Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:

Upload: sara-casey

Post on 31-Dec-2015

90 views

Category:

Documents


1 download

DESCRIPTION

Brentwood Union Free School District. 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates. April 19, 2007. Prepared by:. Brentwood UFSD. Pool Phase “Ross House Pool”. Bids have been received from all Contractors and have been evaluated. - PowerPoint PPT Presentation

TRANSCRIPT

Brentwood Union Free School District

2006 Bond Referendum

Capital Improvement Program Pool Phase, All Alternates

April 19, 2007

Prepared by:

Pool Phase “Ross House Pool”

Bids have been received from all Contractors and have been evaluated.

The Architect and CM have reviewed all bids and have conducted Contractor qualification meetings for all apparent low bidders.

The Architect and CM have generated a letter of recommendation to the District for each qualified low bidder associated with the project.

The Board of Education has awarded the Pool project. Kick-off meetings to be set up.

Brentwood UFSD

Alt. G-1 New Changing Area and Storage Room

Brentwood UFSD

Alt. G-2 Spectator Seating Area Expansion

Brentwood UFSD

Alt. G-3 Diving Area

Brentwood UFSD

Alt. G-4 Replace Entire Existing Roof

Brentwood UFSD

Alt. G-5 Ceramic Wall Tile At “Project East” Wall

Brentwood UFSD

Alt. G-6 Ceramic Tile At “Project North” Wall

Brentwood UFSD

Alt. G-8 New Ceiling and Floor at Vestibules

Brentwood UFSD