1 © Nokia Siemens Networks Presentation / Author / Date For internal use GSM PLM – FS2 Proposal v.0.2 / 4.3.2011 Rauhala Timo, KNi BSS101686 Improved Clear Request Suppression Board Decision Date Version FST <FS2/3 supported> 17.3.2011 0.2 PDT <Approved / Rejected> 11.11.2011 ? Proposal Accept FS2/FS3 for S14 MP9.0, S15 MP2.0 and S16 (effort is stated w.o. / with LK) Visibility Public Priority 5 Licensing ASW Tot. Effort 342h / 419h BSS RG10, 20, 30 BSC S14 MP9.0 , S15MP2.0 , S16 NetAct - UltraSite - MetroSit e - FlexiEDGE - Multiradi o - Talk BTS - InSite - BTSplus - Horizon - Business Case Improve DCR KPI by 30% compared to current implementation. CMCC has set DCR KPI targets for next autumn, so proposed schedule is only viable. Pipeline impact, risks Low risk, changes only in ABI. Request source: CMCC Original target release: RG10 (BSS)

Upload: mohammad-saeed

Post on 08-Nov-2014

118 views

Category:

Documents


23 download

DESCRIPTION

Improve the CDR

TRANSCRIPT

Page 1: BSS101686 Improved Clear Request Suppression

1 © Nokia Siemens Networks Presentation / Author / DateFor internal use

GSM PLM – FS2 Proposal v.0.2 / 4.3.2011Rauhala Timo, KNi

BSS101686 Improved Clear Request Suppression

Board Decision Date Version

FST <FS2/3 supported> 17.3.2011 0.2

PDT <Approved / Rejected> 11.11.2011 ?

Proposal Accept FS2/FS3 for S14 MP9.0, S15 MP2.0 and S16 (effort is stated w.o. / with LK)

Visibility Public Priority 5 Licensing ASW Tot. Effort 342h / 419h

BSS RG10, 20, 30

BSC S14 MP9.0 , S15MP2.0 , S16 NetAct -

UltraSite - MetroSite - FlexiEDGE - Multiradio -

Talk BTS - InSite - BTSplus - Horizon -

Business Case

Improve DCR KPI by 30% compared to current implementation.

CMCC has set DCR KPI targets for next autumn, so proposed schedule is only viable.

Pipeline impact, risks

Low risk, changes only in ABI.

Request source: CMCC

Original target release: RG10 (BSS)

Page 2: BSS101686 Improved Clear Request Suppression

2 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Feature Overview

• Category: Radio Network Performance

• Issue– Current implementation is not effective enough, thus DCR KPI is not improved

as much as with BR implementation.

• Description:– The existing KPI improvement, BSS101467 Clear Request Suppression is

further improved by suppressing all clear requests after "disconnect" -state.

• References: – Focal Point

– S14 CR: EDS14_060

– S15 CR: EPS15_026

– S16 CR: CR013

• Operability: No

• System Impact: No

Page 3: BSS101686 Improved Clear Request Suppression

3 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Customer Business Case

• Not real biz case, but maybe bit less optimization OPEX when KPI just looks better.

Page 4: BSS101686 Improved Clear Request Suppression

4 © Nokia Siemens Networks Presentation / Author / DateFor internal use

NSN Business Plan: Justification and Timing

• NSN business logic– DCR can be improved.

• Negative impact analysis:– DCR KPI target of CMCC can nor be met.

• Feature market potential:

• Latest Release required by the customer:– RG10(BSS)

• Selling window:

Page 5: BSS101686 Improved Clear Request Suppression

5 © Nokia Siemens Networks Presentation / Author / DateFor internal use

NSN Business Plan: Pricing

• Pricing model– BSW/ASW: ASW– Licence Control in Network Element: Trust based– Licence Control Attributes: N/A– Licence Capacity Info: N/A

• Price range: < Low (25 - 100 eur/cell)

• With the estimated value, market potential and cost, is it feasible to price the feature so that NSN business case will be positive? < Yes/No/NA >

– < Comments related to pricing and price level >

Page 6: BSS101686 Improved Clear Request Suppression

6 © Nokia Siemens Networks Presentation / Author / DateFor internal use

NSN Business Plan: Cost

• Work effort estimates on network elements (including FS, IS, MI, MT, FT)

• Work efforts prepared by <PPO / R&D Program> based on < feature description or more detailed material

• < Product costs, e.g. HW costs, laboratory or production investments >

For the proposals before P0 accurate effort is not required.Following categorization can be used: minor (<150h), low (<500h), medium (<2000h), high

Area RG10(BSS) RG20(BSS) RG20(BSS)

ON TOP

Target / Inheritance S14 MP9.0 S15 MP2.0 S16 (main)

BSC/GEMINI/MCBSC

PCU - - -

TCSM/MCTCSM - - -

Platform - - -

BTS - - -

Transport - - -

NetAct - - -

System Specification

System Verification

Documentation

Sub total (h) 135h / 149.5 126h / 133.5 81h / 136h

Total Effort 342 h / 419h (w.o. LK / w. LK)

Page 7: BSS101686 Improved Clear Request Suppression

7 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Target Release and Pipeline Effects

Target release Inheritance Pipeline effects and risks

Program manager’s statement

Program manager’s comments

S14 MP9.0 Yes< Potential impact to schedule of target release > < rationale, if needed > < known risks? >

GO / NO GO

< program mgr XYZ comment >

S15 MP2.0 Yes< Potential impact to schedule of target release > < rationale, if needed > < known risks? >

GO / NO GO

< program mgr XYZ comment >

S16 Yes< Potential impact to schedule of target release > < rationale, if needed > < known risks? >

GO / NO GO

< program mgr XYZ comment >

Page 8: BSS101686 Improved Clear Request Suppression

8 © Nokia Siemens Networks Presentation / Author / DateFor internal use

Dependencies

• 3GPP– None

• NetAct– None

• PS Core (SGSN, GGSN, IMS)– None

• CS Core (MSC/MGW)– None

• MS– None