BROADWAY L-TRAIN MITIGATION
June 12, 2018
1
Presentation to Brooklyn CB 1
-
nyc.gov/dot 2
Project Background
-
nyc.gov/dot
PROJECT BACKGROUND
3
N
Citi Bike station
-
nyc.gov/dot
Broadway is a Vision Zero Corridor with 21 KSI/mile
Both Broadway at Hooper St and Broadway at Flushing are Vision Zero Intersections
Project scope is within a Vision Zero Area
PROJECT AREA AND SAFETY DATA
4
Total
Injuries
Severe
Injuries Fatalities KSI
Pedestrian 70 9 4 13
Bicyclists 59 11 0 11
Motor Vehicle
Occupant 203 1 0 1
Total 332 21 4 25
Broadway, Hooper St to Flushing Ave, BK Injury Summary, 2012-2016 (5 years)
1 7
7 13
1 1 11
20 1 3
2 7
4 2
1 21
3 84
23 3
3 14
14
12
18
11 9
1
16
1 1
21
7
KSI: Killed or Severely Injured N
-
nyc.gov/dot
Project Issues and Solutions
5
-
nyc.gov/dot
PROJECT LOCATIONS
6 Improve access to stations
Un
ion
Ave
N
-
nyc.gov/dot
HOOPER ST EXISTING ISSUES
Multiple missing crosswalks
Inconsistent street network
on Hooper St
7
1
2
EXISTING
1
2
1
1
N
1 1
-
nyc.gov/dot
HOOPER ST PROJECT PLAN
Convert one block of Hooper St
to one-way southbound
Close slips on Division Ave and
Broadway in paint
Add a right turn lane on Hooper
St at Harrison Ave
Build out and extend concrete
triangle and adjacent corners
8
1
2
3
4
2
3
4
2
EXISTING
PLANNED
N
N
Slip Closure in Paint Street Conversions
1
-
nyc.gov/dot
MONTROSE AVE EXISTING ISSUES
9
Missing crossing on S 5th St
Long crossings along Union Ave
Redundancies in vehicular network create conflict for all roadway users
1
2
3
EXISTING
1
2
3
N
3
2
-
nyc.gov/dot
MONTROSE AVE PROJECT PLAN
10
Convert one block of
Montrose Ave to one-
way westbound
Extend sidewalks in
paint along S 5th St
1
2
1
2
EXISTING
PLANNED
N
N Painted Sidewalk Extensions
Street Conversions
-
nyc.gov/dot
UNION AVE EXISTING ISSUES
11
Long pedestrian crossing
distances
Acute right turns from Union onto
Broadway are not geometrically
possible for heavy vehicles
1
2
EXISTING
1
2
2
N
-
nyc.gov/dot
UNION AVE PROJECT PLAN
12
1
2
Restrict the right turns onto
Broadway from Union Ave
Extend sidewalks in paint
1
2
2
1
EXISTING
PLANNED
N N
EXAMPLE OF PAINTED CURB EXTENSIONS
-
nyc.gov/dot
THROOP AVE EXISTING ISSUES
13
Missing crosswalks and ADA compliant access along Broadway and across Throop Ave
Unclear vehicular and pedestrian movements
1
2
EXISTING
N
1 2
-
nyc.gov/dot
THROOP AVE PROJECT PLAN
14
Close the slip from Middleton
St to Broadway in paint
Install a painted sidewalk
extension on Throop Ave at
Broadway
Add crosswalks along the
southern side of Broadway
1
2
3
EXISTING
PLANNED
N
N
Slip Closure in Paint Painted Sidewalk
Extensions
-
nyc.gov/dot
DEBEVOISE ST EXISTING ISSUES
Crosswalk behind the bus
stop making pedestrians
less visible to vehicles
Crosswalk does not match
pedestrian desire line or the
existing ramp
15
1
2
1
2
EXISTING
N
2
-
nyc.gov/dot
DEBEVOISE ST PROJECT PLAN
Add painted curb extension
on the northern side of
Debevoise St
Realign crosswalk to be in
front of the bus stop
16
1
2
1
2
EXISTING
PLANNED
N
N
EXAMPLE OF PAINTED CURB EXTENSIONS
-
nyc.gov/dot
FLUSHING AVE EXISTING ISSUES
Crosswalk does not lead
to the station stairs
Left turns from Flushing
Ave westbound onto
Broadway and Graham
Ave northbound create
an unsafe condition
17
1
2
1
2
EXISTING
N
-
nyc.gov/dot
FLUSHING AVE PROJECT PLAN
Flare the crosswalk on
Flushing Ave and
Broadway
Install hardened centerline
to calm turns from
Flushing onto Broadway
18
1
2
1
2
EXISTING
PLANNED
N
N
Hardened Centerline
-
nyc.gov/dot
THANK YOU!
Questions?
19
NYC DOT NYC DOT nyc_dot NYC DOT
-
nyc.gov/dot
Appendix
20
-
nyc.gov/dot
HOOPER ST - EXISTING
21
EXISTING
N
-
nyc.gov/dot
HOOPER ST PROJECT PLAN
Convert one block of Hooper St
to one-way southbound
Close slips on Division Ave and
Broadway in paint
Add a right turn lane on Hooper
St at Harrison Ave
Build out and extend concrete
triangle and adjacent corners
22
1
2
3
4
2
3
4
2
EXISTING
PLANNED
N
N
Slip Closure in Paint Street Conversions
1
-
nyc.gov/dot
EXAMPLES OF CARS FAILING TO YIELD
23
Examples of cars failing to yield to pedestrians on the Division Ave slip
-
nyc.gov/dot
DIVERSION DIAGRAM HOOPER ST
24
-
nyc.gov/dot
MONTROSE AVE - EXISTING
EXISTING
N
-
nyc.gov/dot
MONTROSE AVE PROJECT PLAN
26
Convert one block of
Montrose Ave to one-
way westbound
Extend sidewalks in
paint along S 5th St
1
2
1
2
EXISTING
PLANNED
N
N Painted Sidewalk Extensions
Street Conversions
-
nyc.gov/dot
DIVERSION DIAGRAM MONTROSE AVE
27
-
nyc.gov/dot
UNION AVE - EXISTING
Long pedestrian crossing distances
Columns impact visibility of pedestrians
Acute turns are not possibly for heavy vehicles
28
EXISTING
N
-
nyc.gov/dot
UNION AVE PROJECT PLAN
29
1
2
Restrict the right turns onto
Broadway from Union Ave
Extend sidewalks in paint
1
2
2
1
EXISTING
PLANNED
N N
EXAMPLE OF PAINTED CURB EXTENSIONS
-
nyc.gov/dot
DIVERSION DIAGRAM UNION AVE
30
-
nyc.gov/dot
THROOP AVE - EXISTING
31
EXISTING
N
-
nyc.gov/dot
THROOP AVE PROJECT PLAN
32
1
2
3
Close the slip from Middleton
to Broadway in paint
Install a painted sidewalk
extension on Throop Ave at
Broadway
Add crosswalks along the
southern side of Broadway
1
2
3
EXISTING
PLANNED
N
N
Slip Closure in Paint Painted Sidewalk
Extensions
-
nyc.gov/dot
THROOP AVE VEHICULAR MOVEMENTS
33
EXISTING
PLANNED
EXISTING CAR TURNING OUT OF SLIP
EXISTING CAR TURNING INTO SLIP
-
nyc.gov/dot
DIVERSION DIAGRAM THROOP AVE
34
-
nyc.gov/dot
DEBEVOISE ST - EXISTING
Column splits the
roadway on Debevoise
St
Bus stop is in front of
crosswalk, impacting
visibility
Pedestrian fatality in
2012
35
EXISTING
N
-
nyc.gov/dot
DEBEVOISE ST PROJECT PLAN
36
1
2
1
2
EXISTING
PLANNED
N
N
EXAMPLE OF PAINTED CURB EXTENSIONS
Add painted curb extension
on the northern side of
Debevoise St
Realign crosswalk to be in
front of the bus stop
-
nyc.gov/dot
FLUSHING AVE EXISTING
37
EXISTING
N
-
nyc.gov/dot
1
2
FLUSHING AVE PROJECT PLAN
38
1
2
EXISTING
PLANNED
N
N
Hardened Centerline
Flare the crosswalk on
Flushing Ave and
Broadway
Install hardened centerline
to calm turns from