bracken library – uts renovation bsu project no. 2011-019€¦ · 1. astm e 1333 0.01 –...

12
2011-019.01BL Bracken Library – UTS Renovation Ball State University 00 01 10 - TABLE OF CONTENTS 2007 (WS) Document Origination Date: June 1, 2009 Document Revision Date May 25, 2010 00 01 10 - 1 DOCUMENT 00 01 10 TABLE OF CONTENTS Bracken Library – UTS Renovation BSU Project No. 2011-019.01BL Section Title DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION 00 01 01 Project Cover Page 00 01 10 Table of Contents (WS) 00 01 15 List of Drawing Sheets PROCUREMENT REQUIREMENTS 00 21 13 Notice to Bid 00 21 14 Instructions to Bidders – AIA A701 00 22 13 Supplementary Instructions to Bidders – BSU A701 (WS) 00 41 13 Bid Form – Indiana Form 96 – Revised 00 43 00 Bid Form Supplements 00 43 13 Bid Security Form – AIA A310 00 45 00 Representations and Certifications (WS) CONTRACTING REQUIREMENTS 00 52 14 Agreement Form - AIA A101 Owner Contractor Agreement 00 54 00 Agreement Form Supplements – BSU A101 00 61 00 Bond Form – AIA A312 Performance Bond and Payment Bond 00 61 14 Amendments to Payment Bond – BSU A312 00 72 14 General Conditions - AIA A201 General Conditions of the Contract for Construction 00 73 13 Supplementary Conditions – BSU A201 (WS) 00 73 43 State of Indiana Common Construction Wage Scale 00 73 73 Escrow Agreement 00 90 00 Bidding, Contract and Administration Documents and Forms 1997 Ed. 5/25/10 2009 6/01/09 1970 Ed. 6/01/09 2007 Ed. 6/01/09 1984 Ed, 6/01/09 2007 Ed. 6/01/09 6/01/09 6/01/09 5/25/10 DIVISION 01 - GENERAL REQUIREMENTS 01 10 00 Summary 01 20 00 Price and Payment Procedures 01 30 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements

Upload: others

Post on 17-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Ball State University 00 01 10 - TABLE OF CONTENTS 2007 (WS) Document Origination Date: June 1, 2009 Document Revision Date May 25, 2010 00 01 10 - 1

DOCUMENT 00 01 10 TABLE OF CONTENTS

Bracken Library – UTS Renovation BSU Project No. 2011-019.01BL

Section Title DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

00 01 01 Project Cover Page 00 01 10 Table of Contents (WS) 00 01 15 List of Drawing Sheets PROCUREMENT REQUIREMENTS

00 21 13 Notice to Bid 00 21 14 Instructions to Bidders – AIA A701 00 22 13 Supplementary Instructions to Bidders – BSU A701 (WS) 00 41 13 Bid Form – Indiana Form 96 – Revised 00 43 00 Bid Form Supplements 00 43 13 Bid Security Form – AIA A310 00 45 00 Representations and Certifications (WS) CONTRACTING REQUIREMENTS

00 52 14 Agreement Form - AIA A101 Owner Contractor Agreement 00 54 00 Agreement Form Supplements – BSU A101 00 61 00 Bond Form – AIA A312 Performance Bond and Payment Bond 00 61 14 Amendments to Payment Bond – BSU A312 00 72 14 General Conditions - AIA A201 General Conditions of the Contract

for Construction 00 73 13 Supplementary Conditions – BSU A201 (WS) 00 73 43 State of Indiana Common Construction Wage Scale 00 73 73 Escrow Agreement 00 90 00 Bidding, Contract and Administration Documents and Forms

1997 Ed. 5/25/10 2009 6/01/09 1970 Ed. 6/01/09 2007 Ed. 6/01/09 1984 Ed, 6/01/09 2007 Ed. 6/01/09 6/01/09 6/01/09 5/25/10

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 Summary 01 20 00 Price and Payment Procedures 01 30 00 Administrative Requirements 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 50 00 Temporary Facilities and Controls 01 60 00 Product Requirements 01 70 00 Execution and Closeout Requirements

Page 2: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Ball State University 00 01 10 - TABLE OF CONTENTS 2007 (WS) Document Origination Date: June 1, 2009 Document Revision Date May 25, 2010 00 01 10 - 2

DIVISION 02 – EXISTING CONDITIONS

02 41 19 Selective Demolition DIVISION 06 – WOOD, PLASTICS AND COMPOSITES 06 04 10 Bamboo Flooring - Alternate 06 20 00 Finish Carpentry DIVISION 08 – OPENINGS

08 14 16 Wood Doors 08 71 00 Door Hardware 08 80 00 Glazing DIVISION 09 – FINISHES

09 21 16 Gypsum Board Assemblies 09 51 23 Acoustical Tile Ceilings 09 65 00 Resilient Flooring 09 90 00 Painting and Coating DIVISION 21 – FIRE SUPPRESSION

21 05 00 General Fire Suppression Requirements 21 05 29 Supports and Anchors 21 23 01 Fire Protection Piping DIVISION 22 – PLUMBING 22 00 00 Plumbing 22 05 00 General Plumbing Requirements 22 05 29 Supports and Anchors 22 07 00 Piping Insulation 22 10 00 Plumbing Piping 22 11 00 Plumbing Specialties 22 40 00 Plumbing Fixtures DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING

23 05 00 General HVAC Requirements 23 05 29 Supports and Anchors 23 05 93 Testing, Adjusting and Balancing 23 07 01 Ductwork Insulation 23 31 00 Ductwork 23 33 00 Ductwork Accessories 23 37 01 Air Outlets and Inlets DIVISION 26 – ELECTRICAL

26 03 00 Electrical Demolition for Remodeling 26 05 00 Basic Electrical Requirements 26 05 19 Wires and Cables – 600 Volts and Less 26 05 26 Grounding and Bonding

Page 3: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Ball State University 00 01 10 - TABLE OF CONTENTS 2007 (WS) Document Origination Date: June 1, 2009 Document Revision Date May 25, 2010 00 01 10 - 3

26 05 29 Supporting Devices 26 05 30 Conduit 26 05 33 Surface Raceways 26 05 34 Boxes 26 05 53 Electrical Identification 26 06 20 Equipment Wiring Systems 26 09 24 Room Occupancy Sensors 26 24 16 Panelboards 26 27 25 Floor Outlets 26 27 26 Wiring Devices 26 51 00 Lighting Fixtures and Accessories DIVISION 27 – COMMUNICATIONS

27 05 00 Communication Systems Electrical Requirements 27 05 01 Basic Communication System Requirements 27 15 00 Voice, Data and Video Cabling Infrastructure DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Electronic Safety and Security Systems Electrical Requirements 28 05 01 Basic Electronic Safety and Security System Requirements 28 31 02 Addressable Fire Alarm System

Page 4: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Bamboo Flooring - Alternate

06 04 10 - 1

SECTION 06 04 10

BAMBOO FLOORING - ALTERNATE

PART 1 GENERAL

1.1 SUMMARY

A. Section includes commercial grade solid strip bamboo flooring in multiple precise lengths.

1.2 REFERENCES

A. American Society for Testing And Materials: 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde

Concentrations in Air and Emission Rates form Wood Products using a Large Chamber.

2. ASTM D 1037-06a – Standard Test Methods for Evaluating Properties of Wood-Based Fiber and Particle Panel Materials.

3. ASTM D 4060-10 – Standard Test Method for Abrasion Resistance of Organic Coating by the Taber Abraser.

4. ASTM D2394-05e1 – Standard Test Methods for Simulating Service of Wood and Wood-Based Finish Flooring.

5. ASTM D4442-07 – Standard Test Methods for Direct Moisture Content Measurements of Wood and Wood-Base Materials.

6. ASTM E 648-10 – Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source.

7. ASTM E 622-09 – Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials.

B. National Fire Protection Association: NFPA 101 – Life Safety Code.

1.3 SUBMITTALS

A. Section 01330 - Submittal Procedures: Submittal procedures.

B. Samples: 1. Submit two samples of finish product, 8x10 inches in size illustrating wood grain

and specified finish.

1.4 QUALITY ASSURANCE

A. Perform work in accordance with WI (Woodwork Institute) Manual of Millwork, Custom Grade.

1.5 QUALIFICATIONS

A. Fabricator: Company specializing in fabricating Products specified in this section with minimum three years experience.

Page 5: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Bamboo Flooring - Alternate

06 04 10 - 2

1.6 DELIVERY, STORAGE, AND HANDLING

A. Section 01600 - Product Requirements: Product storage and handling requirements.

B. Protect work from damage.

1.7 ENVIRONMENTAL REQUIREMENTS

A. Section 01 60 00 - Product Requirements.

B. During and after installation of Work of this section, maintain same temperature and humidity conditions in building spaces as will occur after occupancy.

1.8 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication/order.

1.9 SEQUENCING

A. Section 01 10 00 - Summary: Work sequence.

B. Sequence work to ensure utility connections are achieved in orderly and expeditious manner.

1.10 COORDINATION

A. Section 01300 - Administrative Requirements: Coordination and project conditions.

B. Coordinate work with electrical rough-in, installation of associated and adjacent components, and other related trades.

1.11 WARRENTY

A. Section 01 70 00 - Execution Requirements: Product warranties and product bonds.

B. Provide Manufacturer’s 10-year heavy-use commercial finish warranty.

PART 2 PRODUCTS

2.1 COMMERICAL GRADE SOLID-STRIP BAMBOO FLOORING

A. Manufacturers: 1. Teragren Commercial; Model Synergy TPF-SYN-CHSNT-MPL (Chestnut). 2. Substitutions: Section 01600 - Product Requirement.

2.2 BAMBOO FLOORING COMPONENTS

A. Flooring Planks: 1. Dimensions: Multiple Precise Lengths of ½” x 3¾” x 2’, 3’, 4’ and 6’ in one carton. 2. Milling Profile: Tongue and Groove with micro-beveled edges and ends.

Page 6: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Bamboo Flooring - Alternate

06 04 10 - 3

3. Factory Finish: water-based, solvent-free, 7-coat finish system of aluminum oxide and polyurethane flash-dried with ultraviolet light (UV cured): a. Layers:

1) Sealer 2) Suspended Aluminum Oxide (for abrasion resistance) 3) Sealer 4) Sealer 5) Sealer 6) Polyurethane (for scratch resistance) 7) Polyurethane (for scratch resistance)

B. Glue Down Adhesive: 1. Low-VOC, as recommended by manufacturer.

C. Flooring Trim: 1. Floor reducers as recommended by manufacturer to coordinate with specified

flooring. 2. To match floor finish. 3. Must meet ADA guidelines.

D. Moisture Barrier: 1. Impermeable moisture barrier system/vapor retarder system as recommended by

manufacturer.

E. ASTM Standards: 1. ASTM D1037-06a - Janka Ball, Min. 3,428. 2. ASTM D1037-06a - Dimensional change coefficient (50% RH to 80% RH):

Parallel: .00063 / Perpendicular: .008 / Thickness: N/A. 3. ASTM D4060-10 - CS-17 Taber abrasive wheels: Final wear-through: Minimum

27,500 cycles. 4. ASTM D2394-05e1 - Average; Static 0.592; Sliding 0.62. 5. ASTM D4442-07 - Oven Dry Method: 6-8 percent average. 6. ASTM E648-10 - Class I Interior Floor Finish Rating per NFPA 101. 7. ASTM E622-09 - Maximum 341 in flaming mode; 189 in non-flaming mode.

PART 3 EXECUTION

3.1 EXAMINATION

A. Section 01 30 00 - Administrative Requirements: Coordination and project conditions.

3.2 INSTALLATION

A. Open each box, remove the flooring from its packaging, and stack the flooring planks at least 4" off the ground to allow for complete and even air-circulation around the flooring.

B. Acclimation should occur at the room temperature and relative humidity levels expected to be present before, during, and after installation. Bamboo flooring should be allowed to acclimate on the job site for a minimum of three (3) days. For maximum stability, bamboo flooring should be acclimated at and installed into environments with relative humidity (RH) and temperature controls capable of maintaining the delivered moisture content of 7-9%. See selected flooring manufacturer for suggested percentages.

Page 7: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

2011-019.01BL

Bracken Library – UTS Renovation

Bamboo Flooring - Alternate

06 04 10 - 4

C. Install work in accordance with manufacturer’s standard.

D. Set and secure materials and components in place, plumb and level.

E. Carefully scribe work abutting other components, with maximum gaps of 1/32 inch.

F. Glue down over moisture barrier as recommended by flooring manufacturer.

3.3 ERECTION TOLERANCES

A. Section 01 40 00 - Quality Requirements: Tolerances.

B. Maximum Variation from Indicated Position: 1/8 inch or as recommended by flooring manufacturer.

C. Maximum Offset from Alignment with Abutting Materials: 1/8 inch or as recommended by flooring manufacturer.

3.4 CLEANING

A. Section 01700 - Execution Requirements: Final cleaning.

END OF SECTION

Page 8: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form
Page 9: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form
Page 10: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form
Page 11: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form

Addendum - Page 1 of 1 12/28/10

ADDENDUM NO. 1, December 29, 2009

RE: Bracken Library – UTS Renovation Ball State University Project No. 2011-019.01BL

FROM: Facilities Planning & Management Ball State University Muncie, IN 47306

TO: Prospective Bidders

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated December 17, 2010 as noted below. Acknowledge receipt of this Addendum in the space provided on the Supplements to Bid Form. Failure to do so may subject Bidder to disqualification.

This Addendum is issued in accordance with the provisions of the Instructions to Bidders (AIA A701, 1997 Ed.) and Supplementary Instructions to Bidders Documents of the Project Manual.

This Addendum consists of 1 Page(s), the attached drawings, sheets A100, A101, ALT1.1 and A200, with the revised date of 12.29.10 and the following items:

1. Specification Section 00 01 10 – UTS Table of Contents_WS_Add#1_12.29.10: 1 page 2. Specification Section 06 04 10 – UTS Bamboo Flooring – Alternate_ADD#1_12.29.10:

3 pages CHANGES TO BIDDING REQUIREMENTS:

1. Sheet A100 – Revised finished openings related to the OFOI Steelcase Privacy Wall System. 2. Sheet A101 – Updated RCP and Notes to include Mechanical, Electrical and Technology

items. Added bulkhead detail tag. 3. Sheet ALT1.1 - Updated Alternate RCP and Notes to include Mechanical, Electrical and

Technology items. Removed notes related to “White Melamine” at cabinet interiors. 4. Sheet A200 – Revised detail 9:A200 to show new Steelcase Privacy Wall System

Configuration. Removed notes related to “White Melamine” at cabinet interiors. CHANGES TO SPECIFICATIONS:

1. Added Section 06 04 10 – Bamboo Flooring – Alternate in its entirety. 2. Revised Section 00 01 10 – Table of Contents to include new section.

CHANGES TO DRAWINGS: See Revisions of Sheets – A100, A101, ALT1.1 and A200

END OF ADDENDUM NO. 1

Page 12: Bracken Library – UTS Renovation BSU Project No. 2011-019€¦ · 1. ASTM E 1333 0.01 – Standard Test for Determining Formaldehyde Concentrations in Air and Emission Rates form