Page 1: BT TDM on 21CN – Consult 21 Utilities Webcall

BT TDM on 21CN – Consult 21 Utilities Webcall

Laurie Dennard – BT Group

Martin Wade – BT Design

Bill Du Cann – Consult21

December 10th, 2007

Issue 1.0

Page 2: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 2

The Objectives of the Webcall

• Share BT Wholesale’s portfolio proposals for TDM on 21CN

• Summarise the Consultation process and key messages

• Replay feedback already received

• Address some of the Utilities’ specific concerns

• Share the Consultation plan and timeline

• Gain your feedback through a Q&A session

Page 3: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 3

Disclaimer

• BT's 21st Century Network is still in the process of development and the subject of consultation. The information in these slides may be subject to change at any time without further notice and exclusive reliance on the information in these slides is at your own risk. BT has taken reasonable care to check that the information contained in this document is accurate at time of publication. In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available. With the exception of any products which have already been launched, any notification timescales, launch dates and pricing information provided is indicative only and will, where applicable, be subject to the successful outcome of any trial and to any legal and regulatory approvals being given

Page 4: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 4

Agenda

• Introductions

• The Industry Consultation Process

• Summary of key Consultation messages– Product Annex from Consultation document

• Utilities’ FAQs

• Timeline for the Consultation period

• Q&A

Page 5: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 5

Industry Consultation Explained

The Consultation process:– The Industry Consultation period is for BT Wholesale to consult with CPs on

the future of products on the 21CN, before making final decisions on its 21CN portfolio

– An Industry Consultation document is a set of proposals for comment, for comment from Industry, so the information shared with you today is not set in stone

– After the consultation period is complete and BT has considered all responses from the CPs, it will issue a Consultation Closing Document

• Some CPs have sent BT their responses to a set of questions from the Consultation document

• The Closure document publishes those responses (anonymously), tries to answers any questions raised by CPs and set out BT’s final statements

– After the Closure Document is issued the Consultation is closed and BT Wholesale will commence development of the 21CN TDM portfolio

– The statements within the Consultation document are issued by BTWholesale and only refer to BTWholesale products

– Global Services are treated as any other CP in the Consultation process and therefore are not in a position to provide full plans on their 21CN portfolio until sometime after the final Consultation position is published

Page 6: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 6

TDM Industry Consultation Proposals Summary

20C Legacy 2Mb and above services

Extend SDH platform life from 2011 to Q1 2014

Introduce Next Generation 21C product options

Stop/ sell 20C services when 21C alternatives are available and withdraw

all 20C products by Q1 2014

21C Ethernet (from 2008)

21C Native TDM (from 2009)

Migrate to 21C service

CP led migration from 2009

BT led migration from 2012

20C Legacy Sub 2Mb services inc AoD

Extend DPCN platform life from 2011 to Q1 2014

Introduce Next Generation 21C product options

Stop/ sell 20C services when 21C alternatives are available and withdraw

all 20C products by Q1 2014

Broadband (from today)

21C Native TDM (from 2009)

Migrate to 21C service

CP led migration from 2009

BT led migration from 2012

Page 7: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 7

Product Listing (Annex A of Consultation Document)

Speed Product 20CN Stop Sell**

20CN Withdrawal***

21CNProduct Alternatives

21CN Product Launch

2Mb and above

155Mb PPC 2009 Q1, 2014 155Mb TDM

100Mb and 1Gb Ethernet

2009

2008

34 Mb PPC 2009 Q1, 2014 34Mb TDM

100Mb Ethernet

2009

2008

2Mb PPC 2009 Q1, 2014 2Mb TDM

10Mb Ethernet

2009

2008

2Mb RBS 2009 Q1, 2014 2Mb TDM

10Mb Ethernet

2009

2008

Sub 2Mb 1Mb* PPC 2009 Q1, 2014 2Mb TDM

Broadband/Ethernet

2009

2008

128k- 960k RBS 2009 Q1, 2014 128k-960k TDM

10Mb Ethernet

2009

2008

128k -960k PPC 2009 Q1, 2014 128k-960k TDM

Broadband/Ethernet

2009

2008

64k PPC 2009 Q1, 2014 64k TDM

Broadband/Ethernet

2009

2008

Sub 64K * PPC Complete Q1, 2014 64k TDM

Broadband/Ethernet

2009

2008

* No direct 21CN replacement product at this speed ** Subject to 21CN availability

*** Subject to demand (if there is insufficient demand BT may withdraw earlier).

Page 8: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 8

Utilities’ FAQs – Design

• What performance can I expect from the 21CN Native TDM solution?– 21CN TDM will be based on Next Generation SDH and will be carried natively in 21CN– We are aiming to offer the same customer experience as current 20CN product

performance

• What happened to TDM emulation?– BT’s feasibility on TDM emulation showed that it cannot meet the delay or jitter

requirements for strict TDM performance, so BT does not currently plan to introduce an emulated TDM service.

– BT may reconsider this position if the technology matures to a performance level acceptable in the marketplace

• Will BT need to change my current access network?– It is anticipated that the majority of 20CN TDM access network will be retained to work

with the 21CN– This also applies to PPC Point Of Handover & 3rd party tails

• Can customers see BT 21CN node data & rollout plans?– CPs have access to some of this information, end customers ordinarily would not

• What is the life expectancy of alternative 21CN products?– We have no plans for withdrawal of 21CN products currently but would expect to

withdraw them when they are no longer viable, due to low demand

• What resilience & switching options will be available for TDM on 21CN?– Similar resilience configurations would be available to those currently provided

Page 9: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 9

Utilities’ FAQs – Service

• When will customers get to see 21CN TDM product pricing?– This is likely to be late 2008, at the earliest

• Would there be a fixed time between stop sell and product withdrawal?– We expect that to be no shorter than 2 years but there will not be a fixed time as it will

depend on how far ahead of the 20CN platform closure the stop sell date is issued

• When will customers have an indication of product mapping and stop sell dates?– The current product mapping plan is shown on slide 6– Stop sell dates announcement will be co-ordinated with their 21CN replacement

launch announcement

• Can BT clarify what is meant by ‘support services on 20CN until Q1, 2014 subject to demand?

– If the migration of services away from the 20CN platforms occurs more quickly than expected, then BT may decide to close the platform before 2014

• What is happening with EPS type circuits & non-own exchange circuits– Analogue circuits, non-own exchange, would be mapped to a 64Kb 21CN alternative– Analogue circuits, own exchange, are not impacted by this consultation

• Life expectancy of alternative 21CN products– No current end of life dates for 21CN TDM products

• Do utilities have to repay connection charges when migrating to 21CN– Only when changing bandwidth, or when moving to a different product i.e Ethernet

Page 10: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 10

Timeline

Consultation period: Completed

October 22nd- November 30th

BT produce draft Closure document: December 19th (est.)

Industry provide comment on draft Closure document

January 18thth 2008 (TBA)

BT produce final Closure document January 31st 2008 (TBA)

21CN Product launch announcements/pricing information

Q4 2008 (at earliest)

21CN TDM Product launch 2009 onwards

20CN TDM product stop sell 2009 onwards

Closure of 20CN platforms End of Q1, 2014

Page 11: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 11

Answers

Questions

Page 12: BT TDM on 21CN – Consult 21 Utilities Webcall

© British Telecommunications plc

Page 12

Useful websites

• Switched-on website• http://www.switchedonuk.org

• 21CN website• http://www.btplc.com/21CN/

• Consult21 website • http://www.btwholesale.com/consult21