Page 1: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

STRUCTURE MAINTENANCEBridge Preservation

Page 2: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

OUR OBJECTIVE

• To support region forces by providing technical

advice, training, specialized materials and

equipment as well as emergency response to

ensure safe, efficient and effective bridge ensure safe, efficient and effective bridge

operations.

Page 3: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

STATEWIDE BRIDGE CREW

• Emergency Response

• Specialized Steel Repairs

• Moveable Bridge Maintenance• Moveable Bridge Maintenance

Page 4: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

EMERGENCY RESPONSE

Page 5: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

TEMPORARY SUPPORTS

Page 6: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

BOLTED REPAIRS

Page 7: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

HEAT STRAIGHTENING

Page 8: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

MOVEABLE BRIDGE

Page 9: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

REGION BRIDGE SUPPORT UNIT

• Reachall Operations

• Material Procurement

• Best Practices

• Specialized Equipment• Specialized Equipment

• Training and Expertise

Page 10: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

MAINTENANCE FOCUS AREAS

• Crack Chasing

• Healer Sealer

• Thin Epoxy Overlay

Deck Patching• Deck Patching

• Expansion Joints

• Painting

• Pressure Relief Joints

Page 11: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

WHO DOES BRIDGE MAINTENANCE?

• MDOT Special Crews

– Each Region Utilizes Direct Forces for Bridge

Maintenance.

• Contract Counties• Contract Counties

– Large Urbanized Areas Utilize Contract Counties As

Well.

• Contractors

– Region Bridge Engineers Include Contract Bridge

Maintenance into Programs.

Page 12: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

HOW MAINTENANCE IS CONDUCTED?

• MDOT Direct Forces and Structure Maintenance

Section Establish Procedures

– New Products

– Techniques– Techniques

– Equipment

• Central Offices Create Special Provisions Based

on Field and Laboratory Testing

• Special Provisions Then Used to Contract Bridge

Maintenance

Page 13: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

EXPANSION JOINTS

• Full Depth

• Partial Depth

• Pourable

• Gland Repair/Splicing• Gland Repair/Splicing

Page 14: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

PARTIAL DEPTH JOINT

Page 15: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

DECK PATCHING

• Urgent Repairs

• Block Outs/End Headers

• Fast Set Materials

• Cold Weather Products• Cold Weather Products

Page 16: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

THIN EPOXY OVERLAYS

Page 17: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

THIN EPOXY OVERLAYS

• Very Prep Sensitive

• Time Consuming

• Utilizes Heavy Equipment

• Provides Waterproof Wearing Surface• Provides Waterproof Wearing Surface

• Improves Traction

Page 18: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

HEALER SEALER (PENETRATING SEALER)

Page 19: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

HEALER SEALER (PENETRATING SEALER)

• Prep Lenient

• Fast

• Mobility

• Light Equipment• Light Equipment

• Seals Cracks

• Maintains Original Traction

• Used as Crack Chaser

Page 20: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

HEALER SEALER VS. THIN OVERLAY

• Healer Sealer is Faster

– Approx. 1/3 of the time of a Thin Overlay

– Improves Mobility

• Sand is Cheaper than Chipped Flint

• Healer Sealer Breathes•– May be used on Box Beams and Stay-In-Place Forms

• Healer Sealer Requires Less Prep

– Quick Shot Blast

– No Need to Remove Lane Lines

• Thin Epoxy Overlay Improves Ride Quality

– May be used to Smooth Imperfections

– Improves Skid Resistance

• Overlay Bridges Cracks, Healer Sealer Penetrates Cracks

Page 21: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

FLOOD COAT TRENDS

• Transition From Thin Epoxy Overlays to Healer Sealers

• Thin Epoxy Overlays Still Have a Unique Benefit

• Healers Sealers are More Cost Effective

Page 22: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

PAVEMENT RELIEF JOINTS (PRJ’S)

Page 23: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

SYMPTOMS OF PAVEMENT GROWTH

• Closed Joint Rails

• Crushed Concrete Railing

• Separation of Tube Railing

• Diagonal (Shear) Deck Cracking in Quadrants

• Distortion in Approach Pavement

Page 24: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

SYMPTOMS OF PAVEMENT GROWTH

• Closed Pin and Hangers in Cold Temps

• Tilted Rockers

• Beam Ends in Contact

• Tilted Backwall

• Abutment Spalls

Page 25: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

FREQUENCY OF REINSTALLATION

• 2-3 YEARS

Source: Burke, M.P. Jr. “Reducing Bridge Damage Caused by Pavement Forces” Farmington Hills, MI Jan.-Feb., 2004

Page 26: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

RELIEF JOINT TRENDS

• Large Increase in Relief Joint Installations in 2009/10

– Increased Awareness

– Less Labor Intensive

– Cost Effective

Major Preventative Tool• Major Preventative Tool

Page 27: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

PAINTING

• All Painting Performed by Contract

• Inefficient to Continue Painting by Direct Forces

– Equipment Costs

– Health Hazards

– Time

Page 28: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

FALSE DECKING

• A Need for a Falling Concrete Containment System

that Maintained Deck Visibility.

Page 29: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped

FALSE DECKING

• Constructed of Square Tubing and Chain Link Fencing

• Fabricated per Individual Bridge Specifications

• Easy Installation from Shoulder

• Reusable

Page 30: Bridge Preservation...HEALER SEALER VS. THIN OVERLAY • Healer Sealer is Faster – Approx. 1/3 of the time of a Thin Overlay – Improves Mobility • Sand is Cheaper than Chipped