brac pmo west former nas moffett field overview of second five-year review operable unit (ou) 1...
TRANSCRIPT
BRACBRACPMO WESTPMO WESTFormer NAS Moffett FieldFormer NAS Moffett Field
Overview of Second Five-Year ReviewOverview of Second Five-Year ReviewOperable Unit (OU) 1Operable Unit (OU) 1
September 13, 2007
BRACBRACPMO WESTPMO WEST
WHAT IS A 5-YEAR REVIEW?WHAT IS A 5-YEAR REVIEW?
• Evaluation of in-place remedy to verify that it remains protective of human health and the environment
• Requirement under Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA)
• Navy policy is consistent with EPA guidance
BRACBRACPMO WESTPMO WEST
WHAT IS A 5-YEAR REVIEW? (cont.)WHAT IS A 5-YEAR REVIEW? (cont.)
• 5-Year Review report includes the following:– Protectiveness determination– Documentation of any deficiencies identified during the
review– Recommendations for specific actions to ensure that a
remedy will be or will continue to be protective
• 5-Year Review process integrates decision document information and operational data of actions at the site
• Evaluates implementation and performance of selected remedy
BRACBRACPMO WESTPMO WEST
WHAT IS A 5-YEAR REVIEW? (cont.)WHAT IS A 5-YEAR REVIEW? (cont.)
• Per EPA guidance, the six components of the 5-Year Review process are:– Community involvement and notification– Document review– Data review and analysis– Site inspection– Interviews– Protectiveness determination
BRACBRACPMO WESTPMO WEST
WHEN IS A 5-YEAR REVIEW REQUIRED?WHEN IS A 5-YEAR REVIEW REQUIRED?
• Upon completion of remedial action, hazardous substances, pollutants, or contaminants remain aboveabove levels that allow for unlimited use and unrestricted exposure
• Any Record of Decision signed on or after October 17, 1986 [effective date of Superfund Amendments and Reauthorization Act (SARA)]
BRACBRACPMO WESTPMO WEST
5-YEAR REVIEW “TRIGGER”5-YEAR REVIEW “TRIGGER”
•Selected remedy will not allow for unlimited use and unrestricted exposure
• Remedial action construction– Initiation of construction triggers the 5-Year Review clock
• No remedial action construction (e.g., monitored natural attenuation, institutional controls)– Record of Decision date is trigger
•First 5-Year Review completed within five years– First OU1 5-Year Review in 2002
•Subsequent 5-Year reviews completed no later than five years after previous 5-Year Review reports
BRACBRACPMO WESTPMO WEST
FORMER NAS Moffett BASEMAPFORMER NAS Moffett BASEMAP
FORMER NASMOFFETT FIELD
NASA AMESRESERCH CENTER
SITE 1 LANDFILL
SITE 2 FORMER LANDFILL
Feet
N
BRACBRACPMO WESTPMO WEST
OPERABLE UNIT 1OPERABLE UNIT 1
• OU1 consists of Installation Restoration (IR) Site 1 Runway Landfill and former IR Site 2 Golf Course Landfill
• Record of Decision signed in August 1997
• In 1997, approximately 23,000 cubic yards of refuse from Site 2 was excavated and consolidated with Site 1
• No further action at Site 2; three years of groundwater monitoring completed
BRACBRACPMO WESTPMO WEST
OU1 REMEDYOU1 REMEDY
Major components of OU1 remedy include:
• 12 acre, 2-foot thick, multi-layer, engineered cap
• Groundwater/surface water monitoring (12 wells, 2 piezometers, 2 trench wells)
• Landfill gas monitoring (4 wells, 19 gas vents, 21 perimeter locations)
• Institutional controls: fencing and cap disturbance restrictions
• Inspection/maintenance of vegetative cover, cap, monitoring components, pump appurtenances, and institutional controls
BRACBRACPMO WESTPMO WEST
OU1 - SITE 1 LANDFILLOU1 - SITE 1 LANDFILL
N
US FISH ANDWILDLIFE SERVICE
US FISH ANDWILDLIFE SERVICE
STORMWATERRETENTION BASIN
SITE 1
BRACBRACPMO WESTPMO WEST
OU1 5-YEAR REVIEW SUMMARYOU1 5-YEAR REVIEW SUMMARY
“Draft Operable Unit 1 2007 Five-Year Review Report”
July 30, 2007
Supporting information:
• Groundwater monitoring results
• Landfill gas monitoring results
• Maintenance activities
• Site inspections
Conclusion:
OU1 remedy remains effective and protective of human health and the environment
BRACBRACPMO WESTPMO WEST
Questions?