BRIDGETON LANDFILL LLC.
CONSTRUCTION QUALITY ASSURANCE ACCEPTANCE REPORT
2018 GCCS IMPROVEMENTS
BRIDGETON, ST. LOUIS COUNTY, MISSOURI
Prepared For: Bridgeton Landfill LLC. 13570 St. Charles Rock Road Bridgeton, MO 63044
SEPTEMBER 2018
Project No: BT-143
Prepared By:
Feezor Engineering, Inc. 3377 Hollenberg Drive Bridgeton, MO 63044
-
CONSTRUCTION QUALITY ASSURANCE
ACCEPTANCE REPORT
2018 GCCS IMPROVEMENTS
BRIDGETON LANDFILL, LLC
BRIDGETON, SAINT LOUIS COUNTY, MISSOURI
Prepared for
Bridgeton Landfill, LLC
SEPTEMBER 2018
Prepared by
Feezor Engineering, Inc. 3377 Hollenberg Drive Bridgeton, MO 63044
BT-143
-
CONTENTS
1 INTRODUCTION 2 1.1 Overview of Project 2
2 CONSTRUCTION DOCUMENTS 3 2.1 Construction Drawings 3
3 GCCS INSTALLATION 4 3.1 New Landfill Gas Extraction Wells Installation 4 3.2 Construction Quality Assurance 4
4 SURVEY CONTROL 6 4.1 Construction Surveying 6 4.2 Final As-built Surveying 6
5 CERTIFICATION 7
-
1
LIST OF APPENDICES
A. Field Information A.1 Daily Summary Reports A.2 Equipment Log
B. As-Built Well Logs C. Construction Certification Drawings (Reduced Set)
Drawing 000 Title Page Drawing 001 GCCS Plan View Drawing 002 Details
-
2
1 INTRODUCTION
1.1 Overview of Project
Bridgeton Landfill, LLC is a closed municipal solid waste facility located at 13570 St. Charles Rock Road, Bridgeton, St. Louis County, Missouri. The facility is owned and operated by Bridgeton Landfill, LLC (BL) who operate the facility pursuant to Permit No 118912. (and subsequent modifications), issued by the Missouri Department of Natural Resources (MDNR).
During the 2018 construction seasons, BL installed (15) fifteen additional gas extraction wells. Recovery Drilling Service (RDS) of Dudley, MA was selected as the driller for the project. Sharp STL Inc. of St. Louis, MO and Fusion Solutions Inc. out of Carlinville, IL were chosen to provide support and piping installation during the project. Feezor Engineering Inc. (FEI) of Bridgeton, MO, provided the initial and record surveying to document the location of the installed gas extraction wells and associated GCCS piping.
FEI was also selected as the Construction Quality Assurance (CQA) consultant to observe and document the construction of the leachate system upgrades. Daniel R. Feezor, P.E. of FEI was the Construction Quality Assurance Officer (CQAO). Mr. Feezor selected Jonathan Wilkinson and Bill Abernathy to be the CQA Officers in absentia.
-
3
2 CONSTRUCTION DOCUMENTS
2.1 Construction Drawings
FEI created a detailed set of construction drawings for this project. These drawings provided the detail to properly construct all the necessary components project. Construction drawings were also used for the proper selection of materials and provided adequate detail for the installation of the GCCS upgrades.
-
4
3 GCCS INSTALLATION
3.1 New Landfill Gas Extraction Wells Installation
Fifteen (15) new gas wells were installed throughout areas of the landfill to enhance landfill gas collection. RDS drilled the wells using a Soilmec SR-30 drill rig with a core barrel bucket. FEI observed and documented the drilling process including but not limited to logging of waste depth, temperature and composition. Daily Field Reports can be found in Appendix A.1.
Well piping consisted of 12” SDR-11 HDPE solid and perforated piping. The pipe sections were butt-fused together by Fusion Solutions. A low-pressure HDPE cap was installed at the bottom of each well casing and a pre-fabricated 12” flanged lid on the top of each well casing prior to installation.
The pipe was raised using a winch on the drill rig and lowered into the borehole to the appropriate depth. Granular backfill consisting of one three-quarter (3/4) inch to two (2) inch diameter washed non-carbonate gravel was placed in the borehole around the perforated pipe. A loader transported the gravel to the well location and placed it into the borehole. The gravel was placed to a point generally about two feet above the perforated pipe. Before the bentonite was added, one (1) foot of clean soil was used as a plug. A two (2) foot bentonite seal was then placed above the soil plug. Water was added to the layers of bentonite to adequately hydrate the seal. Cover soil was then placed over the bentonite layer followed by another two (2) foot hydrated bentonite seal. Approved cover soil was used to fill the remaining borehole to the ground surface.
The as-built well depths and well construction details are shown on the as-built well logs in Appendix B.
A three (3) inch diameter well head was installed and connected to the gas header system via lateral piping by Fusion Solutions Inc.
3.2 Construction Quality Assurance
3.2.1 Construction Oversight
The CQAO inspected all materials for the gas collection system. This included piping, valves, fittings, and backfill material to ensure that these materials were acceptable and consistent with the construction plans and site CQA plan. The CQAO inspected the materials to be constructed of HDPE pipe to determine if the materials meet the following requirements:
• All HDPE pipe was new, or first quality, and was furnished at lengths as indicated on the approved design plans. All HDPE piping was straight throughout its length and generally free from all imperfections.
-
5
• The HDPE pipe and fittings had a minimum Standard Dimension Ratio (SDR) as noted on the design plans.
During installation of the landfill gas collection system enhancements, the CQAO documented that the construction adhered to the plans, specifications, and CQA plan. This included:
• Pipe and appurtenances were installed true to line, grade, and location with the pipe supported and restrained against movement with all valve stems plumb.
• The pipe joints, except where flanged joints or electro-fusion couplers were specified on the approved design plans, were butt fused as recommended by the pipe manufacturer. All shavings from the preparation of pipe ends for fusion were removed from the pipe prior to installation.
During storage, the technician documented that pipes and fittings were stacked so as to prevent damage by marring, crushing or puncture. Maximum stacking height was limited to 6 feet.
The technician recorded applicable test data, areas of construction, problems and remedies, construction equipment and methodologies, survey data, and equipment calibration on the Daily Summary Reports and the Daily Inspection Reports, included herein as Appendix A.1.
-
6
4 SURVEY CONTROL
4.1 Construction Surveying
Feezor Engineering Inc. of Bridgeton, Missouri, provided surveying as the Project Surveyor.
4.2 Final As-built Surveying
Feezor Engineering Inc. of Bridgeton, Missouri provided the final certification survey for the as-built coordinates of the installed Gas Extraction Wells.
-
7
5 CERTIFICATION
I, Daniel R. Feezor, P.E., do hereby certify to my best knowledge and belief, that the 2018 GCCS Improvements at the Bridgeton Landfill were constructed in accordance with the construction documents.
-
Appendix A
FIELD INFORMATION
Sub‐Appendices
A.1 Daily Summary Reports
A.2 Equipment Log
-
Sub‐Appendix A.1
Daily Summary Reports
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT-143
Project: 2018 GCCS Improvements Task No.: CQA
Location: Bridgeton, MO Date: 8/16/2018
Contractor(s):
Recovery Drilling Service Inc. (RDS), Sharp
Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Mostly Cloudy PM Mostly Cloudy
Temperature: AM 74 F PM 91 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0640 – I arrive on site. 0710 – Daily safety meeting held with Bridgeton Landfill, Fusion, Kuesel, Sharp, RDS, and FEI. 0735 – RDS and Sharp prep for drilling at GEW-230. Sharp working on Odor Boss (dead generator battery). 0930 – Waiting on survey verification of GEW-230 location. 1032 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-230. 1055 – Drilling cable breaks on Soilmec SR-30. RDS demobes from hole and replaces cable. 1253 – Back on hole, resumes drilling. 1631 – Bottom of GEW-230 borehole = 60 ft. Vac box moved off hole, begin installation of 12-in perforated/solid
sections of riser. 1719 – Rig moved off hole, begin annular backfilling activities. 1827 – Begin emplacement of soil and bentonite layers. 1904 – Cleaning off liner to install safety grate and liner boot. 1932 – Leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT-143
Project: 2018 GCCS Improvements Task No.: CQA
Location: Bridgeton, MO Date: 8/17/2018
Contractor(s):
Recovery Drilling Service Inc. (RDS), Sharp
Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Mostly Cloudy PM Partly Cloudy
Temperature: AM 75 F PM 86 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0640 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0720 – RDS and Sharp prep for drilling at GEW-219. Waiting for flare test to conclude. 0840 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-219. 1000 – Fusion prepping flanged well casing sections. 1115 – Bottom of GEW-219 borehole = 62 ft. Vac box moved off hole, begin installation of 12-in perforated/solid
sections of riser. 1148 – Rig moved off hole, begin annular backfilling activities. 1215 – Begin emplacement of soil and bentonite layers. 1241 – Cleaning off liner to install safety grate and liner boot. RDS moves rig and equipment/supplies to GEW-
218 location. 1302 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-218. 1418 – Fusion prepping flanged well casing sections for GEW-218. 1430 – Bottom of GEW-218 borehole = 62 ft. Vac box moved off hole, begin installation of 12-in perforated/solid
sections of riser. 1502 – Rig moved off hole, begin annular backfilling activities. 1610 – Begin emplacement of soil and bentonite layers. 1632 – Fusion completes safety grate installation, liner boot, and gas connection at GEW-218, cracks open valve
to establish flow. 1645 – Leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483‐3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT‐143
Project:2018 GCCS Improvements Task No.: CQA Location: Bridgeton, MO Date: 8/18/2018
Contractor(s): Recovery Drilling Service Inc. (RDS), Sharp Services (Sharp), Fusion Solutions Inc. (FSI) Report No.:
Weather: AM Sunny PM P. Cloudy Temperature: AM 75 F PM 85 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0650 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, contractors, and FEI. 0730 – RDS sets up drill rig (Soilmec SR‐30 drill rig) on GEW‐220. Sharp sets up odor control devices and vacuum
box connected to GCCS system. 0740 – RDS begins drilling. 0904 – RDS has reached depth of 62 ft on GEW‐220. RDS cleans out hole to 64 ft. 0945 – RDS / FSI begin setting pipe in hole. See the as‐built well logs for specifics on the well casing and annular
backfill. 1007 – Pipe is set in hole. Sharp & FSI begin backfilling hole. RDS moves drill rig to GEW‐221. Sharp sets up
odor control devices and vacuum box connected to GCCS system. 1120 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐220 is complete. FSI
connects GEW‐220 wellhead to GCCS. 1130 – RDS begins drilling at GEW‐221. 1415 – RDS has reached depth of 75 ft on GEW‐221. RDS cleans out hole, maintaining depth of 75 ft. 1457 – RDS / FSI begin setting pipe in hole. See the as‐built well logs for specifics on the well casing and annular
backfill. 1513 – Pipe is set in hole. Sharp & FSI begin backfilling hole. RDS moves drill rig to GEW‐222. Sharp sets up
odor control devices and vacuum box connected to GCCS system for drilling first thing tomorrow morning.
1609 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐221 is complete. FSI connects GEW‐221 wellhead to GCCS. I leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483‐3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT‐143
Project:2018 GCCS Improvements Task No.: CQA Location: Bridgeton, MO Date: 8/19/2018
Contractor(s): Recovery Drilling Service Inc. (RDS), Sharp Services (Sharp), Fusion Solutions Inc. (FSI) Report No.:
Weather: AM Hazy PM P. Cloudy Temperature: AM 75 F PM 80 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0650 – I arrive on site. 0730 – RDS and Sharp morning prep for drilling on GEW‐222. Sharp activates odor control devices and vacuum
box is connected to GCCS system. 0731 – RDS begins drilling GEW‐222. 0847 – RDS has reached depth of 58 ft on GEW‐222. RDS cleans out hole to 61 ft. 0915 – RDS / FSI begin setting pipe in hole. See the as‐built well logs for specifics on the well casing and annular
backfill. 0940 – Pipe is set in hole. Sharp & FSI begin backfilling hole. RDS moves drill rig to GEW‐223. Sharp sets up
odor control devices and vacuum box connected to GCCS system. 1036 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐222 is complete. FSI
connects GEW‐222 wellhead to GCCS. 1047 – RDS begins drilling at GEW‐223. 1158 – RDS has reached depth of 55 ft on GEW‐223. RDS cleans out hole, maintaining depth of 55 ft. 1235 – RDS / FSI begin setting pipe in hole. See the as‐built well logs for specifics on the well casing and annular
backfill. 1254 – Pipe is set in hole. Sharp & FSI begin backfilling hole. RDS moves drill rig to GEW‐229. Sharp sets up
odor control devices and vacuum box connected to GCCS system for drilling first thing tomorrow morning.
1332 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐223 is complete. FSI connects GEW‐223 wellhead to GCCS. I leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT-143
Project: 2018 GCCS Improvements Task No.: CQA
Location: Bridgeton, MO Date: 8/20/2018
Contractor(s):
Recovery Drilling Service Inc. (RDS), Sharp
Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Cloudy PM Mostly Cloudy
Temperature: AM 74 F PM 79 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0641 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0728 – RDS and Sharp prep for drilling at GEW-229. 0803 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-229. 0936 – Fusion prepping flanged well casing sections. 1015 – Bottom of GEW-229 borehole = 60 ft (bucket refusal on steel). Vac box moved off hole, begin installation
of 12-in perforated/solid sections of riser. 1023 – Rig moved off hole, begin annular backfilling activities. 1038 – Begin emplacement of soil and bentonite layers. 1047 – Cleaning off liner to install safety grate and liner boot. RDS moves rig and equipment/supplies to GEW-
226 location. 1203 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-226. 1330 – Fusion prepping flanged well casing sections for GEW-226. 1337 – Bottom of GEW-226 borehole = 67 ft. Vac box moved off hole, begin installation of 12-in perforated/solid
sections of riser. 1429 – Rig moved off hole, begin annular backfilling activities. 1500 – Begin emplacement of soil and bentonite layers. 1541 – Fusion completes gas connection at GEW-226, begins safety grate installation. 1603 – Leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT-143
Project: 2018 GCCS Improvements Task No.: CQA
Location: Bridgeton, MO Date: 8/21/2018
Contractor(s):
Recovery Drilling Service Inc. (RDS), Sharp
Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Cloudy PM Partly Cloudy
Temperature: AM 70 F PM 81 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0641 – I arrive on site. 0715 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0726 – RDS and Sharp prep for drilling at GEW-228. 0809 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-228. 0915 – Fusion prepping flanged well casing sections. 0941 – Bottom of GEW-228 borehole = 63 ft. 0956 - Vac box moved off hole, begin installation of 12-in perforated/solid sections of riser and backfilling. 1041 – Begin emplacement of soil and bentonite layers. 1125 – Cleaning off liner to install safety grate and liner boot. RDS has moved rig and equipment/supplies to
GEW-217 location. 1210 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-217. 1355 – Bottom of GEW-217 borehole = 83 ft. Fusion prepping flanged perforated/solid sections of well casing. 1430 - Vac box moved off hole, begin installation of 12-in perforated/solid sections of riser. 1455 – Rig moved off hole, begin annular backfilling activities. 1534 – Begin emplacement of soil and bentonite layers. 1603 – Fusion completes gas connection at GEW-217, begins safety grate installation. 1625 – Leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483‐3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT‐143
Project:2018 GCCS Improvements Task No.: CQA Location: Bridgeton, MO Date: 8/22/2018
Contractor(s): Recovery Drilling Service Inc. (RDS), Sharp Services (Sharp), Fusion Solutions Inc. (FSI) Report No.:
Weather: AM Sunny PM Sunny Temperature: AM 70 F PM 80 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0650 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, contractors and FEI. 0730 – RDS and Sharp morning prep for drilling on GEW‐227. Sharp activates odor control devices and vacuum
box is connected to GCCS system. 0743 – RDS begins drilling GEW‐227. 0856 – RDS has reached depth of 56‐57 ft on GEW‐227. No recovery is achievable at depth. RDS cleans out
hole, maintaining depth. 1020 – RDS / FSI begin setting pipe in hole. See the as‐built well logs for specifics on the well casing and annular
backfill. 1038 – Pipe is set in hole. Sharp & FSI begin backfilling hole. RDS moves drill rig to GEW‐224. Sharp sets up
odor control devices and vacuum box connected to GCCS system. 1137 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐227 is complete. FSI
connects GEW‐227 wellhead to GCCS. 1255 – RDS begins drilling at GEW‐224. 1401 – RDS has reached depth of 55 ft on GEW‐224. RDS cleans out hole to depth of 58 ft. 1435 – RDS / FSI begin setting pipe in hole. See the as‐built well logs for specifics on the well casing and annular
backfill. 1505 – Pipe is set in hole. Sharp & FSI begin backfilling hole. RDS moves drill rig to GEW‐231. Sharp sets up
odor control devices and vacuum box connected to GCCS system for drilling first thing tomorrow morning.
1605 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐224 is complete. FSI connects GEW‐224 wellhead to GCCS. I leave site.
Page: 1 of 1
-
Copies To: Erin Fanning, Dan Feezor
FEI Representative:
Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118
Daily Field Summary Report
Client: Bridgeton Landfill, LLC Job No.: BT-143
Project: 2018 GCCS Improvements Task No.: CQA
Location: Bridgeton, MO Date: 8/23/2018
Contractor(s):
Recovery Drilling Service Inc. (RDS), Sharp
Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Sunny PM Mostly Cloudy
Temperature: AM 63 F PM 77 F
Description of field activities (include labor, equipment, site conditions, sampling, etc.)
0650 – I arrive on site. 0712 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0730 – RDS and Sharp prep for drilling at GEW-231. 0751 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-231. 0835 – Fusion prepping flanged well casing sections. 0850 – Bottom of GEW-231 borehole = 40 ft. Vac box moved off hole, begin installation of 12-in perforated/solid
sections of riser. 0910 – Rig moved off hole, begin annular backfilling activities. 0951 – Begin emplacement of soil and bentonite layers. 1018 – Cleaning off liner to install safety grate and liner boot. RDS moves rig and equipment/supplies to GEW-
225 location. 1024 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-225. 1142 – Fusion prepping flanged well casing sections for GEW-225. 1150 – Bottom of GEW-225 borehole = 58 ft. Vac box moved off hole, begin installation of 12-in perforated/solid
sections of riser. 1251 – Rig moved off hole, begin annular backfilling activities. 1314 – Begin emplacement of soil and bentonite layers. 1328 – Fusion completes safety grate installation. 1404 – Fusion completes gas connection at GEW-225. 1436 – Leave site.
Page: 1 of 1
-
Sub‐Appendix A.2
Equipment Log
-
Bridgeton Landfill LLC.
2018 GCCS Updates
Construction Equipment List
Recovery Drilling Services
1 -Soilmec SR-30 Hydraulic Drilling Rig
Sharp STL Services
1 – Volvo Front End Loader 1 – Bobcat Skidsteer
1 – CAT Mini-Excavator 1 – Water Truck
1 – Single-Axle Dump Truck
Fusion Solutions Inc.
1 – McElroy 1218 Butt-Fusion Machine 1 – McElroy 6” Bulldog Fusion Machine
1 – Polaris Ranger UTV
-
APPENDIX B
AS‐BUILT WELL LOGS
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Wet, all Black Decomposed Non‐Descript WasteBottom of Hole = 83 ft
Bottom of Perforated Pipe ‐ 12" HDPE Cap (81' bgs)
Liner Surface (32' bgs.)
Top of Soil (38' bgs.)
Top of Perforated Pipe (41' bgs.)
Top of Granular Backfill (39' bgs.)
Top of Bentonite Seal (36' bgs.)
Moist, all Brown / Gray Clay Fill, Depth to Liner 32 ft
‐2.95 Top of Flange (Elev. 497.913)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,619.328
Northing: 1,067,102.656
Gas Well ID: GEW‐217 GS Elevation: 494.965Drill Date(s): 8/21/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 494.965)0
Safety Grate
Dry to Moist, all Brown / Gray Clay / Soil
Top of Bentonite Seal (3' bgs.)
80.85 Top of Soil (5' bgs.)
20
As Above81.210
As Above81.315
As Above85.0
As Above92.525
As Above, with Gray Clay99.430
110.535
Moist Gray Clay and Concrete Pieces119.140
173.660
As Above131.645
Moist, 70% Gray Clay, 30% Waste (Plastic Bags, Cardboard, Wood, Metal Wire), Top of Waste = 48 ft136.850
Moist, 40% Gray Clay, 60% Waste as above, plus Paper156.455
Wet, all Black Decomposed Non‐Descript Waste but for Plastic Bags and Wire Strands197.365
206.570
Dry to Moist, 90% Black Decomposed Non‐Descript Waste, 10% Clay & Gravel
75
80
208.2
209.2
209.8
As Above
As Above, with Strings/Fibers
As Above, with Glass Bottle
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
‐2.00 Top of Flange (Elev. 501.710)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,456.828
Northing: 1,067,153.717
Gas Well ID: GEW‐218 GS Elevation: 499.708Drill Date(s): 8/17/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 499.708)0
Safety Grate
Moist, all Brown Clay / Soil
Top of Bentonite Seal (3' bgs.)
81.65 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
As Above85.410
Moist, 80% Gray Clay, 20% Waste (Plastic Bags, Cardboard), Depth to Liner 13 ft95.515
Liner Surface (13' bgs.)
Top of Bentonite Seal (16' bgs.)
As Above, with HDPE Shards/Pieces
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
100.6
Moist, 65‐70% Waste (Plastic Bags, Paper, Wood), 30‐35% Gray Clay111.225
Moist, 90% Loose, Black Decomposed Waste (Cardboard, Wood, Plastic Bags), 10% Black Clay & Gravel123.430
As Above, no Cardboard137.135
Moist, all Black / Dark Gray Waste (Carpet Pieces, Wood, Plastic Bags, Legible Magazine)156.940
As Above, all Moist to Damp Black Waste with Abundant Gravel Mixed, Gas Cap162.645
Wet, Black Decomposed Non‐Descript Waste, some Plastic Bags191.850
As Above, with Carpet Pieces and Concrete Fragments204.455
207.060Wet, 30% Gray Clay and Gravel, 70% Decomposed Waste
(Plastic Bags) Bottom of Perforated Pipe ‐ 12" HDPE Cap (60' bgs)
Bottom of Hole = 62 ft
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
‐2.79 Top of Flange (Elev. 505.240)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,306.920
Northing: 1,067,154.614
Gas Well ID: GEW‐219 GS Elevation: 502.446Drill Date(s): 8/17/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 502.4460
Safety Grate
Moist, all Brown Clay / Soil
Top of Bentonite Seal (3' bgs.)
108.65 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Moist, all Gray & Brown Clay / Soil, some Roots and Gravel135.110
As Above 99%, with 1% Plastic Bags136.715Top of Bentonite Seal (16' bgs.)
Moist, 80% Gray Clay, 20% Waste (Plastic Bags)
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
151.4
Moist, 40‐50% Gray Clay, 50‐60% Waste (PVC, Plastic Bags, Metal Wire)166.525
Dry to Moist, 33% Gray Clay, 67% Waste (Black Plastic, Carpet Pieces)172.830
As Above185.135
Moist, 25% Gray Clay and Large Rocks, 75% Waste (Plastic, Burlap)192.840
Moist, 35% Sandy Gray Clay, 65% Broken Concrete, Plastic Waste195.245
As Above, Dry to Moist198.950
Dry to Moist, 85‐90% Waste (Wood, Black Non‐Descript Material, Plastic), 10‐15% Black Clay & Gravel206.055
208.360Wet, Black Decomposed Non‐Descript Waste with
Concrete
Bottom of Hole = 62 ft
Bottom of Perforated Pipe ‐ 12" HDPE Cap (60' bgs)
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Jon Wilkinson
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Top of Flange (Elev. 501.965)‐2.13
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,372.973
Northing: 1,067,017.154
Gas Well ID: GEW‐220 GS Elevation: 499.84Drill Date(s): 8/18/2018
Top of Granular Backfill (19' bgs.)
Top of Perforated Pipe (21' bgs.)
0Ground Surface (Elev. 499.84)
Damp, Brown, Clay / Soil82.05 Top of Soil (5' bgs.)
Top of Bentonite Seal (3' bgs.)
Damp, Brown, Clay / Soil82.410
Top of Bentonite Seal (16' bgs.)
Top of Soil (18' bgs.)
Damp, Gray mottled w/ Brown, Clay / Soil95.515
Damp, Gray mottled w/ Brown, Clay / Soil101.520
Damp, Gray mottled w/ Brown, Clay / Soil Trash encountered111.225
Damp to wet, 50% plastic bags, 50% partially decomposed wood / paper158.940
Moist, 50% brown clay, 50% plastic bags130.730
Moist to wet, 1/3 plastic bags,1/3 partially decomposed paper / wood,
1/3 black clay / soilconcrete pieces
149.735
Wet, brown / black, mostly decomposed MSW201.355
Damp to wet, 50% plastic bags, 50% partially decomposed wood / paper190.245
198.6
Bottom of Hole = 64 ft
Safety Grate
209.9 Bottom of Perforated Pipe ‐ 12" HDPE Cap (62' bgs.)
65
70
Wet, black, completely decomposed MSW, with welding / oxygen tank @ 62 ft bgs201.360
Moist to wet, 1/3 plastic bags,1/3 decomposed paper / wood,
1/3 dark brown clay / soil50
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Jon Wilkinson
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Damp, Dark Gray, Clay / Soil132.135
Damp, 50% Gray Clay / Soil,50% 4‐inch Diameter Clean Gravel112.825
Damp, Gray, Clay / Soil1 x 1ft sq piece of flooring tile119.530
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,431.675
Northing: 1,066,891.854
Gas Well ID: GEW‐221 GS Elevation: 492.63Drill Date(s): 8/18/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 492.63)
Damp, Brown, Clay / Soil
Top of Bentonite Seal (3' bgs.)
98.35 Top of Soil (5' bgs.)
0
Top of Perforated Pipe (21' bgs.)
Damp, Brown mottled w/ Gray, Clay / Soil92.010
Damp, Gray with trace Black and with some Brown, Clay / Soil97.815
Top of Bentonite Seal (16' bgs.)
Damp, Gray with trace Black and with trace Brown, Clay / Soil
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
102.220
Damp to Dry, Mottled Brown / Gray, Clay / SoilTrash encountered @ 41 ft bgs144.940
55
Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper186.960
Damp to Moist, 50% Plastic Bags,50% Partially Decomposed Wood / Paper162.345
Damp to Moist, 50% Plastic Bags,50% Partially Decomposed Wood / Paper177.350
Top of Flange (Elev. 495.16)‐2.53
Bottom of Hole = 75 ft75
Safety Grate
Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper210.5
Bottom of Perforated Pipe ‐ 12" HDPE Cap (70' bgs.)
Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper203.865
Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper204.670
Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper184.4
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Jon Wilkinson
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Top of Flange (Elev. 494.08)‐2.72
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,280.587
Northing: 1,066,825.781
Gas Well ID: GEW‐222 GS Elevation: 491.355Drill Date(s): 8/19/2018
0Ground Surface (Elev. 491.355)
Safety Grate
Damp, Brown, Clay / Soil
Top of Bentonite Seal (3' bgs.)
89.25 Top of Soil (5' bgs.)
20Top of Perforated Pipe (19' bgs.)
Damp, Brown mottled with ≈ 10% Gray, Clay / Soil95.610
Damp, Gray, Clay / SoilEVOH Liner encountered @ 13 ft
Trash encountered @ 18 ft101.215
Top of Bentonite Seal (13' bgs.)
Damp, 50% Plastic Bags,50% Slightly Decomposed Wood / Paper,
Mop Head
Top of Soil (15' bgs.)
Top of Granular Backfill (17' bgs.)
116.7
Damp, 50% Gray Clay / Soil,25% Plastic Bags,
25% Partially Decomposed Wood / Paper,Burlap Bag
143.225
Damp, 50% Gray Clay / Soil,25% Plastic Bags,
25% Partially Decomposed Wood / Paper174.030
Damp to Moist, 45% Plastic Bags,45% Partially Decomposed Wood / Paper,
10% Gray Clay / Soil191.335
Moist to Wet, 50% Gray Clay / Soil,10% Plastic Bags,
40% 4‐inch diameter gravel199.340
Moist to Wet, 75% Gray Clay / Soil,25% Plastic Bags200.145
Wet, Gray,75% Mostly Decomposed Paper / Wood,
25% Plastic Bags206.350
Wet, Dark Gray to Black,50% Mostly Decomposed Paper / Wood,
50% Plastic Bags210.455
60Bottom of Perforated Pipe ‐ 12" HDPE Cap (61' bgs.)
65
70
Bottom of Hole = 61 ft
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Jon Wilkinson
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Top of Flange (Elev. 494.08)‐2.40
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,255.61
Northing: 1,066,649.547
Gas Well ID: GEW‐223 GS Elevation: 490.676Drill Date(s): 8/19/2018
0Ground Surface (Elev. 490.676)
Safety Grate
Damp, Brown, Clay / Soil
Top of Bentonite Seal (3' bgs.)
98.25 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Damp, Brown mottled with Gray, Clay / Soil,EVOH Liner Material112.210
Damp, Gray, Clay / Soil128.815Top of Bentonite Seal (16' bgs.)
Damp, Gray, Clay / SoilTrash Encountered @ 23 ft
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
143.9
Moist, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper154.425
Moist, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper166.030
Moist, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper186.235
Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper205.440
Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper205.245
Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper205.750
Bottom of Hole = 55 ftBottom of Perforated Pipe ‐ 12" HDPE Cap (55' bgs.)
65
70
Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,
1/3 Partially Decomposed Wood / Paper210.355
60
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Jon Wilkinson
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Top of Flange (Elev. 492.35)‐2.72
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,179.042
Northing: 1,066,566.573
Gas Well ID: GEW‐224 GS Elevation: 489.626Drill Date(s): 8/22/2018
0Ground Surface (Elev. 489.626)
Safety Grate
Damp, Brown, Clay / Soil
Top of Bentonite Seal (3' bgs.)
99.05 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Damp, Brown mottled with Gray, Clay / Soil106.910
Damp, Light Gray mottled with Dark Gray, Clay / Soil115.915Top of Bentonite Seal (16' bgs.)
Top of Soil (18' bgs.)
Damp, 75% Gray Clay / Soil,25% Plastic BagsTrash Encountered
Top of Granular Backfill (19' bgs.)
130.6
Damp, 25% Black Clay / Soil,25% Plastic Bags,
50% Partially Decomposed Wood / Paper150.725
Damp, 25% Gray Clay / Soil,25% Plastic Bags,
50% Partially Decomposed Wood / Paper170.730
Damp, 25% Gray Clay / Soil,25% Plastic Bags,
50% Partially Decomposed Wood / Paper195.635
Wet, 50% Gray Clay / Soil,50% Mostly Decomposed Wood / Paper
Couple of Plastic Bags206.940
Dry, 50% Brown Clay / Soil,50% Mostly Decomposed Wood / Paper
Barbecue Grill Propane Tank189.545
Wet,90% Dark Gray Completely Decomposed Wood / Paper,
10% Plastic Bags,Fence Post
194.850
Dry, 50% Brown Clay / Soil,25% Plastic Bags,
25% Partially Decomposed Wood / Paper55 Bottom of Perforated Pipe ‐ 12" HDPE Cap (55' bgs.)209.8
60
Bottom of Hole = 58 ft
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
‐1.70 Top of Flange (Elev. 493.225)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,121.004
Northing: 1,066,640.143
Gas Well ID: GEW‐225 GS Elevation: 491.522Drill Date(s): 8/23/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 491.522)0
Safety Grate
Dry to Moist, Brown Clay / Soil
Top of Bentonite Seal (3' bgs.)
91.95 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Dry to Moist As Above with PVC Shard91.910
As Above97.815 Liner Surface (15‐16' bgs.)Top of Bentonite Seal (16' bgs.)
Moist, all Gray / Brown Clay
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
103.8
Moist, 30% Waste (Plastic Bags, Paper, Metal), 70% Gray / Brown Clay110.725
Moist to Damp, 50% Waste (Wood, Plastic Bags), 50% Gray Clay and Gravel143.930
Wet, 80% Waste (Wood, Plastic, Carpet Strings), 20% Gray Clay162.335
As Above172.840
60
Wet, all Black & Dark Gray Decomposed Non‐Descript Waste192.345
As Above, with Decomposed Wood198.150
211.5
As AboveBottom of Perforated Pipe ‐ 12" HDPE Cap (56' bgs)
Bottom of Hole = 58 ftWet, 85‐90% Waste (Wood, Wire, Cloth, Metal Strapping),
10‐15% Black Clay
207.355
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Depth in Feet Temperature (F) Waste/Soil Description
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,008.715
Northing: 1,066,815.763
Gas Well ID: GEW‐226 GS Elevation: 498.536Drill Date(s): 8/20/2018
Well Completion Details
Safety GrateLiner Surface (2' bgs.)
‐3.23 Top of Flange (Elev. 501.769)
20
Ground Surface (Elev. 498.536)0
Moist, Brown Clay / Soil, Depth to Liner 2 ft
Top of Bentonite Seal (3' bgs.)
92.65 Top of Soil (5' bgs.)
Top of Perforated Pipe (21' bgs.)
Moist, 95% Gray Clay and Gravel, 5% Plastic Bags97.810
As Above, Top of Waste = 11 ft107.115Top of Bentonite Seal (16' bgs.)
Moist, 75% Waste (Cardboard, Carpet, Plastic Bags), 25% Gray Clay
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
114.7
Dry to Moist, 75‐85% Waste (Plastic Bags, Cloth), 15‐25% Dark Gray to Black Clay129.025
Dry to Moist, 60% Decomposed Waste as above, 40% Dark Gray Clay171.730
Dry, 60‐40 Mix As Above with Paper, Plastic, and Carpet Pieces176.335
As Above, with Brown & Gray Clay196.240
206.060
Dry Decomposed Waste (Wood, Wire Strands, Foam Padding) and Dark Gray Clay with Gravel200.745
As Above205.250
As Above, with Concrete Pieces206.955
208.565
70
As Above
209.3
As Above
Dry, Bundle of Plastic Sheeting, WireBottom of Hole = 67 ft
Bottom of Perforated Pipe ‐ 12" HDPE Cap (65' bgs)
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Jon Wilkinson
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Top of Flange (Elev. 477.858)‐2.71
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 515,572.081
Northing: 1,067,192.137
Gas Well ID: GEW‐227 GS Elevation: 475.152Drill Date(s): 8/22/2018
0Ground Surface (Elev. 475.152)
Safety Grate
Damp, Brown / Gray, Clay / SoilTrash Encountered @ 9 ft
Top of Bentonite Seal (3' bgs.)
82.35 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Damp, 1/3 Gray / Brown Clay / Soil,1/3 Partially Decomposed Wood / Paper,
1/3 Plastic Bags106.610
Damp, 75% Brown Clay / Soil,25% Partially Decomposed Wood / Paper132.815
Top of Bentonite Seal (15' bgs.)
Top of Soil (18' bgs.)Damp, 50% Brown Clay / Soil,
25% Partially Decomposed Wood / Paper,25% Plastic Bags,
Fence Post
Top of Granular Backfill (19' bgs.)
156.6
Damp, 50% Partially Decomposed Wood / Paper,50% Plastic Bags,
Fence Post, Glass Beer Bottle173.025
Moist, 75% Gray Clay / Soil,25% Plastic Bags187.430
Moist, 50% Brown Clay / Soil,25% Partially Decomposed Wood / Paper,
25% Plastic Bags,Plastic clothes hanger
201.035
Moist, 1/3 Gray Clay / Soil,1/3 Partially Decomposed Wood / Paper,
1/3 Plastic Bags202.040
Moist, 1/3 Dark Brown Clay / Soil,1/3 Partially Decomposed Wood / Paper,
1/3 Plastic Bags201.345
Moist to Wet, 1/3 Dark Brown Clay / Soil,1/3 Partially Decomposed Wood / Paper,
1/3 Plastic Bags208.650
No Recovery @ 55 ftAt 56 ‐ 57 ft bgs,
Wet, 1/3 Dark Brown Clay / Soil,1/3 Partially Decomposed Wood / Paper,
1/3 Plastic Bags, Concrete Block with Rebar210.6
Bottom of Perforated Pipe ‐ 12" HDPE Cap (55' bgs.)55
60
Bottom of Hole = 57 ft
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Bottom of Hole = 63 ft203.8 Damp to Wet, Decomposed Wood, Metal, Glass
Bottom of Perforated Pipe ‐ 12" HDPE Cap (61' bgs)
‐2.79 Top of Flange (Elev. 501.589)
Ground Surface (Elev. 498.800)0
Safety Grate
Dry to Moist, all Brownish Gray Clay / Soil
Top of Bentonite Seal (3' bgs.)
98.25 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 515,858.020
Northing: 1,067,185.456
Gas Well ID: GEW‐228 GS Elevation: 498.800Drill Date(s): 8/21/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
As Above, with Concrete Pieces106.410
As Above121.015Top of Bentonite Seal (16' bgs.)
Dry to Moist, 20% Gray Clay, 80% Plastic Bags, Fiber Mesh, Paper, Cardboard, Top of Waste = 18 ft
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
137.8
As Above, with Wire, Plastic Bags, Cinder Block, Paper161.025
As Above, with Steel Pieces, Plastic Mesh, Wood182.630
Dry to Moist, 25% Gray Clay, 75% Decomposed, Non‐Descript Waste193.635
As Above202.140
202.760
As Above, with Wire, Metal Pieces, Rope, Cardboard, Plastic, Wood205.945
As Above, with Wood and Plastic206.150
As Above, Dry to Moist
Dry, Wood and Plastic Waste207.255
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
‐3.54 Top of Flange (Elev. 508.643)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,000.878
Northing: 1,067,101.386
Gas Well ID: GEW‐229 GS Elevation: 505.107Drill Date(s): 8/20/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 505.107)0
Safety Grate
Moist, all Brown / Gray Clay / Soil
Top of Bentonite Seal (3' bgs.)
89.55 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
As Above94.710
As Above, Gravel Seam at 13 ft99.615Top of Bentonite Seal (16' bgs.)
Dry, Black Plastic Bags and Non‐Descript Waste
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
107.0
Dry to Moist, 80% Waste (Carpet, Plastic Bucket, Cloth, Plywood), 20% Gray Clay124.325
As Above, with Wire, Cardboard, Plastic Bags131.430
As Above, Dry, with Rolled Plastic, Wood, String, Plastic Bags145.035
As Above172.040
Bottom of Perforated Pipe ‐ 12" HDPE Cap (58' bgs)
60 Bottom of Hole = 60 ft
As Above, with Metal Scrap, Wood, Plastic Bags182.545
Dry to Moist, Decomposed Waste (Plastic Bags, Cardboard, Wire)202.650
206.7Wet, Black Decomposed Non‐Descript Waste, Bucket
Refusal on Steel
As Above, with Metal and Concrete Pieces197.855
65
70
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,248.474
Northing: 1,067,353.823
Gas Well ID: GEW‐230 GS Elevation: 488.274Drill Date(s): 8/16/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
0Safety Grate
Moist, 95% Brown / Gray Clay / Soil, 5% Plastic Bags, Top of Waste = 4.5 ft
Top of Bentonite Seal (3' bgs.)
100.25 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Moist, 40% Gray Clay / Soil, 40% Plastic Sheeting, 20% Carpet Strands/Strings125.410
Moist, 33% Plastic Sheeting & Bags, 33% Wood, 33% Cardboard/Paper136.915
Top of Bentonite Seal (16' bgs.)
Moist, 20% Gray Clay, 80% Plastic Bags, Wood, Metal Wire
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
172.6
Moist, 80% Waste as above, 20% Dark Gray Clay187.325
Moist, 85% Waste (Wood, Wire, Burlap), 15% Gray Clay195.630
Moist, 30% Gray Clay, 70% Waste (Wood, Plastic Bags)201.135
Damp to Wet, 40% Gray Clay, 60% Waste (Wood, Concrete, Gravel/Sand, Plastic, Cloth)197.440
Wet, 70% Gray Clay, 30% Concrete Pieces, Rebar, Tin Roofing Remnants208.345
Wet, 75% Black Clay, 25% Decomposed Waste (Cardboard, Plastic) and Concrete Pieces209.150
Wet, Black Decomposed Non‐Descript Waste207.660
207.0
Bottom of Hole = 60 ft
Bottom of Perforated Pipe ‐ 12" HDPE Cap (58' bgs)
Top of Flange (Elev. 490.468)‐2.19
Ground Surface (Elev. 488.274)
65
70
Wet as above, Black Decomposed Waste (Cloth, Plastic, Wood, Gravel/Concrete)55
-
Client: Bridgeton Landfill LLC.
Project Location: Bridgeton, MO
Project Name: 2018 GCCS Updates
FEI Project Number: BT‐143
FEI Inspector: Bill Abernathy
Drilling Contractor: Recovery Drilling Service
Driller: Stan Garrison
Health Physicists: N/A
Bottom of Hole = 40 ft
Bottom of Perforated Pipe ‐ 12" HDPE Cap (38' bgs)
‐1.82 Top of Flange (Elev. 493.295)
Drilling Method: 36" Core Barrel
Well Casing Material: 12" SDR‐11 HDPE
Easting: 516,075.506
Northing: 1,066,457.927
Gas Well ID: GEW‐231 GS Elevation: 491.471Drill Date(s): 8/23/2018
Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details
Ground Surface (Elev. 491.471)0
Safety Grate
Moist, Gray Clay / Soil
Top of Bentonite Seal (3' bgs.)
104.75 Top of Soil (5' bgs.)
20Top of Perforated Pipe (21' bgs.)
Moist, 60% Gray Clay / Soil, 40% Cardboard, Plastic Bags, and Cloth, Top of Waste = 7 ft117.610
Moist, 60/40 Mix As Above, with Steel Cable, Plastic Bags, Mop, Plastic Waste140.815
Top of Bentonite Seal (16' bgs.)
Moist, 40% Gray Clay, 60% Plastic Bags, Wood, Plastic Banding
Top of Soil (18' bgs.)
Top of Granular Backfill (19' bgs.)
186.1
Moist, 35% Gray Clay, 60% Plastic Bags, Carpet Pad, Metal Conduit191.125
Dry to Moist, 30% Gray Clay, 70% Plastic Bags, Felt, Wood, Plastic‐Coated Wire199.430
Moist, 25‐30% Gray Clay, 70‐75% Waste (Metal, Plastic Bags, Cardboard, Wood, Carpet)200.335
Moist, 20% Gray Clay and Gravel, 80% Partially Decomposed Waste (Wood, String, Plastic Bags, Paper)202.340
60
45
50
55
65
70
-
APPENDIX C
CONSTRUCTION CERTIFICATION DRAWINGS (REDUCED SET)
Drawing 000 Title Page Drawing 001 GCCS Plan View Drawing 002 Details
-
INDEX OF DRAWINGS
TITLE PAGE
001
002
BRIDGETON LANDFILL
2018 Q2 GCCS INSTALLATION
3377 HOLLENBERG DRIVE
BRIDGETON, MO 63044
TEL. (217) 483-3118
GCCS PLAN VIEW
DETAILS
LOCATION MAP
N
SEPTEMBER 2018
PREPARED FOR:
Bridgeton Landfill, LLC
13570 ST. CHARLES ROCK ROAD
BRIDGETON, MISSOURI 63044
AS-BUILT DRAWINGS FOR THE
-
GMP-13S, 13D
GMP-11
GMP-14S, 14D
GMP-3
GMP-10
I-73
PZ-204-AS
PZ-204-SS
PZ-103-SS
PZ-106-SS
PZ-106-SD
PZ-203-SS
PZ-104-KS
PZ-205-SS
PZ-205-AS
MW-1204
GMP-3S, 3M, 3D
GMP-6
GMP-4S, 4D
GMP-4
TMP-2S, 2M, 2D
TMP-3S, 3M, 3D
GMP-2
PZ-106-KS
P5
PZ-104-SSPZ-104-SD
PZ-116-SS
PZ-105-SS
PZ-210-SDPZ-210-SS
TMP-9
TMP-6
TMP-19
TMP-14
TMP-12
TMP-5
TMP-SPM-2
TMP-20
TMP-32
TMP-15
TMP-31
TMP-8
TM
P-5
-9
S
TM
P-5
-5
S
TM
P-5-5N
TM
P-5-9N
TM
P-1
0-9
S
TM
P-10-5S
TM
P-1
0-5
N
TM
P-1
0-9
N
TMP-14R
TMP-13
TMP-7R
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
12G
12G12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
4G
4G
6G
4G
6G6G
6G6G
6G
6G
6G
6G6G
6G6G
6G
6GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
12GU
12GU
12GU
12GU
12GU
6GU
6GU
6GU
6GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
6GU 6GU 6GU 6GU
6GU
6GU
6GU
6GU6GU
6GU6GU
6GU
6GU6GU 6GU
6GU 6GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
6GU
6GU
6GU
6GU
6GU
16GU
18GU
18GU
18GU
18GU
18GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
8GU 8GU8GU
8GU8GU
8GU8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
16GU
16GU
16GU
16GU
4GU
4GU
4GU
4GU
4GU
6GU
6GU
6GU
6GU
18GU
18GU
4GU4GU
4GU4GU
4GU
4GU
4GU
4GU
4GU
4GU
8GU
4GU
4GU
4GU
4GU
4GU
18GU18GU
18GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
12GU
18GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
8GU
6GU6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU
6GU6GU
6GU
6GU
6GU
6GU6GU
6GU
6GU
6GU
18GU18GU
18GU18G
U18G
U18G
U
18GU
18GU
18GU
18GU
18GU
18GU18GU
6GU
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2
G
2G
4GU4GU 4GU
4GU 4GU 4GU
4GU
6GU
6GU
6GU6GU6GU6GU6GU
18GU
12G
12G
12G
12G
12G
12G
12G
12G
4PU
4PU
4PU
4PU
4PU
4PU
4PU
4PU
4PU
4PU
4PU
6TD
6TD
6TD
6TD
6TD
4G
4G4G
4G
6TD
6TD
6TD
6TD
4G
4G
4G
4G
4G
4G
4G
6TD
6TD
6TD
6TD
6TD
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
4G
8G
8G
6G
6G
6G
6G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
18G
18G
18G
18G
18G
18G
18G
4G4G
4G
18G
18G
18G
18G
18G18G
18G
18G
18G18G
18G
18G
18G
4G
4G
4G
4G
4G
4G4G
4G
4G
4G
4G
6G
8G
4G
6G
6G
8G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G12G
12G
12G12G
12G12G
12G
12G
12G
12G
12G12G
12G12G
12G
12G
12G12G
12G12G
12G12G
12G
12G
12G12G
12G12G
12G
12G
12G
12G12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
6G
8G
4G
6G
6G
6G
6G
6G
6G
4G
6G
6G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
4G
18G
6G
6G
6G 6G
18G
18G
18G
18G
18G
18G
18G
18G18G
18G18G
18G
18G
18G
18G18G
18G
18G
18G
18G
18G
18G18G
18G
18G18G
18G
18G
6G
6G
6G
6G
6G
6G
6G
6G
4G4G
4G
6G
6G6G
6G6G
8G
8G
4G
6G
4G
6G
6G6G
6G
6G
6G
6G6G
6G
6G
4G6G 6G
6G
6G4G
4G
8G
4G4G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G12G
12G
12G12G
12G
12G12G
12G
12G12G
12G
12G
12G12G
12G
12G12G
12G
12G
12G
12G
12G
12G
12G12G
12G
12G12G
12G
12G12G
12G12G
12G12G
12G
12G12G
12G12G
12G
12G
12G12G
12G12G
12G12G
12G12G
12G12G
12G12G
12G
12G12G
12G12G
12G12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
6G 4G 4
G 4G
4G
4G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
6G
6G
4G
6G
6G
4G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
12G
6G6G
6G
6G
4G
4G
4G
4G
4G
4G 4G
18G
12G
8G
8G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
6G
4G
4G
6G
6G
6G
6G
18G18G
18G
12G12G
12G
12G
12G
12G
12G 12G12G
12G
12G
12G
12G
12G
12G
12G
12G
12G 12G
6G
6G
6G
6G
6G
6G 6G
6G
6G
6G
6G12G
8G 8G
8G
8G
8G
6G
8G 8G
6G
6G
6G6G
8G
8G
8G
6G
8G8G
6G
6G
6G
6G
6G
6G6G
6G
6G
6G
6G
6G
6G
6G
6G
6G
6G
6G
6G
6G
6G 6G
6G
6G
6G
4G
8G
8G
4G
4G
4G
4G
8G
8G
8G
8G
6G
4G
4G
4G
6G6G
18G
18G
18G
18G
18G
18G
18G
18G
18G
18G
12G
12G
12G
12G 12G
12G12G
6G
6G6G
6G
18G
18G
18G
18G
18G
18G
18G
18G
18G
8G
6G
6G
6G
12G
12G
12G
12G
12G
12G
18G
18G
4G
6G
6G
6G
6G
6G
6G
6G6G
6G
6G
6G
6G
6G
6G
6G
6G
12G
12G
6G
6G
6G
12G
12G
12G
12G
12G
12G
12G
6G
6G
6G
6G
6G
6G
6G
6G
6G
6G
8G
8G
8G
8G
8G
8G
8G
2A
2A
2A
2A
2A2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A 2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A2A
2A2A
2A
2A2A2A2A
2A
2A2A
2A2A
2A2A
2A
2A
2A2A2A2
A2A
2A2A2A
2A2A
2A
2A2A 2A 2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A2A
2A2A
2A2A
2A2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A2A
2A2A
2A
2A2A
2A
2A2A
2A2A
2A2A
2A
2A
2A2A
2A
2A 2A2A
2A2A
2A
2A
2A2A
2A2A
2A
2A
2A
2A
2A
2A2A
2A 2A 2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A2A2A
2A
2A
2A
2A
2A
2A
2A
2A 2A2A
2A
2A2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A2A
2A2A
2A2A
2A2A
2A
2A
2A
2A2A
2A
2A
2A2A
2A2A
2A
2AU
2AU2AU
2A
2A
2A2A
2A
2A2A
2A2A
2A
2A
2A
2A
2A2A 2A
2A2A
2A
2A
2A
2A
2A
2A
2A2A 2A
2A
2A
2A
2A
2A2A
2A2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A 2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A2A
2A2A2A
2A
2A
2A
2A2A
2A
2A2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A2A
2A
2A
2A
2A
2A2A2A2A
2A2A
2A
2A2A
2A
2A
2A
2A
2A 2A
2A
2A2A
2A
2A
2A
2A2A
2A
2A
2A2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A 2A
2A
2A2A
2A
2A2A
2A
2A2A
2A
2A2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A2A2A
2A
2A
2A
2A
2A2A
2A2A
2A2A
2A 2A 2A 2A2A
2A
2A2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A
2A
2A
2A2A
2A
2A2A
2A2A
2A2A
2A2A
2A 2A2A 2A
2A 2A
2A2A
2A
2A
2A
2A
2A
2A
2A2A
2A
2A2A
2A2A
2A2A
2A
2A
2A
2A
2A
2A
2A
2A
2A2A2A
2A2A2A
2A 2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
2A
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6X
10L
6X10L
6X10L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6X
10L6X10L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6X
10L
6X
10L
6X
10L
6X
10L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
3
X
6
L
3
X
6
L
3
X
6
L
3
X
6
L
3
X
6
L
3
X
6
L
3X
6L
3
X
6
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
6
X
1
0
L
2L
LS
GC
LS
6
X
1
0
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4X
8 L
4
L
4
L
4
L
4
L
4
L
4
L
4
L
4
L
4
L
4L
4L
4
L
4
L
4L
4L
4L
4
L
4
L
4
L
4
L
4
L
4
L
4
L
4
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L
4
X
8
L