Brentwood Union Free School District. 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates. April 19, 2007. Prepared by:. Brentwood UFSD. Pool Phase “Ross House Pool”. Bids have been received from all Contractors and have been evaluated. - PowerPoint PPT PresentationTRANSCRIPT
Brentwood Union Free School District
2006 Bond Referendum
Capital Improvement Program Pool Phase, All Alternates
April 19, 2007
Prepared by:
Pool Phase “Ross House Pool”
Bids have been received from all Contractors and have been evaluated.
The Architect and CM have reviewed all bids and have conducted Contractor qualification meetings for all apparent low bidders.
The Architect and CM have generated a letter of recommendation to the District for each qualified low bidder associated with the project.
The Board of Education has awarded the Pool project. Kick-off meetings to be set up.