PROJECT # Project Budget $ 50,000.00 Project Budget $ 50,000.00 Budget plan $ - Cost Expended $ - PROJ. ADDRESS $ 50,000.00 Over/Under Budget $ 50,000.00 Task Description Budget for task Notes Start Dat 1 LIVING ROOM 2 DINING 3 GUEST 4 KITCHEN 5 KITCHEN CABINET 6 REAR EXTENSION 7 STAIR AREA 8 FAMILY LIVING 9 MASTER 10 BEDROOM 1 11 BEDROOM 2 12 CURTAIN/LANGSIR 13 GRILL 14 OUTSIDE 15 LANDSCAPE Total $ - plan Enter area of home to be remodled here/ information in task and budget for task automatically populates the sheets Target Finish Date Actual finish date

Upload: sanusi69

Post on 26-Nov-2014

195 views

Category:

Documents


0 download

DESCRIPTION

Perancangan perbelanjaan untuk masuk rumah baru

TRANSCRIPT

Page 1: Budget masuk rumah

PROJECT # Project Budget $ 50,000.00 Project Budget $ 50,000.00 Budget plan $ - Cost Expended $ -

PROJ. ADDRESS Remaining to plan $ 50,000.00 Over/Under Budget $ 50,000.00

Enter area of home to be remodled here/ information in task and budget for task automatically populates the sheets

Task Description Budget for task Notes Start Date1 LIVING ROOM2 DINING3 GUEST4 KITCHEN5 KITCHEN CABINET6 REAR EXTENSION7 STAIR AREA8 FAMILY LIVING9 MASTER

10 BEDROOM 111 BEDROOM 212 CURTAIN/LANGSIR13 GRILL14 OUTSIDE15 LANDSCAPE

Total $ -

Target Finish Date

Actual finish date

D1
Define your budget
F1
Auto populates: Total budget
D2
Auto populates: This is money that has been planned for
F2
Auto populates from information in tabs. This adds the cost of individual items to your budget from tabs
D3
Auto populates: This is money that has yet to be added to the project
F3
Auto populates: Tracks over/under budget amount
B8
Brian: Enter a specific task for your project here (Cabinets, flooring, etc.)Use corresponding tab below to track the breakdown of items for each task.
C8
Brian: Enter the description of the task here
D8
Brian: Enter the portion of the projected budget for this task here- Use corresponding tab below to track the breakdown of items for this task.
E8
Brian: Enter any additional information here- (contractor to be used or special instructions
Page 2: Budget masuk rumah

PROJECT # LIVING ROOM0

PROJ. ADDRESS0

Financial tracking

LIVING ROOM Quantity Price each Total Price

Plaster ceiling 1 $ - $ - Cornice 0 $ - $ - Ceiling light 4 $ - $ - wall light 2 $ - $ - fan 1 $ - $ - aircond 2.0hp 1 $ - $ - Installation 1 $ - $ - wiring $ - $ - Hall cabinet 1 $ - $ - Painting 1 $ - $ - Sofa $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

A11
Use this column to enter individual parts or labor
Page 3: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

E10
Auto populates from Project breakdown
Page 4: Budget masuk rumah

PROJECT # DINING

PROJ. ADDRESS

Financial tracking

DINING Quantity Price each Total Price

Plaster ceiling $ - Cornice 0 $ - Ceiling light/pendant 1 $ - $ - wall light 2 $ - $ - fan 1 $ - $ - Installation 4 $ - $ - wiring $ - hack window 1 $ - $ - new sliding 1 $ - $ - new frame 1 $ - $ - Designer basin/sinki 1 $ - $ - Quality tap $ - plumbing 1 $ - $ - Decorative partition 1 $ - $ - painting $ -

$ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

A11
Use this column to enter individual parts or labor
Page 5: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 6: Budget masuk rumah

PROJECT # GUEST

PROJ. ADDRESS

Financial tracking

GUEST Quantity Price each Total Price

Aircond 0 $ - $ - Installation 0 $ - $ - Wall light 2 $ - $ - Hacking new door 1 $ - $ - new toilet door 1 $ - $ - wardrobe 1 $ - ventilation fan 1 $ - $ - wall fan 1 $ - $ - installation $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

Page 7: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 8: Budget masuk rumah

PROJECT # KITCHEN

PROJ. ADDRESS

Financial tracking

KITCHEN Quantity Price each Total Price

Cornice 0 $ - Fridge 1 $ - $ - Ventilation 1 $ - $ - Pendant 2 $ - $ - Ceiling light 0 $ -

1 $ - $ - wiring $ - Washer tap/plumbing 1 $ - $ - Hacking 1 $ - $ - Timber frame opening 1 $ - $ - painting $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

Plug Modular Multi System

Page 9: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 10: Budget masuk rumah

PROJECT # KITCHEN CABINET

PROJ. ADDRESS

Financial tracking

KITCHEN CABINET Quantity Price each Total Price

Door 1 $ - $ - Vertical Door $ - Drawer $ - Handles $ - Soft hinges $ - Worktop $ - Hob 1 $ - $ - Hood 1 $ - Oven 1 $ - Microwave 1 $ - Sink single bowl 0 $ - Tap 0 $ - $ - plumbing 0 $ - $ - dish rack $ - front pull out basket $ - base pull out $ -

$ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

Page 11: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 12: Budget masuk rumah

PROJECT #

PROJ. ADDRESS

Financial tracking

REAR EXTENSION Quantity Unit Price each

New wall 1 $ - Window 1 $ - window Frame 1 $ - Door 1 $ - Door frame 1 $ - Lock 1 $ - Plaster ceiling 1 $ - *new toilet*Toilet brickwall 1 $ - Sewer pipe 1 $ - water outlet 1 $ - Tap 1 $ - Plumbing 1 $ - Shower 1 $ - Basin/sinki 1 $ - mirror cum cabinet 1 $ - Towel ring 1 $ - Water heater 1 $ - Stainless steel MH 1 $ - Floor tile 35 $ - Emboss artistic wall til 70 $ - Skirting 1 LS $ - plug 1 Nos $ - Ceiling light 1 Nos $ - Switch 1 Nos $ - wiring*wet kitchen*

1 Nos $ - Hob base cabinet 3 ft/run $ -

1 Nos $ - Basin base cabinet 3 ft/run $ - tap 3 Nos $ - plumbing 1 LS $ - Ceiling light 1 Nos $ - swith 1 Nos $ - plug 2 Nos $ - Decorative wall tile 63 $ - Non slip floor tile 50 $ - paintingClear rubbishSpent from budget

ft2

ft2

Hood installation/ventilation

bowl

ft2

ft2

Page 13: Budget masuk rumah

REAR EXTENSION

Financial tracking

Total Price Starting Remaining $ - $ -

$ - $ - $ - $ - $ - $ - $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Page 14: Budget masuk rumah

PROJECT # STAIR AREA

PROJ. ADDRESS

Financial tracking

STAIR AREA Quantity Price each Total Price

wall light 1 $ - $ - pendant 1 $ - $ - switch 2 $ - $ - wiring $ - painting $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

Page 15: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 16: Budget masuk rumah

PROJECT # FAMILY LIVING

PROJ. ADDRESS

Financial tracking

FAMILY LIVING Quantity Price each Total Price

$ - Wall fan 1 $ - $ - Pendant 1 $ - $ - Switch 2 $ - $ - wiring $ -

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

Page 17: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 18: Budget masuk rumah

PROJECT # MASTER

PROJ. ADDRESS

Financial tracking

MASTER Quantity Price each Total Price

Plaster ceiling 1 $ - $ - Wall light 2 $ - $ - Aircond 1 $ - $ - installation 1 $ - $ - ceiling fan 1 $ - $ -

1 $ - $ - 1 $ - $ -

Base preparation 1 $ - $ - Tile 1 $ - $ - Water heater 1 $ - $ - shower 1 $ - $ - tap 2 $ - $ - sinki cabinet 1 $ - $ - shower curtain 1 $ - $ - curtain rod 1 $ - $ - painting 1 $ - wardrobe 1 $ - $ - dressing table 1 $ - Switch 3 $ - $ - Wiring $ -

$ - $ - $ -

Spent from budget $ -

Timber base at window bench0.740m

Page 19: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 20: Budget masuk rumah

PROJECT # BEDROOM 1

PROJ. ADDRESS

Financial tracking

BEDROOM 1 Quantity Price each Total Price

Plaster ceiling 1 $ - $ - wall light 2 $ - $ - ceiing fan 1 $ - $ - aircond 1 $ - $ - installation 1 $ - $ - wardrobe 1 $ - $ - study table 1 $ - book shelve 1 $ - water heater 1 $ - $ - switch 2 $ - $ - plug at study 1 $ - $ - wiring $ -

$ - $ -

Spent from budget $ -

Page 21: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 22: Budget masuk rumah

PROJECT # BEDROOM 2

PROJ. ADDRESS

Financial tracking

BEDROOM 2 Quantity Price each Total Price

Plaster ceiling 1 $ - $ - wall light 2 $ - $ - ceiing fan 1 $ - $ - aircond 1 $ - $ - installation 1 $ - $ - wardrobe 1 $ - $ - study table 1 $ - book shelve 1 $ - water heater 1 $ - $ - switch 2 $ - $ - plug at study 1 $ - $ - wiring $ -

$ - Spent from budget $ -

Page 23: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 24: Budget masuk rumah

PROJECT # CURTAIN/LANGSIR

PROJ. ADDRESS

Financial tracking

CURTAIN/LANGSIR Quantity Price each Total Price

$ - Front window 1 $ - $ - Front sliding $ - living $ - dining sliding $ - Rear window $ - Family living $ - master window $ - bed1 side $ - bed1 rear $ - bed2 rear $ -

$ - Spent from budget $ -

Page 25: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 26: Budget masuk rumah

PROJECT # GRILL

PROJ. ADDRESS

Financial tracking

GRILL Quantity Price each Total Price

Front window 1 $ - $ - Front sliding 1 $ - living 1 $ - dining sliding 1 $ - Rear ceiling 1 $ - Rear window 1 $ - Family living 1 $ - master window 1 $ - bed1 side 1 $ - bed1 rear 1 $ - bed2 rear 1 $ - Toilet 4 $ -

$ - Spent from budget $ -

Page 27: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 28: Budget masuk rumah

PROJECT # OUTSIDE

PROJ. ADDRESS

Financial tracking

OUTSIDE Quantity Price each Total Price

Main gate 0 $ - Porch light 1 $ - $ - Gate light 2 $ - $ - Safety sensor light 1 $ - $ -

$ - $ - $ - $ -

Spent from budget $ -

Page 29: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 30: Budget masuk rumah

PROJECT # LANDSCAPE

PROJ. ADDRESS

Financial tracking

LANDSCAPE Quantity Price each Total Price

$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -

Spent from budget $ -

Page 31: Budget masuk rumah

Financial tracking

Starting Remaining $ - $ -

Page 32: Budget masuk rumah
Page 33: Budget masuk rumah

PROJECT # Project Budget $ 50,000.00 Project BudgetBudget plan $ - Cost Expended

PROJ. ADDRESS Remaining to plan $ 50,000.00 Over/Under Budget

Enter area of home to be remodled here/ information in task and budget for task automatically populates the sheets

Task Description Cost Notes1 LIVING ROOM $ - 2 DINING $ - 3 GUEST $ - 4 KITCHEN $ - 5 KITCHEN CABINET $ - 6 REAR EXTENSION $ - 7 STAIR AREA $ - 8 FAMILY LIVING $ - 9 MASTER $ -

10 BEDROOM 1 $ - 11 BEDROOM 2 $ - 12 CURTAIN/LANGSIR $ - 13 GRILL $ - 14 OUTSIDE $ - 15 LANDSCAPE $ -

Total $ -

D1
Define your budget
D2
Auto populates: This is money that has been planned for
D3
Auto populates: This is money that has yet to be added to the project
B8
Brian: Enter a specific task for your project here (Cabinets, flooring, etc.)Use corresponding tab below to track the breakdown of items for each task.
C8
Brian: Enter the description of the task here
D8
Brian: Enter the portion of the projected budget for this task here- Use corresponding tab below to track the breakdown of items for this task.
E8
Brian: Enter any additional information here- (contractor to be used or special instructions
Page 34: Budget masuk rumah

$ 50,000.00 $ - $ 50,000.00

Enter area of home to be remodled here/ information in task and budget for task automatically populates the sheets

Start Date

Target Finish Date

Actual finish date

F1
Auto populates: Total budget
F2
Auto populates from information in tabs. This adds the cost of individual items to your budget from tabs
F3
Auto populates: Tracks over/under budget amount