Page 1: Brey Tucker Portfolio 2002-2013

Aubrey [email protected]

Portfolio

Page 2: Brey Tucker Portfolio 2002-2013

2002-2013

page 2 of 34

Page 3: Brey Tucker Portfolio 2002-2013

PROFILE

To assist in the implementation and management of digital design, building information models,

digital fabrication and creative design to the creative arts, architecture, engineering and

construction industries.

CONTENTS

4 Work History

5 Professional Project Work

6 CMA

10 NASA CAIL 29

13 KAUST

15 Selected Medical Equipment

17 Equipment Collaborative Database Design

18 Creative Work

19 Digital Fabrication

24 Festival Projects

31 Graphic Work

34 Web Presence

page 3 of 34

Page 4: Brey Tucker Portfolio 2002-2013

PROJECT

EXPERIENCEEMPLOYMENT

EXPERIENCEuniversity of houston - herald d hines college of architecture

HOK Equipment Collaborative

Morris

ST BM2012

CORE BM2012

Flipside2012

NASA CAIL bld 29

CMA Tower

UH Master Plan Model

Perkins+Will

Miami DawnTown

KAUST

OSU Cancer Center

Database Design

Gov. NBAF

811 Tower

Natex

UHCOA Computer Lab

CORE BM2013

Brey Tucker Creative

started using

RevitProfessionally

Certi!ed for Revit

started using

Grasshopper

started using

Rhino

LITE Beam

Inverted Chair

started using

CNC construction methods

Research for CompetitionHouston TX, Hometown - many projectsCummins Engineering CampusSculpture Work for Burning Man

Research for CompetitionCMA SkyScraper BIM Lead

Research for Competition

Canopy Design

20132011200920072005

page 4 of 34

Page 5: Brey Tucker Portfolio 2002-2013

Professional

Project Work

Page 6: Brey Tucker Portfolio 2002-2013

CMA Tower

Saudi Arabia

BIM Lead

HOK

Page 7: Brey Tucker Portfolio 2002-2013

Capital Market

Authority Tower.

This was a massive e�ort

by HOK where I was given

the distinct privilege to

lead the entire BIM e�ort

for a multi-o�ce,

multidiscipline project

from the design submission

model work that was

completed in Rhino to

the Construction

Documents that were

delivered to the

construction team in

Bahrain.

page 7 of 34

Page 8: Brey Tucker Portfolio 2002-2013

page 8 of 34

Page 9: Brey Tucker Portfolio 2002-2013

Even though the scope of this project was staggering and the

team often a little too disconnected for true e�ciency, I

worked closely with all of the greatest leaders in the BIM

world to make a model that could transfer among all the

o�ces cleanly. This did take some time to understand but

at the end of the project we were working in Revit, AutoCAD,

Tekla, Navisworks, Rhino and SketchUp and doing full

material takeo�s that were incredibly accurate.

page 9 of 34

Page 10: Brey Tucker Portfolio 2002-2013

NASA CAIL 29

BIM Lead

HOK

NASA CAIL, Building 29 was an incredibly interesting project,

especially considering this was my �rst project in Revit.

The building was very unique in its original construction as

it was intended to house the centrifuge testing facility.

This quickly taught me the limitations of BIM and when

the 60/40 modelling rule is most apparent. I modelled all of

the structural components on this building along with

the architectural. page 10 of 34

Page 11: Brey Tucker Portfolio 2002-2013

page 11 of 34

Page 12: Brey Tucker Portfolio 2002-2013

KAUST was a challenging project from its undertaking as a �rm

split across four o�ces in the USA down to the extensive

coordination required among the disciplines that often occurs

in fast track projects. Showcased here is my �rst work with

interference checking which I did solely in Revit and then

imaged in Photoshop.

page 12 of 34

Page 13: Brey Tucker Portfolio 2002-2013

KAUST was an incredible project with a diabolical amount of

equipment. The lab showcased in these �nal construction

drawings was for a laser study laboratory that utilized an

incredible amount of custom equipment that was all �rst

developed in our three dimensional BIM model for

space study.

These pages display the desire for clean execution of

construction documents within Revit.

page 13 of 34

Page 14: Brey Tucker Portfolio 2002-2013

page 14 of 34

Page 15: Brey Tucker Portfolio 2002-2013

My time in the medical equipment planning industry provided

a lot of opportunity for me to learn how to be a consultant,

work with a multitude of design related individuals in one of,

if not the most, complicated �elds.

My time here still provided architectural work, rendering below

showcases some of my rendering ability put to use, and

allotted an incredible amount of time for me to master BIM

tools and their appropriate applications.

page 15 of 34

Page 16: Brey Tucker Portfolio 2002-2013

page 16 of 34

Page 17: Brey Tucker Portfolio 2002-2013

E-Catalist Logo

P E CNationWide UCI Cook Tower MDAOSUMC

Departments Rooms Equipment Reports Procurment History

N

P

C

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

E-Catalist Logo

P E CNationWide UCI Cook Tower MDAOSUMC

Departments Rooms Equipment Reports Procurment History

N

P

C

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

E-Catalist LE-Catalist LogoE-Catalist LE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist Logoogog

P E CP EP EP E CP EP EP E CP EP EP E CP EP EP E CP EP EP E CP E CP EP EP E CP EP EP E CP EP ENati Wide UCI C k To r MDAI C k r MOSUMCNationWide UCI Cook Tower MDAI C k To r MOSUMCNati Wide UCI C k To r MDAI C k To r MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMCNationWide UCI Cook Tower MDAI Cook Tower MOSUMC

De rt nts R Equi t R tss R Pr ntDepartments Rooms Equipment Reportss R Procurment HistoryDe rt nts R Equi t R tss R Pr nt HistDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R Procurment HistoryDepartments Rooms Equipment Reportss R HistoryDepartments Rooms Equipment Reportss R History

De rt nt N X De rt nt N X De rt nt N XDepartment Name X Department Name X Department Name XDe rt nt N X De rt nt N X De rt nt N XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name Xpa pa papa pa paBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudg Budg BudgBudg Budg Budg

NNNNN

PPPPPDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name Xpa pa papa pa pa

Budget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iCC Budg Budg Budg

Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned i

x

DEPARTMENT MM

Department Name

Sort Title

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

m i

m i

m i

m i

m i

m i

m i

S

m i

m i

+

Sort Title

Department Info

E-Catalist Logo

P E CNationWide UCI Cook Tower MDAOSUMC

Departments Rooms Equipment Reports Procurment History

All By Department All By Equipment TypeAll By Room

By Signi!cant Client Validation StatusBy Design Leader

Chosen StatusBy Floor Working Status

Common Estimates Summaries

E-Catalist Logo

P E CNationWide UCI Cook Tower MDAOSUMC

Departments Rooms Equipment Reports Procurment History

N

P

C

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

E-Catalist LE-Catalist LogoE-Catalist LE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoogoE-Catalist Logo

P E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI C r MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMC

Departments R Equi t Reportsnts R Proc ntDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments R Equi t Reportsnts R Proc nt HistoDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R HistoryDepartments Rooms Equipment Reportsnts R History

Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned Budget Planned Budget Planned

NNNNN

PPPPPDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name X

Budget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iCC Budget P Budget P Budget P

Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned i

x

DEPARTMENT MM

Department Name

Sort Title

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

m i

m i

m i

m i

m i

m i

m i

S

m i

m i

+

Sort Title

Department Info

Note

Comment

E-Catalist Logo

P E CNationWide UCI Cook Tower MDAOSUMC

Departments Rooms Equipment Reports Procurment History

N

P

C

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

Department Name XBudget Allotted

Budget Planned i

E-Catalist LE-Catalist LogoE-Catalist LE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoE-Catalist LogoogoE-Catalist Logo

P E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CP E CNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMCNationWide UCI Cook Tower MDAUCI C r MDAOSUMCNationWide UCI Cook Tower MDAUCI Cook Tower MDAOSUMC

Departments R Equi t Reportsnts R Proc ntDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments R Equi t Reportsnts R Proc nt HistoDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R Procurment HistoryDepartments Rooms Equipment Reportsnts R HistoryDepartments Rooms Equipment Reportsnts R History

Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned Budget Planned Budget PlannedBudget Planned Budget Planned Budget Planned

NNNNN

PPPPPDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name X

Budget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iC Budget Planned i Budget Planned i Budget Planned iCC Budget P Budget P Budget P

Department Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XDepartment Name X Department Name X Department Name XBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget AllottedBudget Allotted Budget Allotted Budget Allotted

Budget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned iBudget Planned i Budget Planned i Budget Planned i

x

DEPARTMENT MM

Department Name

Sort Title

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

Room Name

m i

m i

m i

m i

m i

m i

m i

S

m i

m i

+

Sort Title

Department Info

x

COMMENT MM

Note Location

blah blah blah blah blah blah

blah blah blah blah blah blah

blah blah blah blah

Date Date

User Info of Commenter

Addressed To

Comment Ticket #

Email Copy

Current Comment Status

E-Catalyst.

On this project I was

given the opportunity

to step out of my

conventional roles

and try my hand at

database design on

a network level and

human interaction

for the graphic

interface portion of

the project.

The project was never

put into use and was

abandoned due to

the company having

to close its doors but

the schematic work

done by me has been

greatly appreciated

by those in the

Medical Equipment

Planning �eld.

page 17 of 34

Page 18: Brey Tucker Portfolio 2002-2013

Creative

Project Work

Page 19: Brey Tucker Portfolio 2002-2013

Digital Fabrication

BIM, CNC, Wiring, Design,

Metal&Wood Construction

Page 20: Brey Tucker Portfolio 2002-2013

LITE Beam was a class project for the Digital Fabrication class of 2005 where I

was responsible for the CNC cut �les, electrical wiring and general construction.

This was a massive moment for the rest of my career as it generated all of my interests

in parametric design and BIM.

page 20 of 34

Page 21: Brey Tucker Portfolio 2002-2013

The Inversion Chair.

This project was an exploration in ergonomics,

CNC design and the use of modular furniture.

The completed sample below would have been

one piece that would be arrayed in a polar fashion

to create a semi-circle for lounge seating of 3-6

people. The schematic model image to the right

displays that �nal idea.

page 21 of 34

Page 22: Brey Tucker Portfolio 2002-2013

page 22 of 34

Page 23: Brey Tucker Portfolio 2002-2013

University of Houston Master Plan Model. This project was comprised

of 7 large tables hat held all of the buildings of the campus and

projected master plan layout for the future. All of the buildings

were modelled, set to CNC cut �les, glued into formation and

placed on the tables which were also cut to reveal lighting holes.

page 23 of 34

Page 24: Brey Tucker Portfolio 2002-2013

Festival Projects

Design Lead

Digital Fabrication

Construction MGMT

Wood Work

Metal Work

Page 25: Brey Tucker Portfolio 2002-2013

Singularity Transmissions

Honorarium 2012

Burning Man Festival

I was the concept design lead and structural CNC productionist. The top

image was the completed project at the festival and the bottom image

was the rendering used to submit the project for grant money. page 25 of 34

Page 26: Brey Tucker Portfolio 2002-2013

This project had many

challenges for CNC

work but it proved to

remain interesting and

full of reward.

Utilizing the shape

of a pentagon for the

main geometry of the

tower and then having

the tower taper made

the connections all

very unique but

operating with

parametric control

on the design made

the process fairly

simple. Images

showcase Rhino

modelling and �nished

structure.

page 26 of 34

Page 27: Brey Tucker Portfolio 2002-2013

ReinCOWnation

CORE 2012

Burning Man Festival

page 27 of 34

Page 28: Brey Tucker Portfolio 2002-2013

page 28 of 34

Page 29: Brey Tucker Portfolio 2002-2013

This project best shows my complete set of abilities.

The story of Houston CORE at Burning Man 2012.

The images of the story start on the previous page.

This project started conceptually with a clay model

that was captured with photogrammetry via

Audodesk 123D catch that I then developed into a

3D Rhino model to understand the structural forces

that then produced the 90 CNC cut �les that our

team built here in Houston �rst, skinned with

recycled scrap wood and then delivered to

Black Rock City to be built in the Nevada desert

and burned after a glorious showing in the chosen

circle of regional e�gies.

page 29 of 34

Page 30: Brey Tucker Portfolio 2002-2013

The team was comprised of about 30

other individuals who are all project

enthusiasts who wanted to complete

something challenging for the �ne

honor we received to represent the city

of Houston.

This project covered a wide array of

jobs from marketing/fund-raising

to full construction, assembly and

transportation. It was a wonderful

experience of total design.

page 30 of 34

Page 31: Brey Tucker Portfolio 2002-2013

Graphic

Work

Page 32: Brey Tucker Portfolio 2002-2013

In my pursuit of great design,

graphic delivery is always a

deep consideration of mine

that I try to push, keep original

and full of organized chaos.

These examples are just a few

of my selected projects from

which I have many over the

years. Clean communication,

problem solving and

simplifying massive data

are my graphic motivators.

page 32 of 34

Page 33: Brey Tucker Portfolio 2002-2013

page 33 of 34

Page 34: Brey Tucker Portfolio 2002-2013

ONLINE PRESENCE

Linked in @ http://www.linkedin.com/in/breytucker

Google+ @ https://plus.google.com/108390849404697060638/about

Archinect @ http://archinect.com/people/cover/16328445/brey-tucker

Behance @ http://www.behance.net/BreyTucker

issuu @ http://www.issuu.com/ Brey_Tucker

Coro!ot @ http://www.coro!ot.com/Brey_Tucker

FolioHD@ http://breytucker.foliohd.com/all

Carbonmade @ http://breytucker.carbonmade.com

Shown’d@ http://shownd.com/breytucker/

Taleo @ https://www.talentexchange.com/pro"le/breytucker

Talent House@ http://www.talenthouse.com/negativeispositive

Flickr@ http://www.!ickr.com/photos/breytucker/sets

ww

w.B

reyT

uck

er.

com

page 34 of 34