Budget Balances. Cash Flow . The June balance after $3M funding will be either $383k ($538k behind the original schedule) or $-155k (depending on timing of RF progress payment 3 ) This has largely solved our cash flow problem for 2011, but a similar problem remains in 2012. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Budget Balances
Page 2: Budget Balances

Budget Balances

Diag - Automation

Diag Enhanced

Diag Upgrade

Control Room

Equip Replacement

Data Infrastructure

Management

MDF

Power Supplies

Vaccum Enh.

RF antennas

RF Power

MNRF carryover

0 1000000 2000000 3000000

Jun-11Allocation

Page 3: Budget Balances

Cash Flow The June balance after $3M funding will be either

$383k ($538k behind the original schedule) or $-155k (depending on timing of RF progress payment 3 )This has largely solved our cash flow problem for 2011, but a similar problem

remains in 2012.Expenditure of the final $2M instalment in 9 months to June 2013 will be a

challenge.

10Q210Q3

10Q41-Se

p11Q1

11Q211Q3

11Q4

Jun2011adj

12Q112Q2

12Q312Q4

13Q113Q2

13Q313Q4

-1000

-500

500

1000

1500

2000

Position by FY Quarter

Position

Page 4: Budget Balances

Milestones for the coming Fiscal Year20 First plasma produced in satellite prototype 31 March 2011

Proposed Milestones to 30 June 201115 Create a database of Magnetic Configurations (magnetic coordinate

transformation) 30 June 2011

18 Decommission radio frequency source and begin installation of the upgraded sources

30 June 2011

19 Commission Spectral Line Monitors dedicated to monitoring specific impurities (e.g. C, O)

30 June 2011

Submit Milestone Report 6 30 June 2011

Proposed Milestones to 30 September 201132 Demonstration of initial diagnostics on Satellite Device 30 September 2011

Submit Annual Report 2 (including Milestone Report 7) 30 September 2011

Proposed Milestones to 31 December 201121 Commission new Radio Frequency Heating Antenna 31 December 2011

16 Upgrade multi-channel interferometer - Phase I complete 31 December 2011

23 Demonstrate operation of new Radio Frequency Heating System (source and antenna)

31 December 2011

Submit Milestone Report 8 31 December 2011

Proposed Milestones to 31 March 201224 Extend the Magnetic Database to include plasma effects 31 March 2012

25 Coherence Imaging Camera upgrade complete 31 March 2012

26 Remote operation from Sydney University 31 March 2012

Submit Annual Business Plan 3 (Including Milestone Report 9 31 March 2012

Proposed Milestones to 30 June 201227 Milestones by March 2012 which is the number to that date in the original contract

Page 5: Budget Balances

Fusion Reactors – the route to ITER and DEMO

H-1 1m3

H-1 Heliac – a type of stellarator, an advanced plasma configuration more stable and more suitable for continuous operation than a tokamak. W7X (helias) operational in 2016

A Stellarator may be the preferred configuration for “DEMO”

Page 6: Budget Balances

Australian Plasma Fusion Research Facility• Australia’s leading fusion-relevant facility• $30 million (ANU contribution ~$20 million) • Facility funding extended to 2013.

Infrastructure upgrade to

Mission:• Study physics of hot plasma in a helical magnetic container• Host development of advanced plasma measurement systems• Contribute to global research, maintain Australian presence in fusion

Improve suitability as a testbed for ITER diagnostics

Improve plasma production/reliability/cleanliness

Improving opportunities for collaboration

Improve data analysis + provide computational support

Improve diagnostics

Page 7: Budget Balances

New Initiative: Materials Diagnostic Test Facility Prototype• Explore effects of plasma on

advanced refractory materials• Joint ANU-ANSTO + USyd, UNew.++• Directly related to Gen 4 nuclear,

high temperature coal, solar• Uses H-1 power systems, diagnostics

Page 8: Budget Balances

• We are a world leader in plasma measurement science and technology

• Diagnostics are largely stand-alone modular systems well defined Australian contribution in scale & budget.

Courtesy: Alan Costley, ITER organisation

Why focus on diagnostics for ITER?

• ITER diagnostics are modular : components installed in multiple port-plugs

• Earlier discussions with ITER suggests integrated package:Erosion monitor (physics)Dust diagnostic (safety)Tritium analyser (licensing)

Page 9: Budget Balances

Budgetary Estimates

Operations $ 0.7M/yearResearch Support (internal+external) $ 2M/yearFacility Upgrades (funded component) $ 7MFacility Upgrades (unfunded component) $ 5MNew Initiatives (incl fusion materials) $ 2MITER Diagnostic Initiative $ 20M

Blackwell, Infrastructure Presentation, Future Technologies 2011

(Capability-wide – includes ITER forum strategic plan 2007: revised version being compiled)