OutlineOutline
Frequency BandsPlans / ListsMain Regulatory Aspects Processing of New Submissions Compatibility Analysis
3
How to get them in the RR?
Frequency BandsFrequency BandsPlan / ListsPlan / Lists
4
Region 1 Region 2 Region 3 11.7-12.5 FIXED BROADCASTING BROADCASTING-SATELLITE MOBILE except aeronautical
mobile
11.7-12.1 FIXED 5.486 FIXED-SATELLITE
(space-to-Earth) Mobile except aeronautical mobile
11.7-12.2 FIXED MOBILE except aeronautical
mobile BROADCASTING BROADCASTING-SATELLITE
12.1-12.2 FIXED-SATELLITE
(space-to-Earth)
12.2-12.7 FIXED MOBILE except aeronautical
mobile BROADCASTING BROADCASTING-SATELLITE
12.2-12.5 FIXED FIXED-SATELLITE
(space-to-Earth) MOBILE except aeronautical
mobile BROADCASTING
12.5-12.75 12.5-12.75 FIXED-SATELLITE
(space-to-Earth) (Earth-to-space)
12.7-12.75 FIXED FIXED-SATELLITE
(Earth-to-space) MOBILE except aeronautical
mobile
FIXED FIXED-SATELLITE
(space-to-Earth) MOBILE except aeronautical
mobile BROADCASTING-
SATELLITE
Article 5 Table of Frequency AllocationsArticle 5 Table of Frequency Allocations
And footnotesAnd footnotes
5
Frequency BandsFrequency BandsPlan / ListsPlan / Lists
Article 5 (Allocation Table & Footnotes) of the Radio Regulations (RR)
Footnotes of Articles 9 and 11 of the RR(see Appendices 30 and 30A…)
6
Frequency BandsFrequency BandsPlan / ListsPlan / Lists
Article 5 (Allocation Table & Footnotes) of the Radio Regulations (RR)
Footnotes of Articles 9 and 11 of the RR
Article 2 of Appendices 30 and 30A
7
ARTICLE 2 of AP30 (WRC-03)Frequency bands
2.1 The provisions of this Appendix apply to the broadcasting-satellite service in the frequency bands between 11.7 GHz and 12.2 GHz in Region 3, between 11.7 GHz and 12.5 GHz in Region 1 and between 12.2 GHz and 12.7 GHz in Region 2 and to the other services to which these bands are allocated in Regions 1, 2 and 3, insofar as their relationship to the broadcasting-satellite service in these bands is concerned.
ARTICLE 2 of AP30A (WRC-03)Frequency bands
2.1 The provisions of this Appendix apply to the feeder-links in the fixed-satellite service (Earth-to-space) in the frequency bands 14.5-14.8 GHz and 17.3-18.1 GHz for the broadcasting-satellite service in Regions 1 and 3, and 17.3-17.8 GHz for the broadcasting-satellite service in Region 2and to other services to which these bands are allocated in Regions 1, 2 and 3 so far as their relationship to the fixed-satellite service (Earth-to-space) in these bands is concerned.
8� � � �
� � �
� � �
� � �
� �
� �
� � � �
� �
� �
� � �
� � �
� � �
� � �
� � �
� �
� �
� � � �
� �
� �
� � �
� � �
���� � � � �� � � � � � � �� � � � � �� � � � �� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � �
����
����
� � � �� � � � � � � �� � � � � �� � � � �� � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � � ����
���
���
� � � � � � �
� � � � � �
� � � � � � � � � � � �
11.7 - 12.5 GHz (space-Earth)14.5 - 14.8 GHz (Earth-space)
except Europe17.3 - 18.1 GHz (Earth-space)
11.7 - 12.2 GHz (space-Earth)14.5 - 14.8 GHz (Earth-space)17.3 - 18.1 GHz (Earth-space)
12.2 - 12.7 GHz (space-Earth)17.3 - 17.8 GHz (Earth-space)
Frequency bandsFrequency bandsBSS Plan/Lists coverage
9
History, description, compatibility
Plan / ListsPlan / Lists
10
HISTORYHISTORY
Appendix 30 Downlink Plans
Regions 1 and 3 Plan (223 entries)1977 rev. in 1997, 2000
Region 2 Plan (170 entries) 1983 included in the RR in 1985
Appendix 30A Feeder-link Plans
Regions 1 and 3 Plans (301 entries)1988 rev. in 1997, 2000
Region 2 Plan (168 entries)1983 included in the RR in 1985
11
AP30/30AAP30/30AProcedureProcedure
Plan Plan List
MIFR MIFR
Region 2 Regions 1 and 3
Art. 4 Art. 4
Art. 5 Art. 5Art. 5 4.1.26 / 4.1.27
12
Technical data used?Technical data used?
Annex 5 of Appendix 30 - Annex 3 of Appendix 30A
• Type of modulation (digital for R1&3), Polarization, C/N, Protection ratio, System noise, Channel, Antenna, Necessary bandwidth, satellite station keeping etc.
• Most of them are characteristics used for establishing Plans → can be different for modifications
• However, when “shall” is used → has to be observed
13
Elements of PlansElements of Plans
National assignments in:
Articles 10 & 11 of AP30 (downlink)Articles 9 & 9A of AP30A (feeder-link)
Description:orbital position, channels, polarisation, power levels, antenna patterns, emission designation, beam coverage, grouping ...
14
Plan Plan -- Region 2Region 2in numbersin numbers
Downlink and Feeder-link together (OEPM)
32 channels for a clusterCluster concept
Same status given to assignments in the Plan resulting from the application of Article 4 procedure if brought into use
Currently 173 entries
15
Plans Plans -- Regions 1 and 3Regions 1 and 3in numbersin numbers
WRC-2000 developed a new Plan that included:10 channels in Region 112 channels in Region 3
223 downlink entries301 feeder-link entries
5 extended-coverage national beams for 15 administrations30 "composite" beams
16
Lists Lists -- Regions 1 and 3Regions 1 and 3in numbersin numbers
Regions 1 and 3 Lists of Additional Usescreated by WRC-2000:
AP30 Downlink List - 12 GHz (currently 54 entries)
AP30A Feeder-link List - 14 GHz / 17 GHz (currently 51 entries)
17
Elements of Lists (1)Elements of Lists (1)
Separated from the PlansAnnexed to MIFR
Lists are evolvingUpdates are published by BR
Assignments in the Lists must be compatible with the Plans and other services
Digital modulation only
18
Elements of Lists (2)Elements of Lists (2)
Data elements submitted - Appendix 4
Non-monopolisation provisions
15 year time limit
Provisions for use of assignments on a non-interference basis in case of disagreements
Provision to accommodate assignments for new ITU Member States
Limitation on application of the grouping concept
19
PPlan & List Beamslan & List Beams
20
Establishment of the Plans (Lists)Establishment of the Plans (Lists)Compatibility among assignments in Plan and List
EPM or OEPM
Compatibility between Plan and other services or Plan in other Regions
PFD, ∆T/TRegulatory mechanism:Remarks in Art. 10 and 11 of AP30, Art. 9 and 9A of AP30A, Art. 9 and 11 of RR for specific feeder-link earth station
21
Regions 1 and 3 Approach(separated links)
Region 2 Approach(overall link analyses)
EPMDown OEPM
EPMUp
Interference Interference
Interference Interference
Chann
el 4
Chann
el 4Channel 4
Channel 4
Difference between Difference between EPM and OEPMEPM and OEPM
22
Compatibility CriteriaCompatibility CriteriaRegion 2 Plan AssignmentsRegion 2 Plan Assignments
Overall Equivalent Protection Margin (OEPM) is used:
Mi = protection margin = (dB)
i = interference type ( 1=co-channel,
2&3=upper & lower first adjacent channels, 4&5=upper & lower second adjacent channels)
PRi = protection ratio for a given interference type i
⎟⎠
⎞⎜⎝
⎛−= ∑=
−5
1
)10/(10log10i
M iOEPM
ii
PRIC
aggr
−
23
Compatibility CriteriaCompatibility CriteriaRegions 1 & 3 Plan AssignmentsRegions 1 & 3 Plan Assignments
Equivalent Protection Margin (EPM) is used:
Mi = protection margin = (dB)
i = interference type (1=co-channel, 2 & 3 = upper & lower first adjacent channels)
PRi = protection ratio for a given interference type i
⎟⎠
⎞⎜⎝
⎛−= ∑=
−3
1
)10/(10log10i
M iEPM
ii
PRIC
aggr
−
24
Main regulatory aspectsMain regulatory aspects
25
MainMain Regulatory Regulatory AspectsAspects
BSS Downlink/ Feeder-link
Modification/Addition (Article 4)
Notification/Implementation (Article 5)
Due diligence information (Resolution 49)
26
MainMain Regulatory Regulatory AspectsAspects
Feeder-link earth station
Modification/Addition (Article 9 of RR)
Notification/Implementation(Article 11 of RR)
27
MainMain Regulatory Regulatory AspectsAspects
Space Operation/TT&Cin the Guardbands
Coordination (Article 2A)
Notification (Article 11 of RR)
28
MainMain Regulatory Regulatory AspectsAspects
TerrestrialCoordination w.r.t Plan/List (Article 6)
FSSCoordination w.r.t. Plan/List (Article 7)
29
Article 5 NotificationArticle 5 NotificationFinal characteristics for Plan and Lists assignmentsConfirmation of date of bringing into useRecorded in MIFR (not taken into account in subsequent technical examination)Appendix 4 data should be submitted not earlier than 3 years but not later than 3 months before planned date of bringing assignments into use Published in Part I-S → Part II-S or Part III-Sdata in MIFR in: BR IFIC and
http://www.itu.int/ITU-R/go/space-plans-mifr/en
30
Article 5Article 5 Examination Examination
conformity with the Convention, Table of Allocations, other provisions conformity with the Plan and List including coordination requirement in the Remarks columnAllowed characteristics different from those in the Plan and List in provision 5.2.1 d)Methodology to check the conformity with the Plan and List is in the ROP
31
Article 4 Article 4 Modification / AdditionModification / Addition
Change of characteristics of assignments in the Plan (Region 2)Addition of assignments in the List (Regions 1&3) and in the Plan (Region 2)
8 years Regulatory periodto complete Article 4 procedure to be included in the Plan and the Listto bring assignments into use (confirmation though notification procedure)to submit due diligence information (Res.49)
32
Article 4
Processing of New Submissions
33
Processing of Article 4Processing of Article 4Submissions (1)Submissions (1)
Submission of validated Appendix 4 data (8 years before planned date of bringing into use)
Validation Check
Publication of the submitted information as received (BR IFIC & SNL Part C http://www.itu.int/ITU-R/space/snl/ )
BR
Acknowledgement by telefax
OK
Fail
ITU-BR
Administration
34
Completeness examination and telefax
Reply must be sent within 30 days (receivability ROP)
Regulatory/technical examination
Publication of Part A Special Section (BR IFIC) that contains the filed satellite network characteristics and potentially affected administrations. Results of the Bureau’s MSPACEg calculations are also in the BR IFIC
Processing of Article 4Processing of Article 4Submissions (2)Submissions (2)
ITU-BR
Administration
35
Administrations should examine each BR IFIC to see if their assignments are affected and respond within 4 months
Affected administrations that do not comment within the 4 month period are deemed to have agreed
After the 4 month period has expired, the BR prepares a list of agreements required and publishes it in a Part D Special Section.
Processing of Article 4Processing of Article 4Submissions (3)Submissions (3)
ITU-BR
Administration
SpaceCom software compulsory from 1 July 2009(CR/305 on Res.55)
36
Submission of validated Appendix 4 data (final characteristics) with agreement (request for Part B publication)
Acknowledgement by telefax
Completeness examination
Reply must be sent within 30 days (receivability ROP)
Validation CheckFail
OK
Processing of Article 4Processing of Article 4Submissions (4)Submissions (4)
ITU-BR
Administration
37
Regulatory/technical examination
Submission of notification (confirmation of bringing into use), Res.49 due diligence information
Publication of Part B Special Section (BR IFIC) that contain the final characteristics
Request for extension of period of operation for assignments in the List (15 years), if required
Processing of Article 4Processing of Article 4Submissions (5)Submissions (5)
ITU-BR
Administration
38
Compatibility
Examination, publications, data
39
Compatibility betweenCompatibility betweenPlan and List AssignmentsPlan and List Assignments
Region 2 Plan based on OEPMRegions 1 & 3 Plan and List based on:
9 degree Coordination ArcEPM and PFD (downlink)EPM, PFD at any point in the GSO and Off-axis e.i.r.p (uplink)
40
Compatibility Compatibility Criteria forCriteria forRegions 1 & 3 List AssignmentsRegions 1 & 3 List AssignmentsBased on both EPM and (hard & trigger) PFD criteria
EPM criteria as per the Regions 1 & 3 PlanPFD criteria also used to identify affected assignments as per Annex 1 of AP30
41
AArticlerticle 44 ExaminationExamination(Appendix (Appendix 30,30, RegionRegion 22))
Protection of the Region 2 PlanSPS/MSPACE: OEPM calculations
Protection of Regions 1 & 3 Plan and ListGIBC(PFD space)/GIMS: PFD
Protection of Terrestrial ServicesGIBC(PFD terrestrial)/GIMS: PFD
Protection of Regions 1 & 3 FSS GIBC(PFD space)/GIMS: PFD
42
AArticlerticle 4 Examination4 Examination(Appendix (Appendix 3030A, Region 2)A, Region 2)
Protection of Region 2 PlanSPS/MSPACE: OEPM calculation
Protection of Regions 1 & 3 Plan and ListGIBC (Appendix 8): delta T/T
43
AArticlerticle 44 ExaminationExamination(Appendix (Appendix 30,30, RegionsRegions 1 1 && 3)3)
Protection of the Regions 1 & 3 Plan and ListSPS/MSPACE: EPM & PFD calculations
Protection of Region 2 Plan GIBC(PFD space)/GIMS: PFD
Protection of Terrestrial ServicesGIBC(PFD terrestrial)/GIMS: PFD
Protection of Region 2 and Region 3 FSS GIBC(PFD space)/GIMS: PFD
44
AArticlerticle 4 Examination4 Examination(Appendix (Appendix 3030A, Regions 1&3)A, Regions 1&3)
Protection of Regions 1&3 Plan and ListsSPS/MSPACE: EPM calculation
Protection of Region 2 Plan GIBC(Appendix 8): delta T/T
Protection of Region 2 FSS receiving feeder-link space station (17.8-18.1GHz)GIBC(Appendix 8): delta T/T
45
Publication of ResultsPublication of Resultsof Examination of Examination
Article 4 procedureSpecial Sections AP30-30A/E, AP30/E and AP30A/E
Part A: Publication of proposed characteristics and administrations considered affectedPart D: Establishment of requirements for agreement Part B: Final characteristics entered into the Plan/ListPart C: Cancellation
SPS_ALL_IFICnnnn, MSPACEg_results_IFICnnnn
46
Publication of ResultsPublication of Resultsof Examinationof Examination
Article 5 procedurePart I-S, II-S and III-S of BR IFICSNS-on-Line or SPS_ALL_IFICnnnn
Article 2A procedureSpecial Section AP30-30A/F/CSpecial Section AP30-30A/F/DSNS-on-Line or SPS_ALL_IFICnnnn
Article 7 procedureSpecial Section CR/CSNS-on-Line or SRS_ALL
47
Plan and List dataPlan and List data
All Plan and List assignment data can be found on the BR IFIC and the ITU website at:
http://www.itu.int/ITU-R/go/space-plans/
Contained in the SPS database (SNS format)
Contains the technical characteristics and reference situation for all Plan, List and pending Article 4 assignments
The SPS database is evolving and is updated regularly
48
Useful Website addresses for Useful Website addresses for more informationmore informationhttp://www.itu.int/ITU-R/go/space-plans/(General information relating to Space Plans)
http://www.itu.int/en/ITU-R/space/plans/Pages/SpaceCap_FAQ.aspx(Guidelines for capturing Appendix 4 data)
http://www.itu.int/ITU-R/space/snl/(SNL-on-Line; list of published networks, networks in the backlog)
http://www.itu.int/sns/plans.html
(SNS-online; online query on SPS_ALL database)
49
Questions?
50
Region 1 Region 2 Region 3 11.7-12.5 FIXED BROADCASTING BROADCASTING-SATELLITE MOBILE except aeronautical
mobile
11.7-12.1 FIXED 5.486 FIXED-SATELLITE
(space-to-Earth) Mobile except aeronautical mobile
11.7-12.2 FIXED MOBILE except aeronautical
mobile BROADCASTING BROADCASTING-SATELLITE
12.1-12.2 FIXED-SATELLITE
(space-to-Earth)
12.2-12.7 FIXED MOBILE except aeronautical
mobile BROADCASTING BROADCASTING-SATELLITE
12.2-12.5 FIXED FIXED-SATELLITE
(space-to-Earth) MOBILE except aeronautical
mobile BROADCASTING
12.5-12.75 12.5-12.75 FIXED-SATELLITE
(space-to-Earth) (Earth-to-space)
12.7-12.75 FIXED FIXED-SATELLITE
(Earth-to-space) MOBILE except aeronautical
mobile
FIXED FIXED-SATELLITE
(space-to-Earth) MOBILE except aeronautical
mobile BROADCASTING-
SATELLITE
Article 5: Table of Frequency AllocationsArticle 5: Table of Frequency Allocations
Return
51
5.487 In the band 11.7-12.5 GHz in Regions 1 and 3, the fixed, fixed-satellite, mobile, except aeronautical mobile, and broadcasting services, in accordance with their respective allocations, shall not cause harmful interference to, or claim protection from, broadcasting-satellite stations operating in accordance with the Regions 1 and 3 Plan in Appendix 30. (WRC-03)
5.490 In Region 2, in the band 12.2-12.7 GHz, existing and future terrestrial radiocommunication services shall not cause harmful interference to the space services operating in conformity with the broadcasting-satellite Plan for Region 2 contained in Appendix 30.
Return
52
ARTICLE 2 of AP30 (WRC-03)
Frequency bands2.1 The provisions of this Appendix apply to the
broadcasting-satellite service in the frequency bands between 11.7 GHz and 12.2 GHz in Region 3, between 11.7 GHz and 12.5 GHz in Region 1 and between 12.2 GHz and 12.7 GHz in Region 2 and to the other services to which these bands are allocated in Regions 1, 2 and 3, insofar as their relationship to the broadcasting-satellite service in these bands is concerned.
ARTICLE 2 of AP30A (WRC-03)
Frequency bands2.1 The provisions of this Appendix apply to the feeder-links
in the fixed-satellite service (Earth-to-space) in the frequency bands 14.5-14.8 GHz and 17.3-18.1 GHz for the broadcasting-satellite service in Regions 1 and 3, and 17.3-17.8 GHz for the broadcasting-satellite service in Region 2and to other services to which these bands are allocated in Regions 1, 2 and 3 so far as their relationship to the fixed-satellite service (Earth-to-space) in these bands is concerned.
Return
53
Original Plan (e.g. Region 2)Original Plan (e.g. Region 2)
Return
54
Cluster ConceptCluster Concept
Return
55
An example of extended-coverage national beams
Return
0.00
-3.00
56
Example of a composite Example of a composite beambeam
Return
57
Grouping ConceptGrouping Concept
The worst interference signal is selectedNo interference calculation between themAll assignments in the group are protected Return
58
Remarks Column in Article 10Remarks Column in Article 10
Return