SUTD HOUSING AND SPORTS COMPLEX (PHASE 1) SECTION 1 - BLOCK X1 1.00 Pa e No Descri tion DrwNo. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate CFA m2 BC S1 1 Sub-structure 1.1 Pilecap including excavation, formwork, concrete and rebar a Excavation m3 exc b Backfill m3 Backfill c Lean concrete - 50mmthick G15 m2 G15 d Concrete G40 m3 G40 e Reinforcement k Rebar f Formwork m2 Fwk  Remove sur lus off site m3 Remove 1.2 Column stum a Concrete G40 G40 b Reinforcement Rebar c Formwork Fwk  Lift it wall a Excavation m3 exc b Concrete G40 m3 G40 c Reinforcement k Rebar d Formwork m2 Fwk  1.3 Ground beam a Excavation m3 exc b Lean concrete - 50mmthick G15 m2 G15 c Concrete G40 m3 G40 d Reinforcement k Rebar e Formwork m2 Fwk  1.4 Ground slab a Excavation m3 exc b Lean concrete - 50mmthick G15 m2 G15 c Concrete G40 m3 G40 d Reinforcement k Rebar e Formwork 150mmthick slab ed e m 150-fwk  1.5 Plinth c Concrete G40 m3 G40 d Reinforcement k Rebar e Formwork m2 Fwk  1.6 Waterproofing system to sub-structure in contact with round 25mm thick cement sand rotection screed to round slab m2 water rf  to round beam m2 water rf  to lift it wall m2 water rf  Water roofin membrane to round slab m2 water rf  to round beam m2 water rf  to lift it wall m2 water rf  Dam roof membrane to round slab m2 water rf  to round beam m2 water rf  to lift it wall m2 water rf  Hydrotite CJ0720-2K swellable water stop to lift pit wall m waterprf  1.7 Anti-termite treatment m2 Anti-Termite 1.8 Others Works not listed above but are necessary to complete the works as a whole (if not stated and allowed herein, shall be deemed to be included or absorbed in the  a b c Carried Forward Page 1 of 110 S1-Blk X1

Upload: fatin-hanun

Post on 05-Apr-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 1/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

CFA m2

BC S1 1 Sub-structure

1.1 Pilecap including excavation, formwork, concrete and

rebara Excavation m3 exc

b Backfill m3 Backfill

c Lean concrete - 50mm thick G15 m2 G15

d Concrete G40 m3 G40

e Reinforcement k Rebar

f Formwork m2 Fwk  

Remove sur lus off site m3 Remove

1.2 Column stum

a Concrete G40 G40

b Reinforcement Rebar

c Formwork Fwk  

Lift it wall

a Excavation m3 exc

b Concrete G40 m3 G40

c Reinforcement k Rebar

d Formwork m2 Fwk  

1.3 Ground beam

a Excavation m3 exc

b Lean concrete - 50mm thick G15 m2 G15

c Concrete G40 m3 G40

d Reinforcement k Rebar

e Formwork m2 Fwk  

1.4 Ground slab

a Excavation m3 exc

b Lean concrete - 50mm thick G15 m2 G15c Concrete G40 m3 G40

d Reinforcement k Rebar

e Formwork  

150mm thick slab ed e m 150-fwk  

1.5 Plinth

c Concrete G40 m3 G40

d Reinforcement k Rebar

e Formwork m2 Fwk  

1.6 Waterproofing system to sub-structure in contact with

round25mm thick cement sand rotection screed

to round slab m2 water rf  

to round beam m2 water rf  to lift it wall m2 water rf  

Water roofin membrane

to round slab m2 water rf  

to round beam m2 water rf  

to lift it wall m2 water rf  

Dam roof membrane

to round slab m2 water rf  

to round beam m2 water rf  

to lift it wall m2 water rf  

Hydrotite CJ0720-2K swellable water stop to lift pit wall m waterprf  

1.7 Anti-termite treatment m2 Anti-Termite

1.8 Others

Works not listed above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 a

b

c

Carried Forward

Page 1 of 110 S1-Blk X1

Page 2: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 2/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 2 Frame

2.1 Concrete in column - G40

a 1st store m3 G40

b 2nd store m3 G40

c 3rd store m3 G40

d 4th store m3 G40

e 5th store m3 G40

f 6th store m3 G40

7th store m3 G40

h 8th store m3 G40

i 9th store m3 G40

10th store m3 G40

k 11th store m3 G40

l Roof level

2.2 Concrete in sus ended ed e beam - G40

a 1st storeb 2nd store m3 G40

c 3rd store m3 G40

d 4th store m3 G40

e 5th store m3 G40

f 6th store m3 G40

7th store m3 G40

h 8th store m3 G40

i 9th store m3 G40

10th store m3 G40

k 11th store m3 G40

l Roof level

2.3 Reinforcement in column

a 1st store k Rebar

b 2nd store k Rebarc 3rd store k Rebar

d 4th store k Rebar

e 5th store k Rebar

f 6th store k Rebar

7th store k Rebar

h 8th store k Rebar

i 9th store k Rebar

Carried Forward

Page 2 of 110 S1-Blk X1

Page 3: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 3/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 3 Frame Cont'd

2.3 Reinforcement in column Cont'd

10th store k Rebar

k 11th store k Rebar

l Roof level

2.4 Reinforcement in sus ended ed e beam

a 1st store

b 2nd store k Rebar

c 3rd store k Rebar

d 4th store k Rebar

e 5th store k Rebar

f 6th store k Rebar

7th store k Rebar

h 8th store k Rebar

i 9th store k Rebar

10th store k Rebark 11th store k Rebar

l Roof level

2.5 Formwork to column

a 1st store m2 Fwk  

b 2nd store m2 Fwk  

c 3rd store m2 Fwk  

d 4th store m2 Fwk  

e 5th store m2 Fwk  

f 6th store m2 Fwk  

7th store m2 Fwk  

h 8th store m2 Fwk  

i 9th store m2 Fwk  

10th store m2 Fwk  

k 11th store m2 Fwk  l Roof level

Carried Forward

Page 3 of 110 S1-Blk X1

Page 4: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 4/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 4 Frame Cont'd

2.6 Formwork to sus ended ed e beam

a 1st store

b 2nd store m2 Fwk  

c 3rd store m2 Fwk  

d 4th store m2 Fwk  

e 5th store m2 Fwk  

f 6th store m2 Fwk  

7th store m2 Fwk  

h 8th store m2 Fwk  

i 9th store m2 Fwk  

10th store m2 Fwk  

k 11th store m2 Fwk  

l Roof level

2.7 Others

Works not listed above but are necessary to completethe works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

above items .a

b

c

U er Floor

3.1 Concrete to sus ended slab - G40

a 1st store

b 2nd store m3 G40

c 3rd store m3 G40d 4th store m3 G40

e 5th store m3 G40

f 6th store m3 G40

7th store m3 G40

h 8th store m3 G40

i 9th store m3 G40

10th store m3 G40

k 11th store m3 G40

l Roof level

Carried Forward

Page 4 of 110 S1-Blk X1

Page 5: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 5/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 5 U er Floor Cont'd

3.2 Reinforcement to sus ended slab

a 1st store

b 2nd store k rebar

c 3rd store k rebar

d 4th store k rebar

e 5th store k rebar

f 6th store k rebar

7th store k rebar

h 8th store k rebar

i 9th store k rebar

10th store k rebar

k 11th store k rebar

l Roof level

3.3 Formwork to sus ended slaba 1st store

b 2nd store m2 fwk  

c 3rd store m2 fwk  

d 4th store m2 fwk  

e 5th store m2 fwk  

f 6th store m2 fwk  

7th store m2 fwk  

h 8th store m2 fwk  

i 9th store m2 fwk  

10th store m2 fwk  

k 11th store m2 fwk  

l Roof level

50mm thick slab ed e

a 2nd store m 50-fwk  

b 3rd store m 50-fwk  c 4th store m 50-fwk  

d 5th store m 50-fwk  

e 6th store m 50-fwk  

f 7th store m 50-fwk  

8th store m 50-fwk  

h 9th store m 50-fwk  

i 10th store m 50-fwk  

11th store m 50-fwk  

Ditto ,20mm thick slab ed e

a 2nd store m 20-fwk  

b 3rd store m 20-fwk  

c 4th store m 20-fwk  

d 5th store m 20-fwk  

e 6th store m 20-fwk  f 7th store m 20-fwk  

8th store m 20-fwk  

h 9th store m 20-fwk  

i 10th store m 20-fwk  

11th store m 20-fwk  

Ditto ,30mm thick slab ed e

a 1st store m 30-fwk  

b 2nd store m 30-fwk  

c 3rd store m 30-fwk  

d 4th store m 30-fwk  

e 5th store m 30-fwk  

f 6th store m 30-fwk  

7th store m 30-fwk  

h 8th store m 30-fwk  

i 9th store m 30-fwk  

10th store m 30-fwk  

k 11th store m 30-fwk  

3.4 Waterproofing system to structural works as specified

a 1st store

b 2nd store

c 3rd store

d 4th store

e 5th store

f 6th store

Carried Forward

Page 5 of 110 S1-Blk X1

Page 6: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 6/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 6 U er Floor Cont'd

3.4 Waterproofing system to structural works as specified

Cont'd7th store

h 8th store

i 9th store

10th store

k 11th store

l Roof level

3.5 Others

Works not listed above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 

ab

c

Structural Wall

4.1 Concrete to structural wall - G40

a 1st store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

b 2nd store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40c 3rd store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

d 4th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

e 5th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

f 6th store

to lift wall m3 G40

to staircase wall m3 G40to internal rc wall m3 G40

7th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

h 8th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

i 9th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

10th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

k 11th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

l Roof level

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

Carried Forward

Page 6 of 110 S1-Blk X1

Page 7: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 7/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 7 Structural Wall Cont'd

4.2 Reinforcement to structural wall

a 1st store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

b 2nd store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

c 3rd store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

d 4th store

to lift wall k rebarto staircase wall k rebar

to internal rc wall k rebar

e 5th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

f 6th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

7th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

h 8th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

i 9th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

10th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

k 11th store

to lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

l Roof levelto lift wall k rebar

to staircase wall k rebar

to internal rc wall k rebar

4.3 Formwork to structural wall

a 1st store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

b 2nd store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

c 3rd store

to lift wall m2 fwk  to staircase wall m2 fwk  

to internal rc wall m2 fwk  

d 4th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

e 5th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

f 6th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

7th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

h 8th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

i 9th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

10th store

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

k 11th storeto lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

l Roof level

to lift wall m2 fwk  

to staircase wall m2 fwk  

to internal rc wall m2 fwk  

4.4 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 a

bc

Carried Forward

Page 7 of 110 S1-Blk X1

Page 8: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 8/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 8 Structural work to roof 

5.1 Concrete roof slab

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork m2 fwk  

5.2 Sus ended roof beam

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork m2 fwk  

Roof linth

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork m2 fwk  

5.3 Stum column at roof  

a Concrete G40

b Reinforcement

c Formwork  

5.4 Roof finishes

a Profile steel roofing- Roof over Pavilion, measured

se aratelb Insulation

c Water roofin

RF Wate roofin to RC Flat Roof m2 54.79 water rf  

consists of:

- min 25mm thk c s screed to fall

- 2.2mm thk EVA/PVC fleece-backed waterproofing

membrane bonded- 6mm thk under-screed draina e sheet

- 1000 x 1000 x 50mm thk c/s panel roofing reinforced

with BRC 3315 mesh polysulphide joints @ every 10m

c c- Pol sul hide sealant

- 50mm wide welded la54.79  54.79

RF1 Wate roofin to RC Flat Roof, non insulated m2 water rf  

RF2 RC Flat Roof over Incubation Pod 3; with 600 x 600 x

50mm thk PC anel

m2 13.49 waterprf 

13.49  13.49

RFU Wate roofin to RC Flat Roof- u turn m 42.23 water rf  

consists of:

- 1.2mm thk EVA/PVC waterproofing membrane bonded

- 25mm thk c s rotection screed with GI mesh

- membrane terminated into groove-line & sealed with

ol urethane sealant42.23 42.23

Water roofin to Non-Insulated Deck m2 water rf  

consists of:

- min 25mm thk c s screed to fall

- 2.2mm thk EVA/PVC fleece-backed waterproofing

membrane bonded

- 6mm thk under-screed draina e sheet- finishes and rotection screed measured se aratel

Water roofin to Landsca e Deck m2 water rf  

consists of:

- min 25mm thk c s screed to fall

- 2.2mm thk EVA/PVC fleece-backed waterproofing

membrane bonded- 25mm thk c s rotection screed

- 100 sm eotextile se aration la er

- 30mm thk interlockin sub-soil draina e modules

- 100 sm eotextile filter fabric

- 50mm thk coarse washed sand

- growth media to Landscape Architect's detail

Softsca e is included in PC Provisional Sums

Waterproofing works to planters- 30mm thk modular

subsoil drainage with geotectile filter fabric

Planter floor m2 227.64 water rf  roof 227.64  227.64

Planter walls m2 380.71 water rf  380.71  380.71

d Perforated aluminum trellis

Roof Trellis/ Aluminium expanded mesh screen to roof m2 350.27 metal-wk 

consists of:

- 600 x 300 GS

- 200 x 100 x 8mm thk hot dipped GS RHS in paint

finish- 6mm thk hot di ed GS late in aint finish

- Aluminium expanded mesh screen in powder coated

finish- 50 x 75 x 6mm thk hot dipped GS L-angle in paint

finish350.27  350.27

e Green roofin s stem B Others

Note Green roofing system by NSC as per Schedule of  

Finishes, Item 1.7.7

Planters at Sk Garden

Plaster and aint to lanter walls m2 380.71 laster380.71  380.71

Perimeter lanter-wall

Planter near timber seatin

Co in w=200mm m 282.01 co in282.01 282.01

Turfin m2 118.60 nil118.60  118.60

f Roof draina e with accessories LS si honic

Scupper drain (w=100mm) at Incubation Pod 3 Roof m 11.44 scupper

IP3 11.44 11.44

150mm wide cement sand skirting with underscreed

draina e mat w=150mm

m skirting

Scupper drain to Corridor near AC Ledges- 150mm

wide x 50mm dee RC surface channel

m scupper

Truss to su ort li hts & fans

Steel structure k steel

Paintin m2 steel

M16 bolt no. steel

Page 8 of 110 S1-Blk X1

Page 9: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 9/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

M20 cast-in bolt no. steel

h Timber deckin to Sk Terrace

Note Timber flooring system (iron wood); Size: 150 x 1200x30mm thk, Colour: natural stain, Finish: natural stain

look alike as per Landscaping Materials and Finishes

Over draina e trench foot ath m2 148.01 tbr deck 148.01  148.01

Reflection Deck m2 tbr deck  

SS handrail to ram at Sk Garden m 10.60 metal-wk 10.60 10.60

i Granite slab with ste in stone

EF13 Granite slab with stepping stones to Laundry Drying

 Area at Roof Garden external

m2 59.06 granite

Note Laundry area is GC-granolithic finish as per

Landscaping Drawing floor plan but WA- timberflooring system as Materials and Finishes Schedule of 

 

59.06  59.06

GR  Granite, grey, natural f inish to hallway, ramp as per

Landsca in Drawin

m2 54.26 granite

54.26  54.26

GC Granolitic, 3-5mm diam, dark grey/ black to hallway as

er Landsca in Drawin

m2 grano

Plinth m2 6.44 linth2 3.22  6.44

k  Roof Pavilion at Grid XC X13-X15

75 x 150mm hardwood timber floorin m2 tbr deck  

Note Timber flooring system (iron wood); Size: 150 x 1200

x30mm thk, Colour: natural stain, Finish: natural stain

look alike as per Landscaping Materials and Finishes

m2 45.13

45.13  45.13

MS expanded mesh screen in powder coated finish to

Roof 

m2 40.72 metal-wk 

40.72  40.72

MS expanded mesh screen in powder coated finish

supported with 10mm thk hot dipped galv MS plate in

paint finish and 50 x 50 x 10mm hot dipped MS L-

 

m2 27.36 metal-wk 

2 3.60 3.80 27.36

Laminated lass barrier to wall h=1.95m m 10.40 lazin10.40  10.40

40mm diam SS balustrade and handrail h=0.90m m 10.35 metal-wk 10.35  10.35

5.5 Built in Gondola s stem Gondola

5.6 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 

a Water ta at Sk Terrace nos others

b Rainscreen

Steel structure k steel

Paintin m2 steel

M16 bolt no. steelc

Carried Forward

Page 9 of 110 S1-Blk X1

Page 10: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 10/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

6.1 Staircase fli ht

a Precast concrete staircaseb Reinforced Concrete to in structure

Concrete G40 m3 G40

Reinforcement k rebar

Formwork m2 fwk  

6.2 Sus ended landin slab

a Concrete G40

b Reinforcement

c Formwork  

6.3 Sus ended landin rakin ed e beam

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork m2 fwk  

6.4 Ex ended mesh screen staircase railin

SR1 MS railin to Staircase h=0.90m to all blocks m Railin

consists of:

- 40 x 100mm thk GS late in enamel aint finish

- 40 x 10mm thk GS plate in enamel paint finish @ max

100mm c c- 50 x 150 x 6mm thk GS an le in enamel aint finish

- SS ex ansion bolt

SR2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.675m) to Staircase Landing and

Smoke Stop Lobby for Blks X1, Y1 and Z1

m Railing

consists of:

- 10mm thk hot dipped GS plate in powder coated finish

- 10mm thk hot dipped GS folded plate in powder

coated finish- 40mm diam hot dipped GS CHS in powder coated

finish- 10mm thk hot dipped GS flat plate baluster in powder

coated finish- 10mm thk hot dipped GS L-angle pre-welded to

aluminium expanded mesh with powder coated finish

- Aluminium expanded mesh with powder coated finish

- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat

plate pre-welded to upright balusters in paint finish

- 10mm thk hot dipped GS angle plate in powder coated

finish- Countersunk anchor bolt

- 20 x 20mm aluminium U-channel in powder coated

finish- 10mm thk hot dipped GS plate in powder coated finish

SR2A Ditto h=1.2m as measured on elevaton m Railin

SR3  Aluminium expanded mesh screen to internal

Staircases h=1.36m to all blocks

m Railing

consists of:

- 40mm diam hot dipped GS CHS in powder coatedfinish

- 10mm thk hot dipped GS L-angle prewelded to

aluminium expanded mesh with powder coated finish

- Aluminium expanded mesh screen in powder coated

finish- 10mm thk hot dipped GS angle plate in powder coated

finish- Countersunk anchor bolt

- 10mm thk hot dipped GS plate in powder coated finish

SR4 GS wall mounted railing to internal staircase to Hall

Fellow Hall Master

m Railing

consists of:- 40mm diam x 3mm hot di ed GS handrai l

- 10mm diam hot di ed GS rod

- 50mm diam x 6mm thk GS flat late

6.5 Timber stud wall to staircase railin

Timber vertical strip to internal staircase for Hall Fellow

and Hall Master

m2 timber

6.6 Stair finishes

Floor Finishes

SF1 Self levelin screed to common staircases

Landin m2 screed

Riser 175mm hi h m S-riser

Treads 250mm wide m S-tread

Nosin tiles m S-Nosin -T

SF2 300mm x 600mm & 110mm x 600mm non-slip

homo eneous tiles to Interaction StaircaseLandin m2 F6

Riser 175mm hi h m flr-tile-R  

Treads 250mm wide m flr-tile-T

Nosin tiles m flr-tile-NT

SF3 Floor finishes to Stairs to Hall Master and Hall Fel low,

finishes not given, assuming similar to Living area,

homogeneous tiles with cement and sand screed

Landin m2 F6

Riser 167mm hi h m flr-tile-R  Treads 250mm wide m flr-tile-T

Tactile nosin m flr-tile-NT

Wall Finishes

SW Plaster and aint to staircase wall m2 laster

Ceilin Finishes

SC1 Plaster and aint to staircase ceilin m2 laster

6.7 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

above items .

ab

c

External Wall and Finishes

7.1 Brickwall

a 1st store

1BRW100E 100mm thk brickwall external m2 100-bwk  

1BRW200E 200mm thk brickwall external m2 200-bwk  

b 2nd store

2BRW100E 100mm thk brickwall external m2 100-bwk  

2BRW200E 200mm thk brickwall external m2 200-bwk  

Page 10 of 110 S1-Blk X1

Page 11: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 11/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

c 3rd store3BRW100E 100mm thk brickwall external m2 100-bwk  

3BRW200E 200mm thk brickwall external m2 200-bwk  

d 4th store

4BRW100E 100mm thk brickwall external m2 100-bwk  4BRW200E 200mm thk brickwall external m2 200-bwk  

e 5th store5BRW100E 100mm thk brickwall external m2 100-bwk  5BRW200E 200mm thk brickwall external m2 200-bwk  

Carried Forward

Page 11 of 110 S1-Blk X1

Page 12: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 12/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate

Brou ht Forward

BC S1 10 External Wall and Finishes Cont'd

7.1 Brickwall Cont'd

f 6th store

6BRW100E 100mm thk brickwall external m2 100-bwk  

6BRW200E 200mm thk brickwall external m2 200-bwk  

7th store

7BRW100E 100mm thk brickwall external m2 100-bwk  

7BRW200E 200mm thk brickwall external m2 200-bwk  

h 8th store8BRW100E 100mm thk brickwall external m2 100-bwk  

8BRW200E 200mm thk brickwall external m2 200-bwk  

i 9th store

9BRW100E 100mm thk brickwall external m2 100-bwk  9BRW200E 200mm thk brickwall external m2 200-bwk  

10th store10BRW100E 100mm thk brickwall external m2 100-bwk  

10BRW200E 200mm thk brickwall external m2 200-bwk  

k 11th store11BRW100E 100mm thk brickwall external m2 100-bwk  

11BRW200E 200mm thk brickwall external m2 200-bwk  

l Roof levelRFBRW100E 100mm thk brickwall external m2 100-bwk  

RFBRW200E 200mm thk brickwall external m2 200-bwk  

7.2 Glass wall panel complete with supporting frame

Note For lass anel details, lease refer to drawin

For details, lease refer to ID Drawin s

For Curtain wall/ glass panels to to Student Common

Loun e lease refer to Facade Drawin s

a 1st store

TGP/01 Glass panel with double leaf door to Hall Admin Office

Blk X1

nos 1 glazing

TGP 02 Glass anel to Hall Admin Office Blk X1 nos 1 lazin

b 2nd store

TGP 15 Glass anel to Multi Pur ose Room Block X1 nos 1 lazin

TGP 16 Glass anel to Multi Pur ose Room Block X1 nos 1 lazin

TGP 17 Glass anel to Multi Use Room Blk X1 nos 3 lazin

TGP 18 Glass anel to Multi Use Room Blk X1 nos 1 lazin

Top hung window with fixed glass panel to Multi Use

Room Blk X1

Think Tank Rooms

TTR/GP3 Fixed glass panel to Think Tank Room 1 (Blk X1),

Think Tank Room 4 Blk Z1

nos 1 glazing

TTR GP7 Fixed lass anel to Think Tank Room 1 Blk X1 nos 1 lazin

TTR/W5 Fixed glass panel with top hung window to Think Tank 

Room 1,4 (Blk X1), Think Tank Room 6 (Blk Z1)

nos 1 glazing

c 3rd store

Incubation PodsFull tempered laminated glass with 200 x 75 x 4mm

thk aluminium RHS in paint finish to Incubation Pods;

m2 glazing

GL/14  Aluminium frame glass louvred window to Incubation

Pod P2 P3

nos 1 glazing

TGP 22 Glass anel to Incubation Pod P2, P3 nos 1 lazin

d 4th store

Think Tank Rooms

TTR/GP11 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);

2 St hi h

nos 1 glazing

TTR/W7 Fixed glass panel with top hung window to Think Tank Room 2 5 9 Blk X1 2 St hi h

nos 1 glazing

e 5th store

Think Tank Rooms

TTR/GP5 Fixed glass panel to Think Tank Room 3,4,6 (Blk X1),

Think Tank Room 2 & 3 (Blk Y1), Think Tank Room

2 6 7 Blk Z1

nos 1 glazing

TTR/W1 Fixed glass panel with top hung window to Think Tank 

Room 3 Blk X1 Think Tank Room 4 Blk Z1

nos 1 glazing

GL/14  Aluminium frame glass louvred window to Incubation

Pod P2 P3

nos glazing

f 6th store

Incubation Pods

Full tempered laminated glass with 200 x 75 x 4mm

thk aluminium RHS in paint finish to Incubation Pods;

external

m2 glazing

Think Tank Rooms

TTR/GP6 Fixed glass panel to Think Tank Room 3,4,6 (Blk X1),

Think Tank Room 2 & 3 (Blk Y1), Think Tank Room

nos 2 glazing

TTR/GP9 Fixed glass panel to Think Tank Room 4 (Blk X1),

Think Tank Room 2 Blk Y1

nos 1 glazing

TTR/GP11 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);

2 St hi h

nos 1 glazing

TTR/W6 Fixed glass panel with top hung window to Think Tank 

Room 1,4 (Blk X1), Think Tank Room 6 (Blk Z1)

nos 1 glazing

TTR/W7 Fixed glass panel with top hung window to Think Tank 

Room 2 5 9 Blk X1 2 St hi h

nos 1 glazing

7th store

Think Tank Rooms

TTR/GP6 Fixed glass panel to Think Tank Room 3,4,6 (Blk X1),

Think Tank Room 2 & 3 (Blk Y1), Think Tank Room

2 6 7 Blk Z1

nos 1 glazing

TTR/GP8 Fixed glass panel to Think Tank Room 6 (Blk X1),

Think Tank Room 7 Blk Z1

nos 1 glazing

TTR/W3 Fixed glass panel with top hung window to Think Tank 

Room 6 Blk X1 , Think Tank Room 7 Blk Z1

nos 1 glazing

h 8th store Na

i 9th store Na

Incubation PodsFull tempered laminated glass with 200 x 75 x 4mm

thk aluminium RHS in paint finish to Incubation Pods;

m2 glazing

GL/14A  Aluminium frame glass louvred window to Incubation

Pod P1

nos 1 glazing

TGP 21 Glass anel to Incubation Pod P1 nos 1 lazin

Think Tank Rooms

Page 12 of 110 S1-Blk X1

Page 13: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 13/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

TTR/W2 Fixed glass panel with top hung window to Think Tank 

Room 7 (Blk X1), Think Tank Room 1,3,4 (Blk Y1),

Think Tank Room 1 2 8 Blk Z1

nos 1 glazing

10th store

Think Tank RoomsTTR/GP10 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);

2 St hi h

nos 1 glazing

TTR/GP11 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);

2 St hi h

nos 1 glazing

TTR/W7 Fixed glass panel with top hung window to Think Tank 

Room 2 5 9 Blk X1 2 St hi h

nos 1 glazing

TTR/W8 Fixed glass panel with top hung window to Think Tank 

Room 8 (Blk X1), Think Tank Room 10 (Blk Z1); 2 Sty

nos 1 glazing

k 11th store

7.3 Perforated anel Com osite Panel MeshNote Steel support for rainscreens / sunshades are

measured se aratel lease refer to Item 5.6b

Page 13 of 110 S1-Blk X1

Page 14: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 14/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate

a 1st store

 Aluminium expanded mesh/ wall to Lift Lobby near

Staircase 1 as shown on Elevation

m2 46.17  Alum-EM

b 2nd store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

 

m2 14.31  Alum-EM

9 1.59 14.31

2 Expanded mesh screen (h=1.0m) to Balcony and AC

Led e at Hall Fellow and Hall Master

m 1.20  Alum-EM

1.20 1.20

3 Aluminium expanded mesh screen/ rain screen

slanted hei ht=2.375m to Blks X1 Y1 and Z1

m 46.17  Alum-EM

consists of:

- 5mm thk hot di ed GS late in aint finish- Aluminium expanded mesh screen in powde coated

finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS folded late in aint finish

- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS late in aint finish

- 50 x 50 x 6mm thk hot dipped GS L-angle in paint

finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish

- 1.2mm thk folded aluminium cladding panel with 6mm

thk non-combustible calcium silicate backin9 5.13 46.17

c 3rd store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

Tender Clarification 2 Item A51

m2 50.88  Alum-EM

32 1.59 50.88

2 Aluminium expanded mesh screen/ rain screen

slanted hei ht=2.375m to Blks X1, Y1 and Z1

m 5.44  Alum-EM

consists of:

- 5mm thk hot di ed GS late in aint finish

- Aluminium expanded mesh screen in powde coated

finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS folded late in aint finish

- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS late in aint finish

- 50 x 50 x 6mm thk hot dipped GS L-angle in paint

finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish

- 1.2mm thk folded aluminium cladding panel with 6mm

thk non-combustible calcium silicate backin5.44 5.44

d 4th store

1 Aluminium expanded mesh screen in powder coatedfinish to Drying Closet, external; 2mm thk as per

Tender Clarification 2 Item A51

m2 65.19  Alum-EM

41 1.59 65.19

2 Expanded mesh screen (h=1.0m) to Balcony and AC

Led e at Hall Fellow and Hall Master

m 2.17  Alum-EM

2.17 2.17

e 5th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

 

m2 58.83  Alum-EM

37 1.59 58.83

f 6th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

Tender Clarification 2 Item A51

m2 52.47  Alum-EM

33 1.59 52.47

2 Expanded mesh screen (h=1.0m) to Balcony and AC

Led e at Hall Fellow and Hall Master

m 2.17  Alum-EM

2.17 2.17

3 Aluminium expanded mesh screen/ rain screen

slanted hei ht=2.375m to Blks X1, Y1 and Z1

m 5.13  Alum-EM

consists of:

- 5mm thk hot di ed GS late in aint finish

- Aluminium expanded mesh screen in powde coated

finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS folded late in aint finish

- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS late in aint finish

- 50 x 50 x 6mm thk hot dipped GS L-angle in paint

finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish

- 1.2mm thk folded aluminium cladding panel with 6mm

thk non-combustible calcium silicate backin5.13 5.13

4 MS expanded mesh screen in powder coated finish to

Corridor near Incubation Pod

m2 4.08  Alum-EM

1 4.08 4.08

7th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

Tender Clarification 2 Item A51

m2 52.47  Alum-EM

33 1.59 52.47

2 Aluminium expanded mesh screen/ rain screen

slanted hei ht=2.375m to Blks X1 Y1 and Z1

m 2.17  Alum-EM

consists of:

- 5mm thk hot di ed GS late in aint finish- Aluminium expanded mesh screen in powde coated

finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS folded late in aint finish

- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS late in aint finish

- 50 x 50 x 6mm thk hot dipped GS L-angle in paint

finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish

- 1.2mm thk folded aluminium cladding panel with 6mm

thk non-combustible calcium silicate backin

Page 14 of 110 S1-Blk X1

Page 15: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 15/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

2.17 2.17

h 8th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

 

m2 62.01  Alum-EM

39 1.59 62.01

2 Aluminium expanded mesh screen/ rain screen

slanted hei ht=2.375m to Blks X1 Y1 and Z1

m 5.00  Alum-EM

consists of:

- 5mm thk hot di ed GS late in aint finish

- Aluminium expanded mesh screen in powde coated

finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS folded late in aint finish

- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS late in aint finish

- 50 x 50 x 6mm thk hot dipped GS L-angle in paint

finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish

- 1.2mm thk folded aluminium cladding panel with 6mm

thk non-combustible calcium silicate backin2 2.5 5.00

i 9th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

Tender Clarification 2 Item A51

m2 60.42  Alum-EM

38 1.59 60.42

10th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

Tender Clarification 2 Item A51

m2 63.60  Alum-EM

40 1.59 63.60

2 Aluminium expanded mesh screen/ rain screen

slanted hei ht=2.375m to Blks X1, Y1 and Z1

m 2.50  Alum-EM

consists of:

- 5mm thk hot di ed GS late in aint finish

- Aluminium expanded mesh screen in powde coated

finish

- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS folded late in aint finish

- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish

- 8mm thk hot di ed GS late in aint finish

- 50 x 50 x 6mm thk hot dipped GS L-angle in paint

finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish

- 1.2mm thk folded aluminium cladding panel with 6mm

thk non-combustible calcium silicate backin2.5 2.50

k 11th store

1 Aluminium expanded mesh screen in powder coated

finish to Drying Closet, external; 2mm thk as per

 

m2 66.78  Alum-EM

42 1.59 66.78

l Roof  

Carried Forward

Page 15 of 110 S1-Blk X1

Page 16: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 16/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 11 External Wall and Finishes Cont'd

7.4 RC ara et wall low wall

a 1st store

b 2nd store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

c 3rd store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

d 4th store

Concrete G40 m3 G40Formwork m2 fwk  

Rebar k rebar

e 5th store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

f 6th store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

7th store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

h 8th store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

i 9th store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

10th store

Concrete G40 m3 G40

Formwork m2 fwk  Rebar k rebar

k 11th store

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

l Roof  

Concrete G40 m3 G40

Formwork m2 fwk  

Rebar k rebar

7.5 Precast anel wall

PW 160mm thk precast RC wall (some drawings shown140mm thk others 150mm thk external

a 1st store m2 Precast-W

b 2nd store m2 Precast-W

c 3rd store m2 Precast-W

d 4th store m2 Precast-W

e 5th store m2 Precast-W

f 6th store m2 Precast-W

7th store m2 Precast-W

h 8th store m2 Precast-W

i 9th store m2 Precast-W

10th store m2 Precast-W

k 11th store m2 Precast-W

l Roof m2 Precast-W

7.6 Perforated Ex anded mesh railin

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

for Blks X1 Y1 and Z1

consists of:

- 10mm thk hot dipped GS plate in powder coated finish

- 10mm thk hot dipped GS folded plate in powder

coated finish- 40mm diam hot dipped GS CHS in powder coated

finish- 10mm thk hot dipped GS flat plate baluster in powder

coated finish

- 10mm thk hot dipped GS L-angle pre-welded toaluminium expanded mesh with powder coated finish

- Aluminium expanded mesh with powder coated finish

- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat

plate pre-welded to upright balusters in paint finish

- 10mm thk hot dipped GS angle plate in powder coated

finish- Countersunk anchor bolt

- 20 x 20mm aluminium U-channel in powder coated

finish- 10mm thk hot dipped GS plate in powder coated finish

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

and Z1

consists of:

- 10mm thk hot di ed GS late in aint finish

- 10mm thk hot dipped GS L-angle pre-welded to

aluminium expanded mesh with powder coated finish

- Aluminium expanded mesh screen in powder coated

finish- 10mm thk hot dipped GS angle plate in powder coated

finish

- SS countersunk anchor bolt- 10mm thk hot di ed GS late in aint finish

R2b Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1

consists of:

- 10mm thk hot dipped GS plate in powder coated finish

- 10mm thk hot dipped GS folded plate in powder

coated finish- 40mm diam hot dipped GS CHS in powder coated

finish- 10mm thk hot dipped GS flat plate baluster in powder

coated finish

Page 16 of 110 S1-Blk X1

Page 17: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 17/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

- 10mm thk hot dipped GS L-angle pre-welded to

aluminium expanded mesh with powder coated finish

- Aluminium expanded mesh with powder coated finish

- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat

plate pre-welded to upright balusters in paint finish

- 10mm thk hot dipped GS angle plate in powder coated

finish- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in powder coated

finish- 10mm thk hot dipped GS plate in powder coated finish

a 1st store

b 2nd store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

 

m 7.90 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

 

m 8.50 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1, Y1 and Z1

m 1.20 Railing

c 3rd store

R1  Aluminium expanded mesh screen/ railing in powdercoated finish to Common Area/ Void Area (h=1.675m)

 

m Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

 

m 5.30 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1 Y1 and Z1

m 2.26 Railing

d 4th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

for Blks X1 Y1 and Z1

m 12.68 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

and Z1

m 2.50 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1 Y1 and Z1

m 4.60 Railing

e 5th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

for Blks X1 Y1 and Z1

m 4.80 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1and Z1

m 8.88 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1 Y1 and Z1

m Railing

f 6th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

 

m 12.10 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

 

m 7.70 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1, Y1 and Z1

m Railing

7th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

 

m 7.10 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

 

m 5.80 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1 Y1 and Z1

m Railing

h 8th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

for Blks X1 Y1 and Z1

m 22.30 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

and Z1

m 5.00 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1 Y1 and Z1

m Railing

i 9th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m)

for Blks X1 Y1 and Z1

m 4.80 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

and Z1

m 18.20 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1 Y1 and Z1

m Railing

10th store

R1  Aluminium expanded mesh screen/ railing in powder

coated finish to Common Area/ Void Area (h=1.675m) 

m 11.50 Railing

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

 

m 2.60 Railing

R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks

X1, Y1 and Z1

m Railing

k 11th store

R2  Aluminium expanded mesh screen/ railing in powder

coated finish (h=1.50m) to AC Ledge for Blks X1, Y1

 

m 12.50 Railing

Page 17 of 110 S1-Blk X1

Page 18: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 18/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate

l Roof  

Carried Forward

Page 18 of 110 S1-Blk X1

Page 19: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 19/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate

Brou ht Forward

BC S1 12 7.7 M&E louvre

a 1st storePV 18  Aluminium louvre vent nos 1 window

PV 30  Aluminium louvre vent nos 2 window

b 2nd store Na

c Roof  PV 21  Aluminium louvre vent to Lift Motor Room nos 2 window

7.8 Others

Works not listed above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

above items .

a WindowsWindows to Common Areas

CWF 15 To hun window to Hall Admin Office Blk X1 nos 1 window

FG 30 Fixed lass window to Hall Admin Office Blk X1 nos 1 window

GL/14  Aluminium frame glass louvred window to Communal

Kitchenette

nos 3 window

GL/28  Aluminium frame glass louvred window to Communal

Kitchenette and Laundr

nos 2 window

GL/25  Aluminium frame glass louvred window to Security

Room (Blk X1); W/25 as per enlarged drawing (AR-

154

nos 1 window

GL/34  Aluminium frame glass louvred window to CommunalKitchenette nos 2 window

GL/72  Aluminium frame glass louvred window to Communal

Laundr

nos 1 window

TH/05 Top hung window to Wash Room, Handicap Toilet,

Bath Powder Room Bath 1 & 2 Toilet

nos 2 window

TH/10 Top hung window to Wash Room, Handicap Toilet,

Bath Powder Room Bath 1 & 2 Toilet

nos 3 window

TH 20 To hun window to Hall Admin Office Blk X1 nos 1 window

TH 42 To hun window to Communal Toilet nos 20 window

Windows to Service A artmentsUnder raduate Sin le UGS

GL/04  Aluminium framed louvred window to Bedroom

Entrance door sides Under raduate Sin le UGS

nos 100 window

CW/15 Casement window and top hung window to Bedroom;

Under raduate Sin le UGS

nos 57 window

Under raduate Double UGD

GL/04  Aluminium framed louvred window to Bedroom

(Entrance door sides); Undergraduate Double (UGD)

nos 380 window

CW/15 Casement window and top hung window to Bedroom;

Under raduate Double UGD

nos 264 window

Graduate Sin le GS

GL/04A  Aluminium framed louvred window to Bedroom

Entrance door sides Graduate Sin le GS

nos 20 window

CW/15 Casement window and top hung window to Bedroom;

Graduate Sin le GS

nos 16 window

TH 06 To hun window to Toilet Graduate Sin le GS nos 16 windowTH 06A To hun window to Toilet Graduate Sin le GS nos 20 window

Graduate Married GM

SW/14A Top hung window to Kitchen; Graduate Married (GM) nos 6 window

CW/15 Casement window and top hung window to Bedroom;

Graduate Married GM

nos 6 window

TH 06 To hun window to Toilet Graduate Married GM nos 6 window

TH 06A To hun window to Toilet Graduate Sin le GM nos 12 window

Under raduate Hall Master UGH-M

Lower LevelCWF/28 LL Casement window with fixed tempered glass panel to

Livin Under raduate Hall Master UGH-M

nos 4 window

SW/12 LL Top hung window to Kitchen; Undergraduate Hall

Master UGH-M

nos 2 window

TH/06 LL Top hung window to Toilet; Undergraduate Hall

Master UGH-M

nos 2 window

U er Level

CW/21 UL Casement window and top hung window to Bedroom

2 Under raduate Hall Master UGH-M

nos Na window

CW/21 UL Casement window and top hung window to Bedroom

2 Under raduate Hall Master UGH-M

2

TH/06 UL Top hung window to Bath 1; Undergraduate Hall

Master UGH-M

nos 4 window

Under raduate Hall Fellows UGH-F

Lower Level

SW/14 LL Top hung window to Kitchen; Undergraduate Hall

Fellows UGH-F

nos 1 window

CW/28 LL Casement window and top hung window to Living ;

Under raduate Hall Fellows UGH-F

nos 1 window

TH/06 LL Top hung window to Toilet; Undergraduate Hall

Fellows UGH-F

nos 1 window

U er Level

CW/21 UL Casement window and top hung window to Bedroom 2,

Master Bedroom ; Undergraduate Hall Fellows (UGH-

F

nos 1 window

TH/06 UL Top hung window to Toilet; Undergraduate Hall

Fellows UGH-F

nos 1 window

b Securit rilles m2 metal-wk  

c  Aluminum led es inside Closets

3mm thk aluminium powder coated ledge supported

with hollow rectangular section (L=0.85m, w=0.60m)

nos

d 10mm thk aluminium plate in powder coated finish

w=0.30m

m cladding

3mm thk aluminium cladding in powde coated finish m2 cladding

8.1 Brickwall excludin wall finishesa 1st store

1BLW100 100mm thk blockwall internal m2 100-blk  

1BLW200 200mm thk blockwall internal m2 200-blk  

1BRW100 100mm thk brickwall internal m2 100-bwk  

1BRW200 200mm thk brickwall internal m2 200-bwk  

b 2nd store

2BLW100 100mm thk blockwall internal m2 100-blk  

2BLW200 200mm thk blockwall internal m2 200-blk  

2BRW100 100mm thk brickwall internal m2 100-bwk  2BRW200 200mm thk brickwall internal m2 200-bwk  

c 3rd store

3BLW100 100mm thk blockwall internal m2 100-blk  

Page 19 of 110 S1-Blk X1

Page 20: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 20/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

3BLW200 200mm thk blockwall internal m2 200-blk  

3BRW100 100mm thk brickwall internal m2 100-bwk  

3BRW200 200mm thk brickwall internal m2 200-bwk  

d 4th store

4BLW100 100mm thk blockwall internal m2 100-blk  

4BLW200 200mm thk blockwall internal m2 200-blk  

4BRW100 100mm thk brickwall internal m2 100-bwk  

4BRW200 200mm thk brickwall internal m2 200-bwk  

e 5th store

5BLW100 100mm thk blockwall internal m2 100-blk  

5BLW200 200mm thk blockwall internal m2 200-blk  

5BRW100 100mm thk brickwall internal m2 100-bwk  

5BRW200 200mm thk brickwall internal m2 200-bwk  

f 6th store

6BLW100 100mm thk blockwall internal m2 100-blk  

6BLW200 200mm thk blockwall internal m2 200-blk  6BRW100 100mm thk brickwall internal m2 100-bwk  

6BRW200 200mm thk brickwall internal m2 200-bwk  

7th store

7BLW100 100mm thk blockwall internal m2 100-blk  

7BLW200 200mm thk blockwall internal m2 200-blk  

7BRW100 100mm thk brickwall internal m2 100-bwk  

7BRW200 200mm thk brickwall internal m2 200-bwk  

h 8th store

8BLW100 100mm thk blockwall internal m2 100-blk  

8BLW200 200mm thk blockwall internal m2 200-blk  

8BRW100 100mm thk brickwall internal m2 100-bwk  

8BRW200 200mm thk brickwall internal m2 200-bwk  

i 9th store

9BLW100 100mm thk blockwall internal m2 100-blk  

9BLW200 200mm thk blockwall internal m2 200-blk  

9BRW100 100mm thk brickwall internal m2 100-bwk  

9BRW200 200mm thk brickwall internal m2 200-bwk  

10th store

10BLW100 100mm thk blockwall internal m2 100-blk  

10BLW200 200mm thk blockwall internal m2 200-blk  

10BRW100 100mm thk brickwall internal m2 100-bwk  

10BRW200 200mm thk brickwall internal m2 200-bwk  

k 11th store

11BLW100 100mm thk blockwall internal m2 100-blk  

11BLW200 200mm thk blockwall internal m2 200-blk  

11BRW100 100mm thk brickwall internal m2 100-bwk  11BRW200 200mm thk brickwall internal m2 200-bwk  

l Roof  

RFBLW100 100mm thk blockwall internal m2 100-blk  

RFBLW200 200mm thk blockwall internal m2 200-blk  

RFBRW100 100mm thk brickwall internal m2 100-bwk  

RFBRW200 200mm thk brickwall internal m2 200-bwk  

8.2 Hollow core light weight wall system excluding

wall finishes

HCW Hollow core with C-glass continous monofilament fibres

tissue for joint to Hostel and Service Apartments as per

Schedule of Finishes, 110mm thk hollow core precast

wall as per enlarged detail; internal

a 1st store m2 Hollow-C

b 2nd store m2 Hollow-C

c 3rd store m2 Hollow-C

d 4th store m2 Hollow-C

e 5th store m2 Hollow-C

f 6th store m2 Hollow-C

7th store m2 Hollow-C

h 8th store m2 Hollow-C

i 9th store m2 Hollow-C

10th store m2 Hollow-C

k 11th store m2 Hollow-C

l Roof m2 Hollow-C

Carried Forward

Page 20 of 110 S1-Blk X1

Page 21: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 21/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 13 Internal Wall and Partition Cont'd

8.3 Glass wall panel complete with supporting frame

Note Included in item 7.2

a 1st store

10mm thk tempered glass panel with stainless steel

frame at sides and top to Security Room (1.50mL x

nos glazing

b 2nd store

c 3rd store

d 4th store

e 5th store

f 6th store

7th storeh 8th store

i 9th store

10th store

k 11th store

l Roof  

8.4  Acoustic wall panel lining including fabric wall

coverin s stemNote Wall finishes for Incubation Pods, Think Tanks and

Multi- ur ose Hall as er Schedule of Finishes

a 7th store

7W9 Fixed acoustic wall anel on non lazed walls m2 Partition

Others

1W9 Fixed acoustic wall anel on non lazed walls m2 Partition2W9 Fixed acoustic wall anel on non lazed walls m2 Partition

3W9 Fixed acoustic wall anel on non lazed walls m2 Partition

4W9 Fixed acoustic wall anel on non lazed walls m2 Partition

5W9 Fixed acoustic wall anel on non lazed walls m2 Partition

6W9 Fixed acoustic wall anel on non lazed walls m2 Partition

8W9 Fixed acoustic wall anel on non lazed walls m2 Partition

9W9 Fixed acoustic wall anel on non lazed walls m2 Partition

10W9 Fixed acoustic wall anel on non lazed walls m2 Partition

11W9 Fixed acoustic wall anel on non lazed walls m2 Partition

RFW9 Fixed acoustic wall anel on non lazed walls m2 Partition

8.5 Steel concrete lintols to brickwall dr wall

a 1st store

b 2nd store

c 3rd stored 4th store

e 5th store

f 6th store

7th store

h 8th store

i 9th store

10th store

k 11th store

l Roof level

8.6 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 a Timber vertical strip to internal staircase for Hall Fellow

and Hall Master

m2

b

c

Carried Forward

Page 21 of 110 S1-Blk X1

Page 22: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 22/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 14 Door and Ironmon er

Note  All 6mm thk wired clear glass panel are 100mm x600mm unless noted

9.1 Fire rated steel door in powder coated impact

resistant satin coating finished c/w

exposed/concealed door frame, mullion,

 a 1st store

FD2/12 Two hour fire rated steel door (double leaf) and frame

(powder coated impact resistant satin coating finish) to

Bin Centre, PABX, LV Switchroom, LT S/W Room

(Emergency), Low Level Transfer Tank Room, Bin

Transit Room, ELV Room, MDF Room, Pool Filtraction

Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos 1 Metal-Dr

FD2/18 Two hour fire rated steel door (double leaf) and frame

(powder coated impact resistant satin coating finish) to

Bin Centre, PABX, LV Switchroom, LT S/W Room

(Emergency), Low Level Transfer Tank Room, Bin

Transit Room, ELV Room, MDF Room, Pool Filtraction

Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos 2 Metal-Dr

FD2/RC12 Two hour fire rated steel door and frame (powder

coated impact resistant satin coating finish) to Refuse

Chute Chamber

nos 1 Metal-Dr

b 2nd store

c 3rd stored 4th store

e 5th store

f 6th store

7th store

h 8th store

i 9th store10th store

k 11th store

l Roof level

9.2 Fire rated steel door in powder coated finished

c/w exposed/concealed door frame, mullion,

ironmongery etc including fixing accessories

Na

a 1st store

b 2nd store

c 3rd stored 4th store

e 5th store

f 6th store

7th storeh 8th store

i 9th store

10th store

k 11th storel Roof  

Carried ForwardBrou ht Forward

BC S1 15 Door and Ironmon er Cont'd

9.3 Non fire rated steel door in powder coated

finished c/w exposed/concealed door frame,

mullion, ironmongery etc including fixing

Na

a 1st store

b 2nd store

c 3rd store

d 4th store

e 5th storef 6th store

7th store

h 8th store

i 9th store10th store

k 11th store

l Roof level

9.4 Fire rated solid timber door in laminate finished

c/w door frame, mullion, push/kick plate,

viewing panel, ironmongery, etc including fixing

accessoriesa 1st store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

Door

nos 2 tbr-dr

FD.5/20 2 hour fire rated timber door with HPMR laminate with

6mm thk aired clear glass panel (2 nos) and self  closin device to Lift Lobb Exit Door

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S08 Half hour fire rated solid core door with HPMR  

laminates to to TEL near Staircase

nos Na tbr-dr

b 2nd store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/15 Half hour fire rated solid core door (one and half leaf)

with HPMR laminates, 6mm thk wired clear glass panel

and self-closing device to Staircase 1,2,3 & 4, Multi-use

Room, SSL (Smoke Stop Lobby), Exit Door

nos 2 tbr-dr

FD.5/15A Half hour fire rated solid core door (one and half leaf)

with HPMR laminates and self-closing device to

Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop

Lobb Exit Door

nos 1 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 2 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

Toilet

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

nos 1 tbr-dr

Hostel and Facult Service A artments

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance Graduate Sin le GS

nos 1 tbr-dr

Page 22 of 110 S1-Blk X1

Page 23: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 23/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

c 3rd store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/15 Half hour fire rated solid core door (one and half leaf)

with HPMR laminates, 6mm thk wired clear glass panel

and self-closing device to Staircase 1,2,3 & 4, Multi-use

Room, SSL (Smoke Stop Lobby), Exit Door

nos 1 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

Toilet

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

UGS

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance Graduate Sin le GS

nos 1 tbr-dr

d 4th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

Toilet

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

nos 2 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance Graduate Sin le GS

nos 1 tbr-dr

e 5th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/15 Half hour fire rated solid core door (one and half leaf)with HPMR laminates, 6mm thk wired clear glass panel

and self-closing device to Staircase 1,2,3 & 4, Multi-use

Room, SSL (Smoke Stop Lobby), Exit Door

nos 1 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT, TEL, SPR, FA, HR FE, SP, ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

Toilet

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

nos 2 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance Graduate Sin le GS

nos 1 tbr-dr

f 6th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

Page 23 of 110 S1-Blk X1

Page 24: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 24/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

Toilet

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

UGS

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

UGD

nos 2 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  laminates to Main Entrance Graduate Sin le GS nos 1 tbr-dr

7th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT, TEL, SPR, FA, HR FE, SP, ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to CommunalToilet

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance Graduate Sin le GS

nos Na tbr-dr

h 8th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

Toilet

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated timber door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

3

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

Toilet

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

nos 1 tbr-dr

i 9th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 9 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT, TEL, SPR, FA, HR FE, SP, ST

nos 4 tbr-dr

Page 24 of 110 S1-Blk X1

Page 25: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 25/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 1 tbr-dr

Hostel and Facult Service A artments

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

UGD

nos 1 tbr-dr

10th store

FD.5/10 Half hour fire rated solid core door with HPMR  laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position by

Electromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

Toilet

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

HR FE DR SFH

nos 3 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

UGS

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

UGD

nos 1 tbr-dr

k 11th store

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/EM15 Half hour fire rated solid core door (one and a half  

leaf) with HPMR laminates, 6mm thk wired clear glass

panel and door held in the open position byElectromagnetic device linked to the Building's Fire

 

nos 4 tbr-dr

FD.5/HT10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Handicap

nos 1 tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR  

laminates to DT TEL SPR FA HR FE SP ST

nos 4 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 4 tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,HR FE DR SFH

nos 1 tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate

with 3mm thk SS finger and kick plates to Communal

Toilet

nos 1 tbr-dr

Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance ; Undergraduate Single

nos 1 tbr-dr

FD.5/HM10 Half hour fire rated solid core door with HPMR  

laminates to Main Entrance; Undergraduate Double

nos 1 tbr-dr

l Roof  

FD.5/10 Half hour fire rated solid core door with HPMR  

laminates, 6mm thk wired clear glass panel and self-

closing device to Protected Staircase, Lift Lobby, Exit

nos 3 tbr-dr

FD.5/S10 Half hour fire rated solid core door (double leaf) with

HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,

nos 3 tbr-dr

9.5 Non fire rated / Timber door in laminate finished

c/w door frame, mullion, finger/push/kick plate,

viewing panel, louvred panel, ironmongery, etc

includinq fixinq accessories

a 1st store

D/08 Timber door with HPMR laminate and 3mm thk SS

finger push and kick plates to Head Officer, Store,

Storage, Photo Copy , Office , Meeting Room, Service

 

nos Na tbr-dr

D/09 Timber door with HPMR laminate and 3mm thk SS

finger push and kick plates to Head Officer, Store,

Storage, Photo Copy , Office , Meeting Room, Service

 Yard Cafe Securit Room

nos 1 tbr-dr

D/10 Timber door with HPMR laminate and 3mm thk SS

finger push and kick plates to Head Officer, Store,

Storage, Photo Copy , Office , Meeting Room, Service

 

nos 2 tbr-dr

DHT/10 Laminated semi-solid timber door with timber louvred

below to Handica Toilet

nos 1 tbr-dr

DK/10 Timber door with HPMR laminate to Communal

Laundr Communal Kitchen

nos 1 tbr-dr

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 3 tbr-dr

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 5 tbr-dr

DS/07 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

Page 25 of 110 S1-Blk X1

Page 26: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 26/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na

DS/10 Timber door (double leaf) to PW/NW, PW, DR/SFH,HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 2 tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nosDS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

 

nos 2 tbr-dr

DT/08 Laminated semi-solid timber door with timber louvre

below and 3mm thk SS finger push and kick plates to

Washroom

nos 2 tbr-dr

b 2nd store

D/10 Timber door with HPMR laminate and 3mm thk SSfinger push and kick plates to Head Officer, Store,

Storage, Photo Copy , Office , Meeting Room, Service

 Yard Cafe Securit Room

nos 1 tbr-dr

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos Na tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 4 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 4 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

with louvres Graduate Sin le GS

nos 1 tbr-dr

DHM/1 LL Semi solid door with timber veneer to Main Entrance;

Undergraduate Apartment Hall Fellows (UGH-F)

nos 1 tbr-dr

DHM/1 UL Semi solid door with timber veneer to Main Entrance;

Undergraduate Apartment Hall Fellows (UGH-F)

nos 1 tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Sin le GS

nos 3 tbr-dr

DT/08A LL Laminated semi-solid timber door to Powder Room;

Undergraduate Apartment Hall Fellows (UGH-F)

nos 2 tbr-dr

DT/08A UL Laminated semi-solid timber door to Bath 1;

Under raduate A artment Hall Fellows UGH-F

nos 1 tbr-dr

DB/10 UL Semi solid door with timber veneer to Master Bedroom,

Bedroom 1; Undergraduate Apartment Hall Fellows

UGH-F

nos 1 tbr-dr

D/S08 LL Timber door with HPMR laminate to Store;Under raduate A artment Hall Fellows UGH-F

nos 1 tbr-dr

c 3rd storeDS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 3 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 16 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

with louvres Graduate Sin le GS

nos 1 tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Sin le GS

nos 2 tbr-dr

d 4th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 3 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 7 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance(with louvres); Undergraduate Double (UGD)

nos 16 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

with louvres Graduate Sin le GS

nos 2 tbr-dr

DHM/1 LL Semi solid door with timber veneer to Main Entrance;

Undergraduate Apartment Hall Master (UGH-M)

nos 1 tbr-dr

DHM/1 UL Semi solid door with timber veneer to Main Entrance;

Undergraduate Apartment Hall Master (UGH-M)

nos 1 tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Sin le GS

nos 3 tbr-dr

DT/08A LL Laminated semi-solid timber door to Bath;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

Page 26 of 110 S1-Blk X1

Page 27: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 27/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

DT/08A UL Laminated semi-solid timber door to Master Bath, Bath

2; Undergraduate Apartment Hall Master (UGH-M)

nos 2 tbr-dr

DB/10 LL Semi solid door with timber veneer to Bedroom 1 ;Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DB/10 UL Semi solid door with timber veneer to Master Bedroom,

Bedroom 2 ; Undergraduate Apartment Hall Master

-

nos 2 tbr-dr

D/S08 LL Timber door with HPMR laminate to Store;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DS/06 LL Timber dor with HPMR laminates to PW/NW;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DS/06 UL Timber dor with HPMR laminates to PW/NW;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

e 5th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

 

nos 1 tbr-dr

Hostel and Facult Service A artmentsDHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 6 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 15 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

with louvres Graduate Sin le GS

nos 2 tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Sin le GS

nos 3 tbr-dr

f 6th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/04 Timber dor with HPMR laminates to Stack Duct, RefuseChute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nosDS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 tbr-dr

Hostel and Facult Service A artmentsDHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 6 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 11 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

with louvres Graduate Sin le GS

nos 2 tbr-dr

DHM/10 LL Semi solid door with timber veneer to Main Entrance;

Undergraduate Apartment Hall Master (UGH-M)

nos 1 tbr-dr

DHM/10 UL Semi solid door with timber veneer to Main Entrance;

Undergraduate Apartment Hall Master (UGH-M)

nos 1 tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Sin le GS

nos 3 tbr-dr

DT/08A LL Laminated semi-solid timber door to Bath;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DT/08A UL Laminated semi-solid timber door to Master Bath, Bath

2; Undergraduate Apartment Hall Master (UGH-M)

nos 2 tbr-dr

DB/10 LL Semi solid door with timber veneer to Bedroom 1 ;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DB/10 UL Semi solid door with timber veneer to Master Bedroom,

Bedroom 2 ; Undergraduate Apartment Hall Master

UGH-M

nos 2 tbr-dr

D/S08 LL Timber door with HPMR laminate to Store;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DS/06 LL Timber dor with HPMR laminates to PW/NW;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

DS/06 UL Timber dor with HPMR laminates to PW/NW;

Under raduate A artment Hall Master UGH-M

nos 1 tbr-dr

Carried Forward

Page 27 of 110 S1-Blk X1

Page 28: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 28/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 16 Door and Ironmon er Cont'd

9.5 Non fire rated / Timber door in laminate finished

c/w door frame, mullion, finger/push/kick plate,

viewing panel, louvred panel, ironmongery, etc

including fixing accessories (Cont'd)

7th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 6 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 12 tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

with louvres Graduate Sin le GS

nos 2 tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Sin le GS

nos 3 tbr-dr

h 8th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 8 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 16 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance;Graduate Married GM

nos 2 Tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Married GM

nos 2 Tbr-dr

DB/09 Semi solid door with timber veneer to Bedroom ;

Graduate Married GM

nos 2 Tbr-dr

i 9th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 Tbr-dr

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na Tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 Tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 Tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

 

nos 1 Tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Single (UGS)

nos 6 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 15 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance;

Graduate Married GM

nos 2 Tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Married GM

nos 2 Tbr-dr

DB/09 Semi solid door with timber veneer to Bedroom ;

Graduate Married GM

nos 2 Tbr-dr

10th store

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 Tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 Tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 Tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 Tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance(with louvres); Undergraduate Single (UGS)

nos 10 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 14 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance;

Graduate Married GM

nos 2 Tbr-dr

DT/08A Laminated semi-solid timber door to Bath; Graduate

Married GM

nos 2 Tbr-dr

DB/09 Semi solid door with timber veneer to Bedroom ;

Graduate Married GM

nos 2 Tbr-dr

k 11th store

Page 28 of 110 S1-Blk X1

Page 29: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 29/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na Tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, RefuseChute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 2 Tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos Na Tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/10A Timber door (double leaf) with 400mmW x 500mmH

6mm thk wired clear glass panel (2 nos) to SFAP

nos 1 tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

Water Riser

nos 1 Tbr-dr

Hostel and Facult Service A artments

DHM/10 Semi solid door with timber veneer to Main Entrance(with louvres); Undergraduate Single (UGS)

nos 6 Tbr-dr

DHM/10 Semi solid door with timber veneer to Main Entrance

(with louvres); Undergraduate Double (UGD)

nos 19 Tbr-dr

l Roof level

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse

Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE

nos 1 Tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,

 

nos 1 Tbr-dr

9.6 Frameless glass door c/w ironmongery, etc

includin fixin accessoriesa 1st store

SGD/10 Tempered sl iding glass door, frameless to Meeting

Room

nos 2 Glass-dr

SGD/12 Tempered sliding glass door, frameless to Hall Officer,

Pantr Toi let

nos 3 Glass-dr

b 2nd store

GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr

c 3rd store

GD/09 Tempered glass door, Cleared full tempered

laminated glass door, frameless c/w ironmongery as

er enlar ed detail to Incubation POD

nos 1 Glass-dr

d 4th store

GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr

e 5th store

GD/10 Tempered glass door, frameless to Think Tank Room nos Glass-dr

f 6th store

GD/09 Tempered glass door, Cleared full tempered

laminated glass door c/w ironmongery as per

enlar ed detail to Incubation POD

nos Glass-dr

GD/10 Tempered glass door, frameless to Think Tank Room nos 3 Glass-dr

7th store

GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr

h 8th store Nil

i 9th store

GD/09 Tempered glass door, Cleared full tempered

laminated glass door c/w ironmongery as per

 

nos 1 Glass-dr

GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr

10th storeGD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr

k 11th store

l Roof level

9.7  Aluminium framed glass door c/w frame,

ironmon er etc includin fixin accessoriesa 1st store

b 2nd store

GD/7 LL Tempered glass door to Balcony / AC Ledge;

Under raduate A artment Hall Fellows UGH-F

nos 1 Glass-dr

SGD/18 UL Sliding glass door, double leaf   to Bedroom 1;

Under raduate A artment Hall Fellows UGH-F

nos 1 Glass-dr

c 3rd store

d 4th store

SGD/18 LL Sliding glass door, double leaf   to Bedroom 1;

Under raduate A artment Hall Master UGH-M

nos 1 Glass-dr

SGD/27 UL Sliding glass door, double leaf   to Master Bedroom;

Under raduate A artment Hall Master UGH-M

nos 1 Glass-dr

e 5th store

f 6th store

SGD/18 LL Sliding glass door, double leaf   to Bedroom 1;

Under raduate A artment Hall Master UGH-M

nos 1 Glass-dr

SGD/27 UL Sliding glass door, double leaf   to Master Bedroom;Under raduate A artment Hall Master UGH-M

nos 1 Glass-dr

7th store

h 8th store

i 9th store

10th store

k 11th store

l Roof level

Carried Forward

Page 29 of 110 S1-Blk X1

Page 30: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 30/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 17 Door and Ironmon er Cont'd

9.8 Metal gate c/w frame, ironmongery etc including

fixin accessoriesa Roof level

MG/16A Metal gate, double leaf to Lift Lobby near Refuse Chute nos 1 metal-wk 

6th store

MG 16 Metal ate, double leaf to Roof Access nos 1 metal-wk 

9.9 Fire rated motorised roller shutter in powder

coated finished c/o ironmongery, shutter box

cover/hood, side guides, bottom rail, locking

system, barrel, removable centre mullion where

necessary, ventilation holes, etc. including fixing

a 1st store

b 2nd store

9.10 Non fire rated motorised roller shutter in powder

coated finished c/o ironmongery, shutter box

cover/hood, side guides, bottom rail, locking

system, barrel, removable centre mullion where

necessary, ventilation holes, etc. including fixing

a 1st store NIL

b 2nd store NIL

9.11 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,shall be deemed to be included or absorbed in the

 a Closet

Closet 30mm thk solid timber door c/w 1mm thk high

pressure laminatef finish on both sides for door to

nos

b Stack Duct Doors

SD/05 40mm thk flush timber door c/w 1mm thk high

pressured laminate finish on both sides and 2mm thk 

aluminium L-angle in powder coat finssihs frame to

 

nos 189 others

SD/07 40mm thk flush timber door c/w 1mm thk high

pressured laminate finish on both sides and 2mm thk 

aluminium L-angle in powder coat finssihs frame to

Stack Duct at Access Corridor near Think Tank Rooms

nos 8 others

c

Other

SGD 07 to bedroom Hall Master nos 2

Wall Finishes

10.1 Plastering and vinyl co-polymer emulsion

aintin

W1a Plaster and aint to wall

a 1st store m2

b 2nd store m2 laster

c 3rd store m2 laster

d 4th store m2 laster

e 5th store m2 laster

f 6th store m2 laster

7th store m2 laster

h 8th store m2 laster

i 9th store m2 laster

10th store m2 laster

k 11th store m2 laster

l Roof m2 laster

Carried ForwardBrou ht Forward

BC S1 18 Wall Finishes cont'd

10.2 Skim coatin and vin l co- ol mer emulsion

W1 5mm skim coated and aint finished to walls

Note Plaster and paint as per Schedule of Finishes, finishes

above as er enlar ed drawin

a 1st store m2 Skim Coat

b 2nd store m2 Skim Coat

c 3rd store m2 Skim Coat

d 4th store m2 Skim Coat

e 5th store m2 Skim Coat

f 6th store m2 Skim Coat

7th store m2 Skim Coat

h 8th store m2 Skim Coat

i 9th store m2 Skim Coat

10th store m2 Skim Coat

k 11th store m2 Skim Coat

l Roof m2 Skim Coat

10.3 Homogeneous wall tile including cement sand

backin screed

W2 300mm x 600mm homogeneous wall tiles with backing

screed

a 1st store m2 wall tile

b 2nd store m2 wall tilec 3rd store m2 wall tile

d 4th store m2 wall tile

e 5th store m2 wall tile

f 6th store m2 wall tile

7th store m2 wall tile

h 8th store m2 wall tile

i 9th store m2 wall tile

10th store m2 wall tile

k 11th store m2 wall tile

l Roof m2 wall tile

10.4 Glazed ceramic wall tile including cement sand

backin screed with adhesivea 1st store

RCCW Glazed wall ti les with backing screed to Refuse ChuteChamber

m2

b 2nd store

c 3rd store

d 4th store

e 5th store

f 6th store

7th store

Carried Forward

Page 30 of 110 S1-Blk X1

Page 31: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 31/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 19 Wall Finishes cont'd

10.4 Glazed ceramic wall tile including cement sand

backin screed with adhesive Cont'dh 8th store

i 9th store10th store

k 11th store

l Roof  

10.5 Granite tile including cement sand backing

screeda 1st store

b 2nd storec 3rd store

d 4th store

e 5th storef 6th store

7th store

h 8th store

i 9th store

10th storek 11th store

l Roof  

10.6 OthersWorks not listed above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

above items .a Other wall finishes

W8 Stud wall with insulation (self adhesive polyurethenesheet vapour barrier and 50mm thk rockwool insulation

complete with 12mm thk non-combustible calcium

silicate baord) to LAN Room / ELVS Room

m2 partition

EWF Skim coat and smooth textured paint finish; external m2 Skim Coat

c Groovelines10mm wide m others

50mm wide m others

c

Floor Finishes11.1 Cement and sand screed with adhesive

a 1st store AR-101 m2 511.18 screedwash rm (m) 2.48  2.48

wash rm (f) 3.09  3.09

handica toilet 4.86  4.86

communal laundr 39.22  39.22

kitchenette 49.37  49.37

letter box 23.55  23.55

hall admin office toilet 3.91  3.91

hall admin office antr rm 7.34  7.34

hall admin office meeting rm 9.42  9.42

hall admin office store rm 4.07  4.07

hall admin office rece tion 17.96  17.96

hall admin office hall officer 40.24  40.24hall admin office head office 10.99  10.99

refuse chutte 1.90  1.90

securit rm 7.83  7.83

lift lobb 10.20  10.20

corridor 274.75  274.75

511.18

b 2nd store m2 514.39 screedlift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32GS shower 1 0.84  0.84

UGD-DL (2) bed rm 2 17.59  35.18

UGS-L 2 bed rm 2 8.81  17.62

communical toilet toilet 27.04  27.04

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

communical toilet store 36.75  36.75

hall fellow level 1 dinin /livin 29.47  29.47

hall fellow level 1 kitchen 5.22  5.22

hall fellow level 1 store 3.81  3.81

hall fellow level 1 owder room 2.38  2.38

multi use rm 24.61  24.61

think tank rm 1 30.00  30.00

corridor 248.81  248.81

514.39

c 3rd store m2 560.41 screedlift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

UGD-DL (2) bed rm 5 17.59  87.95

UGD-DL 1 bed rm 4 17.62  70.48

UGD-SL bed rm 2 17.55  35.10

UGS bed rm 1 8.68  8.68

UGS-L (1) bed rm 1 8.63  8.63

UGD bed rm 2 17.59  35.18

UGS-L 2 bed rm 1 8.81  8.81

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

Incubation od IP3 14.82  14.82

hall fellow level 2 hall 6.67  6.67

hall fellow level 2 bed rm 7.71  7.71

hall fellow level 2 bath 1 2.29  2.29

hall fellow level 2 shower 1.01  1.01

hall fellow level 2 master bed rm 11.87  11.87

corridor 171.13  171.13

560.41

d 4th store m2 650.73 screedlift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 2 17.55  35.10

UGS-L 2 bed rm 5 8.81  44.05

UGS-L (1) bed rm 1 8.63  8.63

Page 31 of 110 S1-Blk X1

Page 32: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 32/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

UGD-DL 1 bed rm 10 17.62  176.20

UGD-DL 2 bed rm 2 17.59  35.18

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50communical toilet HT 4.85  4.85

hall master level 1 dinin /livin 26.92  26.92

hall master level 1 kitchen 5.71  5.71

hall master level 1 store 3.72  3.72

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

hall master level 1 bed rm 1 11.49  11.49

think tank rm 2 25.10  25.10

corridor 149.60  149.60

650.73

e 5th store m2 597.30 screedlift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 4 17.55  70.20

UGS-L 2 bed rm 5 8.81  44.05

UGD-DL 1 bed rm 5 17.62  88.10

UGS-L (1) bed rm 1 8.63  8.63

UGD-DL 2 bed rm 3 17.59  52.77

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 hall 6.56  6.56hall master level 2 stud 4.04  4.04

hall master level 2 master bed rm 16.19  16.19

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 bed rm 2 10.86  10.86

hall master level 2 shower 0.95  0.95

hall master level 2 bath 2 2.51  2.51

think tank rm 3 14.00  14.00

corridor 149.45  149.45

597.30

Carried ForwardBrou ht Forward

BC S1 20 Floor Finishes Cont'd

11.1 Cement and sand screed with adhesive (Cont'd)

f 6th store m2 626.73 screedlift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

UGS-L (2) bed rm 4 8.81  35.24

UGD bed rm 3 17.59  52.77

UGD-SL bed rm 4 17.55  70.20

UGS bed rm 1 8.68  8.68

UGD-DL (1) bed rm 3 17.62  52.86

UGD-DL 2 bed rm 2 17.59  35.18

UGS-L 1 bed rm 1 8.63  8.63

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 1 dinin /livin 26.92  26.92

hall master level 1 kitchen 5.71  5.71

hall master level 1 store 3.72  3.72

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

hall master level 1 bed rm 1 11.49  11.49

think tank rm 4 30.32  30.32think tank rm 5 25.41  25.41

Incubation od IP2 15.76  15.76

corridor 149.99  149.99

626.73

7th store m2 580.89 screedlift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

UGD bed rm 1 17.59  17.59UGD-SL bed rm 7 17.55  122.85

UGS-L (2) bed rm 4 8.81  35.24

UGD-DL (1) bed rm 3 17.62  52.86

UGS-L 1 bed rm 1 8.63  8.63

UGD-DL 2 bed rm 1 17.59  17.59

UGS bed rm 1 8.68  8.68

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 hall 6.56  6.56

hall master level 2 stud 4.04  4.04

hall master level 2 master bed rm 16.19  16.19

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 bed rm 2 10.86  10.86hall master level 2 bath 2 2.51  2.51

hall master level 2 shower 0.95  0.95

think tank rm 33.82  33.82

corridor 148.71  148.71

580.89

h 8th store m2 587.73 screedlift lobb 10.20  10.20

GM livin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

UGS-L (2) bed rm 7 8.81  61.67

UGD bed rm 2 17.59  35.18UGD-SL bed rm 7 17.55  122.85

UGS bed rm 1 8.68  8.68

UGD-DL (1) bed rm 3 17.62  52.86

UGD-DL 2 bed rm 3 17.59  52.77

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 148.71  148.71

587.73

i 9th store m2 589.93 screedlift lobb 10.20  10.20

GM livin /dinin /kitchen 2 12.42  24.84

Page 32 of 110 S1-Blk X1

Page 33: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 33/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

GM bed rm 2 10.27  20.54

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

UGS-L 2 bed rm 5 8.81  44.05UGD bed rm 2 17.59  35.18

UGD-SL bed rm 5 17.55  87.75

UGS bed rm 1 8.68  8.68

UGD-DL 1 bed rm 6 17.62  105.72

UGD-DL 2 bed rm 2 17.59  35.18

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

think tank rm 7 19.65  19.65

corridor 148.71  148.71

589.93

10th store m2 627.22 screed

lift lobb 10.20  10.20GM livin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

UGD-DL (1) bed rm 8 17.62  140.96

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 4 17.55  70.20

UGS bed rm 1 8.68  8.68

UGS-L 2 bed rm 6 8.81  52.86

UGD-DL 2 bed rm 1 17.59  17.59

UGS-L 1 bed rm 1 8.63  8.63

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

think tank rm 8 14.30  14.30think tank rm 9 25.10  25.10

corridor 148.71  148.71

627.22

k 11th store m2 560.15 screedlift lobby 10.20  10.20

UGD-DL 2 bed rm 3 17.59  52.77

UGS bed rm 1 8.68  8.68

UGD bed rm 2 17.59  35.18

UGD-DL (1) bed rm 10 17.62  176.20

UGD-SL bed rm 3 17.55  52.65

UGS-L 2 bed rm 4 8.81  35.24

UGS-L (1) bed rm 1 8.63  8.63

communical toilet toilet 36.58  36.58communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 137.67  137.67

560.15

l Roof screedlift lobb 10.20  10.20 m2 10.20

10.20

11.2 Cement and sand screed with floor hardener

a 1st store m2 200.00 flr hardlv switch rm 7.67  7.67

low level transfer tank

rm73.17  73.17

elv s stem rm 31.48  31.48

common area 11.92  11.92

tow truck route 75.76  75.76

200.00

b 2nd store m2 52.22 flr hardcommon area 47.00  47.00

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD-DL 2 dr in closet 2 0.88  1.76

UGS-L 2 dr in closet 2 0.46  0.92hall fellow level 1 ac led e 1.10  1.10

52.22

c 3rd store m2 47.97 flr hardcommon area 28.72  28.72

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD-DL 2 dr in closet 5 0.88  4.40

UGD-DL 1 dr in closet 4 0.92  3.68

UGD-SL dr in closet 2 0.92  1.84

UGS dr in closet 1 0.46  0.46

UGS-L 1 dr in closet 1 0.46  0.46

UGD dr in closet 2 0.88  1.76

UGS-L (2) dr in closet 1 0.46  0.46hall fellow level 2 ac led e 1.98  1.98

hall fellow level 2 balcon 2.77  2.77

47.97

d 4th store m2 89.00 flr hardcommon area 68.07  68.07

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 2 0.92  1.84

UGS-L 2 dr in closet 5 0.46  2.30

UGS-L (1) dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 10 0.92  9.20

UGD-DL 2 dr in closet 2 0.88  1.76hall master balcon /ac led e 2.17  2.17

89.00

e 5th store m2 68.34 flr hardcommon area 48.39  48.39

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 4 0.92  3.68

UGS-L (2) dr in closet 5 0.46  2.30

UGD-DL 1 dr in closet 5 0.92  4.60

UGS-L 1 dr in closet 1 0.46  0.46

UGD-DL 2 dr in closet 3 0.88  2.64

hall master level 2 balcon /ac led e 3.07  3.07

68.34

f 6th store m2 77.62 flr hardcommon area 60.41  60.41

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGS-L 2 dr in closet 4 0.46  1.84

UGD dr in closet 3 0.88  2.64

UGD-SL dr in closet 4 0.92  3.68

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 3 0.92  2.76

UGD-DL (2) dr in closet 2 0.88  1.76

UGS-L 1 dr in closet 1 0.46  0.46

Page 33 of 110 S1-Blk X1

Page 34: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 34/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

hall master level 1 balcon /ac led e 2.17  2.17

77.62

7th store m2 66.87 flr hardcommon area 38.44  38.44

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 1 0.88  0.88

UGD-SL dr in closet 7 0.92  6.44

UGS-L (2) dr in closet 4 0.46  1.84

UGD-DL 1 dr in closet 3 0.92  2.76

UGS-L 1 dr in closet 1 0.46  0.46

UGD-DL 2 dr in closet 1 0.88  0.88

UGS dr in closet 1 0.46  0.46

hall master level 2 balcon /ac led e 3.07  3.07

LAN rm 10.20  10.20

66.87

h 8th store m2 150.25 flr hardcommon area 132.05  132.05

GM dr in closet 2 0.46  0.92

UGS-L 2 dr in closet 7 0.46  3.22

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 7 0.92  6.44

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 3 0.92  2.76

UGD-DL 2 dr in closet 3 0.88  2.64

150.25

i 9th store m2 61.53 flr hard

common area 44.21  44.21GM dr in closet 2 0.46  0.92

UGS-L (2) dr in closet 5 0.46  2.30

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 5 0.92  4.60

UGS dr in closet 1 0.46  0.46

UGD-DL (1) dr in closet 6 0.92  5.52

UGD-DL 2 dr in closet 2 0.88  1.76

61.53

10th store m2 74.25 flr hardcommon area 55.97  55.97

GM dr in closet 2 0.46  0.92

UGD-DL (1) dr in closet 8 0.92  7.36

UGD drying closet 2 0.88  1.76UGD-SL dr in closet 4 0.92  3.68

UGS dr in closet 1 0.46  0.46

UGS-L (2) dr in closet 6 0.46  2.76

UGD-DL (2) drying closet 1 0.88  0.88

UGS-L 1 dr in closet 1 0.46  0.46

74.25

k 11th store m2 114.19 flr hardcommon area 18.93  18.93

heat um rm 76.14  76.14

UGD-DL (2) dr in closet 3 0.88  2.64

UGS dr in closet 1 0.46  0.46

UGD dr in closet 2 0.88  1.76

UGD-DL 1 dr in closet 10 0.92  9.20UGD-SL dr in closet 3 0.92  2.76

UGS-L 2 dr in closet 4 0.46  1.84

UGS-L 1 dr in closet 1 0.46  0.46

114.19

l Roof m2 142.06 flr hardcommon area 22.83  22.83

water tank 119.23  119.23

142.06

11.3 Li uid -a lied water roofin membrane

a 1st store

WF1 Wate roofin to wet areas to floor m2 386.92 water rf Flexible cementitous waterproof coating; rc slab

surface minimum wood trowelled smooth to receive

waterproofing coating, f inishes and 25mm thk c/s

 wash rm (m) 2.48  2.48

wash rm (f) 3.09  3.09

handica toilet 4.86  4.86

communal laundr 39.22  39.22

kitchenette 49.37  49.37

hall admin office toilet 3.91  3.91

hall admin office antr rm 7.34  7.34

refuse chutte 1.90  1.90

corridor 274.75  274.75

386.92

WF1 Wateproofing to wet areas to wall upturn (h=300mm) m 187.61 waterprf 

Flexible cementitous waterproof coating; rc slab

surface minimum wood trowelled smooth to receive

waterproofing coating, f inishes and 20mm thk c/s

 wash rm (m) 6.92 6.92

DT-08 (1) 0.80 (0.80)

wash rm (f) 7.26 7.26

DT-08 (1) 0.80 (0.80)

handica toilet 8.69 8.69

DHT-10 (1) 1.00 (1.00)

communal laundr 27.82 27.82

DL-10 (1) 1.00 (1.00)

kitchenette 36.25 36.25

DK-10 (1) 1.00 (1.00)

hall admin office toilet 7.92 7.92

SGD-12 (1) 1.20 (1.20)

hall admin office antr rm 11.10 11.10

SGD-12 (1) 1.20 (1.20)

refuse chutte 5.54 5.54

FD2-RC12 (1) 1.20 (1.20)

corridor 105.91 105.91

DL-10 (1) 1.00 (1.00)

DK-10 (1) 1.00 (1.00)

DT-08 (2) 0.80 (1.60)

DHT-10 (1) 1.00 (1.00)DS-10 (2) 1.00 (2.00)

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD2-12 (1) 1.20 (1.20)

FD2-18 (2) 1.80 (3.60)

D-10 (1) 1.00 (1.00)

FD.5-20 (1) 2.00 (2.00)

SGD-12 (1) 1.20 (1.20)

187.61

Page 34 of 110 S1-Blk X1

Page 35: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 35/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

WF1 Wateproofing to wet areas to shower wall (h=1.80m) m Na waterprf 

Flexible cementitous waterproof coating on c/s leveling

render, finishes and 20mm thk c/s protection screedmeasured se aratel

Wate roofin to Sum Pit

Flexible cementitous waterproof coating with 25mm

thk c s rotection screed

Floor m2 NIL

Wall m2 NIL

Wate roofin to Water Tank 

Flexible cementitous waterproof coating with 25mm

thk c/s protection screed; rc slab surface minimum

wood trowelled smooth to receive waterproofing

Floor m2 73.17 NILlow level transfer tank

rm73.17  73.17

Wall m2 NIL

WFL Wate roofin to Lift Pit - floor m2 9.68 water rf lift 2 4.84  9.68

WFL Wate roofin to Lift Pit - wall m2 612.48 water rf lift 2 8.80 39.90 702.24

o enin (2) 12 1.70 2.20 (89.76)

612.48

b 2nd store

WF2 Wate roofin to wet areas to floor m2 374.65 water rf GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 27.04  27.04

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall fellow level 1 kitchen 5.22  5.22

hall fellow level 1 owder room 2.38  2.38

think tank rm 1 30.00  30.00

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD-DL 2 dr in closet 2 0.88  1.76

UGS-L (2) dr in closet 2 0.46  0.92

hall fellow level 1 ac led e 1.10  1.10

common area ac led e 14.58  14.58

common area ac s ace 2.47  2.47

common area rc slab 22.68  22.68

corridor 248.81  248.81

374.65

WF2 Wateproofing to wet areas to wall upturn (h=300mm) m 285.89 waterprf 

GS-L bath 2 6.05 12.10

DT-08A (2) 0.80 (1.60)

GS bath 1 6.29 6.29

DT-08A (1) 0.80 (0.80)

communical toilet toilet 33.53 33.53

FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.50 5.50

o enin (1) 0.70 (0.70)

communical toilet HT 8.79 8.79

FD.5-HT10 (1) 1.05 (1.05)

hall fellow level 1 kitchen 7.54 7.54

hall fellow level 1 owder room 6.19 6.19

DT-08A (1) 0.80 (0.80)

think tank rm 1 25.70 25.70

GD-10 (1) 1.00 (1.00)

GS-L dr in closet 2 2.93 5.86

o enin (2) 0.85 (1.70)

GS dr in closet 1 2.93 2.93

o enin (1) 0.85 (0.85)

UGD-DL 2 dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)UGS-L (2) dr in closet 2 3.00 6.00

o enin (2) 0.85 (1.70)

hall fellow level 1 ac led e 4.03 4.03

corridor 194.07 194.07

DHM-10 (7) 1.00 (7.00)

FD.5-HM10 (1) 1.00 (1.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

FD.5-15A (1) 1.50 (1.50)

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

o enin (1) 8.29 (8.29)

285.89

WF2 Wateproofing to wet areas to shower wall (h=1.80m) m 9.83 waterprf 

GS-L shower 2 3.35 6.70

GS shower 1 3.13 3.13

9.83

c 3rd store

WF3 Wate roofin to wet areas to floor m2 267.82 water rf GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall fellow level 2 bath 1 2.29  2.29

hall fellow level 2 shower 1.01  1.01

GS-L dr in closet 2 0.48  0.96

GS drying closet 1 0.48  0.48

UGD-DL 2 dr in closet 5 0.88  4.40

UGD-DL 1 dr in closet 4 0.92  3.68

UGD-SL dr in closet 2 0.92  1.84

UGS drying closet 1 0.46  0.46

UGS-L 1 dr in closet 1 0.46  0.46

UGD dr in closet 2 0.88  1.76

UGS-L (2) dr in closet 1 0.46  0.46

hall fellow level 2 ac ledge 1.98  1.98

hall fellow level 2 balcon 2.77  2.77

common area ac led e 11.52  11.52

common area ac s ace 2.26  2.26

common area rc slab 7.53  7.53

corridor 171.13  171.13

267.82

WF3 Wateproofing to wet areas to wall upturn (h=300mm) m 305.97 waterprf 

GS-L bath 2 5.39 10.78

Page 35 of 110 S1-Blk X1

Page 36: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 36/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

DT-08A (2) 0.80 (1.60)

GS bath 1 5.52 5.52

DT-08A (1) 0.80 (0.80)

communical toilet toilet 37.37 37.37FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

hall fellow level 2 bath 1 4.63 4.63

DT-08A (1) 0.80 (0.80)

GS-L dr in closet 2 2.93 5.86

o enin (2) 0.85 (1.70)

GS dr in closet 1 2.93 2.93

o enin (1) 0.85 (0.85)

UGD-DL 2 dr in closet 5 5.50 27.50

o enin (5) 1.70 (8.50)

UGD-DL (1) dr in closet 4 6.00 24.00

o enin (4) 1.70 (6.80)UGD-SL dr in closet 2 6.00 12.00

o enin (2) 1.70 (3.40)

UGS dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGS-L 1 dr in closet 1 3.00 3.00

o enin (1) 1.70 (1.70)

UGD dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)

UGS-L 2 dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

hall fellow level 2 ac led e 6.76 6.76

hall fellow level 2 balcon 8.92 8.92

corridor 197.62 197.62

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

FD.5-12 (1) 1.20 (1.20)

DS-08 (1) 0.80 (0.80)

DHM-10 (21) 1.00 (21.00)

FD.5-HM10 (4) 1.00 (4.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-09 (1) 0.90 (0.90)

305.97

WF3 Wateproofing to wet areas to shower wall (h=1.80m) m 13.08 waterprf 

GS-L shower 2 3.35 6.70

GS shower 1 3.13 3.13

hall fellow level 2 shower 3.25 3.25

13.08

d 4th store

WF4 Wate roofin to wet areas to floor m2 318.39 water rf  

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 1 kitchen 5.71  5.71

hall master level 1 bath 1 2.56  2.56hall master level 1 shower 1.21  1.21

think tank rm 2 25.10  25.10

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 2 0.92  1.84

UGS-L 2 dr in closet 5 0.46  2.30

UGS-L 1 dr in closet 1 0.46  0.46

UGD-DL (1) dr in closet 10 0.92  9.20

UGD-DL 2 dr in closet 2 0.88  1.76

hall master balcon /ac led e 2.17  2.17

common area ac led e 7.37  7.37

common area ac s ace 11.97  11.97

common area rc slab 41.11  41.11

corridor 149.60  149.60

318.39

WF4 Wateproofing to wet areas to wall upturn (h=300mm) m 328.46 waterprf 

GS-L bath 2 5.39 10.78

DT-08A (2) 0.80 (1.60)

GS bath 1 5.52 5.52

DT-08A (1) 0.80 (0.80)

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)hall master level 1 kitchen 12.10 12.10

o enin (1) 0.85 (0.85)

hall master level 1 bath 1 5.35 5.35

DT-08A (1) 0.80 (0.80)

think tank rm 2 1.00

GD-10 (1) 1.00 (1.00)

GS-L dr in closet 2 2.93 5.86

o enin (2) 0.85 (1.70)

GS dr in closet 1 2.93 2.93

o enin (1) 0.85 (0.85)

UGD dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)

UGD-SL dr in closet 2 6.00 12.00

o enin (2) 1.70 (3.40)

UGS-L (2) dr in closet 5 3.00 15.00o enin (5) 0.85 (4.25)

UGS-L 1 dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGD-DL (1) dr in closet 10 6.00 60.00

o enin (10) 1.70 (17.00)

UGD-DL 2 dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)

hall master balcon /ac led e 6.40 6.40

corridor 197.62 197.62

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (25) 1.00 (25.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

328.46

WF4 Wateproofing to wet areas to shower wall (h=1.80m) m 13.29 waterprf 

GS-L shower 2 3.35 6.70

GS shower 1 3.13 3.13

hall master level 1 shower 3.46 3.46

13.29

Page 36 of 110 S1-Blk X1

Page 37: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 37/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate

e 5th store

WF5 Wate roofin to wet areas to floor m2 284.19 water rf 

GS-L bath 2 2.27  4.54GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 bath 2 2.51  2.51

hall master level 2 shower 0.95  0.95

think tank rm 3 14.00  14.00

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 4 0.92  3.68UGS-L 2 dr in closet 5 0.46  2.30

UGD-DL 1 dr in closet 5 0.92  4.60

UGS-L 1 dr in closet 1 0.46  0.46

UGD-DL (2) dr in closet 3 0.88  2.64

hall master level 2 balcon /ac led e 3.07  3.07

common area ac led e 9.01  9.01

common area ac s ace 5.01  5.01

common area rc slab 26.75  26.75

corridor 149.45  149.45

284.19

WF5 Wateproofing to wet areas to wall upturn (h=300mm) m 322.65 waterprf 

GS-L bath 2 5.39 10.78DT-08A (2) 0.80 (1.60)

GS bath 1 5.52 5.52

DT-08A (1) 0.80 (0.80)

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

hall master level 2 master bath 5.35 5.35

DT-08A (1) 0.80 (0.80)

hall master level 2 bath 2 5.16 5.16

DB-10 (1) 1.00

think tank rm 3 14.96 14.96

GD-10 (1) 1.00 (1.00)

GS-L dr in closet 2 2.93 5.86

o enin (2) 0.85 (1.70)

GS dr in closet 1 2.93 2.93

opening (1) 0.85 (0.85)

UGD dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)

UGD-SL dr in closet 4 6.00 24.00

o enin (4) 1.70 (6.80)

UGS-L 2 dr in closet 5 3.00 15.00

o enin (5) 0.85 (4.25)

UGD-DL (1) dr in closet 5 6.00 30.00

o enin (5) 1.70 (8.50)

UGS-L 1 dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGD-DL 2 dr in closet 3 5.50 16.50

o enin (3) 1.70 (5.10)hall master level 2 balcon /ac led e 6.40 6.40

corridor 192.04 192.04

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (26) 1.00 (26.00)

FD.5-HM10 (1) 1.00 (1.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

322.65

WF5 Wateproofing to wet areas to shower wall (h=1.80m) m 16.13 waterprf 

GS-L shower 2 3.35 6.70

GS shower 1 3.13 3.13

hall master level 2 shower 3.46 3.46

hall master level 2 shower 2.84 2.84

16.13

f 6th store

WF6 Wate roofin to wet areas to floor m2 337.96 water rf GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 1 kitchen 5.71  5.71

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

think tank rm 4 30.32  30.32

think tank rm 5 25.41  25.41

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGS-L 2 dr in closet 4 0.46  1.84

UGD dr in closet 3 0.88  2.64

UGD-SL dr in closet 4 0.92  3.68

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 3 0.92  2.76UGD-DL (2) dr in closet 2 0.88  1.76

UGS-L 1 dr in closet 1 0.46  0.46

hall master level 1 balcon /ac led e 2.17  2.17

common area ac led e 5.92  5.92

common area ac s ace 12.31  12.31

common area rc slab 34.49  34.49

corridor 149.99  149.99

337.96

WF6 Wateproofing to wet areas to wall upturn (h=300mm) m 357.26 waterprf 

GS-L bath 2 5.39 10.78

DT-08A (2) 0.80 (1.60)

GS bath 1 5.52 5.52

DT-08A (1) 0.80 (0.80)

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

hall master level 1 kitchen 12.10 12.10

o enin (1) 0.85 (0.85)

hall master level 1 bath 1 5.35 5.35

DT-08A (1) 0.80 (0.80)

think tank rm 4 26.78 26.78

GD-10 (1) 1.00 (1.00)

think tank rm 5 22.32 22.32

GD-10 (1) 1.00 (1.00)

Page 37 of 110 S1-Blk X1

Page 38: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 38/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

GS-L dr in closet 2 2.93 5.86

o enin (2) 0.85 (1.70)

GS dr in closet 1 2.93 2.93

o enin (1) 0.85 (0.85)UGS-L 2 dr in closet 4 3.00 12.00

o enin (4) 0.85 (3.40)

UGD dr in closet 3 5.50 16.50

o enin (3) 1.70 (5.10)

UGD-SL dr in closet 4 6.00 24.00

o enin (4) 1.70 (6.80)

UGS dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGD-DL 1 dr in closet 3 6.00 18.00

o enin (3) 1.70 (5.10)

UGD-DL 2 dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)

UGS-L 1 dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

hall master level 1 balcon /ac led e 6.40 6.40corridor 195.92 195.92

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (22) 1.00 (22.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (2) 1.00 (2.00)

GD-09 (1) 0.90 (0.90)

357.26

WF6 Wateproofing to wet areas to shower wall (h=1.80m) m 13.29 waterprf 

GS-L shower 2 3.35 6.70

GS shower 1 3.13 3.13

hall master level 1 shower 3.46 3.46

13.29

7th store

WF7 Wate roofin to wet areas to floor m2 291.53 water rf  

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 bath 2 2.51  2.51

hall master level 2 shower 0.95  0.95

think tank rm 33.82  33.82

corridor 148.71  148.71

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 1 0.88  0.88

UGD-SL dr in closet 7 0.92  6.44

UGS-L (2) dr in closet 4 0.46  1.84

UGD-DL (1) dr in closet 3 0.92  2.76

UGS-L 1 dr in closet 1 0.46  0.46

UGD-DL 2 dr in closet 1 0.88  0.88UGS dr in closet 1 0.46  0.46

hall master level 2 balcony/ac ledge 3.07  3.07

common area ac led e 2.29  2.29

common area ac s ace 6.85  6.85

common area rc slab 21.61  21.61

291.53

WF7 Wateproofing to wet areas to wall upturn (h=300mm) m 334.38 waterprf 

GS-L bath 2 5.39 10.78

DT-08A (2) 0.80 (1.60)

GS bath 1 5.52 5.52

DT-08A (1) 0.80 (0.80)

communical toilet toilet 37.37 37.37FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

hall master level 2 master bath 5.35 5.35

DT-08A (1) 0.80 (0.80)

hall master level 2 bath 2 5.16 5.16

DB-10 (1) 1.00 (1.00)

think tank rm 28.87 28.87

GD-10 (1) 1.00 (1.00)

GS-L dr in closet 2 2.93 5.86

o enin (2) 0.85 (1.70)

GS dr in closet 1 2.93 2.93

o enin (1) 0.85 (0.85)UGD dr in closet 1 5.50 5.50

o enin (1) 1.70 (1.70)

UGD-SL dr in closet 7 6.00 42.00

o enin (7) 1.70 (11.90)

UGS-L 2 dr in closet 4 3.00 12.00

o enin (4) 0.85 (3.40)

UGD-DL (1) dr in closet 3 6.00 18.00

o enin (3) 1.70 (5.10)

UGS-L 1 dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGD-DL 2 dr in closet 1 5.50 5.50

o enin (1) 1.70 (1.70)

UGS dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

hall master level 2 balcon /ac led e 8.34 8.34corridor 192.02 192.02

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (19) 1.00 (19.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

FD2-10 (1) 1.00 (1.00)

334.38

WF7 Wateproofing to wet areas to shower wall (h=1.80m) m 16.13 waterprf 

GS-L shower 2 3.35 6.70

GS shower 1 3.13 3.13

hall master level 2 shower 3.46 3.46

hall master level 2 shower 2.84 2.84

16.13

h 8th store

WF8 Wate roofin to wet areas to floor m2 340.63 water rf  GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

Page 38 of 110 S1-Blk X1

Page 39: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 39/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 148.71  148.71

GM dr in closet 2 0.46  0.92UGS-L 2 dr in closet 7 0.46  3.22

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 7 0.92  6.44

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 3 0.92  2.76

UGD-DL (2) dr in closet 3 0.88  2.64

common area ac led e 4.58  4.58

common area ac s ace 20.99  20.99

common area rc slab 98.72  98.72

340.63

WF8 Wateproofing to wet areas to wall upturn (h=300mm) m 297.06 waterprf 

GM bath 2 5.24 10.48DT-08A (2) 0.80 (1.60)

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet  janitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

GM drying closet 2 2.80 5.60

o enin (2) 0.85 (1.70)

UGS-L 2 dr in closet 7 3.00 21.00

(7) 0.85 (5.95)

UGD drying closet 2 5.50 11.00

(2) 1.70 (3.40)

UGD-SL dr in closet 7 6.00 42.00

(7) 1.70 (11.90)UGS dr in closet 1 3.00 3.00

(1) 0.85 (0.85)

UGD-DL 1 dr in closet 3 6.00 18.00

(3) 1.70 (5.10)

UGD-DL (2) dr in closet 3 5.50 16.50

(3) 1.70 (5.10)

corridor 192.28 192.28

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (22) 1.00 (22.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

297.06

WF8 Wateproofing to wet areas to shower wall (h=1.80m) m 6.70 waterprf 

GM shower 2 3.35 6.70

6.70

i 9th store

WF9 Wate roofin to wet areas to floor m2 271.76 water rf  

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

think tank rm 7 19.65  19.65

corridor 148.71  148.71

GM dr in closet 2 0.46  0.92

UGS-L 2 dr in closet 5 0.46  2.30

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 5 0.92  4.60

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 6 0.92  5.52

UGD-DL (2) dr in closet 2 0.88  1.76

common area ac led e 18.69  18.69

common area ac s ace 4.58  4.58

common area rc slab 13.38  13.38

271.76

WF9 Wateproofing to wet areas to wall upturn (h=300mm) m 246.29 waterprf 

GM bath 2 2.00

DT-08A (2) 0.80 (1.60)

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet  janitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

think tank rm 7 18.51 18.51

GD-10 (1) 1.00 (1.00)

GM dr in closet 2 2.80 5.60

o enin (2) 0.85 (1.70)UGS-L (2) drying closet 5 3.00 15.00

o enin (5) 0.85 (4.25)

UGD dr in closet 2 5.50 11.00

o enin (2) 5.50 (11.00)

UGD-SL dr in closet 5 6.00 30.00

o enin (5) 5.50 (27.50)

UGS dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGD-DL 1 dr in closet 6 6.00 36.00

o enin (6) 5.50 (33.00)

UGD-DL 2 dr in closet 2 5.50 11.00

o enin (2) 5.50 (11.00)

corridor 192.28 192.28

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (20) 1.00 (20.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

246.29

WF9 Wateproofing to wet areas to shower wall (h=1.80m) m 6.70 waterprf 

GM shower 2 3.35 6.70

6.70

10th store

WF10 Wate roofin to wet areas to floor m2 304.09 water rf  

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

think tank rm 8 14.30  14.30

think tank rm 9 25.10  25.10

corridor 148.71  148.71

GM dr in closet 2 0.46  0.92

UGD-DL 1 dr in closet 8 0.92  7.36

Page 39 of 110 S1-Blk X1

Page 40: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 40/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 4 0.92  3.68

UGS dr in closet 1 0.46  0.46

UGS-L 2 dr in closet 6 0.46  2.76UGD-DL (2) dr in closet 1 0.88  0.88

UGS-L 1 dr in closet 1 0.46  0.46

common area ac led e 2.29  2.29

common area ac s ace 11.77  11.77

common area rc slab 34.21  34.21

304.09

WF10 Wateproofing to wet areas to wall upturn (h=300mm) m 324.77 waterprf 

GM bath 2 5.24 10.48

DT-08A (2) 0.80 (1.60)

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

think tank rm 8 15.05 15.05

GD-10 (1) 1.00 (1.00)

think tank rm 9 20.76 20.76

GD-10 (1) 1.00 (1.00)

GM dr in closet 2 2.80 5.60

o enin (2) 0.85 (1.70)

UGD-DL 1 dr in closet 8 6.00 48.00

o enin (8) 1.70 (13.60)

UGD dr in closet 2 5.50 11.00

o enin (2) 1.70 (3.40)

UGD-SL dr in closet 4 6.00 24.00

o enin (4) 1.70 (6.80)UGS dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

UGS-L 2 dr in closet 6 3.00 18.00

o enin (6) 1.70 (10.20)

UGD-DL (2) dr in closet 1 5.50 5.50

o enin (1) 1.70 (1.70)

UGS-L 1 dr in closet 1 3.00 3.00

o enin (1) 0.85 (0.85)

corridor 192.28 192.28

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (22) 1.00 (22.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)

GD-10 (2) 1.00 (2.00)

324.77

WF10 Wateproofing to wet areas to shower wall (h=1.80m) m 6.70 waterprf 

GM shower 2 3.35 6.70

6.70

k 11th store

WF11 Wate roofin to wet areas to floor m2 287.63 water rf  communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 137.67  137.67

heat um rm 76.14  76.14

UGD-DL (2) dr in closet 3 0.88  2.64

UGS dr in closet 1 0.46  0.46

UGD dr in closet 2 0.88  1.76

UGD-DL 1 dr in closet 10 0.92  9.20

UGD-SL dr in closet 3 0.92  2.76

UGS-L 2 dr in closet 4 0.46  1.84

UGS-L 1 dr in closet 1 0.46  0.46

common area ac led e 11.77  11.77

287.63

WF11 Wateproofing to wet areas to wall upturn (h=300mm) m 354.75 waterprf 

communical toilet toilet 37.37 37.37

FD.5-T10 (1) 1.05 (1.05)

communical toilet anitor 5.41 5.41

o enin (1) 0.70 (0.70)

communical toilet HT 8.82 8.82

FD.5-HT10 (1) 1.05 (1.05)

heat um rm 26.90 26.90

ril (1) 1.38 (1.38)

UGD-DL 2 dr in closet 3 5.50 16.50

5.50 5.50

UGS dr in closet 1 3.00 3.00

0.85 0.85

UGD dr in closet 2 5.50 11.001.70 1.70

UGD-DL (1) dr in closet 10 6.00 60.00

1.70 1.70

UGD-SL dr in closet 3 6.00 18.00

1.70 1.70

UGS-L (2) dr in closet 4 3.00 12.00

0.85 0.85

UGS-L 1 dr in closet 1 3.00 3.00

0.85 0.85

corridor 178.16 178.16

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (20) 1.00 (20.00)FD.5-HM10 (2) 1.00 (2.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

heat um (1) 1.38 (1.38)

354.75

WF11 Wateproofing to wet areas to shower wall (h=1.80m) m Na waterprf 

11.4 Heavy duty epoxy polyurenthane floor coating system

a 1st store

Carried Forward

Page 40 of 110 S1-Blk X1

Page 41: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 41/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 21 Floor Finishes Cont'd

11.5 Heavy duty epoxy polyurenthane floor

coatin s stem to skirtina 1st store

11.6 Homo eneous tile

a 1st store

1F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

1F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 10.43 F2

wash rm (m) 2.48  2.48

wash rm (f) 3.09  3.09

handica toilet 4.86  4.86

10.43

1F3 600mm x 600mm non-slip homogenous floor tiles with

cement and sand screed

m2 F3

1F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

1F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

1F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 41.58

letter box 23.55  23.55

securit rm 7.83  7.83

lift lobb 10.20  10.20

41.58

Non-slip homogenous floor tiles with cement and sand

screed

m2 374.59

communal laundr 39.22  39.22

kitchenette 49.37  49.37

hall admin office toilet 3.91  3.91

hall admin office antr rm 7.34  7.34

corridor 274.75  274.75

374.59

RCCF Ceramic floor tiles with cement and sand screed to

Refuse Chute Chamber

m2 1.90

refuse chutte 1.90  1.90

b 2nd store

2F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

2F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 45.67 F2

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 27.04  27.04

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall fellow level 1 owder room 2.38  2.38

45.67

2F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

2F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

2F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 131.89

lift lobb 10.20  10.20GS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

communical toilet store 36.75  36.75

hall fellow level 1 dinin /livin 29.47  29.47

hall fellow level 1 store 3.81  3.81

multi use rm 24.61  24.61

131.89

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 52.80

UGD-DL (2) bed rm 2 17.59  35.18

UGS-L 2 bed rm 2 8.81  17.62

52.80

Non-slip homogenous floor tiles with cement and sand

screed

m2 254.03

hall fellow level 1 kitchen 5.22  5.22

corridor 248.81  248.81

254.03

c 3rd store3F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

3F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 65.14 F2

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bed rm 1 9.01  9.01

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall fellow level 2 bath 1 2.29  2.29

hall fellow level 2 shower 1.01  1.01

65.14

3F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

3F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

3F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 54.49

lift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

hall fellow level 2 hall 6.67  6.67

hall fellow level 2 bed rm 7.71  7.71

hall fellow level 2 master bed rm 11.87  11.87

54.49

Page 41 of 110 S1-Blk X1

Page 42: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 42/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 254.83

UGD-DL 2 bed rm 5 17.59  87.95

UGD-DL (1) bed rm 4 17.62  70.48

UGD-SL bed rm 2 17.55  35.10

UGS bed rm 1 8.68  8.68

UGS-L 1 bed rm 1 8.63  8.63

UGD bed rm 2 17.59  35.18

UGS-L (2) bed rm 1 8.81  8.81

254.83

Non-slip homogenous floor tiles with cement and sand

screed

m2 171.13

corridor 171.13  171.13

171.13

d 4th store

4F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

4F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 62.31 F2

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50communical toilet HT 4.85  4.85

hall master level 1 kitchen 5.71  5.71

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

62.31

4F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

4F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

4F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 79.38

lift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

hall master level 1 dinin /livin 26.92  26.92

hall master level 1 store 3.72  3.72

hall master level 1 bed rm 1 11.49  11.49

79.38

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 334.34

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 2 17.55  35.10

UGS-L (2) bed rm 5 8.81  44.05UGS-L 1 bed rm 1 8.63  8.63

UGD-DL 1 bed rm 10 17.62  176.20

UGD-DL (2) bed rm 2 17.59  35.18

334.34

Non-slip homogenous floor tiles with cement and sand

screed

m2 149.60

corridor 149.60  149.60

149.60

e 5th store

5F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

5F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 60.02 F2

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 shower 1.21  1.21

hall master level 2 shower 0.95  0.95

hall master level 2 master bath 2.52  2.52

hall master level 2 bath 2 2.51  2.51

60.02

5F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

5F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

5F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 78.06

lift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

hall master level 2 hall 6.56  6.56

hall master level 2 stud 4.04  4.04

hall master level 2 master bed rm 16.19  16.19

hall master level 2 bed rm 2 10.86  10.86

78.06

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 298.93

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 4 17.55  70.20

UGS-L 2 bed rm 5 8.81  44.05

UGD-DL (1) bed rm 5 17.62  88.10UGS-L 1 bed rm 1 8.63  8.63

UGD-DL 2 bed rm 3 17.59  52.77

298.93

Non-slip homogenous floor tiles with cement and sand

screed

m2 149.45

corridor 149.45  149.45

149.45

Page 42 of 110 S1-Blk X1

Page 43: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 43/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

f 6th store

6F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

6F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 59.15 F2

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

hall master level 1 kitchen 5.71  5.71

59.15

6F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

6F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

6F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 79.38

lift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

hall master level 1 dinin /livin 26.92  26.92

hall master level 1 store 3.72  3.72

hall master level 1 bed rm 1 11.49  11.49

79.38

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 263.56

UGS-L (2) bed rm 4 8.81  35.24

UGD bed rm 3 17.59  52.77

UGD-SL bed rm 4 17.55  70.20

UGS bed rm 1 8.68  8.68

UGD-DL (1) bed rm 3 17.62  52.86

UGD-DL (2) bed rm 2 17.59  35.18

UGS-L 1 bed rm 1 8.63  8.63

263.56

Non-slip homogenous floor tiles with cement and sand

screed

m2 149.99

corridor 149.99  149.99

149.99

7th store

7F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

7F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 60.02 F2

GS-L bath 2 2.27  4.54

GS-Lshower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 shower 0.95  0.95

hall master level 2 bath 2 2.51  2.51

60.02

7F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

7F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

7F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 74.90

lift lobb 10.20  10.20

GS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

hall master level 2 hall 6.56  6.56

hall master level 2 stud 4.04  4.04

hall master level 2 master bed rm 16.19  16.19

hall master level 2 bed rm 2 10.86  10.86

74.90

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 263.44

UGD bed rm 1 17.59  17.59

UGD-SL bed rm 7 17.55  122.85

UGS-L 2 bed rm 4 8.81  35.24

UGD-DL (1) bed rm 3 17.62  52.86

UGS-L (1) bed rm 1 8.63  8.63

UGD-DL 2 bed rm 1 17.59  17.59

UGS bed rm 1 8.68  8.68

263.44

Non-slip homogenous floor tiles with cement and sand

screed

m2 148.71

corridor 148.71  148.71

148.71

h 8th store

8F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

8F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 49.43 F2

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

49.43

8F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

8F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

8F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 55.58

lift lobb 10.20  10.20

Page 43 of 110 S1-Blk X1

Page 44: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 44/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

GM livin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

55.58

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 334.01

UGS-L 2 bed rm 7 8.81  61.67

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 7 17.55  122.85

UGS bed rm 1 8.68  8.68

UGD-DL 1 bed rm 3 17.62  52.86

UGD-DL 2 bed rm 3 17.59  52.77

334.01

Non-slip homogenous floor tiles with cement and sand

screed

m2 148.71

corridor 148.71  148.71

148.71

i 9th store

9F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

9F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 49.43 F2

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

49.43

9F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

9F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

9F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 55.58

lift lobb 10.20  10.20

GM livin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

55.58

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 316.56

UGS-L 2 bed rm 5 8.81  44.05

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 5 17.55  87.75

UGS bed rm 1 8.68  8.68

UGD-DL 1 bed rm 6 17.62  105.72

UGD-DL (2) bed rm 2 17.59  35.18

316.56

Non-slip homogenous floor tiles with cement and sandscreed

m2 148.71

corridor 148.71  148.71

148.71

10th store

10F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

10F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 49.43 F2

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50communical toilet HT 4.85  4.85

49.43

10F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

10F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

10F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 55.58

lift lobb 10.20  10.20

GMlivin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

55.58

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 334.10

UGD-DL 1 bed rm 8 17.62  140.96

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 4 17.55  70.20

UGS bed rm 1 8.68  8.68

UGS-L 2 bed rm 6 8.81  52.86

UGD-DL 2 bed rm 1 17.59  17.59

UGS-L 1 bed rm 1 8.63  8.63

334.10

Non-slip homogenous floor tiles with cement and sand

screed

m2 148.71

corridor 148.71  148.71

148.71

k 11th store

11F1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

11F2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 42.93 F2

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

42.93

11F4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

11F6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

11F7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 10.20

Page 44 of 110 S1-Blk X1

Page 45: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 45/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

lift lobb 10.20  10.20

10.20

250mm x 250mm Homogenous floor tiles with cement

and sand screed

m2 369.35

UGD-DL 2 bed rm 3 17.59  52.77

UGS bed rm 1 8.68  8.68

UGD bed rm 2 17.59  35.18

UGD-DL 1 bed rm 10 17.62  176.20

UGD-SL bed rm 3 17.55  52.65

UGS-L (2) bed rm 4 8.81  35.24

UGS-L 1 bed rm 1 8.63  8.63

369.35

Non-slip homogenous floor tiles with cement and sand

screed

m2 137.67

corridor 137.67  137.67

137.67

l Roof level

RFF1 600mm x 600mm homogenous floor tiles with cement

and sand screed

m2 F1

RFF2 300mm x 300mm non-slip homogenous floor tiles with

cement and sand screed

m2 F2

RFF4 450mm x 900mm homogeneous tiles with cement and

sand screed

m2 F4

RFF6 300mm x 600mm & 100mm x 600mm non-slip

homo eneous tiles internal

m2 F6

RFF7 450mm x 900mm non-slip homogenous floor tiles with

cement and sand screed internal

m2 F7

Homogenous floor tiles with cement and sand screed m2 10.20

lift lobb 10.20  10.20

10.20

11.7 Heav dut homo eneous tile

a 1st store

b 2nd store

2F16 300mm x 300mm heavy duty non-slip homogenous

floor tiles with cement and sand screed

m2 F1-H

11.8 Homo eneous tile skirtin

S1 100mm high homogenous skirting tile to the following

levels

a 1st storey m 100.96 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

securit rm 10.99 10.99

D-10 (1) 1.00 (1.00)

corridor 105.91 105.91

DL-10 (1) 1.00 (1.00)

DK-10 (1) 1.00 (1.00)

DT-08 (2) 0.80 (1.60)

DHT-10 (1) 1.00 (1.00)

DS-10 (2) 1.00 (2.00)

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD2-12 (1) 1.20 (1.20)

FD2-18 (2) 1.80 (3.60)

D-10 (1) 1.00 (1.00)

FD.5-20 (1) 2.00 (2.00)

SGD-12 (1) 1.20 (1.20)

100.96

b 2nd storey m 301.15 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GS-L bed rm 2 12.63 25.26

DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)GS bed rm 1 12.71 12.71

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

communical toilet store 14.49 14.49

D-10 (1) 1.00 (1.00)

hall fellow level 1 dinin /livin 21.54 21.54

DHM-10 (1) 1.00 (1.00)

GD-07 (1) 0.70 (0.70)

D-S08 (1) 0.80 (0.80)

DT-08A (1) 0.80 (0.80)

hall fellow level 1 store 7.07 7.07

D-S08 (1) 0.80 (0.80)

UGD-DL 2 bed rm 2 19.60 39.20

DHM-10 (2) 2.00 (4.00)

o enin (2) 1.70 (3.40)UGS-L 2 bed rm 2 12.50 25.00

DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)

hall fellow level 1 kitchen 7.54 7.54

corridor 194.07 194.07

DHM-10 (7) 1.00 (7.00)

FD.5-HM10 (1) 1.00 (1.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

FD.5-15A (1) 1.50 (1.50)

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

o enin (1) 8.29 (8.29)

301.15

c 3rd storey m 437.18 frl-sktg

GS bed rm 1 12.71 12.71

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

Page 45 of 110 S1-Blk X1

Page 46: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 46/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GS-L bed rm 2 12.63 25.26DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)

hall fellow level 2 hall 8.60 8.60

DB-10 (2) 1.00 (2.00)

DT-08A (1) 0.80 (0.80)

DHM-10 (1) 1.00 (1.00)

hall fellow level 2 bed rm 12.01 12.01

DB-10 (1) 1.00 (1.00)

hall fellow level 2 master bed rm 14.72 14.72

DB-10 (1) 1.00 (1.00)

UGD-DL 2 bed rm 5 19.60 98.00

DHM-10 (5) 2.00 (10.00)

o enin (5) 1.70 (8.50)

UGD-DL 1 bed rm 4 19.60 78.40

DHM-10 (4) 1.00 (4.00)o enin (4) 1.70 (6.80)

UGD-SL bed rm 2 19.67 39.34

DHM-10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGS-L (1) bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD bed rm 2 1.60 3.20

FD.5-HM10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)

UGS-L 2 bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

opening (1) 0.85 (0.85)

corridor 197.62 197.62

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

FD.5-12 (1) 1.20 (1.20)

DS-08 (1) 0.80 (0.80)

DHM-10 (21) 1.00 (21.00)

FD.5-HM10 (4) 1.00 (4.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-09 (1) 0.90 (0.90)

437.18

d 4th storey m 581.68 frl-sktg

hall master level 1 kitchen 12.10 12.10

o enin (1) 0.85 (0.85)

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GS-L bed rm 2 12.63 25.26

DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)

GS bed rm 1 12.71 12.71FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

hall master level 1 dinin /livin 27.10 27.10

DHM-10 (1) 1.00 (1.00)

D-S08 (1) 0.80 (0.80)

hall master level 1 store 6.84 6.84

D-S08 (1) 0.80 (0.80)

hall master level 1 bed rm 1 14.40 14.40

DB-10 (1) 1.00 (1.00)

SGD-07 (1) 1.80 (1.80)

UGD bed rm 2 19.60 39.20

FD.5-HM10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)

UGD-SL bed rm 2 19.67 39.34

DHM-10 (2) 1.00 (2.00)o enin (2) 1.70 (3.40)

UGS-L 2 bed rm 5 12.50 62.50

DHM-10 (5) 1.00 (5.00)

o enin (5) 0.85 (4.25)

UGS-L (1) bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD-DL (1) bed rm 10 19.60 196.00

DHM-10 (10) 1.00 (10.00)

o enin (10) 1.70 (17.00)

UGD-DL 2 bed rm 2 19.60 39.20

DHM-10 (2) 2.00 (4.00)

o enin (2) 1.70 (3.40)

corridor 197.62 197.62

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (25) 1.00 (25.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

581.68

e 5th storey m 530.36 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GS-L bed rm 2 12.63 25.26

DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)

GS bed rm 1 12.71 12.71

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

hall master level 2 hall 8.45 8.45

DB-10 (2) 1.00 (2.00)

DHM-10 (1) 1.00 (1.00)

hall master level 2 stud 8.34 8.34

o enin 1.35 1.35hall master level 2 master bed rm 19.77 19.77

DB-10 (1) 1.00 (1.00)

SGD-27 (1) 2.70 (2.70)

DT-08A (1) 0.80 (0.80)

hall master level 2 bed rm 2 13.50 13.50

DB-10 (1) 1.00 (1.00)

DT-08A (1) 0.80 (0.80)

UGD bed rm 2 19.60 39.20

FD.5-HM10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)

UGD-SL bed rm 4 19.67 78.68

DHM-10 (4) 1.00 (4.00)

o enin (4) 1.70 (6.80)

Page 46 of 110 S1-Blk X1

Page 47: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 47/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

UGS-L (2) bed rm 5 12.50 62.50

DHM-10 (5) 1.00 (5.00)

o enin (5) 0.85 (4.25)

UGD-DL 1 bed rm 5 19.60 98.00DHM-10 (5) 1.00 (5.00)

o enin (5) 1.70 (8.50)

UGS-L 1 bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD-DL 2 bed rm 3 19.60 58.80

DHM-10 (3) 2.00 (6.00)

o enin (3) 1.70 (5.10)

corridor 192.04 192.04

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (26) 1.00 (26.00)

FD.5-HM10 (1) 1.00 (1.00)FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

530.36

f 6th storey m 513.53 frl-sktg

hall master level 1 kitchen 12.10 12.10

o enin (1) 0.85 (0.85)

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GS-L bed rm 2 12.63 25.26

DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)

GS bed rm 1 12.71 12.71

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

hall master level 1 dining/living 27.10 27.10

DHM-10 (1) 1.00 (1.00)

D-S08 (1) 0.80 (0.80)

hall master level 1 store 6.84 6.84

D-S08 (1) 0.80 (0.80)

hall master level 1 bed rm 1 14.40 14.40

DB-10 (1) 1.00 (1.00)SGD-07 (1) 1.80 (1.80)

UGS-L 2 bed rm 4 12.50 50.00

DHM-10 (4) 1.00 (4.00)

o enin (4) 0.85 (3.40)

UGD bed rm 3 19.60 58.80

FD.5-HM10 (3) 1.00 (3.00)

o enin (3) 1.70 (5.10)

UGD-SL bed rm 4 19.67 78.68

DHM-10 (4) 1.00 (4.00)

o enin (4) 1.70 (6.80)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD-DL 1 bed rm 3 19.60 58.80

DHM-10 (3) 1.00 (3.00)opening (3) 1.70 (5.10)

UGD-DL 2 bed rm 2 19.60 39.20

DHM-10 (2) 2.00 (4.00)

o enin (2) 1.70 (3.40)

UGS-L 1 bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

corridor 195.92 195.92

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (22) 1.00 (22.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)

GD-10 (2) 1.00 (2.00)

GD-09 (1) 0.90 (0.90)

513.53

g 7th storey m 491.41 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)FD.5-10 (1) 1.05 (1.05)

GS-L bed rm 2 12.63 25.26

DHM-10 (2) 1.00 (2.00)

o enin (2) 0.85 (1.70)

GS bed rm 1 12.71 12.71

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

hall master level 2 hall 8.45 8.45

DB-10 (2) 1.00 (2.00)

DHM-10 (1) 1.00 (1.00)

hall master level 2 stud 8.34 8.34

o enin 1.35 1.35

hall master level 2 master bed rm 19.77 19.77

DB-10 (1) 1.00 (1.00)

SGD-27 (1) 2.70 (2.70)

DT-08A (1) 0.80 (0.80)

hall master level 2 bed rm 2 13.50 13.50

DB-10 (1) 1.00 (1.00)

DT-08A (1) 0.80 (0.80)

UGD bed rm 1 19.60 19.60

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 1.70 (1.70)

UGD-SL bed rm 7 19.67 137.69

DHM-10 (4) 1.00 (4.00)

o enin (4) 1.70 (6.80)

UGS-L 2 bed rm 4 12.50 50.00

DHM-10 (4) 1.00 (4.00)

o enin (4) 0.85 (3.40)

UGD-DL 1 bed rm 3 19.60 58.80

DHM-10 (4) 1.00 (4.00)

o enin (4) 1.70 (6.80)UGS-L 1 bed rm 1 12.50 12.50

DHM-10 (4) 1.00 (4.00)

o enin (4) 0.85 (3.40)

UGD-DL (2) bed rm 1 19.60 19.60

DHM-10 (4) 2.00 (8.00)

o enin (4) 1.70 (6.80)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

corridor 192.02 192.02

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

Page 47 of 110 S1-Blk X1

Page 48: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 48/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

DS-08 (1) 0.80 (0.80)

DHM-10 (19) 1.00 (19.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

FD2-10 (1) 1.00 (1.00)

491.41

h 8th storey m 547.47 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)FD.5-10 (1) 1.05 (1.05)

GM living/dining/kitchen 2 15.82 31.64

DHM-10 (2) 1.00 (2.00)

DB-09 (2) 0.90 (1.80)

GM bed rm 2 13.67 27.34

DB-09 (2) 0.90 (1.80)

DT-08A (2) 0.80 (1.60)

o enin (2) 0.85 (1.70)

UGS-L (2) bed rm 7 12.50 87.50

DHM-10 (7) 1.00 (7.00)

o enin (7) 0.85 (5.95)

UGD bed rm 2 19.60 39.20

FD.5-HM10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)

UGD-SL bed rm 7 19.67 137.69DHM-10 (7) 1.00 (7.00)

o enin (7) 1.70 (11.90)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD-DL 1 bed rm 3 19.60 58.80

DHM-10 (3) 1.00 (3.00)

o enin (3) 1.70 (5.10)

UGD-DL 2 bed rm 3 19.60 58.80

DHM-10 (3) 2.00 (6.00)

o enin (3) 1.70 (5.10)

corridor 192.28 192.28

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)DHM-10 (22) 1.00 (22.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

547.47

i 9th storey m 528.03 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GM livin /dinin /kitchen 2 15.82 31.64

DHM-10 (2) 1.00 (2.00)

DB-09 (2) 0.90 (1.80)

GM bed rm 2 13.67 27.34

DB-09 (2) 0.90 (1.80)

DT-08A (2) 0.80 (1.60)

o enin (2) 0.85 (1.70)

UGS-L 2 bed rm 5 12.50 62.50

DHM-10 (5) 1.00 (5.00)

o enin (5) 0.85 (4.25)

UGD bed rm 2 19.60 39.20

FD.5-HM10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)UGD-SL bed rm 5 19.67 98.35

DHM-10 (5) 1.00 (5.00)

o enin (5) 1.70 (8.50)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD-DL (1) bed rm 6 19.60 117.60

DHM-10 (6) 1.00 (6.00)

o enin (6) 1.70 (10.20)

UGD-DL (2) bed rm 2 19.60 39.20

DHM-10 (2) 2.00 (4.00)

o enin (2) 1.70 (3.40)

corridor 192.28 192.28

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (20) 1.00 (20.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (1) 1.00 (1.00)

528.03

 j 10th storey m 541.31 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

GM livin /dinin /kitchen 2 15.82 31.64

DHM-10 (2) 1.00 (2.00)

DB-09 (2) 0.90 (1.80)

GM bed rm 2 13.67 27.34

DB-09 (2) 0.90 (1.80)

DT-08A (2) 0.80 (1.60)

o enin (2) 0.85 (1.70)

UGD-DL 1 bed rm 8 19.60 156.80

DHM-10 (8) 1.00 (8.00)

o enin (8) 1.70 (13.60)

UGD bed rm 2 19.60 39.20FD.5-HM10 (2) 1.00 (2.00)

o enin (2) 1.70 (3.40)

UGD-SL bed rm 4 19.67 78.68

DHM-10 (4) 1.00 (4.00)

o enin (4) 1.70 (6.80)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGS-L (2) bed rm 6 12.50 75.00

DHM-10 (6) 1.00 (6.00)

o enin (6) 1.70 (10.20)

UGD-DL 2 bed rm 1 19.60 19.60

DHM-10 (1) 2.00 (2.00)

Page 48 of 110 S1-Blk X1

Page 49: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 49/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

o enin (1) 1.70 (1.70)

UGS-L 1 bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

o enin (1) 1.70 (1.70)corridor 192.28 192.28

FD.5-S06 (5) 0.60 (3.00)

FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (22) 1.00 (22.00)

FD.5-HM10 (3) 1.00 (3.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

GD-10 (2) 1.00 (2.00)

541.31

k 11th storey m 509.76 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

UGD-DL 2 bed rm 3 19.60 58.80

DHM-10 (3) 2.00 (6.00)

o enin (3) 1.70 (5.10)

UGS bed rm 1 12.41 12.41

FD.5-HM10 (1) 1.00 (1.00)

o enin (1) 0.85 (0.85)

UGD bed rm 2 19.60 39.20

FD.5-HM10 (2) 1.00 (2.00)o enin (2) 1.70 (3.40)

UGD-DL (1) bed rm 10 19.60 196.00

DHM-10 (10) 1.00 (10.00)

o enin (10) 1.70 (17.00)

UGD-SL bed rm 3 19.67 59.01

DHM-10 (3) 1.00 (3.00)

o enin (3) 1.70 (5.10)

UGS-L 2 bed rm 4 12.50 50.00

DHM-10 (4) 1.00 (4.00)

o enin (4) 1.70 (6.80)

UGS-L 1 bed rm 1 12.50 12.50

DHM-10 (1) 1.00 (1.00)

o enin (1) 1.70 (1.70)

corridor 178.16 178.16

FD.5-S06 (5) 0.60 (3.00)FD.5-S10 (3) 1.00 (3.00)

FD.5-10 (2) 1.05 (2.10)

DS-08 (1) 0.80 (0.80)

DHM-10 (20) 1.00 (20.00)

FD.5-HM10 (2) 1.00 (2.00)

FD.5-T10 (1) 1.05 (1.05)

FD.5-HT10 (1) 1.05 (1.05)

heat um (1) 1.38 (1.38)

509.76

l Roof level m 5.01 frl-sktg

lift lobb 12.26 12.26

o enin (2) 1.70 (3.40)

DS-06 (1) 0.60 (0.60)

DS-10A (1) 1.00 (1.00)

DS-12 (1) 1.20 (1.20)

FD.5-10 (1) 1.05 (1.05)

5.01

Carried Forward

Page 49 of 110 S1-Blk X1

Page 50: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 50/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 22 Floor Finishes Cont'd

11.9 Granite tile

a 1st store

b 2nd store

c 3rd store

d 4th store

e 5th store

f 6th store

7th store

h 8th store

i 9th store

10th store

k 11th store

l Roof level

11.10 Vin l floor tilea 2nd store

b 4th store

c 5th store

d 6th store

e 7th store

f 8th store

9th store

h 10th store

l Roof  

11.11 Car et tile

a 1st store

1F5 Car et tile floor with cement and sand screed m2 82.68 car ethall admin office meetin rm 9.42  9.42

hall admin office store rm 4.07  4.07

hall admin office rece tion 17.96  17.96

hall admin office hall officer 40.24  40.24

hall admin office head office 10.99  10.99

82.68

2F5 Car et tile floor with cement and sand screed m2 24.61 car et

2nd storethink tank rm 24.61  24.61

24.61

3F5 Car et tile floor with cement and sand screed m2 14.82 car et

3rd storeIncubation od IP3 14.82  14.82

14.82

4F5 Car et tile floor with cement and sand screed m2 25.10 car et

4th storethink tank rm 2 25.10  25.10

25.10

5F5 Car et tile floor with cement and sand screed m2 14.00 car et

5th storethink tank rm 3 14.00  14.00

14.00

6F5 Car et tile floor with cement and sand screed m2 71.49 car et

6th storethink tank rm 4 30.32  30.32

think tank rm 5 25.41  25.41

Incubation od IP2 15.76  15.76

71.49

7F5 Car et tile floor with cement and sand screed m2 33.82 car et

7th storethink tank rm 6 33.82  33.82

33.82

8F5 Car et tile floor with cement and sand screed m2 Na car et

9F5 Car et tile floor with cement and sand screed m2 19.65 car et

9th storethink tank rm 7 19.65  19.65

19.65

10F5 Car et tile floor with cement and sand screed m2 39.40 car et

10th storethink tank rm 8 14.30  14.30

think tank rm 9 25.10  25.10

39.40

11F5 Car et tile floor with cement and sand screed m2 car et

11.12 Insulated raised floor s stem

a 7th store

1F11 Raised floor insulated to LAN Room ELVS Room m2 10.20 raised flrLAN rm 10.20  10.20

10.20

7F11 Raised floor insulated to LAN Room ELVS Room m2 Na raised flr

11.13 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 a Scupper drain with MS grating (w=150mm) to Refuse

Chute Chamber L=1.30m

nos scupper

b Other skirtin

S2 30mm x 15mm recessed powder coated aluminium

channel 2mm thk skirtin

m Alum-sktg

c

Carried Forward

Page 50 of 110 S1-Blk X1

Page 51: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 51/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 23 Ceilin Finishes

12.1 Skim coating and vinyl co-polymer emulsion

aintina 1st store m2 430.78 Skim Coat

wash rm (m) 2.48  2.48

wash rm (f) 3.09  3.09

handica toilet 4.86  4.86

letter box 23.55  23.55

refuse chutte 1.90  1.90

securit rm 7.83  7.83

corridor 274.75  274.75

lv switch rm 7.67  7.67

low level transfer tank

rm73.17  73.17

elv s stem rm 31.48  31.48

430.78

b 2nd store m2 489.52 Skim CoatGS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

UGD-DL (2) bed rm 2 17.59  35.18

UGS-L 2 bed rm 2 8.81  17.62

communical toilet toilet 27.04  27.04

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

communical toilet store 36.75  36.75

hall fellow level 1 dinin /livin 29.47  29.47

hall fellow level 1 kitchen 5.22  5.22

hall fellow level 1 store 3.81  3.81

corridor 248.81  248.81common area 47.00  47.00

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD-DL (2) dr in closet 2 0.88  1.76

UGS-L 2 dr in closet 2 0.46  0.92

hall fellow level 1 ac led e 1.10  1.10

489.52

c 3rd store m2 570.16 Skim CoatGS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

UGD-DL (2) bed rm 5 17.59  87.95

UGD-DL 1 bed rm 4 17.62  70.48

UGD-SL bed rm 2 17.55  35.10UGS bed rm 1 8.68  8.68

UGS-L (1) bed rm 1 8.63  8.63

UGD bed rm 2 17.59  35.18

UGS-L 2 bed rm 1 8.81  8.81

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall fellow level 2 hall 6.67  6.67

hall fellow level 2 bed rm 7.71  7.71

hall fellow level 2 master bed rm 11.87  11.87

corridor 171.13  171.13

common area 28.72  28.72

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD-DL (2) dr in closet 5 0.88  4.40

UGD-DL 1 dr in closet 4 0.92  3.68

UGD-SL dr in closet 2 0.92  1.84

UGS dr in closet 1 0.46  0.46

UGS-L (1) dr in closet 1 0.46  0.46

UGD drying closet 2 0.88  1.76

UGS-L 2 dr in closet 1 0.46  0.46

hall fellow level 2 ac led e 1.98  1.98

hall fellow level 2 balcon 2.77  2.77

570.16

d 4th store m2 690.76 Skim CoatGS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 2 17.55  35.10UGS-L 2 bed rm 5 8.81  44.05

UGS-L (1) bed rm 1 8.63  8.63

UGD-DL 1 bed rm 10 17.62  176.20

UGD-DL 2 bed rm 2 17.59  35.18

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 1 dinin /livin 26.92  26.92

hall master level 1 kitchen 5.71  5.71

hall master level 1 store 3.72  3.72

hall master level 1 bed rm 1 11.49  11.49

corridor 149.60  149.60

common area 68.07  68.07

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 2 0.92  1.84

UGS-L 2 dr in closet 5 0.46  2.30

UGS-L (1) dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 10 0.92  9.20

UGD-DL 2 dr in closet 2 0.88  1.76

hall master balcon /ac led e 2.17  2.17

690.76

e 5th store m2 624.35 Skim CoatGS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 4 17.55  70.20UGS-L 2 bed rm 5 8.81  44.05

UGD-DL (1) bed rm 5 17.62  88.10

UGS-L (1) bed rm 1 8.63  8.63

UGD-DL 2 bed rm 3 17.59  52.77

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 hall 6.56  6.56

hall master level 2 stud 4.04  4.04

hall master level 2 master bed rm 16.19  16.19

hall master level 2 bed rm 2 10.86  10.86

corridor 149.45  149.45

common area 48.39  48.39

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 4 0.92  3.68

UGS-L 2 dr in closet 5 0.46  2.30

UGD-DL (1) dr in closet 5 0.92  4.60

UGS-L (1) drying closet 1 0.46  0.46

UGD-DL 2 dr in closet 3 0.88  2.64

hall master level 2 balcon /ac led e 3.07  3.07

624.35

f 6th store m2 608.99 Skim CoatGS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

UGS-L (2) bed rm 4 8.81  35.24

Page 51 of 110 S1-Blk X1

Page 52: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 52/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

UGD bed rm 3 17.59  52.77

UGD-SL bed rm 4 17.55  70.20

UGS bed rm 1 8.68  8.68

UGD-DL 1 bed rm 3 17.62  52.86UGD-DL 2 bed rm 2 17.59  35.18

UGS-L 1 bed rm 1 8.63  8.63

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 1 dinin /livin 26.92  26.92

hall master level 1 kitchen 5.71  5.71

hall master level 1 store 3.72  3.72

hall master level 1 bed rm 1 11.49  11.49

corridor 149.99  149.99

common area 60.41  60.41

GS-L dr in closet 2 0.48  0.96

GS drying closet 1 0.48  0.48

UGS-L 2 dr in closet 4 0.46  1.84

UGD dr in closet 3 0.88  2.64UGD-SL dr in closet 4 0.92  3.68

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 3 0.92  2.76

UGD-DL 2 dr in closet 2 0.88  1.76

UGS-L 1 dr in closet 1 0.46  0.46

hall master level 1 balcon /ac led e 2.17  2.17

608.99

7th store m2 576.45 Skim CoatGS-L bed rm 2 9.02  18.04

GS bed rm 1 9.01  9.01

UGD bed rm 1 17.59  17.59

UGD-SL bed rm 7 17.55  122.85

UGS-L (2) bed rm 4 8.81  35.24UGD-DL 1 bed rm 3 17.62  52.86

UGS-L 1 bed rm 1 8.63  8.63

UGD-DL 2 bed rm 1 17.59  17.59

UGS bed rm 1 8.68  8.68

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

hall master level 2 hall 6.56  6.56

hall master level 2 stud 4.04  4.04

hall master level 2 master bed rm 16.19  16.19

hall master level 2 bed rm 2 10.86  10.86

corridor 148.71  148.71

common area 38.44  38.44

GS-L dr in closet 2 0.48  0.96

GS dr in closet 1 0.48  0.48

UGD dr in closet 1 0.88  0.88

UGD-SL dr in closet 7 0.92  6.44

UGS-L (2) drying closet 4 0.46  1.84

UGD-DL 1 dr in closet 3 0.92  2.76

UGS-L 1 dr in closet 1 0.46  0.46

UGD-DL (2) dr in closet 1 0.88  0.88

UGS dr in closet 1 0.46  0.46

hall master level 2 balcon /ac led e 3.07  3.07

576.45

h 8th store m2 721.28 Skim CoatGM livin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

UGS-L (2) bed rm 7 8.81  61.67

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 7 17.55  122.85

UGS bed rm 1 8.68  8.68

UGD-DL 1 bed rm 3 17.62  52.86

UGD-DL (2) bed rm 3 17.59  52.77

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 148.71  148.71

common area 132.05  132.05

GM dr in closet 2 0.46  0.92

UGS-L 2 dr in closet 7 0.46  3.22

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 7 0.92  6.44

UGS dr in closet 1 0.46  0.46

UGD-DL 1 dr in closet 3 0.92  2.76UGD-DL 2 dr in closet 3 0.88  2.64

721.28

i 9th store m2 615.11 Skim CoatGM livin /dinin /kitchen 2 12.42  24.84

GM bed rm 2 10.27  20.54

UGS-L 2 bed rm 5 8.81  44.05

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 5 17.55  87.75

UGS bed rm 1 8.68  8.68

UGD-DL 1 bed rm 6 17.62  105.72

UGD-DL 2 bed rm 2 17.59  35.18

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50communical toilet HT 4.85  4.85

corridor 148.71  148.71

common area 44.21  44.21

GM dr in closet 2 0.46  0.92

UGS-L (2) dr in closet 5 0.46  2.30

UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 5 0.92  4.60

UGS dr in closet 1 0.46  0.46

UGD-DL (1) dr in closet 6 0.92  5.52

UGD-DL 2 dr in closet 2 0.88  1.76

615.11

10th store m2 645.37 Skim Coat

GM livin /dinin /kitchen 2 12.42  24.84GM bed rm 2 10.27  20.54

UGD-DL 1 bed rm 8 17.62  140.96

UGD bed rm 2 17.59  35.18

UGD-SL bed rm 4 17.55  70.20

UGS bed rm 1 8.68  8.68

UGS-L (2) bed rm 6 8.81  52.86

UGD-DL (2) bed rm 1 17.59  17.59

UGS-L 1 bed rm 1 8.63  8.63

communical toilet toilet 36.58  36.58

communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 148.71  148.71

common area 55.97  55.97

GM dr in closet 2 0.46  0.92

UGD-DL (1) dr in closet 8 0.92  7.36UGD dr in closet 2 0.88  1.76

UGD-SL dr in closet 4 0.92  3.68

UGS dr in closet 1 0.46  0.46

UGS-L (2) dr in closet 6 0.46  2.76

UGD-DL (2) drying closet 1 0.88  0.88

UGS-L 1 dr in closet 1 0.46  0.46

645.37

k 11th store m2 588.00 Skim CoatUGD-DL 2 bed rm 3 17.59  52.77

UGS bed rm 1 8.68  8.68

UGD bed rm 2 17.59  35.18

UGD-DL (1) bed rm 10 17.62  176.20

Page 52 of 110 S1-Blk X1

Page 53: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 53/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

UGD-SL bed rm 3 17.55  52.65

UGS-L (2) bed rm 4 8.81  35.24

UGS-L 1 bed rm 1 8.63  8.63

communical toilet toilet 36.58  36.58communical toilet anitor 1.50  1.50

communical toilet HT 4.85  4.85

corridor 137.67  137.67

common area 18.93  18.93

UGD-DL 2 dr in closet 3 0.88  2.64

UGS dr in closet 1 0.46  0.46

UGD dr in closet 2 0.88  1.76

UGD-DL 1 dr in closet 10 0.92  9.20

UGD-SL dr in closet 3 0.92  2.76

UGS-L (2) dr in closet 4 0.46  1.84

UGS-L 1 dr in closet 1 0.46  0.46

588.00

l Roof level m2 22.83 Skim Coatcommon area 22.83  22.83

22.83

12.2 Plasterin and aintin

C1 Plaster and aint to ceilin

a 1st store m2 laster

b 2nd store m2 laster

c 3rd store m2 laster

d 4th store m2 laster

e 5th store m2 laster

f 6th store m2 laster7th store m2 laster

h 8th store m2 laster

i 9th store m2 laster

10th store m2 laster

k 11th store m2 laster

l Roof level m2 laster

12.3 Moisture resistance gypsum plaster suspended

ceilin boarda 1st store

1C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

 

m2 21.45 ceiling

lift lobb 10.20  10.20

hall admin office toilet 3.91  3.91

hall admin office antr rm 7.34  7.34

21.45

1C4 12mm thk perforated gypsum board (with fleece & 

rockwool insulation) with paint finish to Common

Kitchenette, Big Common Lounge, Cafe Lounge,

Collaborative spaces- Incubation Pods/ Think Tank,

 

m2 48.41 ceiling

communal laundr 23.09  23.09

kitchenette 25.32  25.32

48.41

b 2nd store

2C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

 

m2 22.48 ceiling

lift lobb 10.20  10.20

hall fellow level 1 owder room 2.38  2.38

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

22.48

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 15.35

think tank rm 1 15.35  15.35

15.35

12mm tnk erforated sum board m2 24.61multi use rm 24.61  24.61

24.61

c 3rd store

3C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

 

m2 23.40 ceiling

lift lobb 10.20  10.20

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

hall fellow level 2 bath 1 2.29  2.29

hall fellow level 2 shower 1.01  1.01

23.40

d 4th store

4C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

 

m2 23.87 ceiling

lift lobb 10.20  10.20

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

23.87

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 13.28

think tank rm 2 13.28  13.28

13.28

e 5th store

5C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

at S orts Com lex

m2 27.29 ceiling

lift lobb 10.20  10.20

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

Page 53 of 110 S1-Blk X1

Page 54: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 54/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 shower 0.95  0.95

hall master level 2 bath 2 2.51  2.51

27.29

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 7.33

think tank rm 3 7.33  7.33

7.33

f 6th store

6C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

at S orts Com lex

m2 ceiling

lift lobb 10.20  10.20

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

hall master level 1 bath 1 2.56  2.56

hall master level 1 shower 1.21  1.21

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 29.45

think tank rm 4 16.17  16.17

think tank rm 5 13.28  13.28

29.45

7th store

7C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

at S orts Com lex

m2 27.29 ceiling

lift lobb 10.20  10.20

GS-L bath 2 2.27  4.54

GS-L shower 2 1.10  2.20

GS bath 1 2.32  2.32

GS shower 1 0.84  0.84

hall master level 2 master bath 2.52  2.52

hall master level 2 shower 1.21  1.21

hall master level 2 bath 2 2.51  2.51

hall master level 2 shower 0.95  0.95

27.29

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 18.30

think tank rm 18.30  18.30

18.30

h 8th store

Page 54 of 110 S1-Blk X1

Page 55: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 55/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

8C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

at S orts Com lex

m2 16.70 ceiling

lift lobb 10.20  10.20GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

16.70

i 9th store

9C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

 

m2 16.70 ceiling

lift lobb 10.20  10.20

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

16.70

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 10.15

think tank rm 7 10.15  10.15

10.15

10th store

10C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

at S orts Com lex

m2 16.70 ceiling

lift lobb 10.20  10.20

GM bath 2 2.15  4.30

GM shower 2 1.10  2.20

16.70

12mm thk perforated gypsum board ceiling with

acoustic insulation and aint finish

m2 20.71

think tank rm 8 7.39  7.39

think tank rm 9 13.32  13.32

20.71

k 11th store

11C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

at S orts Com lex

m2 86.34 ceiling

lift lobb 10.20  10.20

heat um rm 76.14  76.14

86.34

l Roof level

RFC2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby

 

m2 129.43 ceiling

lift lobb 10.20  10.20

water tank 119.23  119.23

129.43

Carried Forward

Page 55 of 110 S1-Blk X1

Page 56: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 56/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 24 Ceilin Finishes Cont'd

12.4 Moisture resistance gypsum plasterboard for

box -u areaa 1st store

b 2nd store

c 3rd store

d 4th store

e 5th store

f 6th store

7th store

h 8th store

i 9th store

10th store

k 11th store

l Roof level

12.5 Moisture resistance mineral fibre suspended

ceilin board

C3a 9mm thk fibrous plasterboard with paint finish

combined with 12mm thk perforated gypsum board

(with fleece & rockwool insulation) with paint finish to

Incubation Pods/ Think Tank Rooms; Aluminium ceiling

panel strip metal of 300mm width profile as per

 

a 1st store m2 40.18 ceilincommunal laundr 16.13  16.13

kitchenette 24.05  24.05

40.18

b 2nd store m2 14.65 ceilinthink tank rm 1 14.65  14.65

14.65

c 3rd store m2 26.64 ceilinthink tank rm 2 11.82  11.82

Incubation od IP3 14.82  14.82

26.64

d 4th store m2 Na ceilin

e 5th store m2 6.67 ceilinthink tank rm 3 6.67  6.67

6.67

f 6th store m2 42.04 ceilinthink tank rm 4 14.15  14.15

think tank rm 5 12.13  12.13

Incubation od IP2 15.76  15.76

42.04

7th store m2 15.52 ceilinthink tank rm 6 15.52  15.52

15.52

h 8th store m2 Na ceilin

i 9th store m2 9.50 ceilinthink tank rm 7 9.50  9.50

9.50

10th store m2 18.69 ceilinthink tank rm 8 6.91  6.91

think tank rm 9 11.78  11.78

18.69

k 11th store m2 Na ceilin

l Roof level m2 Na ceilin

12.6 Moisture resistance mineral fibre board for box-

u areaa 1st store m2

12.7 Thermally insulated ceiling panel with fibrous

plaster board on concealed suspension system

a 1st store

b 2nd store

c 3rd store

d 4th store

Carried Forward

Page 56 of 110 S1-Blk X1

Page 57: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 57/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 25 Ceilin Finishes Cont'd

12.7 Thermally insulated ceiling panel with fibrous

plaster board on concealed suspension system

'e 5th store

f 6th store

7th store

h 8th store

i 9th store

10th store

k 11th store

12.8 Mineral fibre insulated suspended ceiling board

a 7th store

1C8 Mineral fibreboard with insulation batts above to LAN

Room ELVS Room

m2 10.20 ceiling

LAN rm 10.20  10.20

10.20

7C8 Mineral fibreboard with insulation batts above to LAN

Room ELVS Room

m2 Na ceiling

12.9  Acoustically absorptive mineral fibre suspended

ceilin boarda 1st store

1C5  Acoustically absorptive mineral fibre board to Common

Laundr , Hall Admin, SC Admin

m2 82.68 ceiling

hall admin office meetin rm 9.42  9.42

hall admin office store rm 4.07  4.07

hall admin office rece tion 17.96  17.96

hall admin office hall officer 40.24  40.24

hall admin office head office 10.99  10.99

82.68

b 2nd store

c 3rd store

d 4th store

e 5th store

f 6th store

7th store

h 8th storei 9th store

10th store

k 11th store

l Roof level

12.10  Acoustic lasswool sus ended ceilin board

Note  Acoustic ceiling as per Schedule of Finishes is 75mm

thk acoustic cell spray treatment, quantities are

included in Others Item 12.11

a 1st store

b 2nd store

c 3rd store

d 4th store

e 5th storef 6th store

7th store

h 8th store

i 9th store

10th store

k 11th store

l Roof level

Carried Forward

Page 57 of 110 S1-Blk X1

Page 58: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 58/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 26-A  Ceilin Finishes Cont'd

12.11 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 a Access anels to ceilin 600mm x 600mm nos 40 ceilin

1st st 1 1.00

2nd st 4 4.00

3rd st 5 5.00

4th st 5 5.00

5th st 6 6.00

6th st 5 5.00

7th st 6 6.00

8th st 3 3.00

9th st 3 3.0010th st 1 1.00

11th st 1 1.00

40.00

b Other ceilin finishes

C7 75mm thk acoustic cel l spray treatment to Corridor;

Sprayed acoustic treatment to soffit of slab to

Corridors as per Tender Clarification 2, Architectural

 

m2 ceiling

C7a 75mm thk acoustic cell spray treatment to Kitchen,

Dishwash & Potwash areas, Indoor Sports Hall, Toilet,

Lockers Famil Room

m2 ceiling

GSM GS mesh with GS supports over opening to FA, SPR,

TEL DT PW NW Duct

m2 ceiling

c

Fittin and Furnishin

13.1 Cabinet

a Kitchen hood & hob Included in PC Sums

Note  As per Tender Clarification 2, Architectural Item A15,

cooker and hob are b NSC As per Tender Clarification 2, Architectural Item A58, 4

burner induction hob burners and 3 speed telescopicull hood are b NSC

13.2 Cat ladder

Catladder to Water Tank nos metal-wk  

SS access door anel to Water Tank nos metal-wk  

Grab bar near access anel to Water Tank nos metal-wk  

Catladder with ca e uard nos metal-wk  

Slidin access tra door 1150mm x 1150mm nos metal-wk  

 Aluminium handrail 2 nos sets metal-wk 

Catladder to Lift Pit h=1.80~3.0m nos metal-wk  

300mmW x 300mmD x 300mmH sump pit with GS

ratin to Lift Pit

nos metal-wk  

13.3 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 

a

b

c

Sanitar A liances

Note For sanitary wares specifications, please refer to

Tender Corri endum No 1

14.1 Pedestal water closet

Pedestal water closet with flush valves sets 87 S-wares

Ditto, to Handica Toilet with flush valves sets 11 S-wares

14.2 S uattin an S-wares

14.3 WC conceal cistern nos S-wares

14.4 Urinal S-wares

14.5 Urinal sensor flush valve S-wares

14.6 Soa dis enser nos 40 S-wares

Carried Forward

Page 58 of 110 S1-Blk X1

Page 59: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 59/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 27-A  Sanitar A liances Cont'd

14.7 Waste rece tacle nos S-wares

14.8 Hand dr er nos 10 S-wares

14.9 Toilet a er holder nos 98 S-wares

14.10 Hook on back of door nos 124 S-wares

14.11 Sanitar bin nos S-wares

14.12 Bidet s ra 98 S-wares

14.13 Bib ta nos S-wares

14.14 Janitor sink nos 10 S-wares

14.15 Ta for anitor sink nos 10 S-wares

14.16 Shower head nos 73 S-wares

14.17 Shower mixer set S-wares

14.18 Mirror

Communal Toilet nos 10 mirror

Handica Toilet nos 11 mirror

Washrooms nos 2 mirror

Graduate Sin le nos 18 mirror

Graduate Married nos 6 mirror

Hall - Fellow nos 2 mirror

Hall- Master nos 6 mirror

14.19 Hot water dis enser LS others

14.20 Fli -u s s rab bar shower seat

Shower seat to Handica Toilet nos 10 S-wares

Handica rab bar sets 11 S-wares

14.21 S s horizontal bar fixed to door nos 11 S-wares

14.22 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,shall be deemed to be included or absorbed in the

 a Other works in relation with Toilets

Wash basin c w ta sets 75 S-wares

Ditto, to Handica Toilet sets 11 S-wares

Kitchen sin le sink c w ta L=0.90m sets S-wares

Kitchen single sink c/w tap (L=1.70m) to Think Tank 

Room 7

sets 1 S-wares

Kitchen sin le sink c w ta to Pantr sets 10 S-wares

Kitchen double sink c w ta to Communal Laundr sets S-wares

Kitchen double sink c/w tap to Communal Kitchenette sets S-wares

Floor tra with UPVc ratin nos 163

Floor waste nos 135

Scu er drain to toilets w=150mm m scu er

Toilet cubicles- solid compact laminated panel & 

doorCubicle for Janitor with door sets 10 Toilet-Cub

3 shower cubicles with 3 doors and 2 common

artitions

sets 19 Toilet-Cub

3 toilet cubicles with 3 doors and 2 common partitions sets 1 Toilet-Cub

6 toilet cubicles with 6 doors and 5 common partitions sets 9 Toilet-Cub

 Vanit to c w bracket- Solid ol ester

Communal Toilet L=3.425m, w=0.60mm nos 10  V-to

Pantr L=1.50m, w=0.60m nos 10  V-to

b Laundry troughs to Common Laundry - required as per

Schedule of Finishes Item No 1.4.3

LS others

c Shower screens

GS, GM Shower / glass screen with slid ing door to Graduate

Sin le, Graduate Married

sets 24 Shower-S

HF, HM Shower / glass screen with sl iding door to Hall Fel low

and Hall Master

sets 7 Shower-S

Carried Forward

Page 59 of 110 S1-Blk X1

Page 60: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 60/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 1 - BLOCK X1

1.00

Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate

Brou ht Forward

BC S1 28-A  Sundries

15.1 Earthin work LS earthin

15.2 Li htnin rotection work LS li htnin

15.3 Builders work in connection with M&E work LS Builder

15.4 Fire extin uisher nos 51 Fire-Ext

Ditto, to Think Tank Rooms nos 9 Fire-Ext

15.5 Letter box

 Aluminium letter boxes nos 360 others

15.6 Fire extin uishers with com artment LS 23 Fire-Ext

15.7 Hose reel com artments & access anel LS 33 Fire-ExtBreeching inlet compartments & access panel; door

measured se aratel

nos others

15.8 Fencin

Fencing for Tank Room (h=3.90m including RC kerb)

to Blks X1 Y1 & Z1

m 32.00 metal-wk 

consists of:

- 100 x 500mm hot di ed GS RHS in aint finish

- GS ex anded mesh screen in owder coated finish

- 10mm thk hot dipped GS plate in paint finish pre-

welded to ex anded metal mesh- 200 x 100 x 12mm thk hot dipped GS T-bar in paint

finish32.00 32.00

Ditto on to of ara et wall h=2.90m m 18.00 metal-wk 

consists of:

- 100 x 500mm hot di ed GS RHS in aint finish

- GS ex anded mesh screen in owder coated finish

- 10mm thk hot dipped GS plate in paint finish pre-

welded to ex anded metal mesh- 200 x 100 x 12mm thk hot dipped GS T-bar in paint

finish18.00 18.00

Extra over for double leaf ate nos 1 metal-wk 

Expanded mesh screen fencing to Heat Pump Room,

11th St h=1.10m as er Elevation

m 25.60 metal-wk 

11th St Heat Pum Room, 25.60 25.60

Double leaf ate nos 1 metal-wk 

15.9 Galvanised T- ole laundr han in line w=1.20m m metal-wk  

15.10 Timber seating to Sky Garden (w=0.50m, h=0.50m) m 24.30 timber

24.3 24.30

15.11 Tactile tiles warnin indicator 300mm x 300mm nos 4 Tactile

15.10 Others

Works not l isted above but are necessary to complete

the works as a whole (if not stated and allowed herein,

shall be deemed to be included or absorbed in the

 

a Refuse Chute

Refuse hopper (2nd Sty to Roof Level) for Blks X1, Y1

and Z1 and 3rd to 11 St for Blks X2 and Z2

nos 1 Precast-RC

 Aluminium inspection cover over Refuse Chute Roof 

1.0m x 1.0m

nos 1 metal-wk 

Safet mesh below roof 600mm x 700mm nos 1 metal-wk 

Wiremesh to cover ventilation opening at Roof (700mm

x 200mm

nos 1 metal-wk 

b Insect screen to Housin Units m2 metal-wk  

c Fan hook nos 347 metal-wk 

d Timber table and bench at 1st Sty, near Letter Boxes opposite to letter box &

securit roomnos 3 timber

e Refuse chute com actor nos 1

Total Carried to Summary of Tender Page

ST/1 Item 3.1

Page 60 of 110 S1-Blk X1

Page 61: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 61/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total Amount

CFA m2

BC S4 1 1 Sub-structure

1.1 Pileca includin excavation, formwork, concrete and rebar

a Excavation m3 excb Backfill m3 Backfillc Lean concrete - 50mm thick G15 m2 G15

d Concrete G40 m3 G40e Reinforcement k Rebarf Formwork m2 Fwk  

Excavation to basement0-2m m3 exc2m-4m m3 exc

h Backfill to workin area m3 Backfill

i Remove sur lus off site m3 Remove

1.2 Column stuma Concrete G40 m3 G40b Reinforcement k Rebar

c Formwork m2 Fwk  

Lift it walla Excavation m3 exc

b Concrete G40 m3 G40c Reinforcement k Rebard Formwork m2 Fwk  

Basement walla Concrete G40 m3 G40

b Reinforcement k Rebarc Formwork m2 Fwk  

1.3 Ground beam - 1st sta Excavation m3 excb Lean concrete - 50mm thick G15 m2 G15

c Concrete G40 m3 G40d Reinforcement k Rebare Formwork m2 Fwk  

1.4 Ground slaba Excavation

to basement level m3 excto 1st st m3 exc

b Lean concrete - 50mm thick G15to basement level m2 G15

to 1st st m2 G15c Concrete G40

to basement level m3 G40

to 1st st m3 G40d Reinforcement

to basement level k Rebarto 1st st k Rebar

e Formwork  150mm thick slab ed e m 150-fwk 

1.5 Plinth

1.6 Waterproofing system to sub-structure in contact with ground

25mm thick cement sand rotection screed

to round slab m2 water rf  to round beam m2 water rf  to lift it wall m2 water rf  to basement wall m2 water rf  

Water roofin membraneto round slab m2 water rf  to round beam m2 water rf  

to lift it wall m2 water rf  to basement wall m2 water rf  

Dam roof membrane

to round slab m2 water rf  to round beam m2 water rf  to lift it wall m2 water rf  to basement wall m2 water rf  

H drotite CJ0720-2K swellable water sto to lift it wall m water rf  H drotite CJ0720-2K swellable water sto to basement wall m water rf  

1.7 Anti-termite treatment m2 Anti-Termite

1.8 Others

Works not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 abc

Carried Forward

Page 61 of 110 S4-Blk X2

Page 62: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 62/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 2 2 Frame

2.1 Concrete in column - G40a 1st store m3 G40b 2nd store m3 G40c 3rd store m3 G40d 4th store m3 G40e 5th store m3 G40f 6th store m3 G40

7th store m3 G40h 8th store m3 G40i 9th store m3 G40

10th store m3 G40k 11th store m3 G40l Roof level

2.2 Concrete in sus ended ed e beam - G40

a 1st store m3 G40b 2nd store m3 G40c 3rd store m3 G40d 4th store m3 G40e 5th store m3 G40f 6th store m3 G40

7th store m3 G40h 8th store m3 G40i 9th store m3 G40

10th store m3 G40k 11th store m3 G40l Roof level

2.3 Reinforcement in columna 1st store k   rebar

b 2nd store k   rebar

c 3rd store k   rebard 4th store k   rebar

e 5th store k   rebar

f 6th store k   rebar

7th store k  rebar

h 8th store k   rebar

i 9th store k   rebar

Carried Forward

Page 62 of 110 S4-Blk X2

Page 63: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 63/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 3 2 Frame Cont'd

2.3 Reinforcement in column Cont'd10th store k   rebar

k 11th store k   rebar

l Roof level

2.4 Reinforcement in sus ended ed e beama 1st store k   rebar

b 2nd store k   rebar

c 3rd store k   rebar

d 4th store k   rebar

e 5th store k   rebar

f 6th store k   rebar

7th store k  rebar

h 8th store k   rebar

i 9th store k   rebar

10th store k   rebark 11th store k   rebar

l Roof level

2.5 Formwork to columna 1st store m2 fwk 

b 2nd store m2 fwk 

c 3rd store m2 fwk 

d 4th store m2 fwk 

e 5th store m2 fwk 

f 6th store m2 fwk 

7th store m2 fwk 

h 8th store m2 fwk 

i 9th store m2 fwk 

10th store m2 fwk 

k 11th store m2 fwk 

l Roof level

Carried Forward

Page 63 of 110 S4-Blk X2

Page 64: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 64/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 4 2 Frame Cont'd

2.6 Formwork to sus ended ed e beama 1st store m2 fwk 

b 2nd store m2 fwk 

c 3rd store m2 fwk 

d 4th store m2 fwk 

e 5th store m2 fwk 

f 6th store m2 fwk 

7th store m2 fwk 

h 8th store m2 fwk 

i 9th store m2 fwk 

10th store m2 fwk 

k 11th store m2 fwk 

l Roof level

2.7 Others

Works not lis ted above but are necessary to complete theworks as a whole (if not stated and allowed herein, shall be

 abc

3 U er Floor

3.1 Concrete to sus ended slab - G40a 1st store m3 G40

b 2nd store m3 G40

c 3rd store m3 G40

d 4th store m3 G40

e 5th store m3 G40

f 6th store m3 G40

7th store m3 G40

h 8th store m3 G40

i 9th store m3 G40

10th store m3 G40

k 11th store m3 G40

l Roof level

Concrete to RC led e - G40a 2nd store m3 G40

b 3rd store m3 G40

c 4th store m3 G40

d 5th store m3 G40

e 6th store m3 G40

f 7th store m3 G408th store m3 G40

h 9th store m3 G40

i 10th store m3 G40

11th store m3 G40

k Roof level m3 G40

Carried Forward

Page 64 of 110 S4-Blk X2

Page 65: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 65/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 5 3 U er Floor Cont'd

3.2 Reinforcement to sus ended slab

a 1st store k   rebar

b 2nd store k   rebar

c 3rd store k   rebar

d 4th store k   rebar

e 5th store k   rebar

f 6th store k   rebar

7th store k  rebar

h 8th store k   rebar

i 9th store k   rebar

10th store k   rebar

k 11th store k   rebar

l Roof level

Reinforcement to RC led e

a 2nd store k   rebarb 3rd store k   rebar

c 4th store k   rebar

d 5th store k   rebar

e 6th store k   rebar

f 7th store k   rebar

8th store k  rebar

h 9th store k   rebar

i 10th store k   rebar

11th store k   rebar

k Roof level k   rebar

3.3 Formwork to sus ended slab

a 1st store m2 fwk 

b 2nd store m2 fwk 

c 3rd store m2 fwk d 4th store m2 fwk 

e 5th store m2 fwk 

f 6th store m2 fwk 

7th store m2 fwk 

h 8th store m2 fwk 

i 9th store m2 fwk 

10th store m2 fwk 

k 11th store m2 fwk 

l Roof level

20mm thick slab ed e

b 3rd store m 20-fwk 

c 4th store m 20-fwk 

d 5th store m 20-fwk 

e 6th store m 20-fwk 

f 7th store m 20-fwk 8th store m 20-fwk 

h 9th store m 20-fwk 

i 10th store m 20-fwk 

11th store m 20-fwk 

50mm thick slab ed eb 3rd store m 50-fwk 

c 4th store m 50-fwk 

d 5th store m 50-fwk 

e 6th store m 50-fwk 

f 7th store m 50-fwk 

8th store m 50-fwk 

h 9th store m 50-fwk 

i 10th store m 50-fwk 

11th store m 50-fwk 

Formwork to RC led ea 2nd store m2 fwk 

b 3rd store m2 fwk 

c 4th store m2 fwk 

d 5th store m2 fwk 

e 6th store m2 fwk 

f 7th store m2 fwk 

8th store m2 fwk 

h 9th store m2 fwk 

i 10th store m2 fwk 

11th store m2 fwk 

k Roof level m2 fwk 

Ditto 150mm thick slab ed e to RC led e

a 2nd store m 150-fwk b 3rd store m 150-fwk 

c 4th store m 150-fwk 

d 5th store m 150-fwk 

e 6th store m 150-fwk 

f 7th store m 150-fwk 

8th store m 150-fwk 

h 9th store m 150-fwk 

i 10th store m 150-fwk 

11th store m 150-fwk 

k Roof level m 150-fwk 

3.4 Water roofin s stem to structural works as s ecifieda 1st storeb 2nd store

c 3rd stored 4th storee 5th storef 6th store

Carried Forward

Page 65 of 110 S4-Blk X2

Page 66: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 66/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 6 3 U er Floor Cont'd

nil3.4 Waterproofing system to structural works as specified (Cont'd)

7th storeh 8th storei 9th store

10th store

k 11th storel Roof level

3.5 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 ab

c

4 Structural Wall

4.1 Concrete to structural wall - G40a 1st store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

b 2nd storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

c 3rd storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

d 4th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

e 5th storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

f 6th storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

7th storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

h 8th storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

i 9th storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

10th store

to lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

k 11th storeto lift wall m3 G40

to staircase wall m3 G40

to internal rc wall m3 G40

l Roof levelto lift wall m3 G40

to staircase wall m3 G40

Carried Forward

Page 66 of 110 S4-Blk X2

Page 67: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 67/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 7 4 Structural Wall Cont'd

4.2 Reinforcement to structural walla 1st store

to lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

b 2nd store

to lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

c 3rd storeto lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

d 4th store

to lift wall k   rebar

to staircase wall k   rebarto internal rc wall k   rebar

e 5th storeto lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

f 6th store

to lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

7th storeto lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

h 8th store

to lift wall k   rebarto staircase wall k   rebar

to internal rc wall k   rebar

i 9th storeto lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

10th store

to lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

k 11th storeto lift wall k   rebar

to staircase wall k   rebar

to internal rc wall k   rebar

l Roof level

to lift wall k   rebarto staircase wall k   rebar

4.3 Formwork to structural wall

a 1st storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

b 2nd storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

c 3rd storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk d 4th storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

e 5th storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

f 6th storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

7th storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk h 8th store

to lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

i 9th storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

10th store

to lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

k 11th storeto lift wall m2 fwk 

to staircase wall m2 fwk 

to internal rc wall m2 fwk 

l Roof level

to lift wall m2 fwk 

to staircase wall m2 fwk 

4.4 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 a

bc

Carried Forward

Page 67 of 110 S4-Blk X2

Page 68: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 68/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 8 5 Structural work to roof 

5.1 Concrete roof slaba Concrete G40 m3 G40

b Reinforcement k   rebar

c Formwork m2 fwk 

5.2 Sus ended roof beama Concrete G40 m3 G40

b Reinforcement k   rebar

c Formwork m2 fwk 

5.3 Stum column at roof  a Concrete G40b Reinforcementc Formwork 

5.4 Roof finishesa Profile steel roofin

MDS Metal deck standin seam with insulation & reflective foil m2 roof 

b Insulation

c Water roofin

Note There are 2 details for waterproofing to RC Flat Roof, please

use whichever is a licable

RF Wate roofin to RC Flat Roof m2 water rf  Detail 1 consists of:

- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded- 6mm thk under-screed draina e sheet- 1000 x 1000 x 50mm thk c/s panel roofing reinforced with

 - Pol sul hide sealant- 50mm wide welded la

Detail 2 Wate roofin to RC Flat Roof consists of:

- cement and sand screed to fall- wate roofin membrane- under-screed draina e mat- Extruded ol st rene insulation- Se aration la er- 600 x 600 x 50mm thk PC anel

RF1 Wate roofin to RC Flat Roof non insulated m2 water rf  

RFU Wate roofin to RC Flat Roof- u turn m water rf  consists of:

- 1.2mm thk EVA PVC water roofin membrane bonded- 25mm thk c s rotection screed with GI mesh- membrane terminated into groove-line & sealed with

ol urethane sealant

Water roofin to Non-Insulated Deck m2 water rf  consists of:

- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded- 6mm thk under-screed draina e sheet

- finishes and rotection screed measured se aratel

WFST Water roofin to Landsca e Deck to Sk Terrace, 6th St m2 water rf  consists of:

- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded- 25mm thk c s rotection screed- 100 sm eotextile se aration la er- 30mm thk interlockin sub-soil draina e modules- 100 sm eotextile filter fabric- 50mm thk coarse washed sand- growth media to Landscape Architect's detail (Softscape is

 

Waterproofing works to planters- 30mm thk modular subsoil

 Planter floor m2 water rf  Planter walls m2 water rf  

d Perforated aluminum trellisRoof Trellis Aluminium ex anded mesh screen to roof m2 metal-wk  

Note  Area measured is not only mesh area but including the metal

 

consists of:- 600 x 300 GS- 200 x 100 x 8mm thk hot di ed GS RHS in aint finish- 6mm thk hot di ed GS late in aint finish- Aluminium ex anded mesh screen in owder coated finish- 50 x 75 x 6mm thk hot di ed GS L-an le in aint finish

e Green roofin s stem B Others included included includedNote Green roofing system by NSC as per Schedule of Finishes,

 

f  Roof draina e with accessoriesSi honic rainwater outlet diam not iven nos si honicRWD diam not iven m draina eRoof sci er drain with ratin w=0.50m m draina e

Scupper drain to Corridor near AC Ledges- 150mm wide x

 

m scupper

Truss to su ort li hts & fansSteel structure k steelPaintin m2 steel

M16 bolt no. steelM20 cast-in bolt no. steel

h Timber deckinEF9 Seasoned ironwood for timber decking to Communal Sky

 

m2 tbr deck  

Note WT-Timber flooring system (iron wood); Size: 150 x50mm thk,

Colour: dark mahogany, Finish: natural stain look alike as per

 

EF9a Timber finish to seats/ bench at Communal Sky Terrace and

Roof Garden (Hostel Block); external, irregular shaped, total

 

m2 timber

i Granite slab with ste in stone

Plinth

k Roof avilion

5.5 Built in Gondola s stem Gondola

5.6 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 

a Planters at Sk TerraceCut to size x 20mm thk granite with backing scree to planter

 

m2 granite

Plaster and aint to lanter walls external m2 laster

200 x 300 x 30mm thk ranite co in to lanters m ranite

b SunshadeSteel structure k steelPaintin m2 steelM16 bolt no. steel

c

Carried Forward

Page 68 of 110 S4-Blk X2

Page 69: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 69/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 9 6 Staircase

6.1 Staircase fli ht

a Precast concrete staircaseb Reinforced Concrete to in structure

Concrete G40 m3 G40Reinforcement k rebar

Formwork m2 fwk  

6.2 Sus ended landin slaba Concrete G40

b Reinforcementc Formwork  

6.3 Sus ended landin rakin ed e beama Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork m2 fwk  

6.4 Ex ended mesh screen staircase railin

SR1 MS railin to Staircase h=0.90m to all blocks m Railin

consists of:- 40 x 100mm thk MS late in enamel aint finish- 40 x 10mm thk MS plate in enamel paint f inish @ max 100mm

- 50 x 150 x 6mm thk MS an le in enamel aint finish

- SS ex ansion bolt

SR2b GS expanded mesh screen/ railing in powder coated f inish

h=1.675m to Staircase Landin for Blks X2 and Y2

m Railing

Note  As per drawing title, Blks X2 and Z2 are not included,

assumin similar railin are to be used for Blks X2 and Z2

consists of:- 10mm thk hot di ed GS late in owder coated finish

- 50 x 30mm thk hot di ed GS RHS in owder coated finish- 10mm thk hot dipped GS folded plate in powder coated finish

- 10mm thk hot dipped GS flat plate baluster in powder coated

- 10mm thk hot dipped GS L-angle pre-welded to G/S expanded

 - GS ex anded mesh screen in owder coated finish

- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate

-- 10mm thk hot di ed GS late in owder coated finish

- Countersunk anchor bolt

- 20 x 20mm aluminium U-channel in owder coated finish- 10mm thk hot di ed GS late in owder coated finish

SR2c Ditto h=1.20m as measured on elevation m railin

6.5 Timber stud wall to staircase railin

6.6 Stair finishes

Floor Finishes

SF1 Self levelin screed to common staircasesLandin m2 screed

Riser 167.7mm hi h m S-riserTreads 250mm wide m S-tread

Nosin tiles m S-Nosin -T

Wall FinishesSW Plaster and aint to staircase wall m2 laster

Ceilin FinishesSC1 Plaster and aint to staircase ceilin m2 laster

6.7 Others

Works not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 ab

c

7 External Wall and Finishes

7.1 Brickwalla 1st store

1BRW100E 100mm thk brickwall external m2 100-bwk  1BRW200E 200mm thk brickwall external m2 200-bwk  

b 2nd store - 

2BRW100E 100mm thk brickwall external m2 100-bwk - 2BRW200E 200mm thk brickwall external m2 200-bwk - 

c 3rd store - 

3BRW100E 100mm thk brickwall external m2 100-bwk  

3BRW200E 200mm thk brickwall external m2 200-bwk  

d 4th store - 4BRW100E 100mm thk brickwall external m2 100-bwk  

4BRW200E 200mm thk brickwall external m2 200-bwk - 

e 5th store - 5BRW100E 100mm thk brickwall external m2 100-bwk  

5BRW200E 200mm thk brickwall external m2 200-bwk  

Carried Forward

Page 69 of 110 S4-Blk X2

Page 70: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 70/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 10 7 External Wall and Finishes Cont'd

7.1 Brickwall Cont'df 6th store - 

6BRW100E 100mm thk brickwall external m2 100-bwk  6BRW200E 200mm thk brickwall external m2 200-bwk - 

7th store - 7BRW100E 100mm thk brickwall external m2 100-bwk  7BRW200E 200mm thk brickwall external m2 200-bwk - 

h 8th store - 8BRW100E 100mm thk brickwall external m2 100-bwk  8BRW200E 200mm thk brickwall external m2 200-bwk - 

i 9th store - 9BRW100E 100mm thk brickwall external m2 100-bwk - 9BRW200E 200mm thk brickwall external m2 200-bwk - 

10th store - 10BRW100E 100mm thk brickwall external m2 100-bwk - 10BRW200E 200mm thk brickwall external m2 200-bwk - 

k 11th store - 11BRW100E 100mm thk brickwall external m2 100-bwk - 11BRW200E 200mm thk brickwall external m2 200-bwk - 

l Roof level - RFBRW100E 100mm thk brickwall external m2 100-bwk  RFBRW200E 200mm thk brickwall external m2 200-bwk - 

7.2 Glass wall anel com lete with su ortin frame

a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th store

7.3 Perforated anel Com osite Panel MeshNote Steel support for rainscreens / sunshades are measured

se aratel lease refer to Item 5.6ba 1st store

b 2nd store Aluminium expanded mesh sunshade/ sunshade window fin

=

m GS-mesh

GS expanded mesh screen in powder coated finish (w=0.60m)

 

c 3rd store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

d 4th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

e 5th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

f 6th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

7th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

h 8th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

i 9th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m) 

10th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

k 11th store Aluminium expanded mesh sunshade/ sunshade window fin

=

m railing

GS expanded mesh screen in powder coated finish (w=0.60m)

 

l Roof  

Carried Forward

Page 70 of 110 S4-Blk X2

Page 71: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 71/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 11 7 External Wall and Finishes Cont'd

7.4 RC ara et wall low walla 1st store

b 2nd store

c 3rd storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

d 4th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

e 5th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

f 6th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

7th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

h 8th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

i 9th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

10th storeConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

k 11th store

Concrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

l Roof  Concrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

7.5 Precast anel wall

PW 160mm thk precast RC wall (some drawings shown 140mm

thk others 150mm thk external

a 1st store m2 Precast-W - - - b 2nd store m2 Precast-W - - - c 3rd store m2 Precast-W - - - d 4th store m2 Precast-W - - - e 5th store m2 Precast-W - - - f 6th store m2 Precast-W - - - 

7th store m2 Precast-W - - - h 8th store m2 Precast-W - - - i 9th store m2 Precast-W - - - 

10th store m2 Precast-W - - - k 11th store m2 Precast-W - - - l Roof m2 Precast-W - - - 

7.6 Perforated Ex anded mesh railin

Note For all railings below, please follow detail descriptions as

R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1consists of:

- 10mm thk hot di ed GS late in owder coated finish- 10mm thk hot dipped GS folded plate in powder coated finish

- 40mm diam hot di ed GS CHS in owder coated finish- 10mm thk hot dipped GS flat plate baluster in powder coated

- 10mm thk hot dipped GS L-angle pre-welded to aluminium

 - Aluminium ex anded mesh with owder coated finish- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate

re-welded to u ri ht balusters in aint finish

- 10mm thk hot dipped GS angle plate in powder coated finish

- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in owder coated finish- 10mm thk hot di ed GS late in owder coated finish

R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 consists of:

- 10mm thk hot di ed GS late in owder coated finish- 10mm thk hot dipped GS folded plate in powder coated finish

- 40mm diam hot di ed GS CHS in owder coated finish- 10mm thk hot dipped GS flat plate baluster in powder coated

finish- 10mm thk hot dipped GS L-angle pre-welded to aluminium

ex anded mesh with owder coated finish- Aluminium ex anded mesh with owder coated finish- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate

-- 10mm thk hot dipped GS angle plate in powder coated finish

- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in owder coated finish- 10mm thk hot di ed GS late in owder coated finish

a 1st storeb 2nd store

c 3rd store - 

R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2, Z1 m railin - 

R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 

m railing - 

d 4th store - 

R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 

m railing - 

e 5th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

Blks X2 & Z2

m railing - 

f 6th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 

m railing - 

R4 Glass railin h=0.90m to Sk Terrace for Blks X2 & Z2 m railin - R4 Glass railin h=1.10m to Sk Terrace for Blks X2 & Z2

consists of:- 25 x 25 x 2mm ss ca in- 10mm thk hot di ed GS T-bar in owder coated finish- 20mm thk full tem ered laminated lass- 10mm thk hot dipped GS L-angle prewelded to channeleed

 

7th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 

m railing - 

h 8th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2, Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

Blks X2 & Z2

m railing - 

i 9th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 

m railing - 

10th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

 

m railing - 

k 11th store - 

Page 71 of 110 S4-Blk X2

Page 72: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 72/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountR2b Ditto h=1.50m to AC Led e for Blks X2 and Z2, Z1 m railin - R3  Aluminium expanded mesh screen (h=1.675m) to Balcony for

Blks X2 & Z2

m railing - 

l Roof  

Carried Forward

Page 72 of 110 S4-Blk X2

Page 73: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 73/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 12 7.7 M&E louvre

a 1st storePV 12  Aluminium louvre vent nos windowPV 15  Aluminium louvre vent nos window

b 2nd store

c Roof  PV 21  Aluminium louvre vent to Lift Motor Room nos window

7.8 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 a Precast refuse chute wall m3 Precast-RC

Refuse chut roof rc wallConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

Refuse chut roof slabConcrete G40 m3 G40Formwork m2 Fwk  Rebar k Rebar

b WindowsWindows to Service A artmentsFacult Service A artments1-Bedroom

 AV/06 Glass louvres vents to Utility Room & Bath/WC; 1-Bedroom

 

nos window

CWF/06 Casement window with fixed tempered glass panel to Living/

Dinin 1-Bedroom Service A artments

nos window

CWF/37 Casement window with fixed tempered glass panel to Master

Bedroom Bedroom 1-Bedroom Service A artments

nos window

2-BedroomCWF/06A Casement window with fixed tempered glass panel to Master

-

nos window

CWF/12 Casement window with fixed tempered glass panel to

-

nos window

CWF/30 Casement window with fixed tempered glass panel to Master

-

nos window

 AV/03 Glass louvres vents to Utility Room & Bath/WC; 2-Bedroom

Service A artments

nos window

3-BedroomCWF/06 Casement window with fixed tempered glass panel to Living/

Dinin 3-Bedroom Service A artments

nos window

CWF/06A Casement window with fixed tempered glass panel to Master

-

nos window

CWF/30 Casement window with fixed tempered glass panel to Master

-

nos window

 AV/06 Glass louvres vents to Utility Room & Bath/WC ; 3-Bedroom

 

nos window

GL/06  Adjustable glass louvred window to Kitchen; 3-Bedroom

Service A artments

nos window

b

c

8 Internal Wall and Partition

8.1 Brickwall excludin wall finishes - a 1st store - 

1BLW100 100mm thk blockwall internal m2 100-blk - 1BLW200 200mm thk blockwall internal m2 200-blk - 1BRW100 100mm thk brickwall internal m2 100-bwk - 1BRW200 100mm thk brickwall internal m2 200-bwk - 

b 2nd store - 2BLW100 100mm thk blockwall internal m2 100-blk - 2BLW200 200mm thk blockwall internal m2 200-blk - 2BRW100 100mm thk brickwall internal m2 100-bwk - 2BRW200 100mm thk brickwall internal m2 200-bwk - 

c 3rd store - 3BLW100 100mm thk blockwall internal m2 100-blk - 3BLW200 200mm thk blockwall internal m2 200-blk - 3BRW100 100mm thk brickwall internal m2 100-bwk - 3BRW200 200mm thk brickwall internal m2 200-bwk - 

d 4th store - 4BLW100 100mm thk blockwall internal m2 100-blk - 4BLW200 200mm thk blockwall internal m2 200-blk - 4BRW100 100mm thk brickwall internal m2 100-bwk - 4BRW200 200mm thk brickwall internal m2 200-bwk - 

e 5th store - 5BLW100 100mm thk blockwall internal m2 100-blk - 5BLW200 200mm thk blockwall internal m2 200-blk - 5BRW100 100mm thk brickwall internal m2 100-bwk - 5BRW200 200mm thk brickwall internal m2 200-bwk - 

f 6th store - 6BLW100 100mm thk blockwall internal m2 100-blk - 6BLW200 200mm thk blockwall internal m2 200-blk - 6BRW100 100mm thk brickwall internal m2 100-bwk - 6BRW200 200mm thk brickwall internal m2 200-bwk - 

7th store - 7BLW100 100mm thk blockwall internal m2 100-blk - 7BLW200 200mm thk blockwall internal m2 200-blk - 7BRW100 100mm thk brickwall internal m2 100-bwk - 7BRW200 200mm thk brickwall internal m2 200-bwk - 

h 8th store - 8BLW100 100mm thk blockwall internal m2 100-blk - 8BLW200 200mm thk blockwall internal m2 200-blk - 8BRW100 100mm thk brickwall internal m2 100-bwk - 8BRW200 200mm thk brickwall internal m2 200-bwk - 

i 9th store - 9BLW100 100mm thk blockwall internal m2 100-blk - 9BLW200 200mm thk blockwall internal m2 200-blk - 9BRW100 100mm thk brickwall internal m2 100-bwk - 9BRW200 200mm thk brickwall internal m2 200-bwk - 

10th store - 

10BLW100 100mm thk blockwall internal m2 100-blk - 10BLW200 200mm thk blockwall internal m2 200-blk - 10BRW100 100mm thk brickwall internal m2 100-bwk - 10BRW200 200mm thk brickwall internal m2 200-bwk - 

k 11th store - 

11BLW100 100mm thk blockwall internal m2 100-blk - 11BLW200 200mm thk blockwall internal m2 200-blk - 11BRW100 100mm thk brickwall internal m2 100-bwk - 11BRW200 200mm thk brickwall internal m2 200-bwk - 

l Roof - RFBLW100 100mm thk blockwall internal m2 100-blk - RFBLW200 200mm thk blockwall internal m2 200-blk - RFBRW100 100mm thk brickwall internal m2 100-bwk - RFBRW200 200mm thk brickwall internal m2 200-bwk - 

8.2 Hollow core light weight wall system excluding wall - 

HCW Hollow core with C-glass continous monofilament fibres tissue

for joint to Hostel and Service Apartments as per Schedule of 

Finishes, 110mm thk hollow core precast wall as per enlarged

 

a 1st store m2 Hollow-C - - b 2nd store m2 Hollow-C - - c 3rd store m2 Hollow-C - d 4th store m2 Hollow-C - e 5th store m2 Hollow-C - f 6th store m2 Hollow-C - 

7th store m2 Hollow-C - h 8th store m2 Hollow-C - i 9th store m2 Hollow-C - 

10th store m2 Hollow-C - k 11th store m2 Hollow-C - l Roof m2 Hollow-C - - 

Carried Forward

Page 73 of 110 S4-Blk X2

Page 74: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 74/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 13 8 Internal Wall and Partition Cont'd

8.3 Glass wall anel com lete with su ortin frameNote Included in item 7.2

a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof  

8.4 Acoustic wall panel lining including fabric wall covering system

a 1st storeb 7th store

8.5 Steel concrete lintols to brickwall dr walla 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof level

8.6 OthersWorks not lis ted above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 

a Other railin s

40mm diam GS handrail to be provided all round where to Bio-

Pond ad acent and Ram

m metal-wk  

Ditto wall mounted to Ram m metal-wk  

50.8mm diam (OD) x 2mm thk SS pipe railing with SS supportnot more than 1000c/c to Irrigation Pump Room, 1st Sty

m metal-wk  

bc

Carried Forward

Page 74 of 110 S4-Blk X2

Page 75: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 75/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 14 9 Door and Ironmon er

Note  All 6mm thk wired clear glass panel are 100mm x 600mm 

No given ironmongery schedule, only Specifications, please

include supply and installation of ironmongery to the door

9.1 Fire rated steel door in powder coated impact resistant

satin coating finished c/w exposed/concealed door

frame, mullion, ironmongery etc including fixing

a 1st storeFD2/12 Two hour fire rated steel door (double leaf) and frame

(powder coated impact resistant satin coating finish) to B in

Centre, PABX, LV Switchroom, LT S/W Room (Emergency),

Low Level Transfer Tank Room, Bin Transit Room, ELV Room,

MDF Room, Pool Filtraction Room, Ejector Pump Room,

Generator Room, Newater Tank Riinm Storage, Irrigation

 

nos Metal-Dr

FD2/18 Two hour fire rated steel door (double leaf) and frame

(powder coated impact resistant satin coating finish) to B in

Centre, PABX, LV Switchroom, LT S/W Room (Emergency),

Low Level Transfer Tank Room, Bin Transit Room, ELV Room,

MDF Room, Pool Filtraction Room, Ejector Pump Room,

Generator Room, Newater Tank Riinm Storage, Irrigation

 

nos Metal-Dr

FD2/18 Two hour fire rated steel door (double leaf) and frame

(powder coated impact resistant satin coating finish) to MDF

Room, Pool Filtration Room, Ejector Pump Roon, Generator

Room, Newater Transfer Tank Room/ Hosereel Tank Pump

 

nos Metal-Dr

FD2/RC14 Two hour fire rated steel door and frame (powder coated

impact resistant satin coating finish) to Refuse Chute Chamber

nos Metal-Dr

b 2nd storec 3rd stored 4th store

e 5th storef 6th store

7th store

FD2/10 Two hour fire rated steel door and frame (powder coated

impact resistant satin coating finish) to LAN Roon, PABX

 

nos Metal-Dr

h 8th storei 9th store

10th storek 11th store

l Roof level

9.2 Fire rated steel door in powder coated finished c/w

exposed/concealed door frame, mullion, ironmongery

 a 1st storeb 2nd store

c 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof  

Carried Forward

Page 75 of 110 S4-Blk X2

Page 76: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 76/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 15 9 Door and Ironmon er Cont'd

9.3 Non fire rated steel door in powder coated finished

c/w exposed/concealed door frame, mullion,

 a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof level

9.4 Fire rated solid timber door in laminate finished c/w

door frame, mullion, push/kick plate, viewing panel,

 a 1st store

FD.5/S06 Half hour fire rated solid core door with HPMR laminates to

DT TEL SPR FA HR FE SP ST

nos tbr-dr

FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

b 2nd store

c 3rd storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to to

 FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 1-Bedroom Service A artment

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 2-Bedroom Service A artment

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to-

nos tbr-dr

d 4th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to to

TEL near StaircaseFD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 1-Bedroom Service A artment

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 2-Bedroom Service A artment

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

e 5th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to toTEL near Staircase

FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 1-Bedroom Service A artment

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 2-Bedroom Service A artment

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

Main Entrance 3-Bedroom Service A artment

nos tbr-dr

f 6th storeFD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to 

nos tbr-dr

nosHostel and Facult Service A artments

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

tbr-dr

nos7th store

FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

tbr-dr

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

nosHostel and Facult Service A artments nos

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

tbr-dr

h 8th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to to

 FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

i 9th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to to

 

Page 76 of 110 S4-Blk X2

Page 77: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 77/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountFD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

10th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to to

 FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

k 11th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr

Half hour fire rated solid core door with HPMR laminates to to

 FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR 

 

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW

nos tbr-dr

Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH

FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

FD1/AM10 One hour fire rated solid core door with HPMR laminates to

-

nos tbr-dr

l Roof  FD1/10 One hour fire rated timber door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to

 

nos tbr-dr

9.5 Non fire rated / Timber door in laminate finished c/w

door frame, mullion, finger/push/kick plate, viewing

panel, louvred panel, ironmongery, etc includinq fixinq

a 1st storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

b 2nd store

c 3rd store

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

 

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

Bedroom Service A artmentDAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

2-Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track 

-

d 4th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

 

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

 

DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3- 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

Bedroom 1 2-Bedroom Service A artment

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

Bedroom Service A artment

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track 

to Bedroom 1-Bedroom Service A artment

e 5th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

Page 77 of 110 S4-Blk X2

Page 78: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 78/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountDS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

 

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

 DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track -

f 6th store

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artments

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

Bedroom Service A artment

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

Bedroom Service A artmentDAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

3-Bedroom Service A artment

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

Bedroom 1 & 2 3-Bedroom Service A artment

nos tbr-dr

Carried Forward

Page 78 of 110 S4-Blk X2

Page 79: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 79/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 16 9 Door and Ironmon er Cont'd

9.5 Non fire rated / Timber door in laminate finished c/w

door frame, mullion, finger/push/kick plate, viewing

panel, louvred panel, ironmongery, etc including fixing

'7th store

DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

 

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

 DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

3-Bedroom Service A artment

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

Bedroom 1 & 2 3-Bedroom Service A artment

nos tbr-dr

h 8th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

Bedroom Service A artment

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

Bedroom Service A artmentDAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track 

-

i 9th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

 

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

 DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

2-Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

3-Bedroom Service A artment

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

Bedroom 1 2-Bedroom Service A artment

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

Bedroom 1 & 2 3-Bedroom Service A artment

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track 

-

10th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

 

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS fingerpush and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3

 

nos tbr-dr

Timber door (double leaf) with HPMR laminate to Closet ; 3-

 DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

 

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track 

to Bedroom 1-Bedroom Service A artment

k 11th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water

nos tbr-dr

Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard; 1-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 2-Bedroom Service

nos tbr-dr

D/08 Timber door with HPMR laminate and 3mm thk SS finger

push and kick plates to Service Yard ; 3-Bedroom Service

 

nos tbr-dr

DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3  nos tbr-dr

Page 79 of 110 S4-Blk X2

Page 80: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 80/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total Amount

Timber door (double leaf) with HPMR laminate to Closet ; 3-

 DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-

Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom

Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

2-Bedroom Service A artment

nos tbr-dr

DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;

3-Bedroom Service A artment

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

Bedroom 1 2-Bedroom Service A artment

nos tbr-dr

DB/10 Semi solid door with timber veneer to Master Bedroom,

-

nos tbr-dr

DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-

 

nos tbr-dr

Sliding timber door with HPMR laminate, top hung sliding track 

-

l Roof level

9.6 Frameless glass door c/w ironmongery, etc including

fixin accessoriesa 1st storeb 2nd store

c 3rd stored 4th storee 5th store

f 6th store7th store

h 8th store

i 9th store10th store

k 11th store

l Roof level

9.7  Aluminium framed glass door c/w frame, ironmongery,

etc includin fixin accessoriesa 1st storeb 2nd store

c 3rd storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

d 4th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

e 5th store

SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

f 6th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

7th store

SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

h 8th store

SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

i 9th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

10th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

k 11th store

SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr

l Roof level

Carried Forward

Page 80 of 110 S4-Blk X2

Page 81: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 81/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 17 9 Door and Ironmon er Cont'd

9.8 Metal gate c/w frame, ironmongery etc including fixing

a Roof level

9.9 Fire rated motorised roller shutter in powder coated finished

c/o ironmongery, shutter box cover/hood, side guides, bottom

rail, locking system, barrel, removable centre mullion where

necessary, ventilation holes, etc. including fixing accessories

a 1st storeb 2nd store

9.10 Non fire rated motorised roller shutter in powder coated

finished c/o ironmongery, shutter box cover/hood, side guides,

bottom rail, locking system, barrel, removable centre mullion

where necessary, ventilation holes, etc. including fixing

a 1st store

b 2nd store

9.11 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 abc

10 Wall Finishes

10.1 Plasterin and vin l co- ol mer emulsion aintin

W1a Plaster and aint to wall

a 1st store m2 laster - - b 2nd store m2 laster - - c 3rd store m2 laster - - 

d 4th store m2 laster - - e 5th store m2 laster - - f 6th store m2 laster - - 

7th store m2 laster - - h 8th store m2 laster - - 

i 9th store m2 laster - - 10th store m2 laster - - 

k 11th store m2 laster - - l Roof m2 laster - 

Carried Forward

Page 81 of 110 S4-Blk X2

Page 82: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 82/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 18 10 Wall Finishes cont'd

10.2 Skim coatin and vin l co- ol mer emulsion

W1 5mm skim coated and aint finished to wallsNote Plaster and paint as per Schedule of Finishes, finishes above

 

a 1st store m2 skim coat - - b 2nd store m2 skim coat - - c 3rd store m2 skim coat - - 

d 4th store m2 skim coat - - e 5th store m2 skim coat - - f 6th store m2 skim coat - - 

7th store m2 skim coat - - h 8th store m2 skim coat - - i 9th store m2 skim coat - - 

10th store m2 skim coat - - k 11th store m2 skim coat - - l Roof m2 skim coat - - 

10.3 Homogeneous wall tile including cement sand backing - 

W2 300mm x 600mm homogeneous wall tiles with backing screed

a 1st store m2 wall tile - b 2nd store m2 wall tile - c 3rd store m2 wall tile - 

d 4th store m2 wall tile - e 5th store m2 wall tile - 

f 6th store m2 wall tile - 7th store m2 wall tile - 

h 8th store m2 wall tile - i 9th store m2 wall tile - 

10th store m2 wall tile - k 11th store m2 wall tile - 

l Roof m2 wall tile - 

10.4 Glazed ceramic wall tile including cement sand

backin screed with adhesivea 1st store

RCCW Glazed wall tiles with backing screed to Refuse Chute m2 GWT

b 2nd storec 3rd store

d 4th storee 5th storef 6th store

7th store

Carried Forward

Page 82 of 110 S4-Blk X2

Page 83: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 83/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 19 10 Wall Finishes cont'd

10.4 Glazed ceramic wall tile including cement sand

'h 8th storei 9th store

10th store

k 11th storel Roof  

10.5 Granite tile includin cement sand backin screeda 1st storeb 2nd storec 3rd stored 4th storee 5th store

f 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof  

10.6 Others

Works not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 

a Green Feature Wall to Sk Terrace 6th to 7th St m2 others

External Facade to Riser at Sky Terrace, 6th to 7th Sty,

 

m2 others

b Other wall finishesW8 Stud wall with insulation (self adhesive polyurethene sheet

vapour barrier and 50mm thk rockwool insulation complete

with 12mm thk non-combustible calcium silicate baord) to LAN

 

m2 partition

EWF Skim coat and smooth textured aint finish external m2 skim coat

Grooveline w=20mm m others

11 Floor Finishes11.1 Cement and sand screed with adhesive - 

a 1st store m2 screed - - b 2nd store m2 screed - - 

c 3rd store m2 screed - - d 4th store m2 screed - - e 5th store m2 screed - - 

- - 

Carried Forward

Page 83 of 110 S4-Blk X2

Page 84: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 84/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 20 11 Floor Finishes Cont'd

11.1 Cement and sand screed with adhesive Cont'df 6th store m2 screed

7th store m2 screedh 8th store m2 screedi 9th store m2 screed

10th store m2 screedk 11th store m2 screedl Roof m2 screed - 

11.2 Cement and sand screed with floor hardener - a 1st store m2 flr hard - b 2nd store m2 flr hard - c 3rd store m2 flr hard - d 4th store m2 flr hard - e 5th store m2 flr hard - f 6th store m2 flr hard - 

7th store m2 flr hard - h 8th store m2 flr hard - i 9th store m2 flr hard - 

10th store m2 flr hard - k 11th store m2 flr hard - l Roof m2 flr hard - 

11.3 Li uid -a lied water roofin membranea 1st store

Wate roofin to wet areas to floor m2 water rf  Flexible cementitous waterproof coating; rc slab surface

minimum wood trowelled smooth to receive waterproofing

coating, finishes and 25mm thk c/s protection screed

 

Wate roofin to wet areas to wall u turn h=300mm m water rf  Flexible cementitous waterproof coating; rc slab surface

minimum wood trowelled smooth to receive waterproofing

coating, finishes and 20mm thk c/s protection screed

 

Wate roofin to wet areas to shower wall h=1.80m m water rf - Flexible cementitous waterproof coating on c/s leveling render,

finishes and 20mm thk c/s protection screed measured

Wate roofin to Sum PitFlexible cementitous waterproof coating with 25mm thk c/s

 

Floor m2 water rf  Wall m2 water rf 

Wate roofin to Water Tank Flexible cementitous waterproof coating with 25mm thk c/s

protection screed; rc slab surface minimum wood trowelled

 

Floor m2 water rf  Wall m2 water rf  

WFL Wate roofin to Lift Pit - floor m2 water rf  WFL Wate roofin to Lift Pit - wall m2 water rf  

b 2nd store - WF2 Wate roofin to wet areas to floor m2 water rf - WF2 Wate roofin to wet areas to wall u turn h=300mm m water rf - WF2 Wate roofin to wet areas to shower wall h=1.80m m water rf - 

c 3rd store - WF3 Wate roofin to wet areas to floor m2 water rf  WF3 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF3 Wate roofin to wet areas to shower wall h=1.80m m water rf  

d 4th store - WF4 Wate roofin to wet areas to floor m2 water rf  WF4 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF4 Wate roofin to wet areas to shower wall h=1.80m m water rf  

e 5th store - WF5 Wate roofin to wet areas to floor m2 water rf  WF5 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF5 Wate roofin to wet areas to shower wall h=1.80m m water rf  

f 6th store - WF6 Wate roofin to wet areas to floor m2 water rf  WF6 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF6 Wate roofin to wet areas to shower wall h=1.80m m water rf  

7th store - WF7 Wate roofin to wet areas to floor m2 water rf  WF7 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF7 Wate roofin to wet areas to shower wall h=1.80m m water rf  

h 8th store - 

WF8 Wate roofin to wet areas to floor m2 water rf  WF8 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF8 Wate roofin to wet areas to shower wall h=1.80m m water rf  

i 9th store - WF9 Wate roofin to wet areas to floor m2 water rf  WF9 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF9 Wate roofin to wet areas to shower wall h=1.80m m water rf  

10th store - WF10 Wate roofin to wet areas to floor m2 water rf  WF10 Wate roofin to wet areas to wall u turn h=300mm m water rf  WF10 Wate roofin to wet areas to shower wall h=1.80m m water rf  

k 11th store - WF11 Wate roofin to wet areas to floor m2 water rf  

WF11 Wate roofin to wet areas to wall u turn h=300mm m water rf WF11 Wate roofin to wet areas to shower wall h=1.80m m water rf  

11.4 Heavy duty epoxy polyurenthane floor coating system

a 1st store

Carried Forward

Page 84 of 110 S4-Blk X2

Page 85: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 85/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 21 11 Floor Finishes Cont'd

11.5 Heavy duty epoxy polyurenthane floor coating

 a 1st store

11.6 Homo eneous tile - a 1st store - 

1F1 600mm x 600mm homogenous floor tiles with cement and

 

m2 F1 - 

1F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2 - 

1F3 600mm x 600mm non-slip homogenous floor tiles with cement

 

m2 F3 - 

1F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

1F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

1F4 450mm x 900mm homogeneous tiles with cement and sand

screed

m2 F4 - 

1F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

tiles internal

m2 F6 - 

1F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7 - 

b 2nd store - 2F1 600mm x 600mm homogenous floor tiles with cement and

 

m2 F1 - 

2F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2 - 

2F3a 600mm x 600mm non-slip homogenous floor tiles with cementand sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

2F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

tiles internal

m2 F6 - 

2F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7 - 

c 3rd store - 3F1 600mm x 600mm homogenous floor tiles with cement and

 

m2 F1

3F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2

3F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

3F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

tiles internal

m2 F6 - 

3F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7

d 4th store - 4F1 600mm x 600mm homogenous floor tiles with cement and

 

m2 F1

4F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2

4F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

4F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

tiles internal

m2 F6 - 

4F7 450mm x 900mm non-slip homogenous floor tiles with cementand sand screed internal

m2 F7

e 5th store - 5F1 600mm x 600mm homogenous floor tiles with cement and

 

m2 F1

5F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2

5F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

5F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

tiles internal

m2 F6 - 

5F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7

f 6th store - 6F1 600mm x 600mm homogenous floor tiles with cement and

sand screed

m2 F1

6F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2

6F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A  

6F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

 

m2 F6 - 

6F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7

7th store - 7F1 600mm x 600mm homogenous floor tiles with cement and

sand screed

m2 F1

7F2 300mm x 300mm non-slip homogenous floor tiles with cement

 

m2 F2

7F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A  

7F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

 

m2 F6 - 

7F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7

h 8th store - 8F1 600mm x 600mm homogenous floor tiles with cement and

sand screed

m2 F1

8F2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2

8F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A  

8F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

 

m2 F6 - 

8F7 450mm x 900mm non-slip homogenous floor tiles with cement

 

m2 F7

i 9th store - 9F1 600mm x 600mm homogenous floor tiles with cement and

sand screed

m2 F1

9F2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2

9F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A  

9F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

 

m2 F6 - 

9F7 450mm x 900mm non-slip homogenous floor tiles with cement

 

m2 F7

10th store - 11F1 600mm x 600mm homogenous floor tiles with cement and

sand screed

m2 F1

11F2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2

11F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A - 

11F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

 

m2 F6 - 

11F7 450mm x 900mm non-slip homogenous floor tiles with cement

 

m2 F7

k 11th store - 10F1 600mm x 600mm homogenous floor tiles with cement and

sand screed

m2 F1

10F2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2

10F3a 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed to Balcony as per Floor Finishes Plan

m2 F3A  

10F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

 

m2 F6 - 

10F7 450mm x 900mm non-slip homogenous floor tiles with cement

 

m2 F7

l Roof - RFF1 600mm x 600mm homogenous floor tiles with cement and

 

m2 F1 - 

RFF2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2 - 

RFF6 300mm x 600mm & 100mm x 600mm non-slip homogeneous

tiles internal

m2 F6 - 

RFF7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7 - 

11.7 Heav dut homo eneous tilea 1st storeb 2nd store

11.8 Homo eneous tile skirtin - 

Page 85 of 110 S4-Blk X2

Page 86: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 86/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountS1 100mm high homogenous skirting tile to the following levels

a 1st store m frl-skt - - b 2nd store m frl-skt - - c 3rd store m frl-skt - d 4th store m frl-skt - e 5th store m frl-skt - f 6th store m frl-skt - 

7th store m frl-skt - h 8th store m frl-skt - i 9th store m frl-skt - 

10th store m frl-skt - k 11th store m frl-skt - l Roof m frl-skt - - 

Carried Forward

Page 86 of 110 S4-Blk X2

Page 87: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 87/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 22 11 Floor Finishes Cont'd

11.9 Granite tilea 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof level

11.10 Car et tile

a 1st storeb 2nd store

11.11 Insulated raised floor s stema 7th store

F11 Raised floor insulated to LAN Room ELVS Room raised flr

11.12 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 a Scupper drain with MS grating (w=150mm) to Refuse Chute

=

nos scupper

b Other floor finishesConcrete im rint timber look at 1st St m2 Conc-Im

RCCF Ceramic floor tiles with cement and sand screed to Refuse

Chute Chamber

m2

c Other skirtinS2 30mm x 15mm recessed powder coated aluminium channel

 

m Alum-sktg

Ceilin Finishes

12.1 Skim coatin and vin l co- ol mer emulsion aintin - a 1st store m2 Skim Coatb 2nd store m2 Skim Coat - - c 3rd store m2 Skim Coat - d 4th store m2 Skim Coat - 

e 5th store m2 Skim Coat - f 6th store m2 Skim Coat - 

Carried Forward

Page 87 of 110 S4-Blk X2

Page 88: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 88/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 23 12 Ceilin Finishes Cont'd

12.1 Skim coating and vinyl co-polymer emulsion painting

'7th store m2 Skim Coat

h 8th store m2 Skim Coati 9th store m2 Skim Coat

10th store m2 Skim Coatk 11th store m2 Skim Coatl Roof level m2 Skim Coat - - 

12.2 Plasterin and aintin

C1 Plaster and aint to ceilin - 

a 1st store m2 laster - b 2nd store m2 laster - 

c 3rd store m2 laster - d 4th store m2 laster - e 5th store m2 laster - f 6th store m2 laster - 

7th store m2 laster - h 8th store m2 laster - 

i 9th store m2 laster - 10th store m2 laster - 

k 11th store m2 laster - l Roof level m2 laster - 

12.3 Moisture resistance gypsum plaster suspended ceiling

board

C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports

a 1st store m2 ceilin - b 2nd store m2 ceilin - c 3rd store m2 ceilin - d 4th store m2 ceilin - e 5th store m2 ceilin - 

f 6th store m2 ceilin - 7th store m2 ceilin - 

h 8th store m2 ceilin - i 9th store m2 ceilin - 

10th store m2 ceilin - k 11th store m2 ceilin - 

l Roof level m2 ceilin - - 

Carried Forward

Page 88 of 110 S4-Blk X2

Page 89: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 89/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 24 12 Ceilin Finishes Cont'd

12.4 Moisture resistance gypsum plasterboard for box -up

a 1st store Includedb 2nd store Includedc 3rd store Includedd 4th store Included

e 5th store Includedf 6th store Included

7th store Includedh 8th store Includedi 9th store Included

10th store Includedk 11th store Included

l Roof level Included

12.5 Moisture resistance mineral fibre suspended ceilingboard

C3 9mm thk fibrous plasterboard with paint finish to Bedrooms at

Faculty Service Apartment (Blks X2 and Z2) as per Tender

 

a 1st store m2 ceilin - - b 2nd store m2 ceilin - - c 3rd store m2 ceilin - - d 4th store m2 ceilin - - 

e 5th store m2 ceilin - - f 6th store m2 ceilin - - 

7th store m2 ceilin - - h 8th store m2 ceilin - - 

i 9th store m2 ceilin - - 10th store m2 ceilin - - k 11th store m2 ceilin - - 

l Roof level m2 ceilin - - 

12.6 Moisture resistance mineral fibre board for box-up

a 1st store m2

12.7 Thermally insulated ceiling panel with fibrous plaster

 a 1st storeb 2nd storec 3rd stored 4th store

Carried Forward

Page 89 of 110 S4-Blk X2

Page 90: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 90/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 25 12 Ceilin Finishes Cont'd

12.7 Thermally insulated ceiling panel with fibrous plaster

'e 5th storef 6th store

7th store

h 8th storei 9th store

10th storek 11th store

12.8 Mineral fibre insulated sus ended ceilin boarda 7th store

C8 Mineral fibreboard with insulation batts above to LAN Room /

 

m2 ceiling

12.9  Acoustically absorptive mineral fibre suspended ceiling

a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th storel Roof level

12.10  Acoustic lasswool sus ended ceilin boardNote  Acoustic ceiling as per Schedule of Finishes is 75mm thk 

acoustic cell spray treatment, quantities are included in

 

a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store

7th storeh 8th storei 9th store

10th storek 11th store

l Roof level

Carried Forward

Page 90 of 110 S4-Blk X2

Page 91: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 91/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 26- 12 Ceilin Finishes Cont'd

12.11 Others

Works not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 a Access anels to ceilin 600mm x 600mm nos ceilin

b Other ceilin finishesC7 75mm thk acoustic cell spray treatment to Corridor; Sprayed

acoustic treatment to soffit of slab to Corridors as per Tender

 

m2 ceiling

C7a 75mm thk acoustic cell spray treatment to Kitchen, Dishwash

& Potwash areas, Indoor Sports Hall, Toilet, Lockers, Family

m2 ceiling

6C14  Aluminium expanded metal mesh ceiling in powder coated

finish (ceiling height=5.40m) as per Schedule of Finishes but

concealed ceiling as per Reflected Ceiling Plan to Sky Terrace

 

m2 ceiling

C15 No ceiling to Balcony (Blks X2 and Z2) as per Tender

Clarif ication 2, Architectural Item A34; assuming skim coat

 

m2 ceiling

GSM GS mesh with GS supports over opening to FA, SPR, TEL, DT,

PW NW Duct

m2 ceiling

6C3b 9mm thk fibrous plasterboard with paint finish (ceiling

height=5.0m ~5.11m) to Sky Terrace; flat area was measured

 

m2 ceiling

b

c

13 Fittin and Furnishin13.1 Cabinet

a Kitchen hood & hob Included in PC SumsNote  As per Tender Clarification 2, Architectural Item A15, cooker

and hob are b NSC As per Tender Clarification 2, Architectural Item A58, 4 burner

induction hob burners and 3 speed telescopic pull hood are by

13.2 Cat ladderCatladder with ca e uard nos metal-wk  

Slidin access tra door 1150mm x 1150mm nos metal-wk   Aluminium handrail 2 nos sets metal-wk 

Catladder to Lift Pit h=1.80~3.0m nos metal-wk  

300mmW x 300mmD x 300mmH sump pit with GS grating to

 

nos metal-wk  

13.3 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 

abc

14 Sanitar A liancesNote For sanitary wares specifications, please refer to Tender

14.1 Pedestal water closetMaster water closet to Staff A artment sets S-wares

14.2 S uattin an S-wares

14.3 WC conceal cistern nos S-wares

14.4 Urinal S-wares

14.5 Urinal sensor flush valve S-wares

14.6 Soa dis enser S-wares

Carried Forward

Page 91 of 110 S4-Blk X2

Page 92: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 92/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 27- 14 Sanitar A liances Cont'd

14.7 Waste rece tacle S-wares

14.8 Hand dr er S-wares

14.9 Toilet a er holder nos S-wares

14.10 Hook on back of door nos S-wares

14.11 Sanitar bin S-wares

14.12 Bidet s ra S-wares

14.13 Bib ta S-wares

14.14 Janitor sink S-wares

14.15 Ta for anitor sink S-wares

14.16 Shower headMaster Shower to Staff A artment sets S-waresCommon Shower to Staff A artment sets S-wares

14.17 Shower mixer nos S-waresTowel rail to Staff A artment nos S-wares

14.18 Mirror

Facult A artment- 1 Bedroom nos mirrorFacult A artment- 2 Bedroom nos mirrorFacult A artment- 3 Bedroom nos mirror

14.19 Hot water dis enser S-wares

14.20 Fli -u s s rab bar shower seatShower seat nos S-wares

14.21 S s horizontal bar fixed to door S-wares

14.22 OthersWorks not listed above but are necessary to complete the

works as a whole ( if not stated and allowed herein, shall be

 a Other works in relation with Toilets

Master Basin to Staff A artment sets S-waresCommon Basin to Staff A artment sets S-wares

Kitchen sin le sink c w ta L=0.50m to Staff A artment sets S-wares

Floor tra with UPVc ratin nos S-waresFloor waste nos S-wares

b Shower screens1BR  Shower / glass screen with sliding door to 1-Bedroom Faculty sets Shower-S

2BR  Shower / glass screen with sliding door to 2-Bedroom Faculty

 A artment L-sha ed

sets Shower-S

3BR  Shower / glass screen with sliding door to 3-Bedroom Faculty

 A artment

sets Shower-S

Carried Forward

Page 92 of 110 S4-Blk X2

Page 93: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 93/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 4 - BLOCK X21.00

Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward

BC S4 28- 15 Sundries

15.1 Earthin work LS earthin

15.2 Li htnin rotection work LS li htnin

15.3 Builders work in connection with M&E work LS Builder

15.4 Fire extin uisher nos Fire-Ext

15.5 Letter box Aluminium letter boxes nos metal-wk 

15.6 Fire extin uishers with com artment LS Fire-Ext

15.7 Hose reel com artments & access anel LS Fire-ExtBreeching inlet compartments & access panel; door measured nos others

15.8 Tactile tiles warnin indicator 300mm x 300mm nos flr-tile

15.9 OthersWorks not listed above but are necessary to complete the

works as a whole (if not stated and allowed herein, shall be

 

a Refuse ChuteRefuse hopper (2nd Sty to Roof Level) for Blks X1, Y1 and Z1

 

nos precast

 Aluminium inspection cover over Refuse Chute Roof (1.0m x nos metal-wk 

Safet mesh below roof 600mm x 700mm nos metal-wk  Wiremesh to cover ventilation opening at Roof (700mm x nos metal-wk  

b 2mm thk aluminium ca in w=210mm to Blks X2 & Z2 m metal-wk  

c Insect screen to Housin Units m2 metal-wk  

d Refuse chute com actor

Total Carried to Summary of Tender Page

ST 1 Item 3.4

Page 93 of 110 S4-Blk X2

Page 94: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 94/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount

CFA  m2

BC S7 1 1 Sub-structure

1.1 Basement excavation and backfillin

Excavation

0m-2m m3 exc2m-4m m3 exc4m-6m m3 excExcavation to lift it wall m3 exc

Backfillin m3 backfill

Remove sur lus off site m3 remove

1.2 Pileca includin excavation formwork concrete and rebar

a Excavation m3 exc

b Backfill m3 backfillc Lean concrete - 50mm thick G15 m2 G15

d Concrete G40 m3 G40

e Reinforcement k rebar

f  Formwork  m2 fwk  

1.3 Basement wall column

a Concrete G40

to basement retainin wall m3 G40

to lift it wall m3 G40

to staircase wall stum m3 G40

to basement column m3 G40

to Storm water tank wall m3 G40

to E ector um room wall m3 G40

to column stum m3 G40

b Reinforcementto basement retainin wall k rebar

to lift it wall k rebar

to staircase wall stum k rebar

to basement column k rebar

to Storm water tank wall k rebar

to E ector um room wall k rebar

to column stum k rebar

c Formwork 

to basement retainin wall m2 fwk  

to lift it wall m2 fwk  

to staircase wall stum m2 fwk  

to basement column m2 fwk  

to Storm water tank wall m2 fwk  

to E ector um room wall m2 fwk  

to column stum m2 fwk  

Ditto but curved on lan

to basement column m2 fwk-co

1.4 Basement beam Ground beam

a Excavation m3 exc

b Lean concrete - 50mm thick G15 m2 G15

c Concrete G40 m3 G40

d Reinforcement k rebar

e Formwork  m2 fwk  

1.5 Ground slab Included basement slab

a Excavation m3 exc

b Lean concrete - 50mm thick G15 m2 G15

c Concrete G40 m3 G40

d Reinforcement k rebare Formwork  nil

1.6 Water roofin s stem to sub-structure in contact with round

25mm thick cement sand rotection screed

to basement beam round beam m2 water rf  

to basement slab round slab m2 water rf  

to basement retainin wall m2 water rf  

to lift it wall m2 water rf  

Water roofin membrane

to basement beam round beam m2 water rf  

to basement slab round slab m2 water rf  

to basement retainin wall m2 water rf  

to lift it wall m2 water rf  

Dam roof membrane

to basement beam round beam m2 water rf  

to basement slab round slab m2 water rf  

to basement retainin wall m2 water rf  

to lift it wall m2 water rf  

Hydrotite CJ0720-2K swellable water stop to basement retaining

wall

m waterprf  

H drotite CJ0720-2K swellable water sto to lift it wall m water rf  

1.7  Anti-termite treatment m2 Anti-Termite

1.8 Dewatering and other necessary water table monitoring for deep

excavation as directed b the S.O.

Item

Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty

Page 94 of 108 S7-Sports Complex

Page 95: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 95/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-1.9 Others

Works not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

be included or absorbed in the above items .a

b

c

Carried Forward

Page 95 of 108 S7-Sports Complex

Page 96: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 96/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 2 2 Frame

2.1 Column

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork  m2 fwk  

d Ditto but curved on lan m2 fwk-co

2.2 Cast-in-situ sus ended beam

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork  m2 fwk  

2.3 Reinforcement in column

a Concrete G40 m3

b Reinforcement k 

c Formwork  m2d Post-tension tendons

2.4 Others

Works not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a

b

c

3 U er Floor

3.1 Cast-in-situ slab

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork  m2 fwk  

Carried Forward

Page 96 of 108 S7-Sports Complex

Page 97: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 97/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total AmountDrw No. Level / Grid location ddt No. Side Area L W D/H Sub-QtBrou ht Forward

BC S7 3 2 Frame Cont'd

3.2 Post tension slab

a Concrete G40 nilb Reinforcement nil

c Formwork  nil

d Post-tension tendons

3.3 Water roofin to all wet area Included in Floor Finishes

3.4 OthersWorks not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 ab

c

4 Structural Wall

4.1 Structural wall

a Concrete G40

to internal rc wall m3 G40to staircase wall m3 G40

to lift wall m3 G40

b Reinforcement

to internal rc wall k rebar

to staircase wall k rebarto lift wall k rebar

c Formwork 

to internal rc wall m2 fwk  

to staircase wall m2 fwk  to lift wall m2 fwk  

4.2 OthersWorks not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a

bc

Carried Forward

Page 97 of 108 S7-Sports Complex

Page 98: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 98/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 4 5 Structural work to roof 

5.1 Sus ended roof beam

a Concrete G40 m3 G40

b Reinforcement k rebarc Formwork  m2 fwk  

5.2 Post-tensioned roof beam

a Concrete G40 m3 G40

b Reinforcement k rebar

c Formwork  m2 fwk  d Post-tensionin Item Post-Ten

5.3 Concrete roof slab

a Concrete G40 m3 G40b Reinforcement k rebar

c Formwork  m2 fwk  

5.4 Post-tensioned roof slab

a Concrete G40 m3 G40

b Reinforcement k rebarc Formwork  m2 fwk  

d Post-tensionin Item

5.5 Roof finishes

a Profile steel roofin

Roof claddin to S orts Com lex

 Aluminum standin seam roofin with SS cables for cree ers m2 roof Flashin + Gutter etc sum roof 

Note  Approximate areas were measured, roof and ceiling are irregular/

curved shaped. For accurate areas, please check with the

roof 

 Aluminium com osite faceted soffit claddin ceilin m2 othersPerforated aluminium composite panels with 12mm x 12mm

erforations and min 50% ventilation o enin s ceilin

Note  Approximate areas were measured, roof and ceiling are irregular/

curved shaped. For accurate areas, please check with the

b Insulation

c Waterproofing system

RF Wate roofin to RC Flat Roof  m2 NILconsists of:

- min 25mm thk c s screed to fall

- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded

- 6mm thk under-screed draina e sheet

- 1000 x 1000 x 50mm thk c/s panel roofing reinforced with BRC

3315 mesh ol sul hide oints ever 10m c c- Pol sul hide sealant

- 50mm wide welded la

RF1 Wateproofing to RC Flat Roof, non insulated (to Roof over Stairs

and LMR m2 waterprf  

RFU Wate roofin to RC Flat Roof- u turn mconsists of:

- 1.2mm thk EVA PVC water roofin membrane bonded

- 25mm thk c s rotection screed with GI mesh

- membrane terminated into groove-line & sealed with

ol urethane sealant

Water roofin to Non-Insulated Deck  m2consists of:

- min 25mm thk c s screed to fall

- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded

- 6mm thk under-screed draina e sheet

- finishes and rotection screed measured se aratel

Water roofin to Landsca e Deck  m2 water rf  consists of:

- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded- 25mm thk c s rotection screed

- 100 sm eotextile se aration la er

- 30mm thk interlockin sub-soil draina e modules

- 100 sm eotextile filter fabric

- 50mm thk coarse washed sand

- growth media to Landscape Architect 's detail (Softscape is

included in PC Provisional Sums

d Roof tennis court

Water roofin to Tennis Court Insulated m2 water rf  

consists of:- min 25mm thk c s screed to fall

- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane

bonded- 6mm thk under-screed draina e sheet

- 50mm thk extruded ol st rene insulation board

- 100 sm eotextile se aration la er

Ditto, to access from Staircases/Ramp, assuming similar to

Tennis Court Wate roofin s stem

m2 waterprf  

Finishes to Tennis Court as er enlar ed detail m2 s ortsconsists of:

- 50mm thk RC rotection RC to in

- 50mm thk w1 as halt remix

F18 - acr lic coatinTennis Post no s orts

e Green roofin s stem with fencin

Note Green roofing system by NSC as per Schedule of Finishes, Item

1.7.7

Tennis Court Fencin h=4.0m m s ortsconsists of:

- 10mmthk hot di ed GS late in aint finish

- Galv "U" cli holdin roll to anel

- 5mm thk hot di ed GS L-an le in aint finish

- 75 x 25x 5mm diam polyester powder-coated welded wire mesh

roll-to fencin

- 150 x 50 x 12mm thk hot di ed GS T-bar in aint finish

- 12mm thk hot di ed GS base late in aint finish

- 150mm ht RC kerb with laster and aint finish

Extra over for double leaf ate 1.50mW x 2.20mH nos s orts

Si honic draina e outlet 450mm x 450mm nos si honic

Drain with reinforced stone grating (w=400mm) to Landscape

Deck m others

Scu er drain with GS ratin m scu er

f  Roof draina e with accessories LS draina e

Truss to su ort li hts & fans

Steel structure k steelPaintin m2 steel

M10 bolt no. steelM12 bolt no. steel

M20(cast-in bolt) no. steel

M24 cast-in bolt bolt no. steel

DROP-OFF POINT

Steel structure k steel

Paintin m2 steelM16 bolt no. steel

2ND STOREY INTERMEDIATE STEEL STRUCTURE

Steel structure k steelPaintin m2 steel

M12 bolt no. steel

h Cree er on cable

i Fall Arrester LS fall-A  

 j Timber deckingto access from Staircases/Ramp, as partly shown

on Lift Lobb enlar ed drawin

m2 tbr deck  

40 x 9 x 1200mm thk natural t imber grouped in modular panel

sixe 630mm x 1200mm

k  Smoke vent (include testing, PE endorsement, testing and

commissionin and 12 months DLP maintenancenos others

Carried Forward

Page 98 of 108 S7-Sports Comple

Page 99: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 99/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 5 5 Structural work to roof Cont'd

5.6 Others

Works not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a

b

c

6 Staircase

6.1 Structural works to staircase

a Precast concrete staircase

b Reinforced Concrete to in structure

Concrete G40 m3 G40

Reinforcement k rebarFormwork m2 fwk  

6.2 Staircase handrail and balustrade

SR6 MS railing to Staircase (h=0.90m) to Sports Complex m railing

consists of:

- 40 x 100mm thk MS plate in enamel paint finish

- 40 x 10mm thk MS plate in enamel paint fin ish @ max 100mm

- 50 x 150 x 6mm thk MS angle in enamel paint finish

- SS expansion bolt

SR6a Ditto, (h=1.10m) to Sports Complex m railing

SR7 GS handrail (wall mounted) at Staircase and Ramp to Sports

 

m railing

Note Galv as per description, stainless steel as per details

consists of:

- 40mm diam CHS SS handrail (Grade 43) welded to GS supports

- 45mm diam SS supports at not more than 1000 c/c

SR8 Tempered laminated glass railing to Staircase (h=1.675m) to m railing

consists of:

- 25 x 25 x 2mm thk SS capping

- 10mm thk hot dipped GS folded plate in powder coated finish

- 30 x 50mm thk hot dipped GS RHS in powder coated finish

-10mm thk hot dipped GS T-bar in powder coated finish

- 10mm thk hot dipped GS L-angle in paint finish

- Countersunk anchor bolt

- 20x 20mm aluminium U-channel in powder coated finish

SR9 50mm diam GS handrail, (h=0.90m) to Pool Area m railing

SR10 GS railing measured from FFL, (h=1.0m) to Stairs near Squash m railing

6mm thk hot dipped GS plate in powder coated finish with

 

SR11 Guardrail below Staircase- 45mm wide x 9mm thk SS flat bar

h=0.55m

m railing

6.3 Stair finishes

Floor Finishes

SF5 Cement and sand screed finish with dustproofer as per

enlarged drawing while self level ing screed as per Schedule of 

FinishesLandin m2 screedRiser 142.86~172.92mm hi h m S-riserTreads 250~300mm wide m S-treadTactile nosin m S-Nosin -T

Ste s to S uash Court, no iven finishes

Riser 166.67mm hi h m flr-tile-R Treads 300mm wide m flr-tile-T

Ste s to Entrance Fo er assumin similar finishes

F7 450mm x 900mm non-slip homogenous floor tiles with cementand sand screed internalRiser 143.75mm hi h m flr-tile-R Treads 450mm wide m flr-tile-T

Wall Finishes

SW Plaster and aint to staircase wall m2 laster

Ceilin Finishes

SC1 Plaster and aint to staircase ceilin m2 laster

6.4 Sunscreen shadin

6.5 Others

Works not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a

b

c

Carried Forward

Page 99 of 108 S7-Sports Complex

Page 100: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 100/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 6 7 External Wall and Finishes

7.1 Brickwall

a 1st store

1BRW200E 200mm thk brickwall external m2 200-bwk 

b 2nd store

2BRW100E 110mm thk brickwall external m2 100-bwk 

c Roof 

7.2 Glass Front Wall

a 1st storeb 2nd store

7.3 M&E louvre

a 1st store

b 2nd store

PV 30  Aluminium louvre vent nos window

PV1 15 Louvred window to Generator Room at 2nd St nos window

PV 15B  Aluminium louvre vent nos window

c Roof 

PV 21  Aluminium louvre vent to Lift Motor Room nos window

7.4 Ex anded MS mesh

a 1st store

R5 GS expanded mesh screen railing (h=1.675m) to Sports

Com lex

m railing

 Aluminium expanded mesh screen railing (h=1.675m) to Sports

Com lexconsists of:

- 10mm thk hot di ed GS late in owder coated finish

- 10mm thk hot di ed GS folded late in owder coated finish

- 40mm diam hot di ed GS CHS in owder coated finish

- 10mm thk hot dipped GS flat plate baluster in powder coated

finish- 10mm thk hot dipped GS L-angle pre-welded to aluminium

ex anded mesh with owder coated finish-  Aluminium ex anded mesh with owder coated finish

- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-

welded to u ri ht balusters in aint finish

- 10mm thk hot di ed GS an le late in owder coated finish

- Countersunk anchor bolt

- 20 x 20mm aluminium U-channel in owder coated finish

- 10mm thk hot di ed GS late in owder coated finish

Faceted facade wall to S orts Com lex

Note  Approximate areas were measured, walls are irregular/ curved

shaped. For accurate areas, please check with the Specialist

1.5mm thk expanded mesh in powder coated finish to wall

(aluminium as per Tender Clarification 2, Architectural Item A8)

m2 railing

b 2nd store

R5 GS expanded mesh screen railing (h=1.675m) to Sports

Com lex

m railing

 Aluminium expanded mesh screen railing (h=1.675m) to Sports

Com lexconsists of:

- 10mm thk hot di ed GS late in owder coated finish

- 10mm thk hot di ed GS folded late in owder coated finish

- 40mm diam hot di ed GS CHS in owder coated finish

- 10mm thk hot dipped GS flat plate baluster in powder coated

finish- 10mm thk hot dipped GS L-angle pre-welded to aluminium

ex anded mesh with owder coated finish

-  Aluminium ex anded mesh with owder coated finish

- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-

welded to u ri ht balusters in aint finish- 10mm thk hot di ed GS an le late in owder coated finish

- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in owder coated finish

- 10mm thk hot di ed GS late in owder coated finish

c Roof  - 

7.5 PVDF Aluminium Claddin

a 1st store

b 2nd store Aluminium composite panels to parapet, Grid SC-G/SC-6 to SC-7

(total girth wall until ceiling below as per detail drawing was used

 

m2 Cladding

 Aluminium com osite anels to walls columns m2 Claddin

 Aluminium composite panels at Grid SC-A/SC-7 to SC-10 as shon

2nd St Plan

m2 Cladding

c Roof  Aluminium composite panels to roof over Viewing Gallery as

shown on Sections A B and C Grid SC-G SC-1 to SC-11

m2 Cladding

Ditto to beam Grid SC-G SC-6 to SC-7 m2 Claddin Aluminium composite panels to beam, Grid SC-G/SC-6 to SC-7

7.6 Insitu ara et wall

a 1st store

b 2nd store

c Roof lanter walls

Concrete G40 m3 G40

Formwork m2 fwk  Rebar k rebar

7.7 Railing

Note Other railin s are included in Staircases

a 1st store

b 2nd store

R6 Tempered laminated glass railing (h=1.675m) to Sports

Com lex

m Railing

 Aluminium expanded mesh parapet (h=1.10m) as shown on floor

lan to Corridor

R7 GS flat railing (h=1.10m) to void near Lifeguard Room, 1st Sty m Railing

Tem ered laminated clear lass ara et to VIP seatin m railinTempered laminated clear glass parapet to VIP seating

h=1.10m

c Roof 

Carried Forward

Page 100 of 108 S7-Sports Comple

Page 101: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 101/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 7 7 External Wall and Finishes

7.8 Others

Works not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a

b

c

8 Internal Wall and Partition

8.1 100mm thk brickwall excludin wall finishes

a 1st store

1BRW200 200mm thk brickwall internal m2 200-bwk 

b 2nd store2BRW100 100mm thk brickwall internal m2 100-bwk 

c Roof 

RFBRW100 100mm thk brickwall internal m2 100-bwk 

8.2 200mm thk brickwall excludin wall finishes

a 1st store

b 2nd store

c Roof 

8.3 Fibreglass panel on hot-dipped galvanised SHS steel

frame Rock climbin wall non-climbable

a 1st store

Climbing Rock Wall, Bouldering Wall & Abseiling Station

w=15.0m Grid SC-F SC-2 to SC-4 1st St

sets Rock wall

b 2nd store

c Roof 

8.4 Glass wall panel complete with window frame, mullion,

hardware etc

Note For lass anel details, lease refer to drawin

For details lease refer to ID Drawin s

For Curtain wall/ glass panels to to Student Common Lounge,

lease refer to Facade Drawin s

a 1st store

TGP 25 Glass anel with vertical lass fins to Aerobics 1 at 1st St nos lazin

TGP/26 Glass panel with vertical glass fins to Fitness Centre 1 at 1st Sty nos glazing

TGP/27 Glass panel with vertical glass fins to Fitness Centre 1 at 1st Sty nos glazing

TGP 33 Glass anel to Indoor S orts Hall at 1st St nos lazin

TGP 34 Glass anel with sin le leaf door to S uash Court at 1st St nos lazin

b 2nd store

TGP/35 Glass panel with vert ical glass fins to Multi Purpose Room 1,

 Aerobics 2 at 2nd St

nos glazing

TGP 36 Glass anel to Aerobics 2 at 2nd St nos lazin

TGP 37 Glass anel to Control Room at 2nd St nos lazin

TGP 38 Glass anel to Control Room at 2nd St nos lazin

TGP 39 Glass anel to Control Room at 2nd St nos lazin

TGP 40 Glass anel to Indoor S orts Hall 1 & 2 at 2nd St nos lazin

TGP 41 Glass anel to Indoor S orts Hall 2 at 2nd St nos lazin

TGP 42 Glass anel to Administration Room at 2nd St nos lazin

TGP 44 Glass anel to Administration Room at 2nd St nos lazinTGP 45 Glass anel to Administration Room at 2nd St nos lazin

Note h=2.85m as per floor plan, h=3.0m as per enlarged detail,

assumin h=2.85m as er Corri endum 1Double glazed Low E glass panels with 900mm high motorised

glazed top hung window to Indoor Sports Hall 2 (as shown on

nos glazing

Double glazed Low E glass panels with 900mm high motorised

lazed to hun window to Indoor S orts Hall 1

nos glazing

c Roof 

8.5 Corridor composite locker wall c/w timber doors and

shelved, hardwares, glossy/ matt paint finish to all

 a 1st storey

4 tierred matt laminate finish lockers c/w all accessories in

number lock s stem

sets locker

b 2nd storey

4 tierred matt laminate finish lockers c/w all accessories in

number lock s stem

sets locker

Basement

Locker outside wash room at Basement (4 tier to each column as

per Tender Clarification 2, Architectural Item A22), quantities are

 

nos locker

Carried Forward

Page 101 of 108 S7-Sports Comple

Page 102: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 102/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 8 7 External Wall and Finishes Cont'd

8.6 O erable wall

a 1st store

O erable slidin anel at Indoor S orts Hall 1 & 2 nos O er-wallNote Total hei ht includin the to wall of slidin door

b 2nd store - 

Relocation from existin dover cam us to new s orts com ex

8.7 Toilet artition cubicles c w toilet door cubicle

a 1st storeb 2nd store

8.8 Steel concrete lintols to brickwall dr wall

a 1st store nilb 2nd store

Concrete G40 m3 G40

Reinforcement k rebarFormwork m2 fwk  

c Roof 

Concrete G40 m3 G40Reinforcement k rebar

Formwork m2 fwk  

8.9 Others

Works not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 

a Windows

Windows to Common Areas

SW 23 Slidin window to Life uard Room nos windowSW 36 Slidin window to Life uard Room nos window

SW 44 Slidin window to Life uard Room nos windowSW 72 Slidin window to Administration Room, 2nd St nos window

b Fencin and ate

Note  As per 1st Sty floor plan, fencing is broken line, not sure if to be

rovidedBRC fencing near Transformer Room, Grid SC-G/SC-2 to SC-4, 1st

St

m metal-wk 

Extra over for double leaf ate nos metal-wk 

c Dr wall artition to Admin Office 2nd store m2 artition

9 Door and Ironmongery

Note  All 6mm thk wired clear glass panel are 100mm x 600mm unless

notedNo given ironmongery schedule, only Specifications, please

include supply and installation of ironmongery to the door pricing

9.1 Metal door c e ex osed concealed door frame

a 1st store

FD2/10 Two hour fire rated steel door and frame (powder coated impact

resistant satin coating finish) to LAN Roon, PABX Room, AHU,

 

nos metal-dr

FD2/18 Two hour fire rated steel door (double leaf) and frame (powdercoated impact resistant satin coating finish) to Bin Centre, PABX,

LV Switchroom, LT S/W Room (Emergency), Low Level Transfer

Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool

Filtraction Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos metal-dr

FD2/20 Two hour fire rated steel door (double leaf) and frame (powder

coated impact resistant satin coating finish) to Bin Centre, PABX,

LV Switchroom, LT S/W Room (Emergency), Low Level Transfer

Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool

Filtraction Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos metal-dr

FD2/22 Two hour fire rated steel door (double leaf) and frame (powder

coated impact resistant satin coating finish) to Bin Centre, PABX,

LV Switchroom, LT S/W Room (Emergency), Low Level Transfer

Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool

Filtraction Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos metal-dr

FD2/LT20 Two hour fire rated steel door (double leaf) and frame to

Transformer Room LT & HT Switchroom

nos metal-dr

FD2/TR29 Two hour fire rated steel door (double leaf) and frame to

Transformer Room LT & HT Switchroom

nos metal-dr

Basement

FD2/10 Two hour fire rated steel door and frame (powder coated impact

resistant satin coating finish) to LAN Roon, PABX Room, AHU,

 

nos metal-dr

FD2/18 Two hour fire rated steel door (double leaf) and frame (powder

coated impact resistant satin coating finish) to Bin Centre, PABX,LV Switchroom, LT S/W Room (Emergency), Low Level Transfer

Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool

Filtraction Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos metal-dr

FD2/20 Two hour fire rated steel door (double leaf) and frame (powder

coated impact resistant satin coating finish) to Bin Centre, PABX,

LV Switchroom, LT S/W Room (Emergency), Low Level Transfer

Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool

Filtraction Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos metal-dr

Page 102 of 108 S7-Sports Comple

Page 103: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 103/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-

b 2nd store

FD2/10 Two hour fire rated steel door and frame (powder coated impact

resistant satin coating finish) to LAN Roon, PABX Room, AHU, 

nos metal-dr

FD2/22 Two hour fire rated steel door (double leaf) and frame (powder

coated impact resistant satin coating finish) to Bin Centre, PABX,

LV Switchroom, LT S/W Room (Emergency), Low Level Transfer

Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool

Filtraction Room, Ejector Pump Room, Generator Room, Newater

Tank Riinm Storage, Irrigation Pump Room

nos metal-dr

c Roof 

9.2  Acoustic door c w door frame mullion

a 1st store

b 2nd store

c Roof  

Carried Forward

Page 103 of 108 S7-Sports Complex

Page 104: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 104/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 9 9 Door and Ironmon er Cont'd

9.3  Anodies aluminium louvred door type LD1 to LD3 c/w

door framed mullion ironmon eries etca 1st store

 ADB/08  Aluminium panel door with 2 coats powder coat (red) to

Breechin Inletnos others

b 2nd store

c Roof 

9.4 Glass door c w door frame mullion ironmon eries etc

a 1st store

GD 10 Tem ered lass door, frameless to Life Guard Room nos Glass-dr

b 2nd store

GD 10 Tem ered lass door, frameless to Admin Room nos Glass-dr

9.5 2 hours fire-rated motorised roller shutter

a 1st store

b 2nd store

9.6 Non fire-rated, motorised roller shutter

a 1st storeRoller shutter to Cafe as shown on lan w=1.80m nos Roller-SRoller shutter to Cafe as shown on lan w=2.60m nos Roller-S

b 2nd store

9.7 OthersWorks not listed above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed tobe included or absorbed in the above items .

a Other doors/ gates shown on plan but not included in the

scheduleMG22 Metal ate near Staircase 4 double leaf  nos metal-wk  

Timber doors

FD.5/10 Half hour fire rated solid core door with HPMR laminates, 6mm

thk wired clear glass panel and self-closing device to Protected

 

nos tbr-dr

FD.5/10A Half hour fire rated solid core door with HPMR laminates to Store

Room Control Room Air Lock nos tbr-dr

FD.5/15 Half hour fire rated solid core door (one and half leaf) with HPMR 

laminates, 6mm thk wired clear glass panel and self-closing

device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop

 

nos tbr-dr

FD.5/20 2 hour fire rated timber door with HPMR laminate with 6mm thk 

aired clear glass panel (2 nos) and self closing device to Lift

 

nos tbr-dr

FD.5/22 Half hour fire rated solid core door (double leaf) with HPMR 

laminates, 6mm thk wired clear glass panel (2 nos) and 3mm

thk SS finger push and kick plates to Mult i Purpose Room 1 & 2

 

nos tbr-dr

FD.5/EM22 Half hour fire rated solid core door (double leaf, automatic) with

3mm thk SS finger plates, 6mm thk wired clear glass panel (2

nos), automatically opens to let in fressh air when smokes

 

nos tbr-dr

FD.5/S06 Half hour fire rated solid core door with HPMR laminates to DT,

TEL SPR FA HR FE SP ST

nos tbr-dr

FD.5/S09 Half hour fire rated solid core door with HPMR laminates to DT,

TEL SPR FA HR FE SP STnos tbr-dr

FD.5/S12 Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW HR FE DR SFH

nos tbr-dr

FD.5/S15 Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW HR FE DR SFHnos tbr-dr

FD.5/S20 Half hour fire rated solid core door (double leaf) with HPMR 

laminates to HR FE ELV ELECT DR SFH PW HR FE DR SFH

nos tbr-dr

FD.5/T10 Half hour fire rated solid core door with HPMR laminate with 3mm

thk SS fin er and kick lates to Communal Toiletnos tbr-dr

D/10 Timber door with HPMR laminate and 3mm thk SS finger push

and kick plates to Head Officer, Store, Storage, Photo Copy ,

Office , Meeting Room, Service Yard, Cafe, Security Room

nos tbr-dr

DHT/10 Laminated semi-solid timber door with timber louvred below to

Handica Toilet

nos tbr-dr

DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FE

nos tbr-dr

DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute

Ho er External IR DT FA SPR TEL HR FEnos tbr-dr

DS/10 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Risernos tbr-dr

DS 10 Timber door double leaf  to SFAP, CWR  nos tbr-dr

DS/15 Timber door (double leaf) to PW/NW, PW, DR/SFH,

HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Risernos tbr-dr

b Securit rilles ate next to Cafe nos Metal-wk  

cd

10 Wall Finishes

10.1 Cement laster and aintin to brick concrete

W1a Plaster and aint to wall

a 1st storey plaster

b 2nd storey plaster

c Roof  plaster

10.2 Paintin to dr wall

a 1st store m2

b 2nd store m2 aintin

Carried Forward

Page 104 of 108 S7-Sports Comple

Page 105: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 105/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 10 10 Wall Finishes Cont'd

10.3 Ceramic wall tiles including cement sand backing screed

a 1st store

1W2 300mm x 600mm homo eneous wall tiles with backin screed m2 wall tile

1W5 450mm x 900mm homo enous wall tiles with backin screed m2 wall tile

b 2nd store

2W2 300mm x 600mm homo eneous wall tiles with backin screed m2 wall tile

2W5 450mm x 900mm homo enous wall tiles with backin screed m2 wall tile

2W12 200mm x 200mm matt homogeneous wall tiles with backing

screed

m2 wall tile

10.4 Im ack Resistant Acoustic Panel

a 1st store

1W8 Stud wall with insulation (self adhesive polyurethene sheetvapour barrier and 50mm thk rockwool insulation complete with

12mm thk non-combustible calcium silicate baord) to LAN Room /

 

m2 partition

1W11  Acoustic perforated gypsum board (12.5mm thk) with rockwool

insulation to non- lazed walls to Indoor S orts Hall

m2 partition

b 2nd store

2W8 Stud wall with insulation (self adhesive polyurethene sheet

vapour barrier and 50mm thk rockwool insulation complete with

12mm thk non-combustible calcium silicate baord) to LAN Room /

 

m2 partition

10.5  Anti-static e ox finish

a 1st storeb 2nd store

c Roof 

10.6 Others

Works not l isted above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a Other wall finishes

EWF Skim coat and smooth textured aint finish external m2 skim coat

b

c

11 Floor Finishes

11.1 Cement and sand screed

a 1st store

1F20 Cement and sand screed to M&E Rooms at S ort Com lex m2 screed

b 2nd store

2F20 Cement and sand screed to M&E Rooms at S ort Com lex m2 screed

c Roof 

RFF20 Cement and sand screed to M&E Rooms at S ort Com lex m2 screed

11.2 Li uid -a lied water roofin membrane

a 1st store

Wate roofin to wet areas to floor m2 water rf  Flexible cementitous waterproof coating; rc slab surface

min imum wood trowelled smooth to receive waterproofing

coating, finishes and 25mm thk c/s protection screed measured

Wate roofin to wet areas to wall u turn h=300mm m water rf  Flexible cementitous waterproof coating; rc slab surface

min imum wood trowelled smooth to receive waterproofing

coating, finishes and 20mm thk c/s protection screed measured

Wate roofin to wet areas to shower wall h=1.80m m water rf  Flexible cementitous waterproof coating on c/s leveling render,

finishes and 20mm thk c/s protection screed measured

Wate roofin to Sum Pit

Flexible cementitous waterproof coating with 25mm thk c/srotection screed

Floor m2 water rf  Wall m2 water rf  

Wate roofin to Water Tank 

Flexible cementitous waterproof coating with 25mm thk c/s

protection screed; rc slab surface minimum wood trowelled

 

Floor m2 water rf  Wall m2 water rf  

WFL Wate roofin to Lift Pit - floor m2 water rf  

WFL Wate roofin to Lift Pit - wall m2 water rf  

b 2nd store

Wate roofin to wet areas to floor m2 water rf  Wate roofin to wet areas to wall u turn h=300mm m water rf  Wate roofin to wet areas to shower wall h=1.80m m water rf  

c Roof  waterprf 

Carried Forward

Page 105 of 108 S7-Sports Comple

Page 106: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 106/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 11 11 Floor Finishes Cont'd

11.3 Cement and sand screed with floor hardener

a 1st store

b 2nd store

c Roof 

11.4 Heav dut anti-sli ol urenthane screed

a 1st store

b 2nd store

c Roof 

11.5  Vin l floorin

a 1st store

b 2nd store

11.6 Foam backin s orts floorina 1st store

b 2nd store

11.7 Floatin s orts floor s stem

a 1st store

1F15 Floating sports timber floor m2 Float-flr

b 2nd store

2F15 Floating sports timber floor m2 Float-flr

c Roof 

11.8 300 x 300mm heav dut homo eneous tile

a 1st store

1F1 600mm x 600mm homogenous floor tiles with cement and sandscreed

m2 F1

b 2nd store

2F14 200mm x 200mm heavy duty non-s lip homogenous floor tiles

with cement and sand screed to BOH

m2 F14

c Roof 

11.9 300 x 300mm heav dut non-sli homo eneous tile

a 1st store

1F2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2

1F3 600mm x 600mm non-slip homogenous floor tiles with cement

and sand screed

m2 F3

1F7 450mm x 900mm non-slip homogenous floor tiles with cementand sand screed internal

m2 F7

1F16 300mm x 300mm heavy duty non-s lip homogenous floor tiles

with cement and sand screed

m2 F1-H

b 2nd store

2F2 300mm x 300mm non-slip homogenous floor tiles with cement

and sand screed

m2 F2

2F7 450mm x 900mm non-slip homogenous floor tiles with cement

and sand screed internal

m2 F7

2F16 300mm x 300mm heavy duty non-s lip homogenous floor tiles

with cement and sand screed

m2 F1-H

c Roof  NIL

11.10 85mm hi h homo eneous tile skirtina 1st store

1S1 110mm high homogenous skirting tile m frl-sktg

b 2nd store

2S1 110mm high homogenous skirting tile m frl-sktg

c Roof  NIL

Carried Forward

Page 106 of 108 S7-Sports Complex

Page 107: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 107/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 12 12 Floor Finishes Cont'd

11.11 85mm hi h anti-sli ol urethane recessed skirtin

a 1st store

b 2nd store

S2 30mm x 15mm recessed powder coated alumin ium channel

2mm thk skirtin

m Alum-sktg

c Roof 

11.14 Others

Works not l isted above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to

 a Other floor finishes

2F5 Car et tile floor with cement and sand screed m2 car et

1F11 Raised floor (insulated) to LAN Room / ELVS Room m2 raised flr

2F11 Raised floor (insulated) to LAN Room / ELVS Room m2 raised flr

b

c

Ceilin Finishes

12.1 Perforated G sum board on sus ension s stem

a 1st store

1C4a 12mm thk perforated gypsum board (with fleece & rockwool

insulation) with paint finish with semi-concealed suspension grid

to SC Fitness Centre Aerobics Multi- ur ose Room

m2 ceiling

b 2nd store

2C4a 12mm thk perforated gypsum board (with fleece & rockwool

insulation) with paint finish with semi-concealed suspension grid

-

m2 ceiling

12.2  Acoustic Panel S stem

a 1st store

b 2nd store

2C12  Aluminium composite ceiling with non-staining silicon to all

claddin oints to Hall of Fame 2nd St

m2 ceiling

C10  Aluminium baffle ceilin to Indoor S orts Hall 2 St hi h m2 ceilin

12.3 Im act resistant Acoustic anel s stem

a 1st store

1C5  Acoustically absorptive mineral fibre board to Common Laundry,

Hall Admin SC Admin

m2 ceiling

b 2nd store

2C5  Acousticall absor tive mineral fibre board to SC Admin m2 ceilin

12.4 Fibrous plasterboard ceiling on suspension system

a 1st store

b 2nd store

12.5 Thermally insulated ceiling panel with fibrous plaster

board on concealed sus ension s stem

a 1st store

b 2nd store

Carried Forward

Page 107 of 108 S7-Sports Complex

Page 108: BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412

http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 108/108

SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)

SECTION 7- SPORTS COMPLEX 1.00

Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward

BC S7 13-A 12 Ceilin Finishes Cont'd

12.6 Skim coat with emulsion aint

a 1st store

1C1 Plaster and aint to ceilin m2 Skim Coat

b 2nd store

2C1 Plaster and aint to ceilin m2 laster

2C1a Plaster and paint (vinyl co-polymer emuls ion paint) finish to

ceilin

m2 plaster

c Roof 

RFC1 Plaster and aint to ceilin m2 laster

12.7 Others

Works not l isted above but are necessary to complete the works

as a whole (if not stated and allowed herein, shall be deemed to 

a Other ceilin finishes

GSM GS mesh with GS supports over opening to FA, SPR, TEL, DT,

PW NW Duct

m2 ceiling

1C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports

m2 ceiling

2C2 9mm thk moisture resistant calcium silicate board to

Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports

m2 ceiling

1C7 75mm thk acoust ic cell spray treatment to Corridor; Sprayed

acoustic treatment to soffit of s lab to Corridors as per Tender

 

m2 ceiling

2C7 75mm thk acoust ic cell spray treatment to Corridor; Sprayed

acoustic treatment to soffit of s lab to Corridors as per Tender

 

m2 ceiling

1C7a 75mm thk acoustic cel l spray treatment to MPH, Indoor Sports

Hall Toilet Lockers Famil Room

m2 ceiling

1C8 Mineral fibreboard with insulation batts above to LAN Room /

ELVS Room

m2 ceiling

2C8 Mineral fibreboard with insulation batts above to LAN Room /

ELVS Room

m2 ceiling

1C11 9mm thk calcium sil icate board to Entrance Foyer, 1st Sty,

F&B Cafe

m2 ceiling

2C11 9mm thk calcium sil icate board to Entrance Foyer, 1st Sty,

F&B Cafe

m2 ceiling

C11a 15mm thk calcium silicate board to S uash Courts m2 ceilin

b

c

13 Fittin and Furnishin

13.1 Cabinet

a Locker

13.2 White board/ Pin-up board by NSC

13.3 Retractable screen by NSC

13.4 Motorised ro ection screen b NSC

13.3 Hose reel com artment & access anel LS fire-ext

13.4 Catladder

Catladder to Lift Pit h=1.80~3.0m nos metal-wk 300mmW x 300mmD x 300mmH sump pit with GS grating to Lift

Pit

nos metal-wk 

Catladder to Sprinkler Tank Room (h=1.85m)- aluminium alloy nos metal-wk 

Watertight access panel (1.20m x 0.60m) to Sprinkler Tank Room nos metal-wk 

Catladder to Balancin Tank at Basement nos metal-wk  Access anel 10.0m x 1.0m nos metal-wk 

 Aluminium chequered plate with pull handle to Ejector Pump

2.0m x 2.0m

nos metal-wk 

 Aluminium cat ladder h=3.50m nos metal-wk Handrail nos others

Metal platform/ Catwalk behind expanded mesh, Grid SC-A/SC-1

to SC-7

m metal-wk 

Railin to catwalk m metal-wk Catladder sets metal-wk 

13.5 Dro anel LS

13.6 Retractable basketball ost

Retractable ceilin mounted basketball net nos s ortsMulti-sports electronic scoreboard c/w 2 nos of 24 seconds shot

clock 

nos sports

13.7 Portable volle ball, netball & badminton ost LS s orts

13.8 Cast-in sleeves LSS uash court LS s orts