bsnl wtp pm um 005 create testing equipments v1.1x
DESCRIPTION
Bsnl Wtp Pm Um 005 Create Testing Equipments v1.1xTRANSCRIPT
Page | 1
BSNL
User Manual
Plant Maintenance (PM)
Master Data Create-Testing Equipments
Version:1.1
Page | 2
Version Control
Date Version Author Change Description
09.04.2011 1.1 Pankaj Initial
The document has been prepared to be used by the following stake-holders:
• End Users Performing day to day transactions as per their Roles and Authorizations in SAP
System.
• Core Team – Directly involved.
• Business Process Owners – Respective Business Leaders, involved in validating the process
design.
Important Note:
The information in this document is only meant to be a reference for ERP Process configured as per the Business
Process approved by BSNL Management for Finance & Controlling Module and is not a complete description of the
SAP product and its functionalities. Its main purpose is to serve as a reference Document for User Training and
Support.
Page | 3
Course Overview
SAP Plant Maintenance module manages all the transactions related to maintenance of
machines or buildings. This training material covers the business process for creation of Testing
Equipments.
Target Audience
This course is intended for the following audiences:
• End Users (Executive, Planner & Manager)
Course Prerequisites
• Knowledge of navigating SAP systems
• Basic knowledge of Plant Maintenance
Course Goals
This course will prepare you to:
• Create Equipments: Testing Equipments
Course Objectives
After completing this course, you will be able to:
Page | 4
• Create Equipments: Testing Equipments
Important information to be noted:-
• All documents are to be created in reference to the preceding document.
• All SAP Transactions can be executed either by navigating to the required Transaction through the Menu Path or by simply entering the Transaction Code for
the respective Transaction in the Command Field.
Page | 5
Table of Contents
1 Create Equipment ............................................................................................................................ 6
1.1 Create Testing Equipment ........................................................................................................ 6
1.1.1 Maintain General Data details .......................................................................................... 8
1.1.2 Maintain Location details ................................................................................................. 8
1.1.3 Maintain Organization Data details ................................................................................... 9
1.1.4 Maintain Structure details ................................................................................................ 9
1.1.5 Maintain Class and Characteristics details....................................................................... 10
1.1.6 Maintain PRT Data .......................................................................................................... 12
1.1.7 Maintain warranty and AMC details ............................................................................... 13
2 Structure Display: Structure of Functional Location and Equipment ............................................... 15
Page | 6
1 Create Equipment
1.1 Create Testing Equipment
T-Code: IE01
Page | 7
Select the equipment category “Q” and press enter.
Page | 8
Maintain the following details:
1.1.1 Maintain General Data details
1.1.2 Maintain Location details
Page | 9
1.1.3 Maintain Organization Data details
1.1.4 Maintain Structure details
Page | 10
1.1.5 Maintain Class and Characteristics details
Click on
Page | 11
Maintain the required details
Page | 12
1.1.6 Maintain PRT Data
Page | 13
1.1.7 Maintain warranty and AMC details
Click on save .
Maintain
AMC dates
here
Maintain
Warranty
dates here
Page | 14
Page | 15
2 Structure Display: Structure of Functional Location and Equipment
T-Code: IH01
Page | 16