Page 1: Braintree Leisure Centre Fit Out and Refurbishment

www.integral.co.uk

Case Study

Interior Fit Out and RefurbishmentBraintree Leisure Centre

Page 2: Braintree Leisure Centre Fit Out and Refurbishment

Red

efin

ing

Yo

ur

Sp

ace

www.integral.co.uk

Page 3: Braintree Leisure Centre Fit Out and Refurbishment

Red

efin

ing

Yo

ur

Sp

ace

Client: Fusion LifestyleProject: Braintree Leisure CentreLocation: Braintree, EssexArchitect: Pick EverardValue: £750,000

Fusion Lifestyle are a highly experienced sports and leisure managementorganisation, working in partnership with local authorities, schools,colleges, as well as other public sector organisations, to providerecreational sport, health and fitness activities to local communities. Theyare a registered charity, which means that all their incoming resources areused to improve and develop their facilities and activities.

Client Brief: As part of the ongoing programme of development IntegralBuild were engaged to carry out a large scale refurbishment and fit out atBraintree Leisure Centre in Essex.

The works involved an enlarged modern hi-tec gym incorporatingfunctional fitness and free weights area, an improved and upgraded firstfloor studio, a new spin studio, crèche area, upgraded changing facilitiesacross the centre including upgraded mechanical and electricalinstallations. A new food servery was constructed & installed to allow thesupply of light meals during functions. A new swipe card entrance dooraccess system was installed for better control/segregation of the Schoolpupils during School hours.

Logistics: With the centre being attached to the local secondary schoolthe logistics of the site were particularly challenging with regard toprogramme and day to day deliveries. Whilst at the same time ensuringthat the leisure centre was kept fully operational during the 15 weekproject, this was achieved via a multiple phase programme and theintroduction of temporary screens and hoardings to ensure site works andmembers were kept safely apart.

Integral Build’s on site Project Manager worked closely with centre andschool management to ensure no works interfered with the ongoingoperations in the centre and the school, this was successfully achievedwith handover taking place as planned at the end of the school holidays.

For further information or enquiries please contact us on:TEL: 01179 720 054EMAIL: [email protected]

Client testimonial: “From the outset it was obvious that the Project Manager and team were on top of everything on site. They managed the work well, particularly since works had to take into account school hours and with people there. They were fantastic at keeping contractors ‘at bay’ with a wholly appropriate stern approach. I was impressed with his management of the team. At completion works still require a few snagging issues to be completed but I am very happy with the facility. All snags were dealt with very promptly. The Project Manager was brilliant.– he saw the whole thing from the client’s point of view and this is to be commended.

I’ve worked in the leisure sector for many years and if there was another centre requiring work similar to this I would certainly recommend the Integral Build team. Good job done. “

Jon Richardson, Fusion Lifestyle General Manger

www.integral.co.uk

Page 4: Braintree Leisure Centre Fit Out and Refurbishment

Red

efin

ing

Yo

ur

Sp

ace

www.integral.co.uk

Page 5: Braintree Leisure Centre Fit Out and Refurbishment

Red

efin

ing

Yo

ur

Sp

ace

www.integral.co.uk

Page 6: Braintree Leisure Centre Fit Out and Refurbishment

INTEGRAL BUILD1 Riverside Business Park

St Anne's RoadBristol BS4 4ED

Tel: 01179 720054Fax: 01179 725960

[email protected]