Bridge Expansion Bridge Expansion Feasibility GroupFeasibility Group
![Page 2: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/2.jpg)
Purpose Purpose
Our group is an independent coalition striving to Our group is an independent coalition striving to provide objective information on the expansion of provide objective information on the expansion of the Ambassador Bridge.the Ambassador Bridge.
Our goal is to inform the general public of the Our goal is to inform the general public of the facts involved with the project, thereby allowing facts involved with the project, thereby allowing open, honest debate of the intended bridge open, honest debate of the intended bridge construction.construction.
![Page 3: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/3.jpg)
Group StructureGroup Structure
Ryan G. Todd: Background, finance, and politicalRyan G. Todd: Background, finance, and political Sheena Sharma: Legal aspectsSheena Sharma: Legal aspects Mike Peres: Environmental and Heritage aspectsMike Peres: Environmental and Heritage aspects Chris Lepain: Alternatives, recommendations, Chris Lepain: Alternatives, recommendations,
conclusionconclusion Faisal Rehman: Information tech., technical Faisal Rehman: Information tech., technical
aspectsaspects
![Page 4: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/4.jpg)
BackgroundBackground Ambassador Bridge privately owned by Manuel “Matty” Ambassador Bridge privately owned by Manuel “Matty”
Moroun.Moroun. Originally built in 1929.Originally built in 1929. Busiest commercial crossing in North America, moving Busiest commercial crossing in North America, moving
nearly $100 billion annually across the border.nearly $100 billion annually across the border. Heavy traffic flow in late 90’s spurred the need for Heavy traffic flow in late 90’s spurred the need for
additional span.additional span. Current traffic flow is reduced, but will eventually grow.Current traffic flow is reduced, but will eventually grow. New, 6-lane span intended to built directly adjacent to New, 6-lane span intended to built directly adjacent to
existing bridge with dedicated truck traffic intended.existing bridge with dedicated truck traffic intended. Bridge will cost approximately 1 billion dollars and is Bridge will cost approximately 1 billion dollars and is
privately funded.privately funded.
![Page 5: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/5.jpg)
Feasibility FactorsFeasibility Factors
Environmental Environmental FinancialFinancial HeritageHeritage LegalLegal AlternativesAlternatives Political issuesPolitical issues
![Page 6: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/6.jpg)
Michael PeresMichael Peres
Environmental Advantages Environmental Advantages - Decreased Air pollution -> No traffic lights Decreased Air pollution -> No traffic lights
and more lanesand more lanes- Less EmissionsLess Emissions- No Ecosystems effectedNo Ecosystems effectedHuman HealthHuman Health- No effectNo effect- Ware and tare on streets Ware and tare on streets - Urban DumpingUrban Dumping
![Page 7: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/7.jpg)
Sheena SharmaSheena Sharma
Legal IssuesLegal Issues
Lawsuits Lawsuits
-Fail to follow federal guidelines -Fail to follow federal guidelines
-racial and income discrimination -racial and income discrimination
![Page 8: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/8.jpg)
Christine LepainChristine Lepain
DRTP - Detroit River Tunnel PartnershipDRTP - Detroit River Tunnel Partnership
• Created 6 weeks after 9/11Created 6 weeks after 9/11
• Partnership between the Canadian Pacific Railway and a subsidiary of Partnership between the Canadian Pacific Railway and a subsidiary of the Ontario Municipal Employees Retirement System pensionthe Ontario Municipal Employees Retirement System pension
• Convert an existing 100-year-old train tunnel into a truck throughway Convert an existing 100-year-old train tunnel into a truck throughway and bore another tunnel downriver for the displaced trainsand bore another tunnel downriver for the displaced trains
• The government would have paid $170 million and the remaining $430 The government would have paid $170 million and the remaining $430 million would have been privately funded million would have been privately funded
• Idea was scrapped because Idea was scrapped because 1.1. It would have required a 6-lane feeder road which would have had It would have required a 6-lane feeder road which would have had
a major impact on numerous urban communities a major impact on numerous urban communities 2.2. It was determined that it still would not have served the long-term It was determined that it still would not have served the long-term
demand.demand.
AlternativesAlternatives
![Page 9: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/9.jpg)
DRIC - Detroit River International CrossingDRIC - Detroit River International Crossing
• Supported by opponents of the Ambassador Supported by opponents of the Ambassador Bridge Twin-span.Bridge Twin-span.
• Crossing would connect the Detroit Delray Crossing would connect the Detroit Delray neighborhood north of Zug Island to an area on neighborhood north of Zug Island to an area on the Canadian side located between the the Canadian side located between the Canadian Salt Mine Company and the Brighton Canadian Salt Mine Company and the Brighton Beach Power Plant.Beach Power Plant.
• Publicly funded and will cost between 1.5 and 3 Publicly funded and will cost between 1.5 and 3 billion dollars to construct.billion dollars to construct.
![Page 10: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/10.jpg)
Although there is some strong political opposition to Although there is some strong political opposition to the Ambassador Bridge Twin-span, it has been the Ambassador Bridge Twin-span, it has been determined that Manuel, Matty, Maroun should be determined that Manuel, Matty, Maroun should be allowed to continue with the expansion.allowed to continue with the expansion.
The facts presented prove that the Twin-span will The facts presented prove that the Twin-span will not have a detrimental impact upon the not have a detrimental impact upon the environment, it will adequately accommodate the environment, it will adequately accommodate the expected traffic volume increases and it is the expected traffic volume increases and it is the more financially viable option for the taxpayers.more financially viable option for the taxpayers.
![Page 11: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/11.jpg)
The VideoThe Video
http://www.ambassadorbridge.com/ads/http://www.ambassadorbridge.com/ads/bridge.htmlbridge.html
![Page 12: Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador](https://reader036.vdocuments.mx/reader036/viewer/2022082611/56649ef45503460f94c07de8/html5/thumbnails/12.jpg)
Questions ?Questions ?