bruce monroe at park view elementary school modernization ... · bruce monroe at park view...

15
BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION JANUARY 28, 2012 NORTHWEST WASHINGTON, D.C. PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Upload: lynguyet

Post on 07-Sep-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

PROPOSED MAIN ENTRY - EXTERIOR RENDERING

STREET VIEW

SECONDARY ENTRY

EXISTING PLAY STRUCTURE

PEDESTRIAN ACCESSSchool access to existing alley leads

students through vehicular path

CHAIN LINK ENCLOSED PARKINGLimited number of parking spaces.

No designated loading area.

MAIN ENTRYNo ADA accessible entry

SCHOOL BUILDINGApproximately 85,000 sq. ft.

SECONDARY ENTRY

ALLEY ACCESSPoor visibility to main roadway for vehicular and pedestrian traffic

FLAT ROOFAreas of ponding water.Repair or replacement needed

OT

IS P

LA

CE

NW

NE

WT

ON

PL

AC

E N

W

WARDER STREET NW

6TH STREET NW

64320

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

EXISTING SITE AERIAL PHOTOGRAPH

ENTRY POINT

IMPROVED PAVED AREAVaried materials and play graphics, separation between vehicular service & student play area.

NEW STAIRProvides pedestrian access from Improved Play Area to sidewalk

ADDITIONAL PARKINGWith kitchen loading area and secured

with new fencing

ADDITIONAL PLAY AREASSized to accommodate 3 distinct age

group play structures

ADDITIONAL PLAY AREASSized to accommodate 3 distinctage group play structures

NEW ADA RAMPAccessible ramp & sloped walk

OT

IS P

LA

CE

NW

NE

WT

ON

PL

AC

E N

W

WARDER STREET NW

6TH STREET NW

64320

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

PROPOSED SITE PLAN

EXISTING SECURITYReplace metal grille and windows with new security glazing at lower two floors, per DCPS guidelines - typical throughout.

EXISTING ELEVATION

EXISTING MASONRYClean and repoint stone and brick as required - typical throughout

EXISTING STONEClean and repoint as necessary - typical throughout

EXISTING EXTERIOR DOORS

Replace with new paneled doors per DCPS guidelines and historic photographs -

typical throughout.

MEP ELEMENTS Piping and conduit to be removed and concealed within the building - typical throughout

EXISTING WINDOWSReplace with new low-E windows per DCPS guidelines - typical throughout.

EXISTING ELECTRICALReplace lighting and conceal conduit - typical throughout

EAST ELEVATION

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

EXISTING STONE Clean and repoint as necessary -

typical throughout

ROOF DRAINAGE Replace existing downspouts with new metal downspouts to match existing metal flashing - typical throughout

EXISTING MASONRY Clean and repoint as required - typical throughout

SECURITY Replace cameras and

conceal conduit - typical throughout

HVAC Replace existing window units with new central system - typical throughout

SOUTH AND NORTH ELEVATIONS

EXISTING ELEVATION

EXISTING WINDOWSReplace with new low-E windows per DCPS guidelines - typical throughout.

EXISTING SECURITYReplace metal grille and windows with new security glazing at lower two floors, per DCPS guidelines - typical throughout

EXISTING EXTERIOR DOORSReplace with new paneled doors per DCPS guidelines and historic photographs, typical throughout.

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

MASONRY CRACK Repair cracked brick at exterior wall.

MASONRY CRACK Repair cracked brick at exterior wall.

EXISTING STONE Replace damaged stone as required - typical throughout

EXISTING STONE Clean and repoint as necessary - typical throughout

WEST ELEVATION

EXISTING ELEVATION

EXISTING SECURITYReplace metal grille and windows with new security glazing at lower two floors, per DCPS guidelines, typical throughout.

EXISTING WINDOWSReplace with new low-E windows per DCPS guidelines, typical throughout.

EXISTING EXTERIOR DOORS

Replace with new paneled doors per DCPS guidelines and historic photographs,

typical throughout.

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

Pre-K

Boys’Boys’

Girls’Girls’

Stor. Stor.Pre-K

PROPOSED BLOCKING AND STACKING

GROUND FLOOR PLAN

16 320

Administration/Health

Auditorium

Cafeteria

Pre-School/Pre-K

Kindergarten

Classroom 1-5

Media Center

Computer Lab

Physical Education

Music/Art

Other Core Academic Areas

Special Ed

Teacher Support/Workroom

Restrooms

Building Support

LEGEND

Unassigned

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

Kitchen

Pre-K

Stor.

Pre-KPre-KPre-K

Before / After Care

Teacher’s Work Room

Multi-Purpose / Cafeteria

StagePhysical

Education

Auditorium

Supply / Receive

Head End

Engineer’s Office

P.E. Office

Book Storage

Freezer / Cooler

Chair & Table Storage

Dry Storage

Art

Girls’Girls’

Boys’

FIRST FLOOR PLAN

16 320

Administration/Health

Auditorium

Cafeteria

Pre-School/Pre-K

Kindergarten

Classroom 1-5

Media Center

Computer Lab

Physical Education

Music/Art

Other Core Academic Areas

Special Ed

Teacher Support/Workroom

Restrooms

Building Support

LEGEND

Unassigned

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

1st Grade1st Grade

Kinder-garten

Kinder-garten

Kinder-garten

Kinder-garten

PROPOSED BLOCKING AND STACKING

Upper Auditorium(Open to Below)

Resource Class

Resource Class

Parent Resource

Welcome Center

1st Grade R

ec.

Boys’

1st Grade

Music

Lounge

Conf.

Instructional Coach

Speech Room

Student Services Offices

MailCouns.

Data

Principal Administration Work Area

Cots

OfficeExam

I.T.

PROPOSED BLOCKING AND STACKING

Office

SECOND FLOOR PLAN

16 320

Administration/Health

Auditorium

Cafeteria

Pre-School/Pre-K

Kindergarten

Classroom 1-5

Media Center

Computer Lab

Physical Education

Music/Art

Other Core Academic Areas

Special Ed

Teacher Support/Workroom

Restrooms

Building Support

LEGEND

Unassigned

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

3rd Grade

3rd Grade

Media Center

I.T.

3rd Grade

3rd Grade

2nd Grade

2nd Grade

2nd Grade

2nd Grade

4th Grade

4th Grade4th

Grade

4th Grade

5th Grade

5th Grade

Computer Lab

5th Grade

Stor.

Girls’Girls’

Boys’ Boys’

First Floor

Ground Floor

Second Floor

Second Floor

First Floor

Ground Floor

New drywall floating ceiling

New glass enclosure behind existing railing to remain

New interior window from office to main entry stair

All interior doors to be replaced with new paneled wood doors

with vision panels

New sound-attenuating Tectum panels

Welcome Center

Media Center

PROPOSED FULL BUILDING SECTIONSBRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

SMART BOARDNew interactive whiteboards installed in all classrooms to enhance learning activities.

TEACHER’S WORKSPACEDesk and chair provide a work environment and personal storage for teachers.

COMPUTER WORKSTATIONSContinuous counter with computers, printer station and chairs.

CUBBIESNew casework storage for students.

CLOSETDedicated storage for teaching materials.

TABLES AND CHAIRSFurniture for various learning activities.

SINKNew plumbing fixtures and counters with additional storage

RUGFor group instruction and play per DCPS guidleines

NEW ACOUSTIC TILES AND LINEAR LIGHTINGImproves acoustic and light qualities of teaching space

NEW CASEWORKFurniture and casework to meet DCPS standards

PRIMARY TEACHING WALLWith tack space, marker board, and smart wall technology

EXISTING CLASSROOMS

TYPICAL CLASSROOM FURNITURE AND EQUIPMENT PLANBRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

EXISTING MEDIA CENTER

CASEWORKNew casework throughout to

meet DCPS guidelines

SKYLIGHTNew skylights to be installed at media center to provide natural light

TABLESVariety of table sizes for

multi-use space

COMPUTER STATIONSContinuous counter with

computer and printer stations

GLASS ENCLOSUREOffice with glass enclosure to allow view of entire media center

STAFF OFFICEOffice with work station and large table

MILLWORKCustom millwork at reception desk

CASEWORKStorage display along exterior walls

COMPUTER STATIONSState of the art media with computer stations

FURNITURENew furniture to create various seating opportunities

MEDIA CENTER FURNITURE AND EQUIPMENT PLANBRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

PROPOSED MEDIA CENTER RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

PROPOSED CLASSROOM RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATIONJANUARY 28, 2012NORTHWEST WASHINGTON, D.C.

PROPOSED WELCOME CENTER RENDERING