Bridgeport Comprehensive Waterfront Plan 2 nd Launch – Neighborhood Meeting 3/9/16 City of Bridgeport OPED, Department of Planning © CivicMoxie 2016 #WaterfrontBPT @CivicMoxie

Upload: others

Post on 18-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Bridgeport Comprehensive Waterfront Plan2nd Launch – Neighborhood Meeting 3/9/16City of Bridgeport OPED, Department of Planning© CivicMoxie 2016

#WaterfrontBPT@CivicMoxie

Page 2: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

“Bridgeport’s greatest asset is its 24 miles of waterfront. There are approximately 260 waterfront properties […] out of which approximately 49 % are publicly owned. The Waterfront Plan will provide a framework to guide land use along the city’s entire waterfront in a way that balances the needs of environmentally sensitive areas with economic development opportunities and provides openings for public access and open space… [The Plan] will promote a bold rethinking of the city’s water’s edge.”

- Office of Planning and Economic Development

Page 3: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Why now?

Page 4: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Because Bridgeport has this…

Page 5: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

…and this.

Page 6: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

And also this…

Page 7: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

…and this.

Page 8: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Landschaftspark, Duisburg-Nord, Germany

Page 9: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Landschaftspark, Duisburg-Nord, Germany

Page 10: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Waterfront Toronto

Page 11: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Waterfront Toronto

Page 12: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Waterfront Toronto

Page 13: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

The Yard at Mission Rock, San Francisco, CA

Page 14: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Morgan’s Pier, Philadelphia, PA

Page 15: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Vision 2020 NYC Comprehensive Waterfront Plan

Page 16: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Goals for the Waterfront Plan…

• Create a unified vision• Encourage economic development• Identify community connections• Identify opportunity sites for development• Establish waterfront development policies• Identify early action strategies• Address brownfield redevelopment challenges• Incorporate strategies for resiliency of the economy,

neighborhoods, environment

Page 17: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

The CivicMoxie Team

Susan Silberberg, CivicMoxiePrincipal-in-Charge

Regina Winters, Zared Enterprises

Karl Seidman, Seidman Economic Development Consulting

Tom Corso,AMS Consulting

Val Ferro,Weston + Sampson

Tanner Burgdorf + The Green Team!Groundwork Bridgeport

Lee Dwyer, CivicMoxieAssistant Project Manager

JD Reeves,Reeves Studio

Alexandra Stroud,Urban Focus

Taru Ruchi,CivicMoxieUrban Designer and Planner

Page 18: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

What This Planning Process will Look Like

© CivicMoxie 2016

Page 19: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

The Master Plan…

• Economic Development• Development Opportunity

Sites• Community Connections• Setup for Success• Build on Existing Momentum• Support the Steelpointe

Harbor Vision• Parks + Open Space • Early “wins”

A conceptual vision plan to guide decision-making and implementation and to excite local stakeholders and investors.

Page 20: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Moving from wishing to doingConnection to Yellow Mill Creek Greenway

Pedestrian Access to Pleasure Beach

Mixed-use developments

More lighting along the waterfront river walk

Create sustainable and flood-proof storm water infrastructure

Revitalize recreation facilities

Reuse/redevelopment of warehouses on brownfield sites

Better bike and pedestrian connections

More benches and improved pedestrian crossings

Source: NRZ Plans for the waterfront neighborhoods

Page 21: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Moving from wishing to doingConnection to Yellow Mill Creek Greenway

Pedestrian Access to Pleasure Beach

Mixed-use developments

More lighting along the waterfront river walk

Create sustainable and flood-proof storm water infrastructure

Revitalize recreation facilities

Reuse/redevelopment of warehouses on brownfield sites

Better bike and pedestrian connections

More benches and improved pedestrian crossings

Page 22: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

How to Get there: Inspiration and Innovation in Context

Brownfields Challenges 100 Year Flood PlainWaterfront Plan and Resilient BPTMarket ConditionsRegulatory ConstraintsSite Control (ownership)

Page 23: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

© CivicMoxie 2016

Page 24: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Flood Zones

Page 25: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

THE WATERFRONT PLAN and RESILIENT BRIDGEPORT

Managed and funded by City of Bridgeport, OPED, Dept of Planning

Managed by CT Dept of Housing, Funded by HUD, Administered by CT Dept of Housing

Coordinated vision and road map for waterfront economic development, community connections and amenities

Framework for protection/resiliency strategies to reduce risk/enhance quality of life: Black Rock and South End

Planning/identifying a pilot project that catalyzes broader investments in resilient infrastructure/development

Planning activities ( community outreach, research, conceptual planning, data analysis)

18 months planning – wrap up in June 2017Pilot project work to continue in 2017 - 2018

Final Plan in late summer 2016

Led by Waggonner and Ball (New Orleans) with ARCADIS, Yale Urban Design Workshop, Dorgan Arch. & Planning

Led by CivicMoxie (Boston) with Zared, AMS, Weston & Sampson, Reeves Studio, Seidman Consulting, Urban Focus

South End and Black Rock Harbor w focus on resilient development and floor risk reduction

LI Sound shoreline, rivers, creeks with focus on former industrial & underdeveloped sites and neighborhoods

Community outreach building off NRZ planning and RBD work, coordinate with RBD team where applicable

Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to engage community

Vision plan and road map for waterfront economic development, public space, real estate dev, amenities

Framework for building resilience in South End & Black Rock Harbor, pilot project that demonstrates strategies

To learn more and get involved, go to:www.courbanize.com/waterfrontbpt

To learn more and get involved, contact:[email protected] website under construction

Page 26: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

WHO REGULATES THE WATERFRONT?

© CivicMoxie 2016

Page 27: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Back to the Waterfront Master Plan Goals…

• Create a unified vision• Encourage economic development• Identify community connections• Identify opportunity sites for development• Develop waterfront policies• Identify early action strategies• Address brownfield redevelopment challenges• Incorporate strategies for resiliency of the economy,

neighborhoods, environment

Page 28: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to
Page 29: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

What We See and Hear

Page 30: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Recent Planning Initiatives

1990 1995 2000 2005 2010 2015

RPA Buildout Assessment

Page 31: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

East End NRZ Strategic Action Plan• 2005: Vita Nuova, LLC• Highlights brownfield redevelopment, more waterfront

access, connecting to open space• Goals include establishing linear park along creek,

waterfront park at end of Central Ave

East Side NRZ Strategic Plan• 2010: Killeen, PRE/view, and David Barbour Architects• Highlights rehabbing blighted properties, more

waterfront access, jobs, diversity, + amenities• Goals include specific public access points to water,

improving Waterfront/James Brown Park, pedestrian bridge over Pequonnock River

NRZ Plans

Page 32: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

East End

Page 33: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

East Side

Page 34: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Ownership (Site Control)

Page 35: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Water Dependent Uses

Page 36: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Current + Planned Development Initiatives

Page 37: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Brownfields

Page 38: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Public Access to Waterfront

Page 39: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

“I think Bridgeport needs a better image

in order to attract more jobs.”

“The city has a lot of potential, with these projects like the Eco-

Technology Park and the Remington site.”

“Everyone loves Seaside Park, but what about neighborhood

water access?”

“There are concerns about stormwater and

water contamination...”

Page 40: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

“We don’t need another plan, we

need strategies to pay for things.”

“Can we build on the momentum of the

Steelpointe development?

“How will you deal with meeting fatigue? We have done a lot of

planning.”

“How can we get more activity on the waterfront

while we wait for development?”

Page 41: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Moving Forward Beyond Documentation

• 24 miles is a lot of shoreline…where are the best opportunities for waterfront change?

• How can we build on existing momentum?• What does an analysis of the market tell us about feasibility and

incentives needed?• What elements of an overall framework for the waterfront will

be most important to success?

Page 42: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

We will be Looking at Opportunity Areas

• Site control• Open space • Community waterfront access• Critical mass to build on existing momentum• Level of brownfield remediation required

Page 43: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Community Conversation and Action

Places inthe Making:How placemaking buildsplaces and communities

Page 44: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

© CivicMoxie 2016

Page 45: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

www.courbanize.com/waterfrontBPT

Page 46: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to
Page 47: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to
Page 48: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Tonight’s Breakout1. Join a group.

2. Groups are organized by Waterfront Neighborhoods, including Downtown. There are three groups each for East Side and East End.

3. Read the instructions and get started!

4. You have 30 minutes and 2 questions.

Page 49: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Question #1

What’s missing from the map? Mark with X’s!

Think about:• activities (permanent or temporary)• Destinations (public spaces, major

businesses, community organizations, etc.)• Waterfront locations, connections and

activities

Page 50: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Question #2

In the short term, can you think of a temporary or pop-up use along the waterfront?

Where would you locate it? (Mark with circles.)

What neighborhood groups, institutions, businesses could work toward recruiting this use/setting this up, and managing it day to day, week to week, or simply one time?

Page 51: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Listening…

1. Who was here tonight?

2. Temporary waterfront activation or pop-up ideas?

Page 52: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

PHASE AGETTING STARTED/

EXISTING CONDITIONS

PHASE BTHE MARKET

PHASE CENVIRONMENTAL +

RESILIENCY

PHASE DLAND USE &

PROGRAMMING

PHASE EDRAFT VISION

PHASE FFINAL VISION

PHASE GINTERACTIVE MAP

August September - December January February March April May June July August September

PHASE FFINAL VISION

Oversight Committee Meeting or Conference Call

Public Meetings/Workshops/Events

SCHEDULE

Page 53: Bridgeport Comprehensive Waterfront Plan 2nd Launch –Neighborhood Meeting 3/9/16 · 2016-03-11 · Continuing/expanding conversations of RBD Phase 1, working w/waterfront team to

Thank you for coming!

1. Questions? Contact Lynn Haig, Senior Planner at the Bridgeport OPED, Dept of Planning:[email protected]

2. Sign up for the project website and start offering feedback!

www.courbanize.com/waterfrontBPT/