUEL Contact Irish Chapman

[email protected] (530) 885-0401 ext. 2181