  • Fabien HILLAIRETEnvironmental Investments

    CEZ, a. s.

    Bucharest Renewable Energy

    Conference 2009

    CEZ overview of Environmental Investments

  • 1

    Agenda

    ÿ CEZ Group, a learder in energy generation in Europe

    ÿ CEZ, plan to triple the annual renewable energy production

    ÿ Zoom on the wind investments in Romania

  • 2

    CEZ is the leading utility in Central and Southeastern Europewith strong growth dynamics over the past years

    COMMENTS

    • 7th European power utility by number ofcustomers and by market capitalization1)

    • One of the most profitable utilities inEurope2)

    • Strong dynamics in profit growth over thepast years

    • 75% market share in the Czech Republic(power production)

    • Company committed and recognized forits CSR3) program (CEZ foundation,Green Energy projects, etc.)

    KEY MARKETS OF THE CEZ GROUP

    1) As of February 24, 2009 2) EBITDA margin 48.0 (2008), 43.2 (2007) 3) Corporate Social Responsibility

  • 3

    ENVIRONMENTAL INVESTMENTS: DEVELOPING“PHYSICAL“AND “FINANCIAL“PORTFOLIOS

    Moving from being a purely „strategic“investor to a model with own development capacity, andsome PE/VC investing capability

    ENVIRONMENTAL INVESTMENTS

    RENEWABLE ENERGY “PHYSICAL”PORTFOLIO

    CLEANTECH & CARBON “FINANCIAL”PORTFOLIO

    PE/VCCLEANTECH

    FUNDS

    JI/CDMPROGRAM

    ENERGYEFFICIENCY (EPC)

    PROGRAM

    ß At least 1000 MW to be contracted by2012 –acquistions and projectdevelopmentß At least €1bn to be invested by 2020 in

    the Czech Rep. only (through CEZObnovitelne zdroje, s.r.o.)

  • 4

    Beginning of a large investment plan in wind farm iscurrently focus outsite Czech Republic

    724MW310 GWh65MW26-39MW16 MW32-48 MWUp to 66 MW0,01 MW

    Hydro Power plantsBiomass cofired plantsSmall hydro plantsStribro Wind Park (expected contruction 2012)Resice Wind Park (expected contruction)WindfarmTavíkovice- ermákovice (2011)Wind farmDlouhé Pole (under development)Solar PV

    CEZ Group in the Czech Republic

    492 MW

    238MW

    Skawina, Southern PolandOver 84,6 GWh of "green" energyproduced in 2008

    Elcho Power plant58,6 GWh of "green" energy produced in2009

    CEZ Group in Poland(99.91% stake in Skawina, 89% in Elcho)

    Fantanele and Cogealac are situated in theDobrogea province, north of Constanta, about 17kilometers from the Black Sea

    600 MWFantanele & Cogealac projects

    CEZ Group in Romania(focus on wind)

  • 5

    ß Two wind farm projects in Dobrogea county, between villages of Fantanele and Cogealac (north ofConstanta, 17 km west of the Black Sea coast);ß Total projected size: 240 WTGs(1) of 2.5MW–installed capacity of 600MW;ß The project will be the largest onshore wind farm in Europe;ß Once wind farm are operational, CEZ will have 10 % share on the Romanian market with

    renewable energy.

    Wind park projects in Fantanele and Cogealac will be thelargest on-shore wind farm built in Europe

    Basic information about CEZ wind farm projects

    Both wind parks

    ß 1st phase of the project –139 wind turbines;ß To be finished in 2010;ß CEZ has engaged CWP as a project

    manager; CEZ project team performscontrolling and monitoring functions;ß Construction has started in October 2008.

    Fantanele Projectß 2nd phase of the project –101 wind turbines;ß To be finished by the end of 2010/beginning

    2011;

    Note: (1) WTG –Wind Turbine GeneratorSource: CEZ

    Cogealac Project

  • 6

    Fantanele project is designed to provide 347.5 mw capacityof the ecological energy

    Overview of the key technical parameters of Fantanele project

    Technical parameter Description

    Total generation capacity 347.5 MW

    Wind turbine generatorscomposition

    139 generators (generation capacity 2.5 MW each) –100m hub height,99m rotor diameter

    Energy transformationGenerators are connected to four 33 kV/110kV substations, whichdeliver on 110kV level to the Main Transformer Station which connectsthe Fantanele wind farm on the 400kV grid line Constanta -Tulceaoperated by Transelectrica.

    Selected technicalinformation on WindTurbine Generators(WTG)

    Producer: General ElectricMaximum speed: 73.6 m/sBlades material: fiber glass –epoxy resin/polyesterCut-in wind speed: 3 m/sCut-out wind speed: 25 m/sRated power output: 2.5 MWTower: tubular steel, 100m

    Source: CEZ; General Electric

  • 7

    Pouring of blinding concrete Mounting of ring for foundation

    Anchor ring for foundation

    Pouring of blinding concrete Construction of adapter ring and steelinstallation

    Pictures from the site

    Source: CWP

  • 8

    Pictures from the site

    Placing of cable ducts into foundationPlacing of adaptor to foundation

    Source: CWP

  • 9

    Finalization of concrete foundation FE17 Laying of 110 kV cables

    Pictures from the site

    Source: CWP

  • 10

    Foundation of FE substation

    Start of the works for MTS roads

    Pictures from the site

    Foundation of FE substation

    Source: CWP

  • 11

    Pictures from the site

    Installation of the transformer in thefoundation

    Delivery of the 1st transformer for FEsubstation on site

    Source: CWP

  • 12

    Pictures from the site

    Source: CWP

    Delivery of GE “oversized components”(blades) First ship of GE in Midia Port

  • Thank you very much for your attention

    Contact :

    Fabien HillairetEnvironmental Investments

    [email protected]+420 724 804 146

    mailto:[email protected]