BRIDGETON LANDFILL LLC. CONSTRUCTION QUALITY ASSURANCE ACCEPTANCE REPORT 2018 GCCS IMPROVEMENTS BRIDGETON, ST. LOUIS COUNTY, MISSOURI Prepared For: Bridgeton Landfill LLC. 13570 St. Charles Rock Road Bridgeton, MO 63044 SEPTEMBER 2018 Project No: BT-143 Prepared By: Feezor Engineering, Inc. 3377 Hollenberg Drive Bridgeton, MO 63044

Upload: others

Post on 27-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • BRIDGETON LANDFILL LLC.

    CONSTRUCTION QUALITY ASSURANCE ACCEPTANCE REPORT

    2018 GCCS IMPROVEMENTS

    BRIDGETON, ST. LOUIS COUNTY, MISSOURI

    Prepared For: Bridgeton Landfill LLC. 13570 St. Charles Rock Road Bridgeton, MO 63044

    SEPTEMBER 2018

    Project No: BT-143

    Prepared By:

    Feezor Engineering, Inc. 3377 Hollenberg Drive Bridgeton, MO 63044

  • CONSTRUCTION QUALITY ASSURANCE

    ACCEPTANCE REPORT

    2018 GCCS IMPROVEMENTS

    BRIDGETON LANDFILL, LLC

    BRIDGETON, SAINT LOUIS COUNTY, MISSOURI

    Prepared for

    Bridgeton Landfill, LLC

    SEPTEMBER 2018

    Prepared by

    Feezor Engineering, Inc. 3377 Hollenberg Drive Bridgeton, MO 63044

    BT-143

  • CONTENTS

    1 INTRODUCTION 2 1.1 Overview of Project 2

    2 CONSTRUCTION DOCUMENTS 3 2.1 Construction Drawings 3

    3 GCCS INSTALLATION 4 3.1 New Landfill Gas Extraction Wells Installation 4 3.2 Construction Quality Assurance 4

    4 SURVEY CONTROL 6 4.1 Construction Surveying 6 4.2 Final As-built Surveying 6

    5 CERTIFICATION 7

  • 1

    LIST OF APPENDICES

    A. Field Information A.1 Daily Summary Reports A.2 Equipment Log

    B. As-Built Well Logs C. Construction Certification Drawings (Reduced Set)

    Drawing 000 Title Page Drawing 001 GCCS Plan View Drawing 002 Details

  • 2

    1 INTRODUCTION

    1.1 Overview of Project

    Bridgeton Landfill, LLC is a closed municipal solid waste facility located at 13570 St. Charles Rock Road, Bridgeton, St. Louis County, Missouri. The facility is owned and operated by Bridgeton Landfill, LLC (BL) who operate the facility pursuant to Permit No 118912. (and subsequent modifications), issued by the Missouri Department of Natural Resources (MDNR).

    During the 2018 construction seasons, BL installed (15) fifteen additional gas extraction wells. Recovery Drilling Service (RDS) of Dudley, MA was selected as the driller for the project. Sharp STL Inc. of St. Louis, MO and Fusion Solutions Inc. out of Carlinville, IL were chosen to provide support and piping installation during the project. Feezor Engineering Inc. (FEI) of Bridgeton, MO, provided the initial and record surveying to document the location of the installed gas extraction wells and associated GCCS piping.

    FEI was also selected as the Construction Quality Assurance (CQA) consultant to observe and document the construction of the leachate system upgrades. Daniel R. Feezor, P.E. of FEI was the Construction Quality Assurance Officer (CQAO). Mr. Feezor selected Jonathan Wilkinson and Bill Abernathy to be the CQA Officers in absentia.

  • 3

    2 CONSTRUCTION DOCUMENTS

    2.1 Construction Drawings

    FEI created a detailed set of construction drawings for this project. These drawings provided the detail to properly construct all the necessary components project. Construction drawings were also used for the proper selection of materials and provided adequate detail for the installation of the GCCS upgrades.

  • 4

    3 GCCS INSTALLATION

    3.1 New Landfill Gas Extraction Wells Installation

    Fifteen (15) new gas wells were installed throughout areas of the landfill to enhance landfill gas collection. RDS drilled the wells using a Soilmec SR-30 drill rig with a core barrel bucket. FEI observed and documented the drilling process including but not limited to logging of waste depth, temperature and composition. Daily Field Reports can be found in Appendix A.1.

    Well piping consisted of 12” SDR-11 HDPE solid and perforated piping. The pipe sections were butt-fused together by Fusion Solutions. A low-pressure HDPE cap was installed at the bottom of each well casing and a pre-fabricated 12” flanged lid on the top of each well casing prior to installation.

    The pipe was raised using a winch on the drill rig and lowered into the borehole to the appropriate depth. Granular backfill consisting of one three-quarter (3/4) inch to two (2) inch diameter washed non-carbonate gravel was placed in the borehole around the perforated pipe. A loader transported the gravel to the well location and placed it into the borehole. The gravel was placed to a point generally about two feet above the perforated pipe. Before the bentonite was added, one (1) foot of clean soil was used as a plug. A two (2) foot bentonite seal was then placed above the soil plug. Water was added to the layers of bentonite to adequately hydrate the seal. Cover soil was then placed over the bentonite layer followed by another two (2) foot hydrated bentonite seal. Approved cover soil was used to fill the remaining borehole to the ground surface.

    The as-built well depths and well construction details are shown on the as-built well logs in Appendix B.

    A three (3) inch diameter well head was installed and connected to the gas header system via lateral piping by Fusion Solutions Inc.

    3.2 Construction Quality Assurance

    3.2.1 Construction Oversight

    The CQAO inspected all materials for the gas collection system. This included piping, valves, fittings, and backfill material to ensure that these materials were acceptable and consistent with the construction plans and site CQA plan. The CQAO inspected the materials to be constructed of HDPE pipe to determine if the materials meet the following requirements:

    • All HDPE pipe was new, or first quality, and was furnished at lengths as indicated on the approved design plans. All HDPE piping was straight throughout its length and generally free from all imperfections.

  • 5

    • The HDPE pipe and fittings had a minimum Standard Dimension Ratio (SDR) as noted on the design plans.

    During installation of the landfill gas collection system enhancements, the CQAO documented that the construction adhered to the plans, specifications, and CQA plan. This included:

    • Pipe and appurtenances were installed true to line, grade, and location with the pipe supported and restrained against movement with all valve stems plumb.

    • The pipe joints, except where flanged joints or electro-fusion couplers were specified on the approved design plans, were butt fused as recommended by the pipe manufacturer. All shavings from the preparation of pipe ends for fusion were removed from the pipe prior to installation.

    During storage, the technician documented that pipes and fittings were stacked so as to prevent damage by marring, crushing or puncture. Maximum stacking height was limited to 6 feet.

    The technician recorded applicable test data, areas of construction, problems and remedies, construction equipment and methodologies, survey data, and equipment calibration on the Daily Summary Reports and the Daily Inspection Reports, included herein as Appendix A.1.

  • 6

    4 SURVEY CONTROL

    4.1 Construction Surveying

    Feezor Engineering Inc. of Bridgeton, Missouri, provided surveying as the Project Surveyor.

    4.2 Final As-built Surveying

    Feezor Engineering Inc. of Bridgeton, Missouri provided the final certification survey for the as-built coordinates of the installed Gas Extraction Wells.

  • 7

    5 CERTIFICATION

    I, Daniel R. Feezor, P.E., do hereby certify to my best knowledge and belief, that the 2018 GCCS Improvements at the Bridgeton Landfill were constructed in accordance with the construction documents.

  • Appendix A

    FIELD INFORMATION

    Sub‐Appendices

    A.1 Daily Summary Reports

    A.2 Equipment Log

  • Sub‐Appendix A.1

    Daily Summary Reports

  • Copies To: Erin Fanning, Dan Feezor

    FEI Representative:

    Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118

    Daily Field Summary Report

    Client: Bridgeton Landfill, LLC Job No.: BT-143

    Project: 2018 GCCS Improvements Task No.: CQA

    Location: Bridgeton, MO Date: 8/16/2018

    Contractor(s):

    Recovery Drilling Service Inc. (RDS), Sharp

    Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Mostly Cloudy PM Mostly Cloudy

    Temperature: AM 74 F PM 91 F

    Description of field activities (include labor, equipment, site conditions, sampling, etc.)

    0640 – I arrive on site. 0710 – Daily safety meeting held with Bridgeton Landfill, Fusion, Kuesel, Sharp, RDS, and FEI. 0735 – RDS and Sharp prep for drilling at GEW-230. Sharp working on Odor Boss (dead generator battery). 0930 – Waiting on survey verification of GEW-230 location. 1032 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-230. 1055 – Drilling cable breaks on Soilmec SR-30. RDS demobes from hole and replaces cable. 1253 – Back on hole, resumes drilling. 1631 – Bottom of GEW-230 borehole = 60 ft. Vac box moved off hole, begin installation of 12-in perforated/solid

    sections of riser. 1719 – Rig moved off hole, begin annular backfilling activities. 1827 – Begin emplacement of soil and bentonite layers. 1904 – Cleaning off liner to install safety grate and liner boot. 1932 – Leave site.

    Page: 1 of 1

  • Copies To: Erin Fanning, Dan Feezor

    FEI Representative:

    Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118

    Daily Field Summary Report

    Client: Bridgeton Landfill, LLC Job No.: BT-143

    Project: 2018 GCCS Improvements Task No.: CQA

    Location: Bridgeton, MO Date: 8/17/2018

    Contractor(s):

    Recovery Drilling Service Inc. (RDS), Sharp

    Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Mostly Cloudy PM Partly Cloudy

    Temperature: AM 75 F PM 86 F

    Description of field activities (include labor, equipment, site conditions, sampling, etc.)

    0640 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0720 – RDS and Sharp prep for drilling at GEW-219. Waiting for flare test to conclude. 0840 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-219. 1000 – Fusion prepping flanged well casing sections. 1115 – Bottom of GEW-219 borehole = 62 ft. Vac box moved off hole, begin installation of 12-in perforated/solid

    sections of riser. 1148 – Rig moved off hole, begin annular backfilling activities. 1215 – Begin emplacement of soil and bentonite layers. 1241 – Cleaning off liner to install safety grate and liner boot. RDS moves rig and equipment/supplies to GEW-

    218 location. 1302 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-218. 1418 – Fusion prepping flanged well casing sections for GEW-218. 1430 – Bottom of GEW-218 borehole = 62 ft. Vac box moved off hole, begin installation of 12-in perforated/solid

    sections of riser. 1502 – Rig moved off hole, begin annular backfilling activities. 1610 – Begin emplacement of soil and bentonite layers. 1632 – Fusion completes safety grate installation, liner boot, and gas connection at GEW-218, cracks open valve

    to establish flow. 1645 – Leave site.

    Page: 1 of 1

  •  

    Copies To:  Erin Fanning, Dan Feezor    

    FEI Representative: 

     

     Feezor Engineering, Inc. 406 E. Walnut St.                                                                                                              Chatham, IL 62629 (217) 483‐3118  

     Daily Field Summary Report 

                 Client: Bridgeton Landfill, LLC  Job No.: BT‐143 

    Project:2018 GCCS Improvements  Task No.: CQA Location: Bridgeton, MO  Date: 8/18/2018 

    Contractor(s): Recovery Drilling Service Inc. (RDS), Sharp Services (Sharp), Fusion Solutions Inc. (FSI)  Report No.:  

    Weather: AM Sunny  PM P. Cloudy  Temperature: AM 75 F  PM 85 F 

      Description of field activities (include labor, equipment, site conditions, sampling, etc.) 

     0650 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, contractors, and FEI. 0730 – RDS sets up drill rig (Soilmec SR‐30 drill rig) on GEW‐220.  Sharp sets up odor control devices and vacuum 

    box connected to GCCS system. 0740 – RDS begins drilling. 0904 – RDS has reached depth of 62 ft on GEW‐220.  RDS cleans out hole to 64 ft. 0945 – RDS / FSI begin setting pipe in hole.  See the as‐built well logs for specifics on the well casing and annular 

    backfill. 1007 – Pipe is set in hole.  Sharp & FSI begin backfilling hole.  RDS moves drill rig to GEW‐221.  Sharp sets up 

    odor control devices and vacuum box connected to GCCS system. 1120 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐220 is complete.  FSI 

    connects GEW‐220 wellhead to GCCS. 1130 – RDS begins drilling at GEW‐221. 1415 – RDS has reached depth of 75 ft on GEW‐221.  RDS cleans out hole, maintaining depth of 75 ft. 1457 – RDS / FSI begin setting pipe in hole.  See the as‐built well logs for specifics on the well casing and annular 

    backfill. 1513 – Pipe is set in hole.  Sharp & FSI begin backfilling hole.  RDS moves drill rig to GEW‐222.  Sharp sets up 

    odor  control  devices  and  vacuum  box  connected  to  GCCS  system  for  drilling  first  thing  tomorrow morning. 

    1609 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐221 is complete.  FSI connects GEW‐221 wellhead to GCCS.  I leave site. 

    Page: 1  of  1 

  •  

    Copies To:  Erin Fanning, Dan Feezor    

    FEI Representative: 

     

     Feezor Engineering, Inc. 406 E. Walnut St.                                                                                                              Chatham, IL 62629 (217) 483‐3118  

     Daily Field Summary Report 

                 Client: Bridgeton Landfill, LLC  Job No.: BT‐143 

    Project:2018 GCCS Improvements  Task No.: CQA Location: Bridgeton, MO  Date: 8/19/2018 

    Contractor(s): Recovery Drilling Service Inc. (RDS), Sharp Services (Sharp), Fusion Solutions Inc. (FSI)  Report No.:  

    Weather: AM Hazy  PM P. Cloudy  Temperature: AM 75 F  PM 80 F 

      Description of field activities (include labor, equipment, site conditions, sampling, etc.) 

     0650 – I arrive on site. 0730 – RDS and Sharp morning prep for drilling on GEW‐222.  Sharp activates odor control devices and vacuum 

    box is connected to GCCS system. 0731 – RDS begins drilling GEW‐222. 0847 – RDS has reached depth of 58 ft on GEW‐222.  RDS cleans out hole to 61 ft. 0915 – RDS / FSI begin setting pipe in hole.  See the as‐built well logs for specifics on the well casing and annular 

    backfill. 0940 – Pipe is set in hole.  Sharp & FSI begin backfilling hole.  RDS moves drill rig to GEW‐223.  Sharp sets up 

    odor control devices and vacuum box connected to GCCS system. 1036 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐222 is complete.  FSI 

    connects GEW‐222 wellhead to GCCS. 1047 – RDS begins drilling at GEW‐223. 1158 – RDS has reached depth of 55 ft on GEW‐223.  RDS cleans out hole, maintaining depth of 55 ft. 1235 – RDS / FSI begin setting pipe in hole.  See the as‐built well logs for specifics on the well casing and annular 

    backfill. 1254 – Pipe is set in hole.  Sharp & FSI begin backfilling hole.  RDS moves drill rig to GEW‐229.  Sharp sets up 

    odor  control  devices  and  vacuum  box  connected  to  GCCS  system  for  drilling  first  thing  tomorrow morning. 

    1332 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐223 is complete.  FSI connects GEW‐223 wellhead to GCCS.  I leave site. 

    Page: 1  of  1 

  • Copies To: Erin Fanning, Dan Feezor

    FEI Representative:

    Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118

    Daily Field Summary Report

    Client: Bridgeton Landfill, LLC Job No.: BT-143

    Project: 2018 GCCS Improvements Task No.: CQA

    Location: Bridgeton, MO Date: 8/20/2018

    Contractor(s):

    Recovery Drilling Service Inc. (RDS), Sharp

    Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Cloudy PM Mostly Cloudy

    Temperature: AM 74 F PM 79 F

    Description of field activities (include labor, equipment, site conditions, sampling, etc.)

    0641 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0728 – RDS and Sharp prep for drilling at GEW-229. 0803 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-229. 0936 – Fusion prepping flanged well casing sections. 1015 – Bottom of GEW-229 borehole = 60 ft (bucket refusal on steel). Vac box moved off hole, begin installation

    of 12-in perforated/solid sections of riser. 1023 – Rig moved off hole, begin annular backfilling activities. 1038 – Begin emplacement of soil and bentonite layers. 1047 – Cleaning off liner to install safety grate and liner boot. RDS moves rig and equipment/supplies to GEW-

    226 location. 1203 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-226. 1330 – Fusion prepping flanged well casing sections for GEW-226. 1337 – Bottom of GEW-226 borehole = 67 ft. Vac box moved off hole, begin installation of 12-in perforated/solid

    sections of riser. 1429 – Rig moved off hole, begin annular backfilling activities. 1500 – Begin emplacement of soil and bentonite layers. 1541 – Fusion completes gas connection at GEW-226, begins safety grate installation. 1603 – Leave site.

    Page: 1 of 1

  • Copies To: Erin Fanning, Dan Feezor

    FEI Representative:

    Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118

    Daily Field Summary Report

    Client: Bridgeton Landfill, LLC Job No.: BT-143

    Project: 2018 GCCS Improvements Task No.: CQA

    Location: Bridgeton, MO Date: 8/21/2018

    Contractor(s):

    Recovery Drilling Service Inc. (RDS), Sharp

    Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Cloudy PM Partly Cloudy

    Temperature: AM 70 F PM 81 F

    Description of field activities (include labor, equipment, site conditions, sampling, etc.)

    0641 – I arrive on site. 0715 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0726 – RDS and Sharp prep for drilling at GEW-228. 0809 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-228. 0915 – Fusion prepping flanged well casing sections. 0941 – Bottom of GEW-228 borehole = 63 ft. 0956 - Vac box moved off hole, begin installation of 12-in perforated/solid sections of riser and backfilling. 1041 – Begin emplacement of soil and bentonite layers. 1125 – Cleaning off liner to install safety grate and liner boot. RDS has moved rig and equipment/supplies to

    GEW-217 location. 1210 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-217. 1355 – Bottom of GEW-217 borehole = 83 ft. Fusion prepping flanged perforated/solid sections of well casing. 1430 - Vac box moved off hole, begin installation of 12-in perforated/solid sections of riser. 1455 – Rig moved off hole, begin annular backfilling activities. 1534 – Begin emplacement of soil and bentonite layers. 1603 – Fusion completes gas connection at GEW-217, begins safety grate installation. 1625 – Leave site.

    Page: 1 of 1

  •  

    Copies To:  Erin Fanning, Dan Feezor    

    FEI Representative: 

     

     Feezor Engineering, Inc. 406 E. Walnut St.                                                                                                              Chatham, IL 62629 (217) 483‐3118  

     Daily Field Summary Report 

                 Client: Bridgeton Landfill, LLC  Job No.: BT‐143 

    Project:2018 GCCS Improvements  Task No.: CQA Location: Bridgeton, MO  Date: 8/22/2018 

    Contractor(s): Recovery Drilling Service Inc. (RDS), Sharp Services (Sharp), Fusion Solutions Inc. (FSI)  Report No.:  

    Weather: AM Sunny  PM Sunny  Temperature: AM 70 F  PM 80 F 

      Description of field activities (include labor, equipment, site conditions, sampling, etc.) 

     0650 – I arrive on site. 0700 – Daily safety meeting held with Bridgeton Landfill, contractors and FEI. 0730 – RDS and Sharp morning prep for drilling on GEW‐227.  Sharp activates odor control devices and vacuum 

    box is connected to GCCS system. 0743 – RDS begins drilling GEW‐227. 0856 – RDS has reached depth of 56‐57 ft on GEW‐227.  No recovery is achievable at depth.  RDS cleans out 

    hole, maintaining depth. 1020 – RDS / FSI begin setting pipe in hole.  See the as‐built well logs for specifics on the well casing and annular 

    backfill. 1038 – Pipe is set in hole.  Sharp & FSI begin backfilling hole.  RDS moves drill rig to GEW‐224.  Sharp sets up 

    odor control devices and vacuum box connected to GCCS system. 1137 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐227 is complete.  FSI 

    connects GEW‐227 wellhead to GCCS. 1255 – RDS begins drilling at GEW‐224. 1401 – RDS has reached depth of 55 ft on GEW‐224.  RDS cleans out hole to depth of 58 ft. 1435 – RDS / FSI begin setting pipe in hole.  See the as‐built well logs for specifics on the well casing and annular 

    backfill. 1505 – Pipe is set in hole.  Sharp & FSI begin backfilling hole.  RDS moves drill rig to GEW‐231.  Sharp sets up 

    odor  control  devices  and  vacuum  box  connected  to  GCCS  system  for  drilling  first  thing  tomorrow morning. 

    1605 – Safety grate in place and soil backfilled to ground surface – construction of GEW‐224 is complete.  FSI connects GEW‐224 wellhead to GCCS.  I leave site. 

    Page: 1  of  1 

  • Copies To: Erin Fanning, Dan Feezor

    FEI Representative:

    Feezor Engineering, Inc. 406 E. Walnut St. Chatham, IL 62629 (217) 483-3118

    Daily Field Summary Report

    Client: Bridgeton Landfill, LLC Job No.: BT-143

    Project: 2018 GCCS Improvements Task No.: CQA

    Location: Bridgeton, MO Date: 8/23/2018

    Contractor(s):

    Recovery Drilling Service Inc. (RDS), Sharp

    Services (Sharp), Fusion Solutions Inc. (FSI) Report No.: Weather: AM Sunny PM Mostly Cloudy

    Temperature: AM 63 F PM 77 F

    Description of field activities (include labor, equipment, site conditions, sampling, etc.)

    0650 – I arrive on site. 0712 – Daily safety meeting held with Bridgeton Landfill, Fusion, Sharp, RDS, and FEI. 0730 – RDS and Sharp prep for drilling at GEW-231. 0751 – Sharp activates Odor Boss and connects vacuum box to GCCS system, RDS begins drilling GEW-231. 0835 – Fusion prepping flanged well casing sections. 0850 – Bottom of GEW-231 borehole = 40 ft. Vac box moved off hole, begin installation of 12-in perforated/solid

    sections of riser. 0910 – Rig moved off hole, begin annular backfilling activities. 0951 – Begin emplacement of soil and bentonite layers. 1018 – Cleaning off liner to install safety grate and liner boot. RDS moves rig and equipment/supplies to GEW-

    225 location. 1024 – Sharp connects vacuum box to GCCS system, RDS begins drilling GEW-225. 1142 – Fusion prepping flanged well casing sections for GEW-225. 1150 – Bottom of GEW-225 borehole = 58 ft. Vac box moved off hole, begin installation of 12-in perforated/solid

    sections of riser. 1251 – Rig moved off hole, begin annular backfilling activities. 1314 – Begin emplacement of soil and bentonite layers. 1328 – Fusion completes safety grate installation. 1404 – Fusion completes gas connection at GEW-225. 1436 – Leave site.

    Page: 1 of 1

  • Sub‐Appendix A.2

    Equipment Log

  • Bridgeton Landfill LLC.

    2018 GCCS Updates

    Construction Equipment List

    Recovery Drilling Services

    1 -Soilmec SR-30 Hydraulic Drilling Rig

    Sharp STL Services

    1 – Volvo Front End Loader 1 – Bobcat Skidsteer

    1 – CAT Mini-Excavator 1 – Water Truck

    1 – Single-Axle Dump Truck

    Fusion Solutions Inc.

    1 – McElroy 1218 Butt-Fusion Machine 1 – McElroy 6” Bulldog Fusion Machine

    1 – Polaris Ranger UTV

  • APPENDIX B

    AS‐BUILT WELL LOGS

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Wet, all Black Decomposed Non‐Descript WasteBottom of Hole = 83 ft

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (81' bgs)

    Liner Surface (32' bgs.)

    Top of Soil (38' bgs.)

    Top of Perforated Pipe (41' bgs.)

    Top of Granular Backfill (39' bgs.)

    Top of Bentonite Seal (36' bgs.)

    Moist, all Brown / Gray Clay Fill, Depth to Liner 32 ft

    ‐2.95 Top of Flange (Elev. 497.913)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,619.328

    Northing: 1,067,102.656

    Gas Well ID: GEW‐217 GS Elevation: 494.965Drill Date(s): 8/21/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 494.965)0

    Safety Grate

    Dry to Moist, all Brown / Gray Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    80.85 Top of Soil (5' bgs.)

    20

    As Above81.210

    As Above81.315

    As Above85.0

    As Above92.525

    As Above, with Gray Clay99.430

    110.535

    Moist Gray Clay and Concrete Pieces119.140

    173.660

    As Above131.645

    Moist, 70% Gray Clay, 30% Waste (Plastic Bags, Cardboard, Wood, Metal Wire), Top of Waste = 48 ft136.850

    Moist, 40% Gray Clay, 60% Waste as above, plus Paper156.455

    Wet, all Black Decomposed Non‐Descript Waste but for Plastic Bags and Wire Strands197.365

    206.570

    Dry to Moist, 90% Black Decomposed Non‐Descript Waste, 10% Clay & Gravel

    75

    80

    208.2

    209.2

    209.8

    As Above

    As Above, with Strings/Fibers

    As Above, with Glass Bottle

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    ‐2.00 Top of Flange (Elev. 501.710)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,456.828

    Northing: 1,067,153.717

    Gas Well ID: GEW‐218 GS Elevation: 499.708Drill Date(s): 8/17/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 499.708)0

    Safety Grate

    Moist, all Brown Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    81.65 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    As Above85.410

    Moist, 80% Gray Clay, 20% Waste (Plastic Bags, Cardboard), Depth to Liner 13 ft95.515

    Liner Surface (13' bgs.)

    Top of Bentonite Seal (16' bgs.)

    As Above, with HDPE Shards/Pieces

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    100.6

    Moist, 65‐70% Waste (Plastic Bags, Paper, Wood), 30‐35% Gray Clay111.225

    Moist, 90% Loose, Black Decomposed Waste (Cardboard, Wood, Plastic Bags), 10% Black Clay & Gravel123.430

    As Above, no Cardboard137.135

    Moist, all Black / Dark Gray Waste (Carpet Pieces, Wood, Plastic Bags, Legible Magazine)156.940

    As Above, all Moist to Damp Black Waste with Abundant Gravel Mixed, Gas Cap162.645

    Wet, Black Decomposed Non‐Descript Waste, some Plastic Bags191.850

    As Above, with Carpet Pieces and Concrete Fragments204.455

    207.060Wet, 30% Gray Clay and Gravel, 70% Decomposed Waste 

    (Plastic Bags) Bottom of Perforated Pipe ‐ 12" HDPE Cap (60' bgs)

    Bottom of Hole = 62 ft

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    ‐2.79 Top of Flange (Elev. 505.240)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,306.920

    Northing: 1,067,154.614

    Gas Well ID: GEW‐219 GS Elevation: 502.446Drill Date(s): 8/17/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 502.4460

    Safety Grate

    Moist, all Brown Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    108.65 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Moist, all Gray & Brown Clay / Soil, some Roots and Gravel135.110

    As Above 99%, with 1% Plastic Bags136.715Top of Bentonite Seal (16' bgs.)

    Moist, 80% Gray Clay, 20% Waste (Plastic Bags)

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    151.4

    Moist, 40‐50% Gray Clay, 50‐60% Waste (PVC, Plastic Bags, Metal Wire)166.525

    Dry to Moist, 33% Gray Clay, 67% Waste (Black Plastic, Carpet Pieces)172.830

    As Above185.135

    Moist, 25% Gray Clay and Large Rocks, 75% Waste (Plastic, Burlap)192.840

    Moist, 35% Sandy Gray Clay, 65% Broken Concrete, Plastic Waste195.245

    As Above, Dry to Moist198.950

    Dry to Moist, 85‐90% Waste (Wood, Black Non‐Descript Material, Plastic), 10‐15% Black Clay & Gravel206.055

    208.360Wet, Black Decomposed Non‐Descript Waste with 

    Concrete

    Bottom of Hole = 62 ft

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (60' bgs)

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Jon Wilkinson

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Top of Flange (Elev. 501.965)‐2.13

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,372.973

    Northing: 1,067,017.154

    Gas Well ID: GEW‐220 GS Elevation: 499.84Drill Date(s): 8/18/2018

    Top of Granular Backfill (19' bgs.)

    Top of Perforated Pipe (21' bgs.)

    0Ground Surface (Elev. 499.84)

    Damp, Brown, Clay / Soil82.05 Top of Soil (5' bgs.)

    Top of Bentonite Seal (3' bgs.)

    Damp, Brown, Clay / Soil82.410

    Top of Bentonite Seal (16' bgs.)

    Top of Soil (18' bgs.)

    Damp, Gray mottled w/ Brown, Clay / Soil95.515

    Damp, Gray mottled w/ Brown, Clay / Soil101.520

    Damp, Gray mottled w/ Brown, Clay / Soil Trash encountered111.225

    Damp to wet, 50% plastic bags, 50% partially decomposed wood / paper158.940

    Moist, 50% brown clay, 50% plastic bags130.730

    Moist to wet, 1/3 plastic bags,1/3 partially decomposed paper / wood,

    1/3 black clay / soilconcrete pieces

    149.735

    Wet, brown / black, mostly decomposed MSW201.355

    Damp to wet, 50% plastic bags, 50% partially decomposed wood / paper190.245

    198.6

    Bottom of Hole = 64 ft

    Safety Grate

    209.9 Bottom of Perforated Pipe ‐ 12" HDPE Cap (62' bgs.)

    65

    70

    Wet, black, completely decomposed MSW, with welding / oxygen tank @ 62 ft bgs201.360

    Moist to wet, 1/3 plastic bags,1/3 decomposed paper / wood,

    1/3 dark brown clay / soil50

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Jon Wilkinson

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Damp, Dark Gray, Clay / Soil132.135

    Damp, 50% Gray Clay / Soil,50% 4‐inch Diameter Clean Gravel112.825

    Damp, Gray, Clay / Soil1 x 1ft sq piece of flooring tile119.530

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,431.675

    Northing: 1,066,891.854

    Gas Well ID: GEW‐221 GS Elevation: 492.63Drill Date(s): 8/18/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 492.63)

    Damp, Brown, Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    98.35 Top of Soil (5' bgs.)

    0

    Top of Perforated Pipe (21' bgs.)

    Damp, Brown mottled w/ Gray, Clay / Soil92.010

    Damp, Gray with trace Black and with some Brown, Clay / Soil97.815

    Top of Bentonite Seal (16' bgs.)

    Damp, Gray with trace Black and with trace Brown, Clay / Soil

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    102.220

    Damp to Dry, Mottled Brown / Gray, Clay / SoilTrash encountered @ 41 ft bgs144.940

    55

    Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper186.960

    Damp to Moist, 50% Plastic Bags,50% Partially Decomposed Wood / Paper162.345

    Damp to Moist, 50% Plastic Bags,50% Partially Decomposed Wood / Paper177.350

    Top of Flange (Elev. 495.16)‐2.53

    Bottom of Hole = 75 ft75

    Safety Grate

    Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper210.5

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (70' bgs.)

    Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper203.865

    Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper204.670

    Wet, Grayish Black, 50% Plastic Bags50% Partially Decomposed Wood / Paper184.4

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Jon Wilkinson

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Top of Flange (Elev. 494.08)‐2.72

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,280.587

    Northing: 1,066,825.781

    Gas Well ID: GEW‐222 GS Elevation: 491.355Drill Date(s): 8/19/2018

    0Ground Surface (Elev. 491.355)

    Safety Grate

    Damp, Brown, Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    89.25 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (19' bgs.)

    Damp, Brown mottled with ≈ 10% Gray, Clay / Soil95.610

    Damp, Gray, Clay / SoilEVOH Liner encountered @ 13 ft

    Trash encountered @ 18 ft101.215

    Top of Bentonite Seal (13' bgs.)

    Damp, 50% Plastic Bags,50% Slightly Decomposed Wood / Paper,

    Mop Head

    Top of Soil (15' bgs.)

    Top of Granular Backfill (17' bgs.)

    116.7

    Damp, 50% Gray Clay / Soil,25% Plastic Bags,

    25% Partially Decomposed Wood / Paper,Burlap Bag

    143.225

    Damp, 50% Gray Clay / Soil,25% Plastic Bags,

    25% Partially Decomposed Wood / Paper174.030

    Damp to Moist, 45% Plastic Bags,45% Partially Decomposed Wood / Paper,

    10% Gray Clay / Soil191.335

    Moist to Wet, 50% Gray Clay / Soil,10% Plastic Bags,

    40% 4‐inch diameter gravel199.340

    Moist to Wet, 75% Gray Clay / Soil,25% Plastic Bags200.145

    Wet, Gray,75% Mostly Decomposed Paper / Wood,

    25% Plastic Bags206.350

    Wet, Dark Gray to Black,50% Mostly Decomposed Paper / Wood,

    50% Plastic Bags210.455

    60Bottom of Perforated Pipe ‐ 12" HDPE Cap (61' bgs.)

    65

    70

    Bottom of Hole = 61 ft

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Jon Wilkinson

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Top of Flange (Elev. 494.08)‐2.40

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,255.61

    Northing: 1,066,649.547

    Gas Well ID: GEW‐223 GS Elevation: 490.676Drill Date(s): 8/19/2018

    0Ground Surface (Elev. 490.676)

    Safety Grate

    Damp, Brown, Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    98.25 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Damp, Brown mottled with Gray, Clay / Soil,EVOH Liner Material112.210

    Damp, Gray, Clay / Soil128.815Top of Bentonite Seal (16' bgs.)

    Damp, Gray, Clay / SoilTrash Encountered @ 23 ft

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    143.9

    Moist, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper154.425

    Moist, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper166.030

    Moist, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper186.235

    Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper205.440

    Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper205.245

    Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper205.750

    Bottom of Hole = 55 ftBottom of Perforated Pipe ‐ 12" HDPE Cap (55' bgs.)

    65

    70

    Wet, 1/3 Black Clay / Soil,1/3 Plastic Bags,

    1/3 Partially Decomposed Wood / Paper210.355

    60

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Jon Wilkinson

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Top of Flange (Elev. 492.35)‐2.72

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,179.042

    Northing: 1,066,566.573

    Gas Well ID: GEW‐224 GS Elevation: 489.626Drill Date(s): 8/22/2018

    0Ground Surface (Elev. 489.626)

    Safety Grate

    Damp, Brown, Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    99.05 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Damp, Brown mottled with Gray, Clay / Soil106.910

    Damp, Light Gray mottled with Dark Gray, Clay / Soil115.915Top of Bentonite Seal (16' bgs.)

    Top of Soil (18' bgs.)

    Damp, 75% Gray Clay / Soil,25% Plastic BagsTrash Encountered

    Top of Granular Backfill (19' bgs.)

    130.6

    Damp, 25% Black Clay / Soil,25% Plastic Bags,

    50% Partially Decomposed Wood / Paper150.725

    Damp, 25% Gray Clay / Soil,25% Plastic Bags,

    50% Partially Decomposed Wood / Paper170.730

    Damp, 25% Gray Clay / Soil,25% Plastic Bags,

    50% Partially Decomposed Wood / Paper195.635

    Wet, 50% Gray Clay / Soil,50% Mostly Decomposed Wood / Paper

    Couple of Plastic Bags206.940

    Dry, 50% Brown Clay / Soil,50% Mostly Decomposed Wood / Paper

    Barbecue Grill Propane Tank189.545

    Wet,90% Dark Gray Completely Decomposed Wood / Paper,

    10% Plastic Bags,Fence Post

    194.850

    Dry, 50% Brown Clay / Soil,25% Plastic Bags,

    25% Partially Decomposed Wood / Paper55 Bottom of Perforated Pipe ‐ 12" HDPE Cap (55' bgs.)209.8

    60

    Bottom of Hole = 58 ft

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    ‐1.70 Top of Flange (Elev. 493.225)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,121.004

    Northing: 1,066,640.143

    Gas Well ID: GEW‐225 GS Elevation: 491.522Drill Date(s): 8/23/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 491.522)0

    Safety Grate

    Dry to Moist, Brown Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    91.95 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Dry to Moist As Above with PVC Shard91.910

    As Above97.815 Liner Surface (15‐16' bgs.)Top of Bentonite Seal (16' bgs.)

    Moist, all Gray / Brown Clay

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    103.8

    Moist, 30% Waste (Plastic Bags, Paper, Metal), 70% Gray / Brown Clay110.725

    Moist to Damp, 50% Waste (Wood, Plastic Bags), 50% Gray Clay and Gravel143.930

    Wet, 80% Waste (Wood, Plastic, Carpet Strings), 20% Gray Clay162.335

    As Above172.840

    60

    Wet, all Black & Dark Gray Decomposed Non‐Descript Waste192.345

    As Above, with Decomposed Wood198.150

    211.5

    As AboveBottom of Perforated Pipe ‐ 12" HDPE Cap (56' bgs)

    Bottom of Hole = 58 ftWet, 85‐90% Waste (Wood, Wire, Cloth, Metal Strapping), 

    10‐15% Black Clay

    207.355

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Depth in Feet Temperature (F) Waste/Soil Description

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,008.715

    Northing: 1,066,815.763

    Gas Well ID: GEW‐226 GS Elevation: 498.536Drill Date(s): 8/20/2018

    Well Completion Details

                               Safety GrateLiner Surface (2' bgs.)

    ‐3.23 Top of Flange (Elev. 501.769)

    20

    Ground Surface (Elev. 498.536)0

    Moist, Brown Clay / Soil, Depth to Liner 2 ft

    Top of Bentonite Seal (3' bgs.)

    92.65 Top of Soil (5' bgs.)

    Top of Perforated Pipe (21' bgs.)

    Moist, 95% Gray Clay and Gravel, 5% Plastic Bags97.810

    As Above, Top of Waste = 11 ft107.115Top of Bentonite Seal (16' bgs.)

    Moist, 75% Waste (Cardboard, Carpet, Plastic Bags), 25% Gray Clay

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    114.7

    Dry to Moist, 75‐85% Waste (Plastic Bags, Cloth), 15‐25% Dark Gray to Black Clay129.025

    Dry to Moist, 60% Decomposed Waste as above, 40% Dark Gray Clay171.730

    Dry, 60‐40 Mix As Above with Paper, Plastic, and Carpet Pieces176.335

    As Above, with Brown & Gray Clay196.240

    206.060

    Dry Decomposed Waste (Wood, Wire Strands, Foam Padding) and Dark Gray Clay with Gravel200.745

    As Above205.250

    As Above, with Concrete Pieces206.955

    208.565

    70

    As Above

    209.3

    As Above

    Dry, Bundle of Plastic Sheeting, WireBottom of Hole = 67 ft

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (65' bgs)

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Jon Wilkinson

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Top of Flange (Elev. 477.858)‐2.71

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 515,572.081

    Northing: 1,067,192.137

    Gas Well ID: GEW‐227 GS Elevation: 475.152Drill Date(s): 8/22/2018

    0Ground Surface (Elev. 475.152)

    Safety Grate

    Damp, Brown / Gray, Clay / SoilTrash Encountered @ 9 ft

    Top of Bentonite Seal (3' bgs.)

    82.35 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Damp, 1/3 Gray / Brown Clay / Soil,1/3 Partially Decomposed Wood / Paper,

    1/3 Plastic Bags106.610

    Damp, 75% Brown Clay / Soil,25% Partially Decomposed Wood / Paper132.815

    Top of Bentonite Seal (15' bgs.)

    Top of Soil (18' bgs.)Damp, 50% Brown Clay  / Soil,

    25% Partially Decomposed Wood / Paper,25% Plastic Bags,

    Fence Post

    Top of Granular Backfill (19' bgs.)

    156.6

    Damp, 50% Partially Decomposed Wood / Paper,50% Plastic Bags,

    Fence Post, Glass Beer Bottle173.025

    Moist, 75% Gray Clay  / Soil,25% Plastic Bags187.430

    Moist, 50% Brown Clay / Soil,25% Partially Decomposed Wood / Paper,

    25% Plastic Bags,Plastic clothes hanger

    201.035

    Moist, 1/3 Gray Clay  / Soil,1/3 Partially Decomposed Wood / Paper,

    1/3 Plastic Bags202.040

    Moist, 1/3 Dark Brown Clay  / Soil,1/3 Partially Decomposed Wood / Paper,

    1/3 Plastic Bags201.345

    Moist to Wet, 1/3 Dark Brown Clay  / Soil,1/3 Partially Decomposed Wood / Paper,

    1/3 Plastic Bags208.650

    No Recovery @ 55 ftAt 56 ‐ 57 ft bgs,

    Wet, 1/3 Dark Brown Clay  / Soil,1/3 Partially Decomposed Wood / Paper,

    1/3 Plastic Bags, Concrete Block with Rebar210.6

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (55' bgs.)55

    60

    Bottom of Hole = 57 ft

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Bottom of Hole = 63 ft203.8 Damp to Wet, Decomposed Wood, Metal, Glass

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (61' bgs)

    ‐2.79 Top of Flange (Elev. 501.589)

    Ground Surface (Elev. 498.800)0

    Safety Grate

    Dry to Moist, all Brownish Gray Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    98.25 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 515,858.020

    Northing: 1,067,185.456

    Gas Well ID: GEW‐228 GS Elevation: 498.800Drill Date(s): 8/21/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    As Above, with Concrete Pieces106.410

    As Above121.015Top of Bentonite Seal (16' bgs.)

    Dry to Moist, 20% Gray Clay, 80% Plastic Bags, Fiber Mesh, Paper, Cardboard, Top of Waste = 18 ft

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    137.8

    As Above, with Wire, Plastic Bags, Cinder Block, Paper161.025

    As Above, with Steel Pieces, Plastic Mesh, Wood182.630

    Dry to Moist, 25% Gray Clay, 75% Decomposed, Non‐Descript Waste193.635

    As Above202.140

    202.760

    As Above, with Wire, Metal Pieces, Rope, Cardboard, Plastic, Wood205.945

    As Above, with Wood and Plastic206.150

    As Above, Dry to Moist

    Dry, Wood and Plastic Waste207.255

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    ‐3.54 Top of Flange (Elev. 508.643)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,000.878

    Northing: 1,067,101.386

    Gas Well ID: GEW‐229 GS Elevation: 505.107Drill Date(s): 8/20/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 505.107)0

    Safety Grate

    Moist, all Brown / Gray Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    89.55 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    As Above94.710

    As Above, Gravel Seam at 13 ft99.615Top of Bentonite Seal (16' bgs.)

    Dry, Black Plastic Bags and Non‐Descript Waste

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    107.0

    Dry to Moist, 80% Waste (Carpet, Plastic Bucket, Cloth, Plywood), 20% Gray Clay124.325

    As Above, with Wire, Cardboard, Plastic Bags131.430

    As Above, Dry, with Rolled Plastic, Wood, String, Plastic Bags145.035

    As Above172.040

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (58' bgs)

    60 Bottom of Hole = 60 ft

    As Above, with Metal Scrap, Wood, Plastic Bags182.545

    Dry to Moist, Decomposed Waste (Plastic Bags, Cardboard, Wire)202.650

    206.7Wet, Black Decomposed Non‐Descript Waste, Bucket 

    Refusal on Steel

    As Above, with Metal and Concrete Pieces197.855

    65

    70

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,248.474

    Northing: 1,067,353.823

    Gas Well ID: GEW‐230 GS Elevation: 488.274Drill Date(s): 8/16/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    0Safety Grate

    Moist, 95% Brown / Gray Clay / Soil, 5% Plastic Bags, Top of Waste = 4.5 ft

    Top of Bentonite Seal (3' bgs.)

    100.25 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Moist, 40% Gray Clay / Soil, 40% Plastic Sheeting, 20% Carpet Strands/Strings125.410

    Moist, 33% Plastic Sheeting & Bags, 33% Wood, 33% Cardboard/Paper136.915

    Top of Bentonite Seal (16' bgs.)

    Moist, 20% Gray Clay, 80% Plastic Bags, Wood, Metal Wire

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    172.6

    Moist, 80% Waste as above, 20% Dark Gray Clay187.325

    Moist, 85% Waste (Wood, Wire, Burlap), 15% Gray Clay195.630

    Moist, 30% Gray Clay, 70% Waste (Wood, Plastic Bags)201.135

    Damp to Wet, 40% Gray Clay, 60% Waste (Wood, Concrete, Gravel/Sand, Plastic, Cloth)197.440

    Wet, 70% Gray Clay, 30% Concrete Pieces, Rebar, Tin Roofing Remnants208.345

    Wet, 75% Black Clay, 25% Decomposed Waste (Cardboard, Plastic) and Concrete Pieces209.150

    Wet, Black Decomposed Non‐Descript Waste207.660

    207.0

    Bottom of Hole = 60 ft

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (58' bgs)

    Top of Flange (Elev. 490.468)‐2.19

    Ground Surface (Elev. 488.274)

    65

    70

    Wet as above, Black Decomposed Waste (Cloth, Plastic, Wood, Gravel/Concrete)55

  • Client: Bridgeton Landfill LLC.

    Project Location: Bridgeton, MO

    Project Name: 2018 GCCS Updates

    FEI Project Number: BT‐143

    FEI Inspector: Bill Abernathy

    Drilling Contractor: Recovery Drilling Service

    Driller: Stan Garrison

    Health Physicists: N/A

    Bottom of Hole = 40 ft

    Bottom of Perforated Pipe ‐ 12" HDPE Cap (38' bgs)

    ‐1.82 Top of Flange (Elev. 493.295)

    Drilling Method: 36" Core Barrel

    Well Casing Material: 12" SDR‐11 HDPE

    Easting: 516,075.506

    Northing: 1,066,457.927

    Gas Well ID: GEW‐231 GS Elevation: 491.471Drill Date(s): 8/23/2018

    Depth in Feet Temperature (F) Waste/Soil Description Well Completion Details

    Ground Surface (Elev. 491.471)0

    Safety Grate

    Moist, Gray Clay / Soil

    Top of Bentonite Seal (3' bgs.)

    104.75 Top of Soil (5' bgs.)

    20Top of Perforated Pipe (21' bgs.)

    Moist, 60% Gray Clay / Soil, 40% Cardboard, Plastic Bags, and Cloth, Top of Waste = 7 ft117.610

    Moist, 60/40 Mix As Above, with Steel Cable, Plastic Bags, Mop, Plastic Waste140.815

    Top of Bentonite Seal (16' bgs.)

    Moist, 40% Gray Clay, 60% Plastic Bags, Wood, Plastic Banding

    Top of Soil (18' bgs.)

    Top of Granular Backfill (19' bgs.)

    186.1

    Moist, 35% Gray Clay, 60% Plastic Bags, Carpet Pad, Metal Conduit191.125

    Dry to Moist, 30% Gray Clay, 70% Plastic Bags, Felt, Wood, Plastic‐Coated Wire199.430

    Moist, 25‐30% Gray Clay, 70‐75% Waste (Metal, Plastic Bags, Cardboard, Wood, Carpet)200.335

    Moist, 20% Gray Clay and Gravel, 80% Partially Decomposed Waste (Wood, String, Plastic Bags, Paper)202.340

    60

    45

    50

    55

    65

    70

  • APPENDIX C

    CONSTRUCTION CERTIFICATION DRAWINGS (REDUCED SET)

    Drawing 000 Title Page Drawing 001 GCCS Plan View Drawing 002 Details

  • INDEX OF DRAWINGS

    TITLE PAGE

    001

    002

    BRIDGETON LANDFILL

    2018 Q2 GCCS INSTALLATION

    3377 HOLLENBERG DRIVE

    BRIDGETON, MO 63044

    TEL. (217) 483-3118

    GCCS PLAN VIEW

    DETAILS

    LOCATION MAP

    N

    SEPTEMBER 2018

    PREPARED FOR:

    Bridgeton Landfill, LLC

    13570 ST. CHARLES ROCK ROAD

    BRIDGETON, MISSOURI 63044

    AS-BUILT DRAWINGS FOR THE

  • GMP-13S, 13D

    GMP-11

    GMP-14S, 14D

    GMP-3

    GMP-10

    I-73

    PZ-204-AS

    PZ-204-SS

    PZ-103-SS

    PZ-106-SS

    PZ-106-SD

    PZ-203-SS

    PZ-104-KS

    PZ-205-SS

    PZ-205-AS

    MW-1204

    GMP-3S, 3M, 3D

    GMP-6

    GMP-4S, 4D

    GMP-4

    TMP-2S, 2M, 2D

    TMP-3S, 3M, 3D

    GMP-2

    PZ-106-KS

    P5

    PZ-104-SSPZ-104-SD

    PZ-116-SS

    PZ-105-SS

    PZ-210-SDPZ-210-SS

    TMP-9

    TMP-6

    TMP-19

    TMP-14

    TMP-12

    TMP-5

    TMP-SPM-2

    TMP-20

    TMP-32

    TMP-15

    TMP-31

    TMP-8

    TM

    P-5

    -9

    S

    TM

    P-5

    -5

    S

    TM

    P-5-5N

    TM

    P-5-9N

    TM

    P-1

    0-9

    S

    TM

    P-10-5S

    TM

    P-1

    0-5

    N

    TM

    P-1

    0-9

    N

    TMP-14R

    TMP-13

    TMP-7R

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    Q

    12G

    12G12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    4G

    4G

    6G

    4G

    6G6G

    6G6G

    6G

    6G

    6G

    6G6G

    6G6G

    6G

    6GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    12GU

    12GU

    12GU

    12GU

    12GU

    6GU

    6GU

    6GU

    6GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    6GU 6GU 6GU 6GU

    6GU

    6GU

    6GU

    6GU6GU

    6GU6GU

    6GU

    6GU6GU 6GU

    6GU 6GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    6GU

    6GU

    6GU

    6GU

    6GU

    16GU

    18GU

    18GU

    18GU

    18GU

    18GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    8GU 8GU8GU

    8GU8GU

    8GU8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    16GU

    16GU

    16GU

    16GU

    4GU

    4GU

    4GU

    4GU

    4GU

    6GU

    6GU

    6GU

    6GU

    18GU

    18GU

    4GU4GU

    4GU4GU

    4GU

    4GU

    4GU

    4GU

    4GU

    4GU

    8GU

    4GU

    4GU

    4GU

    4GU

    4GU

    18GU18GU

    18GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    12GU

    18GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    8GU

    6GU6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU

    6GU6GU

    6GU

    6GU

    6GU

    6GU6GU

    6GU

    6GU

    6GU

    18GU18GU

    18GU18G

    U18G

    U18G

    U

    18GU

    18GU

    18GU

    18GU

    18GU

    18GU18GU

    6GU

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2

    G

    2G

    4GU4GU 4GU

    4GU 4GU 4GU

    4GU

    6GU

    6GU

    6GU6GU6GU6GU6GU

    18GU

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    4PU

    4PU

    4PU

    4PU

    4PU

    4PU

    4PU

    4PU

    4PU

    4PU

    4PU

    6TD

    6TD

    6TD

    6TD

    6TD

    4G

    4G4G

    4G

    6TD

    6TD

    6TD

    6TD

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    6TD

    6TD

    6TD

    6TD

    6TD

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    4G

    8G

    8G

    6G

    6G

    6G

    6G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    4G4G

    4G

    18G

    18G

    18G

    18G

    18G18G

    18G

    18G

    18G18G

    18G

    18G

    18G

    4G

    4G

    4G

    4G

    4G

    4G4G

    4G

    4G

    4G

    4G

    6G

    8G

    4G

    6G

    6G

    8G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G12G

    12G

    12G12G

    12G12G

    12G

    12G

    12G

    12G

    12G12G

    12G12G

    12G

    12G

    12G12G

    12G12G

    12G12G

    12G

    12G

    12G12G

    12G12G

    12G

    12G

    12G

    12G12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    6G

    8G

    4G

    6G

    6G

    6G

    6G

    6G

    6G

    4G

    6G

    6G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    4G

    18G

    6G

    6G

    6G 6G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G18G

    18G18G

    18G

    18G

    18G

    18G18G

    18G

    18G

    18G

    18G

    18G

    18G18G

    18G

    18G18G

    18G

    18G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    4G4G

    4G

    6G

    6G6G

    6G6G

    8G

    8G

    4G

    6G

    4G

    6G

    6G6G

    6G

    6G

    6G

    6G6G

    6G

    6G

    4G6G 6G

    6G

    6G4G

    4G

    8G

    4G4G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G12G

    12G

    12G12G

    12G

    12G12G

    12G

    12G12G

    12G

    12G

    12G12G

    12G

    12G12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G12G

    12G

    12G12G

    12G

    12G12G

    12G12G

    12G12G

    12G

    12G12G

    12G12G

    12G

    12G

    12G12G

    12G12G

    12G12G

    12G12G

    12G12G

    12G12G

    12G

    12G12G

    12G12G

    12G12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    6G 4G 4

    G 4G

    4G

    4G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    6G

    6G

    4G

    6G

    6G

    4G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    6G6G

    6G

    6G

    4G

    4G

    4G

    4G

    4G

    4G 4G

    18G

    12G

    8G

    8G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    6G

    4G

    4G

    6G

    6G

    6G

    6G

    18G18G

    18G

    12G12G

    12G

    12G

    12G

    12G

    12G 12G12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    12G 12G

    6G

    6G

    6G

    6G

    6G

    6G 6G

    6G

    6G

    6G

    6G12G

    8G 8G

    8G

    8G

    8G

    6G

    8G 8G

    6G

    6G

    6G6G

    8G

    8G

    8G

    6G

    8G8G

    6G

    6G

    6G

    6G

    6G

    6G6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G 6G

    6G

    6G

    6G

    4G

    8G

    8G

    4G

    4G

    4G

    4G

    8G

    8G

    8G

    8G

    6G

    4G

    4G

    4G

    6G6G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    12G

    12G

    12G

    12G 12G

    12G12G

    6G

    6G6G

    6G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    18G

    8G

    6G

    6G

    6G

    12G

    12G

    12G

    12G

    12G

    12G

    18G

    18G

    4G

    6G

    6G

    6G

    6G

    6G

    6G

    6G6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    12G

    12G

    6G

    6G

    6G

    12G

    12G

    12G

    12G

    12G

    12G

    12G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    6G

    8G

    8G

    8G

    8G

    8G

    8G

    8G

    2A

    2A

    2A

    2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A 2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A2A

    2A2A

    2A

    2A2A2A2A

    2A

    2A2A

    2A2A

    2A2A

    2A

    2A

    2A2A2A2

    A2A

    2A2A2A

    2A2A

    2A

    2A2A 2A 2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A2A

    2A2A

    2A2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A2A

    2A2A

    2A

    2A2A

    2A

    2A2A

    2A2A

    2A2A

    2A

    2A

    2A2A

    2A

    2A 2A2A

    2A2A

    2A

    2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A 2A 2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A 2A2A

    2A

    2A2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A2A

    2A2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A2A

    2A2A

    2A

    2AU

    2AU2AU

    2A

    2A

    2A2A

    2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A2A 2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A 2A

    2A

    2A

    2A

    2A

    2A2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A 2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A2A

    2A2A2A

    2A

    2A

    2A

    2A2A

    2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A2A2A2A

    2A2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A 2A

    2A

    2A2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A 2A

    2A

    2A2A

    2A

    2A2A

    2A

    2A2A

    2A

    2A2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A2A2A

    2A

    2A

    2A

    2A

    2A2A

    2A2A

    2A2A

    2A 2A 2A 2A2A

    2A

    2A2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A2A

    2A2A

    2A2A

    2A2A

    2A 2A2A 2A

    2A 2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A

    2A

    2A2A

    2A2A

    2A2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A2A2A

    2A2A2A

    2A 2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    2A

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6X

    10L

    6X10L

    6X10L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6X

    10L6X10L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6X

    10L

    6X

    10L

    6X

    10L

    6X

    10L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    3

    X

    6

    L

    3

    X

    6

    L

    3

    X

    6

    L

    3

    X

    6

    L

    3

    X

    6

    L

    3

    X

    6

    L

    3X

    6L

    3

    X

    6

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    6

    X

    1

    0

    L

    2L

    LS

    GC

    LS

    6

    X

    1

    0

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4X

    8 L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4L

    4L

    4

    L

    4

    L

    4L

    4L

    4L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L

    4

    X

    8

    L