Page 1: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Bridge Preventative Bridge Preventative Bridge Preventative Bridge Preventative MaintenanceMaintenance

Jim Stack Asst DirectorJim Stack, Asst. DirectorGenesee Transportation CouncilDan Hallowell, NYSDOT Region 4, g

Todd Gadd, Wyoming County Hwy. Super.

Page 2: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

“We haven’t the money so we’ve “We haven’t the money so we’ve We haven t the money, so we ve We haven t the money, so we ve got to think”. got to think”. -- Ernest RutherfordErnest Rutherford

Page 3: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510
Page 4: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510
Page 5: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Bridge PM Scores are sorted highest to lowest. The top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on.y

Page 6: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Todd GaddWyoming County Highway Superintendent

Page 7: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

2010 Census: 42,1550 0 Ce sus , 55◦ Down 2.9% since 2000◦ 44,156 cows, up 2.6%601 Square Miles241 miles of County roads84 B id84 Bridges300 Large Culverts14 Road Workers 6 Bridge Maintenance 14 Road Workers, 6 Bridge Maintenance workers

Who We Are/What We HaveWho We Are/What We HaveWho We Are/What We HaveWho We Are/What We Have

Page 8: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Cyclical Preventive Maintenance

◦ Bridge Washing

B id S li (C t d W d)◦ Bridge Sealing (Concrete and Wood)

◦ Bridge InspectionsBridge Inspections

What We DoWhat We DoWhat We DoWhat We Do

Page 9: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Condition Based PM

◦ Steel Repairs◦ Concrete Beam RepairsS b t t R i◦ Substructure Repairs◦ Membrane Overlay◦ Scour Protection/Debris RemovalScour Protection/Debris Removal◦ Pave Inverts on Culverts

What We DoWhat We DoWhat We DoWhat We Do

Page 10: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Pier Rehab/Replacement Pier Rehab/Replacement Pier Rehab/Replacement Pier Rehab/Replacement Investigation required to determine appropriate scope consisting of partial repair, encasement, or replacement.

Page 11: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Structural Flag Beam End RepairStructural Flag Beam End RepairStructural Flag Beam End RepairStructural Flag Beam End Repair

Page 12: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Substructure Repair and Bearing Substructure Repair and Bearing Replacement Replacement Replacement Replacement

Page 13: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Bridge Deck InlayBridge Deck InlayBridge Deck InlayBridge Deck Inlay

Investigation required to determine appropriate scope consisting of inlay, overlay, or membrane and pave.

Page 14: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Joint RepairJoint RepairJoint RepairJoint Repair

Page 15: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Membrane and OverlayMembrane and OverlayMembrane and OverlayMembrane and OverlayRestore deck functionality by providing a quality riding surface while maximizing remaining deck life.

Page 16: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

Federal Funds to the Rescue!!Federal Funds to the Rescue!!

In 2010, applied for and received funding In 2010, applied for and received funding for PM project in 2011-14 TIPSummary◦ Element Specific work on 34 Bridges ◦ Programmed Cost: $1.566 millionExtends life 15 to 30 years◦ Extends life 15 to 30 years

Bottom Line – For the cost of a typical bridge replacement we have added about bridge replacement, we have added about 20 years to 34 structures – THAT’S 680 BRIDGE YEARS!

Page 17: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

2011-2014 Transportation Improvement Program (TIP)2011 2014 Transportation Improvement Program (TIP)Bridge Corrective/Preventive Maintenance* Project Information Summary

Project Sponsor: County of Wyoming

Bridge Name ("feature carried" over "feature crossed") & BIN Type of Work to be Undertaken

ElementRating ** ADT

Treament Life (yrs) Project Cost

Deck Area (sq.

ft.)

1Prospect Street over Tonawanda Creek BIN 3319560 Approach Slab Repl / Curb & S/W 4 3643 30 $88,000 4556

2Factory Rd over Buffalo Creek BIN 3320180 Memb & Pave / Brg / Scour 3 357 15 $123 000 24002 BIN 3320180 Memb. & Pave / Brg / Scour 3 357 15 $123,000 2400

3Hollow Rd over E. Fork Tonawanda Crk BIN 3320030 Repl W/W / Paved Invert 3 59 15 $141,600 1127

4Sanders Rd over Buffalo Creek BIN 3320190

Memb. & Pave / Joints / Rail / Scour 3 339 15 $212,900 2500

5Bullis Rd over Cayuga Creek BIN 3319650 Bearing Replacement 4 971 40 $90 000 34855 BIN 3319650 Bearing Replacement 4 971 40 $90,000 3485

6

7 Total Cost $655,500 14068

Page 18: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510
Page 19: Bridge Preventative MaintenanceThe top 10% get an evaluation score of 10 followed by a 9 for the next 10% and so on. Todd Gadd Wyoming County Highway Superintendent. y2000Cesus ,5510

What’s Next??What’s Next??

Until we have a new Surface Transportation Bill, providing d f d “adequate funding, “we must

think.”Preventative Maintenance in the Preventative Maintenance in the Transportation Improvement Program (TIP)Program (TIP)