1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
CFA m2
BC S1 1 Sub-structure
1.1 Pilecap including excavation, formwork, concrete and
rebara Excavation m3 exc
b Backfill m3 Backfill
c Lean concrete - 50mm thick G15 m2 G15
d Concrete G40 m3 G40
e Reinforcement k Rebar
f Formwork m2 Fwk
Remove sur lus off site m3 Remove
1.2 Column stum
a Concrete G40 G40
b Reinforcement Rebar
c Formwork Fwk
Lift it wall
a Excavation m3 exc
b Concrete G40 m3 G40
c Reinforcement k Rebar
d Formwork m2 Fwk
1.3 Ground beam
a Excavation m3 exc
b Lean concrete - 50mm thick G15 m2 G15
c Concrete G40 m3 G40
d Reinforcement k Rebar
e Formwork m2 Fwk
1.4 Ground slab
a Excavation m3 exc
b Lean concrete - 50mm thick G15 m2 G15c Concrete G40 m3 G40
d Reinforcement k Rebar
e Formwork
150mm thick slab ed e m 150-fwk
1.5 Plinth
c Concrete G40 m3 G40
d Reinforcement k Rebar
e Formwork m2 Fwk
1.6 Waterproofing system to sub-structure in contact with
round25mm thick cement sand rotection screed
to round slab m2 water rf
to round beam m2 water rf to lift it wall m2 water rf
Water roofin membrane
to round slab m2 water rf
to round beam m2 water rf
to lift it wall m2 water rf
Dam roof membrane
to round slab m2 water rf
to round beam m2 water rf
to lift it wall m2 water rf
Hydrotite CJ0720-2K swellable water stop to lift pit wall m waterprf
1.7 Anti-termite treatment m2 Anti-Termite
1.8 Others
Works not listed above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a
b
c
Carried Forward
Page 1 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 2/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 2 Frame
2.1 Concrete in column - G40
a 1st store m3 G40
b 2nd store m3 G40
c 3rd store m3 G40
d 4th store m3 G40
e 5th store m3 G40
f 6th store m3 G40
7th store m3 G40
h 8th store m3 G40
i 9th store m3 G40
10th store m3 G40
k 11th store m3 G40
l Roof level
2.2 Concrete in sus ended ed e beam - G40
a 1st storeb 2nd store m3 G40
c 3rd store m3 G40
d 4th store m3 G40
e 5th store m3 G40
f 6th store m3 G40
7th store m3 G40
h 8th store m3 G40
i 9th store m3 G40
10th store m3 G40
k 11th store m3 G40
l Roof level
2.3 Reinforcement in column
a 1st store k Rebar
b 2nd store k Rebarc 3rd store k Rebar
d 4th store k Rebar
e 5th store k Rebar
f 6th store k Rebar
7th store k Rebar
h 8th store k Rebar
i 9th store k Rebar
Carried Forward
Page 2 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 3/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 3 Frame Cont'd
2.3 Reinforcement in column Cont'd
10th store k Rebar
k 11th store k Rebar
l Roof level
2.4 Reinforcement in sus ended ed e beam
a 1st store
b 2nd store k Rebar
c 3rd store k Rebar
d 4th store k Rebar
e 5th store k Rebar
f 6th store k Rebar
7th store k Rebar
h 8th store k Rebar
i 9th store k Rebar
10th store k Rebark 11th store k Rebar
l Roof level
2.5 Formwork to column
a 1st store m2 Fwk
b 2nd store m2 Fwk
c 3rd store m2 Fwk
d 4th store m2 Fwk
e 5th store m2 Fwk
f 6th store m2 Fwk
7th store m2 Fwk
h 8th store m2 Fwk
i 9th store m2 Fwk
10th store m2 Fwk
k 11th store m2 Fwk l Roof level
Carried Forward
Page 3 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 4/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 4 Frame Cont'd
2.6 Formwork to sus ended ed e beam
a 1st store
b 2nd store m2 Fwk
c 3rd store m2 Fwk
d 4th store m2 Fwk
e 5th store m2 Fwk
f 6th store m2 Fwk
7th store m2 Fwk
h 8th store m2 Fwk
i 9th store m2 Fwk
10th store m2 Fwk
k 11th store m2 Fwk
l Roof level
2.7 Others
Works not listed above but are necessary to completethe works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
above items .a
b
c
U er Floor
3.1 Concrete to sus ended slab - G40
a 1st store
b 2nd store m3 G40
c 3rd store m3 G40d 4th store m3 G40
e 5th store m3 G40
f 6th store m3 G40
7th store m3 G40
h 8th store m3 G40
i 9th store m3 G40
10th store m3 G40
k 11th store m3 G40
l Roof level
Carried Forward
Page 4 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 5/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 5 U er Floor Cont'd
3.2 Reinforcement to sus ended slab
a 1st store
b 2nd store k rebar
c 3rd store k rebar
d 4th store k rebar
e 5th store k rebar
f 6th store k rebar
7th store k rebar
h 8th store k rebar
i 9th store k rebar
10th store k rebar
k 11th store k rebar
l Roof level
3.3 Formwork to sus ended slaba 1st store
b 2nd store m2 fwk
c 3rd store m2 fwk
d 4th store m2 fwk
e 5th store m2 fwk
f 6th store m2 fwk
7th store m2 fwk
h 8th store m2 fwk
i 9th store m2 fwk
10th store m2 fwk
k 11th store m2 fwk
l Roof level
50mm thick slab ed e
a 2nd store m 50-fwk
b 3rd store m 50-fwk c 4th store m 50-fwk
d 5th store m 50-fwk
e 6th store m 50-fwk
f 7th store m 50-fwk
8th store m 50-fwk
h 9th store m 50-fwk
i 10th store m 50-fwk
11th store m 50-fwk
Ditto ,20mm thick slab ed e
a 2nd store m 20-fwk
b 3rd store m 20-fwk
c 4th store m 20-fwk
d 5th store m 20-fwk
e 6th store m 20-fwk f 7th store m 20-fwk
8th store m 20-fwk
h 9th store m 20-fwk
i 10th store m 20-fwk
11th store m 20-fwk
Ditto ,30mm thick slab ed e
a 1st store m 30-fwk
b 2nd store m 30-fwk
c 3rd store m 30-fwk
d 4th store m 30-fwk
e 5th store m 30-fwk
f 6th store m 30-fwk
7th store m 30-fwk
h 8th store m 30-fwk
i 9th store m 30-fwk
10th store m 30-fwk
k 11th store m 30-fwk
3.4 Waterproofing system to structural works as specified
a 1st store
b 2nd store
c 3rd store
d 4th store
e 5th store
f 6th store
Carried Forward
Page 5 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 6/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 6 U er Floor Cont'd
3.4 Waterproofing system to structural works as specified
Cont'd7th store
h 8th store
i 9th store
10th store
k 11th store
l Roof level
3.5 Others
Works not listed above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
ab
c
Structural Wall
4.1 Concrete to structural wall - G40
a 1st store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
b 2nd store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40c 3rd store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
d 4th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
e 5th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
f 6th store
to lift wall m3 G40
to staircase wall m3 G40to internal rc wall m3 G40
7th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
h 8th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
i 9th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
10th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
k 11th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
l Roof level
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
Carried Forward
Page 6 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 7/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 7 Structural Wall Cont'd
4.2 Reinforcement to structural wall
a 1st store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
b 2nd store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
c 3rd store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
d 4th store
to lift wall k rebarto staircase wall k rebar
to internal rc wall k rebar
e 5th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
f 6th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
7th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
h 8th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
i 9th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
10th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
k 11th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
l Roof levelto lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
4.3 Formwork to structural wall
a 1st store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
b 2nd store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
c 3rd store
to lift wall m2 fwk to staircase wall m2 fwk
to internal rc wall m2 fwk
d 4th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
e 5th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
f 6th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
7th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
h 8th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
i 9th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
10th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
k 11th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
l Roof level
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
4.4 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a
bc
Carried Forward
Page 7 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 8/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 8 Structural work to roof
5.1 Concrete roof slab
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
5.2 Sus ended roof beam
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
Roof linth
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
5.3 Stum column at roof
a Concrete G40
b Reinforcement
c Formwork
5.4 Roof finishes
a Profile steel roofing- Roof over Pavilion, measured
se aratelb Insulation
c Water roofin
RF Wate roofin to RC Flat Roof m2 54.79 water rf
consists of:
- min 25mm thk c s screed to fall
- 2.2mm thk EVA/PVC fleece-backed waterproofing
membrane bonded- 6mm thk under-screed draina e sheet
- 1000 x 1000 x 50mm thk c/s panel roofing reinforced
with BRC 3315 mesh polysulphide joints @ every 10m
c c- Pol sul hide sealant
- 50mm wide welded la54.79 54.79
RF1 Wate roofin to RC Flat Roof, non insulated m2 water rf
RF2 RC Flat Roof over Incubation Pod 3; with 600 x 600 x
50mm thk PC anel
m2 13.49 waterprf
13.49 13.49
RFU Wate roofin to RC Flat Roof- u turn m 42.23 water rf
consists of:
- 1.2mm thk EVA/PVC waterproofing membrane bonded
- 25mm thk c s rotection screed with GI mesh
- membrane terminated into groove-line & sealed with
ol urethane sealant42.23 42.23
Water roofin to Non-Insulated Deck m2 water rf
consists of:
- min 25mm thk c s screed to fall
- 2.2mm thk EVA/PVC fleece-backed waterproofing
membrane bonded
- 6mm thk under-screed draina e sheet- finishes and rotection screed measured se aratel
Water roofin to Landsca e Deck m2 water rf
consists of:
- min 25mm thk c s screed to fall
- 2.2mm thk EVA/PVC fleece-backed waterproofing
membrane bonded- 25mm thk c s rotection screed
- 100 sm eotextile se aration la er
- 30mm thk interlockin sub-soil draina e modules
- 100 sm eotextile filter fabric
- 50mm thk coarse washed sand
- growth media to Landscape Architect's detail
Softsca e is included in PC Provisional Sums
Waterproofing works to planters- 30mm thk modular
subsoil drainage with geotectile filter fabric
Planter floor m2 227.64 water rf roof 227.64 227.64
Planter walls m2 380.71 water rf 380.71 380.71
d Perforated aluminum trellis
Roof Trellis/ Aluminium expanded mesh screen to roof m2 350.27 metal-wk
consists of:
- 600 x 300 GS
- 200 x 100 x 8mm thk hot dipped GS RHS in paint
finish- 6mm thk hot di ed GS late in aint finish
- Aluminium expanded mesh screen in powder coated
finish- 50 x 75 x 6mm thk hot dipped GS L-angle in paint
finish350.27 350.27
e Green roofin s stem B Others
Note Green roofing system by NSC as per Schedule of
Finishes, Item 1.7.7
Planters at Sk Garden
Plaster and aint to lanter walls m2 380.71 laster380.71 380.71
Perimeter lanter-wall
Planter near timber seatin
Co in w=200mm m 282.01 co in282.01 282.01
Turfin m2 118.60 nil118.60 118.60
f Roof draina e with accessories LS si honic
Scupper drain (w=100mm) at Incubation Pod 3 Roof m 11.44 scupper
IP3 11.44 11.44
150mm wide cement sand skirting with underscreed
draina e mat w=150mm
m skirting
Scupper drain to Corridor near AC Ledges- 150mm
wide x 50mm dee RC surface channel
m scupper
Truss to su ort li hts & fans
Steel structure k steel
Paintin m2 steel
M16 bolt no. steel
Page 8 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 9/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
M20 cast-in bolt no. steel
h Timber deckin to Sk Terrace
Note Timber flooring system (iron wood); Size: 150 x 1200x30mm thk, Colour: natural stain, Finish: natural stain
look alike as per Landscaping Materials and Finishes
Over draina e trench foot ath m2 148.01 tbr deck 148.01 148.01
Reflection Deck m2 tbr deck
SS handrail to ram at Sk Garden m 10.60 metal-wk 10.60 10.60
i Granite slab with ste in stone
EF13 Granite slab with stepping stones to Laundry Drying
Area at Roof Garden external
m2 59.06 granite
Note Laundry area is GC-granolithic finish as per
Landscaping Drawing floor plan but WA- timberflooring system as Materials and Finishes Schedule of
59.06 59.06
GR Granite, grey, natural f inish to hallway, ramp as per
Landsca in Drawin
m2 54.26 granite
54.26 54.26
GC Granolitic, 3-5mm diam, dark grey/ black to hallway as
er Landsca in Drawin
m2 grano
Plinth m2 6.44 linth2 3.22 6.44
k Roof Pavilion at Grid XC X13-X15
75 x 150mm hardwood timber floorin m2 tbr deck
Note Timber flooring system (iron wood); Size: 150 x 1200
x30mm thk, Colour: natural stain, Finish: natural stain
look alike as per Landscaping Materials and Finishes
m2 45.13
45.13 45.13
MS expanded mesh screen in powder coated finish to
Roof
m2 40.72 metal-wk
40.72 40.72
MS expanded mesh screen in powder coated finish
supported with 10mm thk hot dipped galv MS plate in
paint finish and 50 x 50 x 10mm hot dipped MS L-
m2 27.36 metal-wk
2 3.60 3.80 27.36
Laminated lass barrier to wall h=1.95m m 10.40 lazin10.40 10.40
40mm diam SS balustrade and handrail h=0.90m m 10.35 metal-wk 10.35 10.35
5.5 Built in Gondola s stem Gondola
5.6 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a Water ta at Sk Terrace nos others
b Rainscreen
Steel structure k steel
Paintin m2 steel
M16 bolt no. steelc
Carried Forward
Page 9 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 10/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
6.1 Staircase fli ht
a Precast concrete staircaseb Reinforced Concrete to in structure
Concrete G40 m3 G40
Reinforcement k rebar
Formwork m2 fwk
6.2 Sus ended landin slab
a Concrete G40
b Reinforcement
c Formwork
6.3 Sus ended landin rakin ed e beam
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
6.4 Ex ended mesh screen staircase railin
SR1 MS railin to Staircase h=0.90m to all blocks m Railin
consists of:
- 40 x 100mm thk GS late in enamel aint finish
- 40 x 10mm thk GS plate in enamel paint finish @ max
100mm c c- 50 x 150 x 6mm thk GS an le in enamel aint finish
- SS ex ansion bolt
SR2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.675m) to Staircase Landing and
Smoke Stop Lobby for Blks X1, Y1 and Z1
m Railing
consists of:
- 10mm thk hot dipped GS plate in powder coated finish
- 10mm thk hot dipped GS folded plate in powder
coated finish- 40mm diam hot dipped GS CHS in powder coated
finish- 10mm thk hot dipped GS flat plate baluster in powder
coated finish- 10mm thk hot dipped GS L-angle pre-welded to
aluminium expanded mesh with powder coated finish
- Aluminium expanded mesh with powder coated finish
- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat
plate pre-welded to upright balusters in paint finish
- 10mm thk hot dipped GS angle plate in powder coated
finish- Countersunk anchor bolt
- 20 x 20mm aluminium U-channel in powder coated
finish- 10mm thk hot dipped GS plate in powder coated finish
SR2A Ditto h=1.2m as measured on elevaton m Railin
SR3 Aluminium expanded mesh screen to internal
Staircases h=1.36m to all blocks
m Railing
consists of:
- 40mm diam hot dipped GS CHS in powder coatedfinish
- 10mm thk hot dipped GS L-angle prewelded to
aluminium expanded mesh with powder coated finish
- Aluminium expanded mesh screen in powder coated
finish- 10mm thk hot dipped GS angle plate in powder coated
finish- Countersunk anchor bolt
- 10mm thk hot dipped GS plate in powder coated finish
SR4 GS wall mounted railing to internal staircase to Hall
Fellow Hall Master
m Railing
consists of:- 40mm diam x 3mm hot di ed GS handrai l
- 10mm diam hot di ed GS rod
- 50mm diam x 6mm thk GS flat late
6.5 Timber stud wall to staircase railin
Timber vertical strip to internal staircase for Hall Fellow
and Hall Master
m2 timber
6.6 Stair finishes
Floor Finishes
SF1 Self levelin screed to common staircases
Landin m2 screed
Riser 175mm hi h m S-riser
Treads 250mm wide m S-tread
Nosin tiles m S-Nosin -T
SF2 300mm x 600mm & 110mm x 600mm non-slip
homo eneous tiles to Interaction StaircaseLandin m2 F6
Riser 175mm hi h m flr-tile-R
Treads 250mm wide m flr-tile-T
Nosin tiles m flr-tile-NT
SF3 Floor finishes to Stairs to Hall Master and Hall Fel low,
finishes not given, assuming similar to Living area,
homogeneous tiles with cement and sand screed
Landin m2 F6
Riser 167mm hi h m flr-tile-R Treads 250mm wide m flr-tile-T
Tactile nosin m flr-tile-NT
Wall Finishes
SW Plaster and aint to staircase wall m2 laster
Ceilin Finishes
SC1 Plaster and aint to staircase ceilin m2 laster
6.7 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
above items .
ab
c
External Wall and Finishes
7.1 Brickwall
a 1st store
1BRW100E 100mm thk brickwall external m2 100-bwk
1BRW200E 200mm thk brickwall external m2 200-bwk
b 2nd store
2BRW100E 100mm thk brickwall external m2 100-bwk
2BRW200E 200mm thk brickwall external m2 200-bwk
Page 10 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 11/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
c 3rd store3BRW100E 100mm thk brickwall external m2 100-bwk
3BRW200E 200mm thk brickwall external m2 200-bwk
d 4th store
4BRW100E 100mm thk brickwall external m2 100-bwk 4BRW200E 200mm thk brickwall external m2 200-bwk
e 5th store5BRW100E 100mm thk brickwall external m2 100-bwk 5BRW200E 200mm thk brickwall external m2 200-bwk
Carried Forward
Page 11 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 12/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate
Brou ht Forward
BC S1 10 External Wall and Finishes Cont'd
7.1 Brickwall Cont'd
f 6th store
6BRW100E 100mm thk brickwall external m2 100-bwk
6BRW200E 200mm thk brickwall external m2 200-bwk
7th store
7BRW100E 100mm thk brickwall external m2 100-bwk
7BRW200E 200mm thk brickwall external m2 200-bwk
h 8th store8BRW100E 100mm thk brickwall external m2 100-bwk
8BRW200E 200mm thk brickwall external m2 200-bwk
i 9th store
9BRW100E 100mm thk brickwall external m2 100-bwk 9BRW200E 200mm thk brickwall external m2 200-bwk
10th store10BRW100E 100mm thk brickwall external m2 100-bwk
10BRW200E 200mm thk brickwall external m2 200-bwk
k 11th store11BRW100E 100mm thk brickwall external m2 100-bwk
11BRW200E 200mm thk brickwall external m2 200-bwk
l Roof levelRFBRW100E 100mm thk brickwall external m2 100-bwk
RFBRW200E 200mm thk brickwall external m2 200-bwk
7.2 Glass wall panel complete with supporting frame
Note For lass anel details, lease refer to drawin
For details, lease refer to ID Drawin s
For Curtain wall/ glass panels to to Student Common
Loun e lease refer to Facade Drawin s
a 1st store
TGP/01 Glass panel with double leaf door to Hall Admin Office
Blk X1
nos 1 glazing
TGP 02 Glass anel to Hall Admin Office Blk X1 nos 1 lazin
b 2nd store
TGP 15 Glass anel to Multi Pur ose Room Block X1 nos 1 lazin
TGP 16 Glass anel to Multi Pur ose Room Block X1 nos 1 lazin
TGP 17 Glass anel to Multi Use Room Blk X1 nos 3 lazin
TGP 18 Glass anel to Multi Use Room Blk X1 nos 1 lazin
Top hung window with fixed glass panel to Multi Use
Room Blk X1
Think Tank Rooms
TTR/GP3 Fixed glass panel to Think Tank Room 1 (Blk X1),
Think Tank Room 4 Blk Z1
nos 1 glazing
TTR GP7 Fixed lass anel to Think Tank Room 1 Blk X1 nos 1 lazin
TTR/W5 Fixed glass panel with top hung window to Think Tank
Room 1,4 (Blk X1), Think Tank Room 6 (Blk Z1)
nos 1 glazing
c 3rd store
Incubation PodsFull tempered laminated glass with 200 x 75 x 4mm
thk aluminium RHS in paint finish to Incubation Pods;
m2 glazing
GL/14 Aluminium frame glass louvred window to Incubation
Pod P2 P3
nos 1 glazing
TGP 22 Glass anel to Incubation Pod P2, P3 nos 1 lazin
d 4th store
Think Tank Rooms
TTR/GP11 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);
2 St hi h
nos 1 glazing
TTR/W7 Fixed glass panel with top hung window to Think Tank Room 2 5 9 Blk X1 2 St hi h
nos 1 glazing
e 5th store
Think Tank Rooms
TTR/GP5 Fixed glass panel to Think Tank Room 3,4,6 (Blk X1),
Think Tank Room 2 & 3 (Blk Y1), Think Tank Room
2 6 7 Blk Z1
nos 1 glazing
TTR/W1 Fixed glass panel with top hung window to Think Tank
Room 3 Blk X1 Think Tank Room 4 Blk Z1
nos 1 glazing
GL/14 Aluminium frame glass louvred window to Incubation
Pod P2 P3
nos glazing
f 6th store
Incubation Pods
Full tempered laminated glass with 200 x 75 x 4mm
thk aluminium RHS in paint finish to Incubation Pods;
external
m2 glazing
Think Tank Rooms
TTR/GP6 Fixed glass panel to Think Tank Room 3,4,6 (Blk X1),
Think Tank Room 2 & 3 (Blk Y1), Think Tank Room
nos 2 glazing
TTR/GP9 Fixed glass panel to Think Tank Room 4 (Blk X1),
Think Tank Room 2 Blk Y1
nos 1 glazing
TTR/GP11 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);
2 St hi h
nos 1 glazing
TTR/W6 Fixed glass panel with top hung window to Think Tank
Room 1,4 (Blk X1), Think Tank Room 6 (Blk Z1)
nos 1 glazing
TTR/W7 Fixed glass panel with top hung window to Think Tank
Room 2 5 9 Blk X1 2 St hi h
nos 1 glazing
7th store
Think Tank Rooms
TTR/GP6 Fixed glass panel to Think Tank Room 3,4,6 (Blk X1),
Think Tank Room 2 & 3 (Blk Y1), Think Tank Room
2 6 7 Blk Z1
nos 1 glazing
TTR/GP8 Fixed glass panel to Think Tank Room 6 (Blk X1),
Think Tank Room 7 Blk Z1
nos 1 glazing
TTR/W3 Fixed glass panel with top hung window to Think Tank
Room 6 Blk X1 , Think Tank Room 7 Blk Z1
nos 1 glazing
h 8th store Na
i 9th store Na
Incubation PodsFull tempered laminated glass with 200 x 75 x 4mm
thk aluminium RHS in paint finish to Incubation Pods;
m2 glazing
GL/14A Aluminium frame glass louvred window to Incubation
Pod P1
nos 1 glazing
TGP 21 Glass anel to Incubation Pod P1 nos 1 lazin
Think Tank Rooms
Page 12 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 13/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
TTR/W2 Fixed glass panel with top hung window to Think Tank
Room 7 (Blk X1), Think Tank Room 1,3,4 (Blk Y1),
Think Tank Room 1 2 8 Blk Z1
nos 1 glazing
10th store
Think Tank RoomsTTR/GP10 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);
2 St hi h
nos 1 glazing
TTR/GP11 Fixed glass panel to Think Tank Room 2,5,8,9 (Blk X1);
2 St hi h
nos 1 glazing
TTR/W7 Fixed glass panel with top hung window to Think Tank
Room 2 5 9 Blk X1 2 St hi h
nos 1 glazing
TTR/W8 Fixed glass panel with top hung window to Think Tank
Room 8 (Blk X1), Think Tank Room 10 (Blk Z1); 2 Sty
nos 1 glazing
k 11th store
7.3 Perforated anel Com osite Panel MeshNote Steel support for rainscreens / sunshades are
measured se aratel lease refer to Item 5.6b
Page 13 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 14/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate
a 1st store
Aluminium expanded mesh/ wall to Lift Lobby near
Staircase 1 as shown on Elevation
m2 46.17 Alum-EM
b 2nd store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
m2 14.31 Alum-EM
9 1.59 14.31
2 Expanded mesh screen (h=1.0m) to Balcony and AC
Led e at Hall Fellow and Hall Master
m 1.20 Alum-EM
1.20 1.20
3 Aluminium expanded mesh screen/ rain screen
slanted hei ht=2.375m to Blks X1 Y1 and Z1
m 46.17 Alum-EM
consists of:
- 5mm thk hot di ed GS late in aint finish- Aluminium expanded mesh screen in powde coated
finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS folded late in aint finish
- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS late in aint finish
- 50 x 50 x 6mm thk hot dipped GS L-angle in paint
finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish
- 1.2mm thk folded aluminium cladding panel with 6mm
thk non-combustible calcium silicate backin9 5.13 46.17
c 3rd store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
Tender Clarification 2 Item A51
m2 50.88 Alum-EM
32 1.59 50.88
2 Aluminium expanded mesh screen/ rain screen
slanted hei ht=2.375m to Blks X1, Y1 and Z1
m 5.44 Alum-EM
consists of:
- 5mm thk hot di ed GS late in aint finish
- Aluminium expanded mesh screen in powde coated
finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS folded late in aint finish
- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS late in aint finish
- 50 x 50 x 6mm thk hot dipped GS L-angle in paint
finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish
- 1.2mm thk folded aluminium cladding panel with 6mm
thk non-combustible calcium silicate backin5.44 5.44
d 4th store
1 Aluminium expanded mesh screen in powder coatedfinish to Drying Closet, external; 2mm thk as per
Tender Clarification 2 Item A51
m2 65.19 Alum-EM
41 1.59 65.19
2 Expanded mesh screen (h=1.0m) to Balcony and AC
Led e at Hall Fellow and Hall Master
m 2.17 Alum-EM
2.17 2.17
e 5th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
m2 58.83 Alum-EM
37 1.59 58.83
f 6th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
Tender Clarification 2 Item A51
m2 52.47 Alum-EM
33 1.59 52.47
2 Expanded mesh screen (h=1.0m) to Balcony and AC
Led e at Hall Fellow and Hall Master
m 2.17 Alum-EM
2.17 2.17
3 Aluminium expanded mesh screen/ rain screen
slanted hei ht=2.375m to Blks X1, Y1 and Z1
m 5.13 Alum-EM
consists of:
- 5mm thk hot di ed GS late in aint finish
- Aluminium expanded mesh screen in powde coated
finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS folded late in aint finish
- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS late in aint finish
- 50 x 50 x 6mm thk hot dipped GS L-angle in paint
finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish
- 1.2mm thk folded aluminium cladding panel with 6mm
thk non-combustible calcium silicate backin5.13 5.13
4 MS expanded mesh screen in powder coated finish to
Corridor near Incubation Pod
m2 4.08 Alum-EM
1 4.08 4.08
7th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
Tender Clarification 2 Item A51
m2 52.47 Alum-EM
33 1.59 52.47
2 Aluminium expanded mesh screen/ rain screen
slanted hei ht=2.375m to Blks X1 Y1 and Z1
m 2.17 Alum-EM
consists of:
- 5mm thk hot di ed GS late in aint finish- Aluminium expanded mesh screen in powde coated
finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS folded late in aint finish
- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS late in aint finish
- 50 x 50 x 6mm thk hot dipped GS L-angle in paint
finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish
- 1.2mm thk folded aluminium cladding panel with 6mm
thk non-combustible calcium silicate backin
Page 14 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 15/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
2.17 2.17
h 8th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
m2 62.01 Alum-EM
39 1.59 62.01
2 Aluminium expanded mesh screen/ rain screen
slanted hei ht=2.375m to Blks X1 Y1 and Z1
m 5.00 Alum-EM
consists of:
- 5mm thk hot di ed GS late in aint finish
- Aluminium expanded mesh screen in powde coated
finish- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS folded late in aint finish
- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS late in aint finish
- 50 x 50 x 6mm thk hot dipped GS L-angle in paint
finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish
- 1.2mm thk folded aluminium cladding panel with 6mm
thk non-combustible calcium silicate backin2 2.5 5.00
i 9th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
Tender Clarification 2 Item A51
m2 60.42 Alum-EM
38 1.59 60.42
10th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
Tender Clarification 2 Item A51
m2 63.60 Alum-EM
40 1.59 63.60
2 Aluminium expanded mesh screen/ rain screen
slanted hei ht=2.375m to Blks X1, Y1 and Z1
m 2.50 Alum-EM
consists of:
- 5mm thk hot di ed GS late in aint finish
- Aluminium expanded mesh screen in powde coated
finish
- 50 x 100 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS folded late in aint finish
- 75 x 150 x 8mm thk hot dipped GS RHS in paint finish
- 8mm thk hot di ed GS late in aint finish
- 50 x 50 x 6mm thk hot dipped GS L-angle in paint
finish- 50 x 100 x 6mm thk hot dipped GS RHS in paint finish
- 1.2mm thk folded aluminium cladding panel with 6mm
thk non-combustible calcium silicate backin2.5 2.50
k 11th store
1 Aluminium expanded mesh screen in powder coated
finish to Drying Closet, external; 2mm thk as per
m2 66.78 Alum-EM
42 1.59 66.78
l Roof
Carried Forward
Page 15 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 16/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 11 External Wall and Finishes Cont'd
7.4 RC ara et wall low wall
a 1st store
b 2nd store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
c 3rd store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
d 4th store
Concrete G40 m3 G40Formwork m2 fwk
Rebar k rebar
e 5th store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
f 6th store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
7th store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
h 8th store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
i 9th store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
10th store
Concrete G40 m3 G40
Formwork m2 fwk Rebar k rebar
k 11th store
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
l Roof
Concrete G40 m3 G40
Formwork m2 fwk
Rebar k rebar
7.5 Precast anel wall
PW 160mm thk precast RC wall (some drawings shown140mm thk others 150mm thk external
a 1st store m2 Precast-W
b 2nd store m2 Precast-W
c 3rd store m2 Precast-W
d 4th store m2 Precast-W
e 5th store m2 Precast-W
f 6th store m2 Precast-W
7th store m2 Precast-W
h 8th store m2 Precast-W
i 9th store m2 Precast-W
10th store m2 Precast-W
k 11th store m2 Precast-W
l Roof m2 Precast-W
7.6 Perforated Ex anded mesh railin
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
for Blks X1 Y1 and Z1
consists of:
- 10mm thk hot dipped GS plate in powder coated finish
- 10mm thk hot dipped GS folded plate in powder
coated finish- 40mm diam hot dipped GS CHS in powder coated
finish- 10mm thk hot dipped GS flat plate baluster in powder
coated finish
- 10mm thk hot dipped GS L-angle pre-welded toaluminium expanded mesh with powder coated finish
- Aluminium expanded mesh with powder coated finish
- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat
plate pre-welded to upright balusters in paint finish
- 10mm thk hot dipped GS angle plate in powder coated
finish- Countersunk anchor bolt
- 20 x 20mm aluminium U-channel in powder coated
finish- 10mm thk hot dipped GS plate in powder coated finish
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
and Z1
consists of:
- 10mm thk hot di ed GS late in aint finish
- 10mm thk hot dipped GS L-angle pre-welded to
aluminium expanded mesh with powder coated finish
- Aluminium expanded mesh screen in powder coated
finish- 10mm thk hot dipped GS angle plate in powder coated
finish
- SS countersunk anchor bolt- 10mm thk hot di ed GS late in aint finish
R2b Ditto (h=1.50m) to AC Ledge for Blks X2 and Z2, Z1
consists of:
- 10mm thk hot dipped GS plate in powder coated finish
- 10mm thk hot dipped GS folded plate in powder
coated finish- 40mm diam hot dipped GS CHS in powder coated
finish- 10mm thk hot dipped GS flat plate baluster in powder
coated finish
Page 16 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 17/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
- 10mm thk hot dipped GS L-angle pre-welded to
aluminium expanded mesh with powder coated finish
- Aluminium expanded mesh with powder coated finish
- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat
plate pre-welded to upright balusters in paint finish
- 10mm thk hot dipped GS angle plate in powder coated
finish- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in powder coated
finish- 10mm thk hot dipped GS plate in powder coated finish
a 1st store
b 2nd store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
m 7.90 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
m 8.50 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1, Y1 and Z1
m 1.20 Railing
c 3rd store
R1 Aluminium expanded mesh screen/ railing in powdercoated finish to Common Area/ Void Area (h=1.675m)
m Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
m 5.30 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1 Y1 and Z1
m 2.26 Railing
d 4th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
for Blks X1 Y1 and Z1
m 12.68 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
and Z1
m 2.50 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1 Y1 and Z1
m 4.60 Railing
e 5th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
for Blks X1 Y1 and Z1
m 4.80 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1and Z1
m 8.88 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1 Y1 and Z1
m Railing
f 6th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
m 12.10 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
m 7.70 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1, Y1 and Z1
m Railing
7th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
m 7.10 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
m 5.80 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1 Y1 and Z1
m Railing
h 8th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
for Blks X1 Y1 and Z1
m 22.30 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
and Z1
m 5.00 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1 Y1 and Z1
m Railing
i 9th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
for Blks X1 Y1 and Z1
m 4.80 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
and Z1
m 18.20 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1 Y1 and Z1
m Railing
10th store
R1 Aluminium expanded mesh screen/ railing in powder
coated finish to Common Area/ Void Area (h=1.675m)
m 11.50 Railing
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
m 2.60 Railing
R2a Ditto (h=0.95m) to AC Ledge near Roof Slab for Blks
X1, Y1 and Z1
m Railing
k 11th store
R2 Aluminium expanded mesh screen/ railing in powder
coated finish (h=1.50m) to AC Ledge for Blks X1, Y1
m 12.50 Railing
Page 17 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 18/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate
l Roof
Carried Forward
Page 18 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 19/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate
Brou ht Forward
BC S1 12 7.7 M&E louvre
a 1st storePV 18 Aluminium louvre vent nos 1 window
PV 30 Aluminium louvre vent nos 2 window
b 2nd store Na
c Roof PV 21 Aluminium louvre vent to Lift Motor Room nos 2 window
7.8 Others
Works not listed above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
above items .
a WindowsWindows to Common Areas
CWF 15 To hun window to Hall Admin Office Blk X1 nos 1 window
FG 30 Fixed lass window to Hall Admin Office Blk X1 nos 1 window
GL/14 Aluminium frame glass louvred window to Communal
Kitchenette
nos 3 window
GL/28 Aluminium frame glass louvred window to Communal
Kitchenette and Laundr
nos 2 window
GL/25 Aluminium frame glass louvred window to Security
Room (Blk X1); W/25 as per enlarged drawing (AR-
154
nos 1 window
GL/34 Aluminium frame glass louvred window to CommunalKitchenette nos 2 window
GL/72 Aluminium frame glass louvred window to Communal
Laundr
nos 1 window
TH/05 Top hung window to Wash Room, Handicap Toilet,
Bath Powder Room Bath 1 & 2 Toilet
nos 2 window
TH/10 Top hung window to Wash Room, Handicap Toilet,
Bath Powder Room Bath 1 & 2 Toilet
nos 3 window
TH 20 To hun window to Hall Admin Office Blk X1 nos 1 window
TH 42 To hun window to Communal Toilet nos 20 window
Windows to Service A artmentsUnder raduate Sin le UGS
GL/04 Aluminium framed louvred window to Bedroom
Entrance door sides Under raduate Sin le UGS
nos 100 window
CW/15 Casement window and top hung window to Bedroom;
Under raduate Sin le UGS
nos 57 window
Under raduate Double UGD
GL/04 Aluminium framed louvred window to Bedroom
(Entrance door sides); Undergraduate Double (UGD)
nos 380 window
CW/15 Casement window and top hung window to Bedroom;
Under raduate Double UGD
nos 264 window
Graduate Sin le GS
GL/04A Aluminium framed louvred window to Bedroom
Entrance door sides Graduate Sin le GS
nos 20 window
CW/15 Casement window and top hung window to Bedroom;
Graduate Sin le GS
nos 16 window
TH 06 To hun window to Toilet Graduate Sin le GS nos 16 windowTH 06A To hun window to Toilet Graduate Sin le GS nos 20 window
Graduate Married GM
SW/14A Top hung window to Kitchen; Graduate Married (GM) nos 6 window
CW/15 Casement window and top hung window to Bedroom;
Graduate Married GM
nos 6 window
TH 06 To hun window to Toilet Graduate Married GM nos 6 window
TH 06A To hun window to Toilet Graduate Sin le GM nos 12 window
Under raduate Hall Master UGH-M
Lower LevelCWF/28 LL Casement window with fixed tempered glass panel to
Livin Under raduate Hall Master UGH-M
nos 4 window
SW/12 LL Top hung window to Kitchen; Undergraduate Hall
Master UGH-M
nos 2 window
TH/06 LL Top hung window to Toilet; Undergraduate Hall
Master UGH-M
nos 2 window
U er Level
CW/21 UL Casement window and top hung window to Bedroom
2 Under raduate Hall Master UGH-M
nos Na window
CW/21 UL Casement window and top hung window to Bedroom
2 Under raduate Hall Master UGH-M
2
TH/06 UL Top hung window to Bath 1; Undergraduate Hall
Master UGH-M
nos 4 window
Under raduate Hall Fellows UGH-F
Lower Level
SW/14 LL Top hung window to Kitchen; Undergraduate Hall
Fellows UGH-F
nos 1 window
CW/28 LL Casement window and top hung window to Living ;
Under raduate Hall Fellows UGH-F
nos 1 window
TH/06 LL Top hung window to Toilet; Undergraduate Hall
Fellows UGH-F
nos 1 window
U er Level
CW/21 UL Casement window and top hung window to Bedroom 2,
Master Bedroom ; Undergraduate Hall Fellows (UGH-
F
nos 1 window
TH/06 UL Top hung window to Toilet; Undergraduate Hall
Fellows UGH-F
nos 1 window
b Securit rilles m2 metal-wk
c Aluminum led es inside Closets
3mm thk aluminium powder coated ledge supported
with hollow rectangular section (L=0.85m, w=0.60m)
nos
d 10mm thk aluminium plate in powder coated finish
w=0.30m
m cladding
3mm thk aluminium cladding in powde coated finish m2 cladding
8.1 Brickwall excludin wall finishesa 1st store
1BLW100 100mm thk blockwall internal m2 100-blk
1BLW200 200mm thk blockwall internal m2 200-blk
1BRW100 100mm thk brickwall internal m2 100-bwk
1BRW200 200mm thk brickwall internal m2 200-bwk
b 2nd store
2BLW100 100mm thk blockwall internal m2 100-blk
2BLW200 200mm thk blockwall internal m2 200-blk
2BRW100 100mm thk brickwall internal m2 100-bwk 2BRW200 200mm thk brickwall internal m2 200-bwk
c 3rd store
3BLW100 100mm thk blockwall internal m2 100-blk
Page 19 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 20/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
3BLW200 200mm thk blockwall internal m2 200-blk
3BRW100 100mm thk brickwall internal m2 100-bwk
3BRW200 200mm thk brickwall internal m2 200-bwk
d 4th store
4BLW100 100mm thk blockwall internal m2 100-blk
4BLW200 200mm thk blockwall internal m2 200-blk
4BRW100 100mm thk brickwall internal m2 100-bwk
4BRW200 200mm thk brickwall internal m2 200-bwk
e 5th store
5BLW100 100mm thk blockwall internal m2 100-blk
5BLW200 200mm thk blockwall internal m2 200-blk
5BRW100 100mm thk brickwall internal m2 100-bwk
5BRW200 200mm thk brickwall internal m2 200-bwk
f 6th store
6BLW100 100mm thk blockwall internal m2 100-blk
6BLW200 200mm thk blockwall internal m2 200-blk 6BRW100 100mm thk brickwall internal m2 100-bwk
6BRW200 200mm thk brickwall internal m2 200-bwk
7th store
7BLW100 100mm thk blockwall internal m2 100-blk
7BLW200 200mm thk blockwall internal m2 200-blk
7BRW100 100mm thk brickwall internal m2 100-bwk
7BRW200 200mm thk brickwall internal m2 200-bwk
h 8th store
8BLW100 100mm thk blockwall internal m2 100-blk
8BLW200 200mm thk blockwall internal m2 200-blk
8BRW100 100mm thk brickwall internal m2 100-bwk
8BRW200 200mm thk brickwall internal m2 200-bwk
i 9th store
9BLW100 100mm thk blockwall internal m2 100-blk
9BLW200 200mm thk blockwall internal m2 200-blk
9BRW100 100mm thk brickwall internal m2 100-bwk
9BRW200 200mm thk brickwall internal m2 200-bwk
10th store
10BLW100 100mm thk blockwall internal m2 100-blk
10BLW200 200mm thk blockwall internal m2 200-blk
10BRW100 100mm thk brickwall internal m2 100-bwk
10BRW200 200mm thk brickwall internal m2 200-bwk
k 11th store
11BLW100 100mm thk blockwall internal m2 100-blk
11BLW200 200mm thk blockwall internal m2 200-blk
11BRW100 100mm thk brickwall internal m2 100-bwk 11BRW200 200mm thk brickwall internal m2 200-bwk
l Roof
RFBLW100 100mm thk blockwall internal m2 100-blk
RFBLW200 200mm thk blockwall internal m2 200-blk
RFBRW100 100mm thk brickwall internal m2 100-bwk
RFBRW200 200mm thk brickwall internal m2 200-bwk
8.2 Hollow core light weight wall system excluding
wall finishes
HCW Hollow core with C-glass continous monofilament fibres
tissue for joint to Hostel and Service Apartments as per
Schedule of Finishes, 110mm thk hollow core precast
wall as per enlarged detail; internal
a 1st store m2 Hollow-C
b 2nd store m2 Hollow-C
c 3rd store m2 Hollow-C
d 4th store m2 Hollow-C
e 5th store m2 Hollow-C
f 6th store m2 Hollow-C
7th store m2 Hollow-C
h 8th store m2 Hollow-C
i 9th store m2 Hollow-C
10th store m2 Hollow-C
k 11th store m2 Hollow-C
l Roof m2 Hollow-C
Carried Forward
Page 20 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 21/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 13 Internal Wall and Partition Cont'd
8.3 Glass wall panel complete with supporting frame
Note Included in item 7.2
a 1st store
10mm thk tempered glass panel with stainless steel
frame at sides and top to Security Room (1.50mL x
nos glazing
b 2nd store
c 3rd store
d 4th store
e 5th store
f 6th store
7th storeh 8th store
i 9th store
10th store
k 11th store
l Roof
8.4 Acoustic wall panel lining including fabric wall
coverin s stemNote Wall finishes for Incubation Pods, Think Tanks and
Multi- ur ose Hall as er Schedule of Finishes
a 7th store
7W9 Fixed acoustic wall anel on non lazed walls m2 Partition
Others
1W9 Fixed acoustic wall anel on non lazed walls m2 Partition2W9 Fixed acoustic wall anel on non lazed walls m2 Partition
3W9 Fixed acoustic wall anel on non lazed walls m2 Partition
4W9 Fixed acoustic wall anel on non lazed walls m2 Partition
5W9 Fixed acoustic wall anel on non lazed walls m2 Partition
6W9 Fixed acoustic wall anel on non lazed walls m2 Partition
8W9 Fixed acoustic wall anel on non lazed walls m2 Partition
9W9 Fixed acoustic wall anel on non lazed walls m2 Partition
10W9 Fixed acoustic wall anel on non lazed walls m2 Partition
11W9 Fixed acoustic wall anel on non lazed walls m2 Partition
RFW9 Fixed acoustic wall anel on non lazed walls m2 Partition
8.5 Steel concrete lintols to brickwall dr wall
a 1st store
b 2nd store
c 3rd stored 4th store
e 5th store
f 6th store
7th store
h 8th store
i 9th store
10th store
k 11th store
l Roof level
8.6 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a Timber vertical strip to internal staircase for Hall Fellow
and Hall Master
m2
b
c
Carried Forward
Page 21 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 22/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 14 Door and Ironmon er
Note All 6mm thk wired clear glass panel are 100mm x600mm unless noted
9.1 Fire rated steel door in powder coated impact
resistant satin coating finished c/w
exposed/concealed door frame, mullion,
a 1st store
FD2/12 Two hour fire rated steel door (double leaf) and frame
(powder coated impact resistant satin coating finish) to
Bin Centre, PABX, LV Switchroom, LT S/W Room
(Emergency), Low Level Transfer Tank Room, Bin
Transit Room, ELV Room, MDF Room, Pool Filtraction
Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos 1 Metal-Dr
FD2/18 Two hour fire rated steel door (double leaf) and frame
(powder coated impact resistant satin coating finish) to
Bin Centre, PABX, LV Switchroom, LT S/W Room
(Emergency), Low Level Transfer Tank Room, Bin
Transit Room, ELV Room, MDF Room, Pool Filtraction
Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos 2 Metal-Dr
FD2/RC12 Two hour fire rated steel door and frame (powder
coated impact resistant satin coating finish) to Refuse
Chute Chamber
nos 1 Metal-Dr
b 2nd store
c 3rd stored 4th store
e 5th store
f 6th store
7th store
h 8th store
i 9th store10th store
k 11th store
l Roof level
9.2 Fire rated steel door in powder coated finished
c/w exposed/concealed door frame, mullion,
ironmongery etc including fixing accessories
Na
a 1st store
b 2nd store
c 3rd stored 4th store
e 5th store
f 6th store
7th storeh 8th store
i 9th store
10th store
k 11th storel Roof
Carried ForwardBrou ht Forward
BC S1 15 Door and Ironmon er Cont'd
9.3 Non fire rated steel door in powder coated
finished c/w exposed/concealed door frame,
mullion, ironmongery etc including fixing
Na
a 1st store
b 2nd store
c 3rd store
d 4th store
e 5th storef 6th store
7th store
h 8th store
i 9th store10th store
k 11th store
l Roof level
9.4 Fire rated solid timber door in laminate finished
c/w door frame, mullion, push/kick plate,
viewing panel, ironmongery, etc including fixing
accessoriesa 1st store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
Door
nos 2 tbr-dr
FD.5/20 2 hour fire rated timber door with HPMR laminate with
6mm thk aired clear glass panel (2 nos) and self closin device to Lift Lobb Exit Door
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S08 Half hour fire rated solid core door with HPMR
laminates to to TEL near Staircase
nos Na tbr-dr
b 2nd store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/15 Half hour fire rated solid core door (one and half leaf)
with HPMR laminates, 6mm thk wired clear glass panel
and self-closing device to Staircase 1,2,3 & 4, Multi-use
Room, SSL (Smoke Stop Lobby), Exit Door
nos 2 tbr-dr
FD.5/15A Half hour fire rated solid core door (one and half leaf)
with HPMR laminates and self-closing device to
Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop
Lobb Exit Door
nos 1 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 2 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
Toilet
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
nos 1 tbr-dr
Hostel and Facult Service A artments
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance Graduate Sin le GS
nos 1 tbr-dr
Page 22 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 23/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
c 3rd store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/15 Half hour fire rated solid core door (one and half leaf)
with HPMR laminates, 6mm thk wired clear glass panel
and self-closing device to Staircase 1,2,3 & 4, Multi-use
Room, SSL (Smoke Stop Lobby), Exit Door
nos 1 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
Toilet
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
UGS
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance Graduate Sin le GS
nos 1 tbr-dr
d 4th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
Toilet
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
nos 2 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance Graduate Sin le GS
nos 1 tbr-dr
e 5th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/15 Half hour fire rated solid core door (one and half leaf)with HPMR laminates, 6mm thk wired clear glass panel
and self-closing device to Staircase 1,2,3 & 4, Multi-use
Room, SSL (Smoke Stop Lobby), Exit Door
nos 1 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT, TEL, SPR, FA, HR FE, SP, ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
Toilet
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
nos 2 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance Graduate Sin le GS
nos 1 tbr-dr
f 6th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
Page 23 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 24/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
Toilet
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
UGS
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
UGD
nos 2 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR laminates to Main Entrance Graduate Sin le GS nos 1 tbr-dr
7th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT, TEL, SPR, FA, HR FE, SP, ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to CommunalToilet
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance Graduate Sin le GS
nos Na tbr-dr
h 8th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
Toilet
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated timber door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
3
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
Toilet
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
nos 1 tbr-dr
i 9th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 9 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT, TEL, SPR, FA, HR FE, SP, ST
nos 4 tbr-dr
Page 24 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 25/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 1 tbr-dr
Hostel and Facult Service A artments
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
UGD
nos 1 tbr-dr
10th store
FD.5/10 Half hour fire rated solid core door with HPMR laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position by
Electromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
Toilet
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
HR FE DR SFH
nos 3 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
UGS
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
UGD
nos 1 tbr-dr
k 11th store
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/EM15 Half hour fire rated solid core door (one and a half
leaf) with HPMR laminates, 6mm thk wired clear glass
panel and door held in the open position byElectromagnetic device linked to the Building's Fire
nos 4 tbr-dr
FD.5/HT10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Handicap
nos 1 tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR
laminates to DT TEL SPR FA HR FE SP ST
nos 4 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 4 tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,HR FE DR SFH
nos 1 tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate
with 3mm thk SS finger and kick plates to Communal
Toilet
nos 1 tbr-dr
Hostel and Facult Service A artmentsFD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance ; Undergraduate Single
nos 1 tbr-dr
FD.5/HM10 Half hour fire rated solid core door with HPMR
laminates to Main Entrance; Undergraduate Double
nos 1 tbr-dr
l Roof
FD.5/10 Half hour fire rated solid core door with HPMR
laminates, 6mm thk wired clear glass panel and self-
closing device to Protected Staircase, Lift Lobby, Exit
nos 3 tbr-dr
FD.5/S10 Half hour fire rated solid core door (double leaf) with
HPMR laminates to HR/FE, ELV, ELECT, DR/SFH, PW,
nos 3 tbr-dr
9.5 Non fire rated / Timber door in laminate finished
c/w door frame, mullion, finger/push/kick plate,
viewing panel, louvred panel, ironmongery, etc
includinq fixinq accessories
a 1st store
D/08 Timber door with HPMR laminate and 3mm thk SS
finger push and kick plates to Head Officer, Store,
Storage, Photo Copy , Office , Meeting Room, Service
nos Na tbr-dr
D/09 Timber door with HPMR laminate and 3mm thk SS
finger push and kick plates to Head Officer, Store,
Storage, Photo Copy , Office , Meeting Room, Service
Yard Cafe Securit Room
nos 1 tbr-dr
D/10 Timber door with HPMR laminate and 3mm thk SS
finger push and kick plates to Head Officer, Store,
Storage, Photo Copy , Office , Meeting Room, Service
nos 2 tbr-dr
DHT/10 Laminated semi-solid timber door with timber louvred
below to Handica Toilet
nos 1 tbr-dr
DK/10 Timber door with HPMR laminate to Communal
Laundr Communal Kitchen
nos 1 tbr-dr
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 3 tbr-dr
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 5 tbr-dr
DS/07 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
Page 25 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 26/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na
DS/10 Timber door (double leaf) to PW/NW, PW, DR/SFH,HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 2 tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nosDS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
nos 2 tbr-dr
DT/08 Laminated semi-solid timber door with timber louvre
below and 3mm thk SS finger push and kick plates to
Washroom
nos 2 tbr-dr
b 2nd store
D/10 Timber door with HPMR laminate and 3mm thk SSfinger push and kick plates to Head Officer, Store,
Storage, Photo Copy , Office , Meeting Room, Service
Yard Cafe Securit Room
nos 1 tbr-dr
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos Na tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 4 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 4 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
with louvres Graduate Sin le GS
nos 1 tbr-dr
DHM/1 LL Semi solid door with timber veneer to Main Entrance;
Undergraduate Apartment Hall Fellows (UGH-F)
nos 1 tbr-dr
DHM/1 UL Semi solid door with timber veneer to Main Entrance;
Undergraduate Apartment Hall Fellows (UGH-F)
nos 1 tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Sin le GS
nos 3 tbr-dr
DT/08A LL Laminated semi-solid timber door to Powder Room;
Undergraduate Apartment Hall Fellows (UGH-F)
nos 2 tbr-dr
DT/08A UL Laminated semi-solid timber door to Bath 1;
Under raduate A artment Hall Fellows UGH-F
nos 1 tbr-dr
DB/10 UL Semi solid door with timber veneer to Master Bedroom,
Bedroom 1; Undergraduate Apartment Hall Fellows
UGH-F
nos 1 tbr-dr
D/S08 LL Timber door with HPMR laminate to Store;Under raduate A artment Hall Fellows UGH-F
nos 1 tbr-dr
c 3rd storeDS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 3 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 16 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
with louvres Graduate Sin le GS
nos 1 tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Sin le GS
nos 2 tbr-dr
d 4th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 3 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 7 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance(with louvres); Undergraduate Double (UGD)
nos 16 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
with louvres Graduate Sin le GS
nos 2 tbr-dr
DHM/1 LL Semi solid door with timber veneer to Main Entrance;
Undergraduate Apartment Hall Master (UGH-M)
nos 1 tbr-dr
DHM/1 UL Semi solid door with timber veneer to Main Entrance;
Undergraduate Apartment Hall Master (UGH-M)
nos 1 tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Sin le GS
nos 3 tbr-dr
DT/08A LL Laminated semi-solid timber door to Bath;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
Page 26 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 27/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
DT/08A UL Laminated semi-solid timber door to Master Bath, Bath
2; Undergraduate Apartment Hall Master (UGH-M)
nos 2 tbr-dr
DB/10 LL Semi solid door with timber veneer to Bedroom 1 ;Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DB/10 UL Semi solid door with timber veneer to Master Bedroom,
Bedroom 2 ; Undergraduate Apartment Hall Master
-
nos 2 tbr-dr
D/S08 LL Timber door with HPMR laminate to Store;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DS/06 LL Timber dor with HPMR laminates to PW/NW;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DS/06 UL Timber dor with HPMR laminates to PW/NW;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
e 5th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
nos 1 tbr-dr
Hostel and Facult Service A artmentsDHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 6 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 15 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
with louvres Graduate Sin le GS
nos 2 tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Sin le GS
nos 3 tbr-dr
f 6th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/04 Timber dor with HPMR laminates to Stack Duct, RefuseChute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nosDS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 tbr-dr
Hostel and Facult Service A artmentsDHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 6 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 11 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
with louvres Graduate Sin le GS
nos 2 tbr-dr
DHM/10 LL Semi solid door with timber veneer to Main Entrance;
Undergraduate Apartment Hall Master (UGH-M)
nos 1 tbr-dr
DHM/10 UL Semi solid door with timber veneer to Main Entrance;
Undergraduate Apartment Hall Master (UGH-M)
nos 1 tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Sin le GS
nos 3 tbr-dr
DT/08A LL Laminated semi-solid timber door to Bath;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DT/08A UL Laminated semi-solid timber door to Master Bath, Bath
2; Undergraduate Apartment Hall Master (UGH-M)
nos 2 tbr-dr
DB/10 LL Semi solid door with timber veneer to Bedroom 1 ;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DB/10 UL Semi solid door with timber veneer to Master Bedroom,
Bedroom 2 ; Undergraduate Apartment Hall Master
UGH-M
nos 2 tbr-dr
D/S08 LL Timber door with HPMR laminate to Store;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DS/06 LL Timber dor with HPMR laminates to PW/NW;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
DS/06 UL Timber dor with HPMR laminates to PW/NW;
Under raduate A artment Hall Master UGH-M
nos 1 tbr-dr
Carried Forward
Page 27 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 28/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 16 Door and Ironmon er Cont'd
9.5 Non fire rated / Timber door in laminate finished
c/w door frame, mullion, finger/push/kick plate,
viewing panel, louvred panel, ironmongery, etc
including fixing accessories (Cont'd)
7th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 6 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 12 tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
with louvres Graduate Sin le GS
nos 2 tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Sin le GS
nos 3 tbr-dr
h 8th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 8 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 16 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance;Graduate Married GM
nos 2 Tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Married GM
nos 2 Tbr-dr
DB/09 Semi solid door with timber veneer to Bedroom ;
Graduate Married GM
nos 2 Tbr-dr
i 9th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 Tbr-dr
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na Tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 Tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 Tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
nos 1 Tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Single (UGS)
nos 6 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 15 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance;
Graduate Married GM
nos 2 Tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Married GM
nos 2 Tbr-dr
DB/09 Semi solid door with timber veneer to Bedroom ;
Graduate Married GM
nos 2 Tbr-dr
10th store
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 Tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 Tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 Tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 Tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance(with louvres); Undergraduate Single (UGS)
nos 10 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 14 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance;
Graduate Married GM
nos 2 Tbr-dr
DT/08A Laminated semi-solid timber door to Bath; Graduate
Married GM
nos 2 Tbr-dr
DB/09 Semi solid door with timber veneer to Bedroom ;
Graduate Married GM
nos 2 Tbr-dr
k 11th store
Page 28 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 29/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na Tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, RefuseChute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 2 Tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos Na Tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/10A Timber door (double leaf) with 400mmW x 500mmH
6mm thk wired clear glass panel (2 nos) to SFAP
nos 1 tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
Water Riser
nos 1 Tbr-dr
Hostel and Facult Service A artments
DHM/10 Semi solid door with timber veneer to Main Entrance(with louvres); Undergraduate Single (UGS)
nos 6 Tbr-dr
DHM/10 Semi solid door with timber veneer to Main Entrance
(with louvres); Undergraduate Double (UGD)
nos 19 Tbr-dr
l Roof level
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse
Chute (Hopper External), IR, DT, FA, SPR, TEL, HR/FE
nos 1 Tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet,
nos 1 Tbr-dr
9.6 Frameless glass door c/w ironmongery, etc
includin fixin accessoriesa 1st store
SGD/10 Tempered sl iding glass door, frameless to Meeting
Room
nos 2 Glass-dr
SGD/12 Tempered sliding glass door, frameless to Hall Officer,
Pantr Toi let
nos 3 Glass-dr
b 2nd store
GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr
c 3rd store
GD/09 Tempered glass door, Cleared full tempered
laminated glass door, frameless c/w ironmongery as
er enlar ed detail to Incubation POD
nos 1 Glass-dr
d 4th store
GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr
e 5th store
GD/10 Tempered glass door, frameless to Think Tank Room nos Glass-dr
f 6th store
GD/09 Tempered glass door, Cleared full tempered
laminated glass door c/w ironmongery as per
enlar ed detail to Incubation POD
nos Glass-dr
GD/10 Tempered glass door, frameless to Think Tank Room nos 3 Glass-dr
7th store
GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr
h 8th store Nil
i 9th store
GD/09 Tempered glass door, Cleared full tempered
laminated glass door c/w ironmongery as per
nos 1 Glass-dr
GD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr
10th storeGD/10 Tempered glass door, frameless to Think Tank Room nos 1 Glass-dr
k 11th store
l Roof level
9.7 Aluminium framed glass door c/w frame,
ironmon er etc includin fixin accessoriesa 1st store
b 2nd store
GD/7 LL Tempered glass door to Balcony / AC Ledge;
Under raduate A artment Hall Fellows UGH-F
nos 1 Glass-dr
SGD/18 UL Sliding glass door, double leaf to Bedroom 1;
Under raduate A artment Hall Fellows UGH-F
nos 1 Glass-dr
c 3rd store
d 4th store
SGD/18 LL Sliding glass door, double leaf to Bedroom 1;
Under raduate A artment Hall Master UGH-M
nos 1 Glass-dr
SGD/27 UL Sliding glass door, double leaf to Master Bedroom;
Under raduate A artment Hall Master UGH-M
nos 1 Glass-dr
e 5th store
f 6th store
SGD/18 LL Sliding glass door, double leaf to Bedroom 1;
Under raduate A artment Hall Master UGH-M
nos 1 Glass-dr
SGD/27 UL Sliding glass door, double leaf to Master Bedroom;Under raduate A artment Hall Master UGH-M
nos 1 Glass-dr
7th store
h 8th store
i 9th store
10th store
k 11th store
l Roof level
Carried Forward
Page 29 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 30/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 17 Door and Ironmon er Cont'd
9.8 Metal gate c/w frame, ironmongery etc including
fixin accessoriesa Roof level
MG/16A Metal gate, double leaf to Lift Lobby near Refuse Chute nos 1 metal-wk
6th store
MG 16 Metal ate, double leaf to Roof Access nos 1 metal-wk
9.9 Fire rated motorised roller shutter in powder
coated finished c/o ironmongery, shutter box
cover/hood, side guides, bottom rail, locking
system, barrel, removable centre mullion where
necessary, ventilation holes, etc. including fixing
a 1st store
b 2nd store
9.10 Non fire rated motorised roller shutter in powder
coated finished c/o ironmongery, shutter box
cover/hood, side guides, bottom rail, locking
system, barrel, removable centre mullion where
necessary, ventilation holes, etc. including fixing
a 1st store NIL
b 2nd store NIL
9.11 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,shall be deemed to be included or absorbed in the
a Closet
Closet 30mm thk solid timber door c/w 1mm thk high
pressure laminatef finish on both sides for door to
nos
b Stack Duct Doors
SD/05 40mm thk flush timber door c/w 1mm thk high
pressured laminate finish on both sides and 2mm thk
aluminium L-angle in powder coat finssihs frame to
nos 189 others
SD/07 40mm thk flush timber door c/w 1mm thk high
pressured laminate finish on both sides and 2mm thk
aluminium L-angle in powder coat finssihs frame to
Stack Duct at Access Corridor near Think Tank Rooms
nos 8 others
c
Other
SGD 07 to bedroom Hall Master nos 2
Wall Finishes
10.1 Plastering and vinyl co-polymer emulsion
aintin
W1a Plaster and aint to wall
a 1st store m2
b 2nd store m2 laster
c 3rd store m2 laster
d 4th store m2 laster
e 5th store m2 laster
f 6th store m2 laster
7th store m2 laster
h 8th store m2 laster
i 9th store m2 laster
10th store m2 laster
k 11th store m2 laster
l Roof m2 laster
Carried ForwardBrou ht Forward
BC S1 18 Wall Finishes cont'd
10.2 Skim coatin and vin l co- ol mer emulsion
W1 5mm skim coated and aint finished to walls
Note Plaster and paint as per Schedule of Finishes, finishes
above as er enlar ed drawin
a 1st store m2 Skim Coat
b 2nd store m2 Skim Coat
c 3rd store m2 Skim Coat
d 4th store m2 Skim Coat
e 5th store m2 Skim Coat
f 6th store m2 Skim Coat
7th store m2 Skim Coat
h 8th store m2 Skim Coat
i 9th store m2 Skim Coat
10th store m2 Skim Coat
k 11th store m2 Skim Coat
l Roof m2 Skim Coat
10.3 Homogeneous wall tile including cement sand
backin screed
W2 300mm x 600mm homogeneous wall tiles with backing
screed
a 1st store m2 wall tile
b 2nd store m2 wall tilec 3rd store m2 wall tile
d 4th store m2 wall tile
e 5th store m2 wall tile
f 6th store m2 wall tile
7th store m2 wall tile
h 8th store m2 wall tile
i 9th store m2 wall tile
10th store m2 wall tile
k 11th store m2 wall tile
l Roof m2 wall tile
10.4 Glazed ceramic wall tile including cement sand
backin screed with adhesivea 1st store
RCCW Glazed wall ti les with backing screed to Refuse ChuteChamber
m2
b 2nd store
c 3rd store
d 4th store
e 5th store
f 6th store
7th store
Carried Forward
Page 30 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 31/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 19 Wall Finishes cont'd
10.4 Glazed ceramic wall tile including cement sand
backin screed with adhesive Cont'dh 8th store
i 9th store10th store
k 11th store
l Roof
10.5 Granite tile including cement sand backing
screeda 1st store
b 2nd storec 3rd store
d 4th store
e 5th storef 6th store
7th store
h 8th store
i 9th store
10th storek 11th store
l Roof
10.6 OthersWorks not listed above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
above items .a Other wall finishes
W8 Stud wall with insulation (self adhesive polyurethenesheet vapour barrier and 50mm thk rockwool insulation
complete with 12mm thk non-combustible calcium
silicate baord) to LAN Room / ELVS Room
m2 partition
EWF Skim coat and smooth textured paint finish; external m2 Skim Coat
c Groovelines10mm wide m others
50mm wide m others
c
Floor Finishes11.1 Cement and sand screed with adhesive
a 1st store AR-101 m2 511.18 screedwash rm (m) 2.48 2.48
wash rm (f) 3.09 3.09
handica toilet 4.86 4.86
communal laundr 39.22 39.22
kitchenette 49.37 49.37
letter box 23.55 23.55
hall admin office toilet 3.91 3.91
hall admin office antr rm 7.34 7.34
hall admin office meeting rm 9.42 9.42
hall admin office store rm 4.07 4.07
hall admin office rece tion 17.96 17.96
hall admin office hall officer 40.24 40.24hall admin office head office 10.99 10.99
refuse chutte 1.90 1.90
securit rm 7.83 7.83
lift lobb 10.20 10.20
corridor 274.75 274.75
511.18
b 2nd store m2 514.39 screedlift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32GS shower 1 0.84 0.84
UGD-DL (2) bed rm 2 17.59 35.18
UGS-L 2 bed rm 2 8.81 17.62
communical toilet toilet 27.04 27.04
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
communical toilet store 36.75 36.75
hall fellow level 1 dinin /livin 29.47 29.47
hall fellow level 1 kitchen 5.22 5.22
hall fellow level 1 store 3.81 3.81
hall fellow level 1 owder room 2.38 2.38
multi use rm 24.61 24.61
think tank rm 1 30.00 30.00
corridor 248.81 248.81
514.39
c 3rd store m2 560.41 screedlift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
UGD-DL (2) bed rm 5 17.59 87.95
UGD-DL 1 bed rm 4 17.62 70.48
UGD-SL bed rm 2 17.55 35.10
UGS bed rm 1 8.68 8.68
UGS-L (1) bed rm 1 8.63 8.63
UGD bed rm 2 17.59 35.18
UGS-L 2 bed rm 1 8.81 8.81
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
Incubation od IP3 14.82 14.82
hall fellow level 2 hall 6.67 6.67
hall fellow level 2 bed rm 7.71 7.71
hall fellow level 2 bath 1 2.29 2.29
hall fellow level 2 shower 1.01 1.01
hall fellow level 2 master bed rm 11.87 11.87
corridor 171.13 171.13
560.41
d 4th store m2 650.73 screedlift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 2 17.55 35.10
UGS-L 2 bed rm 5 8.81 44.05
UGS-L (1) bed rm 1 8.63 8.63
Page 31 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 32/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
UGD-DL 1 bed rm 10 17.62 176.20
UGD-DL 2 bed rm 2 17.59 35.18
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50communical toilet HT 4.85 4.85
hall master level 1 dinin /livin 26.92 26.92
hall master level 1 kitchen 5.71 5.71
hall master level 1 store 3.72 3.72
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
hall master level 1 bed rm 1 11.49 11.49
think tank rm 2 25.10 25.10
corridor 149.60 149.60
650.73
e 5th store m2 597.30 screedlift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 4 17.55 70.20
UGS-L 2 bed rm 5 8.81 44.05
UGD-DL 1 bed rm 5 17.62 88.10
UGS-L (1) bed rm 1 8.63 8.63
UGD-DL 2 bed rm 3 17.59 52.77
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 hall 6.56 6.56hall master level 2 stud 4.04 4.04
hall master level 2 master bed rm 16.19 16.19
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 bed rm 2 10.86 10.86
hall master level 2 shower 0.95 0.95
hall master level 2 bath 2 2.51 2.51
think tank rm 3 14.00 14.00
corridor 149.45 149.45
597.30
Carried ForwardBrou ht Forward
BC S1 20 Floor Finishes Cont'd
11.1 Cement and sand screed with adhesive (Cont'd)
f 6th store m2 626.73 screedlift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
UGS-L (2) bed rm 4 8.81 35.24
UGD bed rm 3 17.59 52.77
UGD-SL bed rm 4 17.55 70.20
UGS bed rm 1 8.68 8.68
UGD-DL (1) bed rm 3 17.62 52.86
UGD-DL 2 bed rm 2 17.59 35.18
UGS-L 1 bed rm 1 8.63 8.63
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 1 dinin /livin 26.92 26.92
hall master level 1 kitchen 5.71 5.71
hall master level 1 store 3.72 3.72
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
hall master level 1 bed rm 1 11.49 11.49
think tank rm 4 30.32 30.32think tank rm 5 25.41 25.41
Incubation od IP2 15.76 15.76
corridor 149.99 149.99
626.73
7th store m2 580.89 screedlift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
UGD bed rm 1 17.59 17.59UGD-SL bed rm 7 17.55 122.85
UGS-L (2) bed rm 4 8.81 35.24
UGD-DL (1) bed rm 3 17.62 52.86
UGS-L 1 bed rm 1 8.63 8.63
UGD-DL 2 bed rm 1 17.59 17.59
UGS bed rm 1 8.68 8.68
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 hall 6.56 6.56
hall master level 2 stud 4.04 4.04
hall master level 2 master bed rm 16.19 16.19
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 bed rm 2 10.86 10.86hall master level 2 bath 2 2.51 2.51
hall master level 2 shower 0.95 0.95
think tank rm 33.82 33.82
corridor 148.71 148.71
580.89
h 8th store m2 587.73 screedlift lobb 10.20 10.20
GM livin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
UGS-L (2) bed rm 7 8.81 61.67
UGD bed rm 2 17.59 35.18UGD-SL bed rm 7 17.55 122.85
UGS bed rm 1 8.68 8.68
UGD-DL (1) bed rm 3 17.62 52.86
UGD-DL 2 bed rm 3 17.59 52.77
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 148.71 148.71
587.73
i 9th store m2 589.93 screedlift lobb 10.20 10.20
GM livin /dinin /kitchen 2 12.42 24.84
Page 32 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 33/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
GM bed rm 2 10.27 20.54
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
UGS-L 2 bed rm 5 8.81 44.05UGD bed rm 2 17.59 35.18
UGD-SL bed rm 5 17.55 87.75
UGS bed rm 1 8.68 8.68
UGD-DL 1 bed rm 6 17.62 105.72
UGD-DL 2 bed rm 2 17.59 35.18
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
think tank rm 7 19.65 19.65
corridor 148.71 148.71
589.93
10th store m2 627.22 screed
lift lobb 10.20 10.20GM livin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
UGD-DL (1) bed rm 8 17.62 140.96
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 4 17.55 70.20
UGS bed rm 1 8.68 8.68
UGS-L 2 bed rm 6 8.81 52.86
UGD-DL 2 bed rm 1 17.59 17.59
UGS-L 1 bed rm 1 8.63 8.63
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
think tank rm 8 14.30 14.30think tank rm 9 25.10 25.10
corridor 148.71 148.71
627.22
k 11th store m2 560.15 screedlift lobby 10.20 10.20
UGD-DL 2 bed rm 3 17.59 52.77
UGS bed rm 1 8.68 8.68
UGD bed rm 2 17.59 35.18
UGD-DL (1) bed rm 10 17.62 176.20
UGD-SL bed rm 3 17.55 52.65
UGS-L 2 bed rm 4 8.81 35.24
UGS-L (1) bed rm 1 8.63 8.63
communical toilet toilet 36.58 36.58communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 137.67 137.67
560.15
l Roof screedlift lobb 10.20 10.20 m2 10.20
10.20
11.2 Cement and sand screed with floor hardener
a 1st store m2 200.00 flr hardlv switch rm 7.67 7.67
low level transfer tank
rm73.17 73.17
elv s stem rm 31.48 31.48
common area 11.92 11.92
tow truck route 75.76 75.76
200.00
b 2nd store m2 52.22 flr hardcommon area 47.00 47.00
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD-DL 2 dr in closet 2 0.88 1.76
UGS-L 2 dr in closet 2 0.46 0.92hall fellow level 1 ac led e 1.10 1.10
52.22
c 3rd store m2 47.97 flr hardcommon area 28.72 28.72
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD-DL 2 dr in closet 5 0.88 4.40
UGD-DL 1 dr in closet 4 0.92 3.68
UGD-SL dr in closet 2 0.92 1.84
UGS dr in closet 1 0.46 0.46
UGS-L 1 dr in closet 1 0.46 0.46
UGD dr in closet 2 0.88 1.76
UGS-L (2) dr in closet 1 0.46 0.46hall fellow level 2 ac led e 1.98 1.98
hall fellow level 2 balcon 2.77 2.77
47.97
d 4th store m2 89.00 flr hardcommon area 68.07 68.07
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 2 0.92 1.84
UGS-L 2 dr in closet 5 0.46 2.30
UGS-L (1) dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 10 0.92 9.20
UGD-DL 2 dr in closet 2 0.88 1.76hall master balcon /ac led e 2.17 2.17
89.00
e 5th store m2 68.34 flr hardcommon area 48.39 48.39
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 4 0.92 3.68
UGS-L (2) dr in closet 5 0.46 2.30
UGD-DL 1 dr in closet 5 0.92 4.60
UGS-L 1 dr in closet 1 0.46 0.46
UGD-DL 2 dr in closet 3 0.88 2.64
hall master level 2 balcon /ac led e 3.07 3.07
68.34
f 6th store m2 77.62 flr hardcommon area 60.41 60.41
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGS-L 2 dr in closet 4 0.46 1.84
UGD dr in closet 3 0.88 2.64
UGD-SL dr in closet 4 0.92 3.68
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 3 0.92 2.76
UGD-DL (2) dr in closet 2 0.88 1.76
UGS-L 1 dr in closet 1 0.46 0.46
Page 33 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 34/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
hall master level 1 balcon /ac led e 2.17 2.17
77.62
7th store m2 66.87 flr hardcommon area 38.44 38.44
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 1 0.88 0.88
UGD-SL dr in closet 7 0.92 6.44
UGS-L (2) dr in closet 4 0.46 1.84
UGD-DL 1 dr in closet 3 0.92 2.76
UGS-L 1 dr in closet 1 0.46 0.46
UGD-DL 2 dr in closet 1 0.88 0.88
UGS dr in closet 1 0.46 0.46
hall master level 2 balcon /ac led e 3.07 3.07
LAN rm 10.20 10.20
66.87
h 8th store m2 150.25 flr hardcommon area 132.05 132.05
GM dr in closet 2 0.46 0.92
UGS-L 2 dr in closet 7 0.46 3.22
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 7 0.92 6.44
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 3 0.92 2.76
UGD-DL 2 dr in closet 3 0.88 2.64
150.25
i 9th store m2 61.53 flr hard
common area 44.21 44.21GM dr in closet 2 0.46 0.92
UGS-L (2) dr in closet 5 0.46 2.30
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 5 0.92 4.60
UGS dr in closet 1 0.46 0.46
UGD-DL (1) dr in closet 6 0.92 5.52
UGD-DL 2 dr in closet 2 0.88 1.76
61.53
10th store m2 74.25 flr hardcommon area 55.97 55.97
GM dr in closet 2 0.46 0.92
UGD-DL (1) dr in closet 8 0.92 7.36
UGD drying closet 2 0.88 1.76UGD-SL dr in closet 4 0.92 3.68
UGS dr in closet 1 0.46 0.46
UGS-L (2) dr in closet 6 0.46 2.76
UGD-DL (2) drying closet 1 0.88 0.88
UGS-L 1 dr in closet 1 0.46 0.46
74.25
k 11th store m2 114.19 flr hardcommon area 18.93 18.93
heat um rm 76.14 76.14
UGD-DL (2) dr in closet 3 0.88 2.64
UGS dr in closet 1 0.46 0.46
UGD dr in closet 2 0.88 1.76
UGD-DL 1 dr in closet 10 0.92 9.20UGD-SL dr in closet 3 0.92 2.76
UGS-L 2 dr in closet 4 0.46 1.84
UGS-L 1 dr in closet 1 0.46 0.46
114.19
l Roof m2 142.06 flr hardcommon area 22.83 22.83
water tank 119.23 119.23
142.06
11.3 Li uid -a lied water roofin membrane
a 1st store
WF1 Wate roofin to wet areas to floor m2 386.92 water rf Flexible cementitous waterproof coating; rc slab
surface minimum wood trowelled smooth to receive
waterproofing coating, f inishes and 25mm thk c/s
wash rm (m) 2.48 2.48
wash rm (f) 3.09 3.09
handica toilet 4.86 4.86
communal laundr 39.22 39.22
kitchenette 49.37 49.37
hall admin office toilet 3.91 3.91
hall admin office antr rm 7.34 7.34
refuse chutte 1.90 1.90
corridor 274.75 274.75
386.92
WF1 Wateproofing to wet areas to wall upturn (h=300mm) m 187.61 waterprf
Flexible cementitous waterproof coating; rc slab
surface minimum wood trowelled smooth to receive
waterproofing coating, f inishes and 20mm thk c/s
wash rm (m) 6.92 6.92
DT-08 (1) 0.80 (0.80)
wash rm (f) 7.26 7.26
DT-08 (1) 0.80 (0.80)
handica toilet 8.69 8.69
DHT-10 (1) 1.00 (1.00)
communal laundr 27.82 27.82
DL-10 (1) 1.00 (1.00)
kitchenette 36.25 36.25
DK-10 (1) 1.00 (1.00)
hall admin office toilet 7.92 7.92
SGD-12 (1) 1.20 (1.20)
hall admin office antr rm 11.10 11.10
SGD-12 (1) 1.20 (1.20)
refuse chutte 5.54 5.54
FD2-RC12 (1) 1.20 (1.20)
corridor 105.91 105.91
DL-10 (1) 1.00 (1.00)
DK-10 (1) 1.00 (1.00)
DT-08 (2) 0.80 (1.60)
DHT-10 (1) 1.00 (1.00)DS-10 (2) 1.00 (2.00)
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD2-12 (1) 1.20 (1.20)
FD2-18 (2) 1.80 (3.60)
D-10 (1) 1.00 (1.00)
FD.5-20 (1) 2.00 (2.00)
SGD-12 (1) 1.20 (1.20)
187.61
Page 34 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 35/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
WF1 Wateproofing to wet areas to shower wall (h=1.80m) m Na waterprf
Flexible cementitous waterproof coating on c/s leveling
render, finishes and 20mm thk c/s protection screedmeasured se aratel
Wate roofin to Sum Pit
Flexible cementitous waterproof coating with 25mm
thk c s rotection screed
Floor m2 NIL
Wall m2 NIL
Wate roofin to Water Tank
Flexible cementitous waterproof coating with 25mm
thk c/s protection screed; rc slab surface minimum
wood trowelled smooth to receive waterproofing
Floor m2 73.17 NILlow level transfer tank
rm73.17 73.17
Wall m2 NIL
WFL Wate roofin to Lift Pit - floor m2 9.68 water rf lift 2 4.84 9.68
WFL Wate roofin to Lift Pit - wall m2 612.48 water rf lift 2 8.80 39.90 702.24
o enin (2) 12 1.70 2.20 (89.76)
612.48
b 2nd store
WF2 Wate roofin to wet areas to floor m2 374.65 water rf GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 27.04 27.04
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall fellow level 1 kitchen 5.22 5.22
hall fellow level 1 owder room 2.38 2.38
think tank rm 1 30.00 30.00
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD-DL 2 dr in closet 2 0.88 1.76
UGS-L (2) dr in closet 2 0.46 0.92
hall fellow level 1 ac led e 1.10 1.10
common area ac led e 14.58 14.58
common area ac s ace 2.47 2.47
common area rc slab 22.68 22.68
corridor 248.81 248.81
374.65
WF2 Wateproofing to wet areas to wall upturn (h=300mm) m 285.89 waterprf
GS-L bath 2 6.05 12.10
DT-08A (2) 0.80 (1.60)
GS bath 1 6.29 6.29
DT-08A (1) 0.80 (0.80)
communical toilet toilet 33.53 33.53
FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.50 5.50
o enin (1) 0.70 (0.70)
communical toilet HT 8.79 8.79
FD.5-HT10 (1) 1.05 (1.05)
hall fellow level 1 kitchen 7.54 7.54
hall fellow level 1 owder room 6.19 6.19
DT-08A (1) 0.80 (0.80)
think tank rm 1 25.70 25.70
GD-10 (1) 1.00 (1.00)
GS-L dr in closet 2 2.93 5.86
o enin (2) 0.85 (1.70)
GS dr in closet 1 2.93 2.93
o enin (1) 0.85 (0.85)
UGD-DL 2 dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)UGS-L (2) dr in closet 2 3.00 6.00
o enin (2) 0.85 (1.70)
hall fellow level 1 ac led e 4.03 4.03
corridor 194.07 194.07
DHM-10 (7) 1.00 (7.00)
FD.5-HM10 (1) 1.00 (1.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
FD.5-15A (1) 1.50 (1.50)
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
o enin (1) 8.29 (8.29)
285.89
WF2 Wateproofing to wet areas to shower wall (h=1.80m) m 9.83 waterprf
GS-L shower 2 3.35 6.70
GS shower 1 3.13 3.13
9.83
c 3rd store
WF3 Wate roofin to wet areas to floor m2 267.82 water rf GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall fellow level 2 bath 1 2.29 2.29
hall fellow level 2 shower 1.01 1.01
GS-L dr in closet 2 0.48 0.96
GS drying closet 1 0.48 0.48
UGD-DL 2 dr in closet 5 0.88 4.40
UGD-DL 1 dr in closet 4 0.92 3.68
UGD-SL dr in closet 2 0.92 1.84
UGS drying closet 1 0.46 0.46
UGS-L 1 dr in closet 1 0.46 0.46
UGD dr in closet 2 0.88 1.76
UGS-L (2) dr in closet 1 0.46 0.46
hall fellow level 2 ac ledge 1.98 1.98
hall fellow level 2 balcon 2.77 2.77
common area ac led e 11.52 11.52
common area ac s ace 2.26 2.26
common area rc slab 7.53 7.53
corridor 171.13 171.13
267.82
WF3 Wateproofing to wet areas to wall upturn (h=300mm) m 305.97 waterprf
GS-L bath 2 5.39 10.78
Page 35 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 36/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
DT-08A (2) 0.80 (1.60)
GS bath 1 5.52 5.52
DT-08A (1) 0.80 (0.80)
communical toilet toilet 37.37 37.37FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
hall fellow level 2 bath 1 4.63 4.63
DT-08A (1) 0.80 (0.80)
GS-L dr in closet 2 2.93 5.86
o enin (2) 0.85 (1.70)
GS dr in closet 1 2.93 2.93
o enin (1) 0.85 (0.85)
UGD-DL 2 dr in closet 5 5.50 27.50
o enin (5) 1.70 (8.50)
UGD-DL (1) dr in closet 4 6.00 24.00
o enin (4) 1.70 (6.80)UGD-SL dr in closet 2 6.00 12.00
o enin (2) 1.70 (3.40)
UGS dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGS-L 1 dr in closet 1 3.00 3.00
o enin (1) 1.70 (1.70)
UGD dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)
UGS-L 2 dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
hall fellow level 2 ac led e 6.76 6.76
hall fellow level 2 balcon 8.92 8.92
corridor 197.62 197.62
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
FD.5-12 (1) 1.20 (1.20)
DS-08 (1) 0.80 (0.80)
DHM-10 (21) 1.00 (21.00)
FD.5-HM10 (4) 1.00 (4.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-09 (1) 0.90 (0.90)
305.97
WF3 Wateproofing to wet areas to shower wall (h=1.80m) m 13.08 waterprf
GS-L shower 2 3.35 6.70
GS shower 1 3.13 3.13
hall fellow level 2 shower 3.25 3.25
13.08
d 4th store
WF4 Wate roofin to wet areas to floor m2 318.39 water rf
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 1 kitchen 5.71 5.71
hall master level 1 bath 1 2.56 2.56hall master level 1 shower 1.21 1.21
think tank rm 2 25.10 25.10
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 2 0.92 1.84
UGS-L 2 dr in closet 5 0.46 2.30
UGS-L 1 dr in closet 1 0.46 0.46
UGD-DL (1) dr in closet 10 0.92 9.20
UGD-DL 2 dr in closet 2 0.88 1.76
hall master balcon /ac led e 2.17 2.17
common area ac led e 7.37 7.37
common area ac s ace 11.97 11.97
common area rc slab 41.11 41.11
corridor 149.60 149.60
318.39
WF4 Wateproofing to wet areas to wall upturn (h=300mm) m 328.46 waterprf
GS-L bath 2 5.39 10.78
DT-08A (2) 0.80 (1.60)
GS bath 1 5.52 5.52
DT-08A (1) 0.80 (0.80)
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)hall master level 1 kitchen 12.10 12.10
o enin (1) 0.85 (0.85)
hall master level 1 bath 1 5.35 5.35
DT-08A (1) 0.80 (0.80)
think tank rm 2 1.00
GD-10 (1) 1.00 (1.00)
GS-L dr in closet 2 2.93 5.86
o enin (2) 0.85 (1.70)
GS dr in closet 1 2.93 2.93
o enin (1) 0.85 (0.85)
UGD dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)
UGD-SL dr in closet 2 6.00 12.00
o enin (2) 1.70 (3.40)
UGS-L (2) dr in closet 5 3.00 15.00o enin (5) 0.85 (4.25)
UGS-L 1 dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGD-DL (1) dr in closet 10 6.00 60.00
o enin (10) 1.70 (17.00)
UGD-DL 2 dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)
hall master balcon /ac led e 6.40 6.40
corridor 197.62 197.62
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (25) 1.00 (25.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
328.46
WF4 Wateproofing to wet areas to shower wall (h=1.80m) m 13.29 waterprf
GS-L shower 2 3.35 6.70
GS shower 1 3.13 3.13
hall master level 1 shower 3.46 3.46
13.29
Page 36 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 37/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. type location ddt No. Side Area L W D/H Sub-Qty Unit t Code Rate
e 5th store
WF5 Wate roofin to wet areas to floor m2 284.19 water rf
GS-L bath 2 2.27 4.54GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 bath 2 2.51 2.51
hall master level 2 shower 0.95 0.95
think tank rm 3 14.00 14.00
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 4 0.92 3.68UGS-L 2 dr in closet 5 0.46 2.30
UGD-DL 1 dr in closet 5 0.92 4.60
UGS-L 1 dr in closet 1 0.46 0.46
UGD-DL (2) dr in closet 3 0.88 2.64
hall master level 2 balcon /ac led e 3.07 3.07
common area ac led e 9.01 9.01
common area ac s ace 5.01 5.01
common area rc slab 26.75 26.75
corridor 149.45 149.45
284.19
WF5 Wateproofing to wet areas to wall upturn (h=300mm) m 322.65 waterprf
GS-L bath 2 5.39 10.78DT-08A (2) 0.80 (1.60)
GS bath 1 5.52 5.52
DT-08A (1) 0.80 (0.80)
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
hall master level 2 master bath 5.35 5.35
DT-08A (1) 0.80 (0.80)
hall master level 2 bath 2 5.16 5.16
DB-10 (1) 1.00
think tank rm 3 14.96 14.96
GD-10 (1) 1.00 (1.00)
GS-L dr in closet 2 2.93 5.86
o enin (2) 0.85 (1.70)
GS dr in closet 1 2.93 2.93
opening (1) 0.85 (0.85)
UGD dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)
UGD-SL dr in closet 4 6.00 24.00
o enin (4) 1.70 (6.80)
UGS-L 2 dr in closet 5 3.00 15.00
o enin (5) 0.85 (4.25)
UGD-DL (1) dr in closet 5 6.00 30.00
o enin (5) 1.70 (8.50)
UGS-L 1 dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGD-DL 2 dr in closet 3 5.50 16.50
o enin (3) 1.70 (5.10)hall master level 2 balcon /ac led e 6.40 6.40
corridor 192.04 192.04
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (26) 1.00 (26.00)
FD.5-HM10 (1) 1.00 (1.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
322.65
WF5 Wateproofing to wet areas to shower wall (h=1.80m) m 16.13 waterprf
GS-L shower 2 3.35 6.70
GS shower 1 3.13 3.13
hall master level 2 shower 3.46 3.46
hall master level 2 shower 2.84 2.84
16.13
f 6th store
WF6 Wate roofin to wet areas to floor m2 337.96 water rf GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 1 kitchen 5.71 5.71
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
think tank rm 4 30.32 30.32
think tank rm 5 25.41 25.41
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGS-L 2 dr in closet 4 0.46 1.84
UGD dr in closet 3 0.88 2.64
UGD-SL dr in closet 4 0.92 3.68
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 3 0.92 2.76UGD-DL (2) dr in closet 2 0.88 1.76
UGS-L 1 dr in closet 1 0.46 0.46
hall master level 1 balcon /ac led e 2.17 2.17
common area ac led e 5.92 5.92
common area ac s ace 12.31 12.31
common area rc slab 34.49 34.49
corridor 149.99 149.99
337.96
WF6 Wateproofing to wet areas to wall upturn (h=300mm) m 357.26 waterprf
GS-L bath 2 5.39 10.78
DT-08A (2) 0.80 (1.60)
GS bath 1 5.52 5.52
DT-08A (1) 0.80 (0.80)
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
hall master level 1 kitchen 12.10 12.10
o enin (1) 0.85 (0.85)
hall master level 1 bath 1 5.35 5.35
DT-08A (1) 0.80 (0.80)
think tank rm 4 26.78 26.78
GD-10 (1) 1.00 (1.00)
think tank rm 5 22.32 22.32
GD-10 (1) 1.00 (1.00)
Page 37 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 38/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
GS-L dr in closet 2 2.93 5.86
o enin (2) 0.85 (1.70)
GS dr in closet 1 2.93 2.93
o enin (1) 0.85 (0.85)UGS-L 2 dr in closet 4 3.00 12.00
o enin (4) 0.85 (3.40)
UGD dr in closet 3 5.50 16.50
o enin (3) 1.70 (5.10)
UGD-SL dr in closet 4 6.00 24.00
o enin (4) 1.70 (6.80)
UGS dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGD-DL 1 dr in closet 3 6.00 18.00
o enin (3) 1.70 (5.10)
UGD-DL 2 dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)
UGS-L 1 dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
hall master level 1 balcon /ac led e 6.40 6.40corridor 195.92 195.92
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (22) 1.00 (22.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (2) 1.00 (2.00)
GD-09 (1) 0.90 (0.90)
357.26
WF6 Wateproofing to wet areas to shower wall (h=1.80m) m 13.29 waterprf
GS-L shower 2 3.35 6.70
GS shower 1 3.13 3.13
hall master level 1 shower 3.46 3.46
13.29
7th store
WF7 Wate roofin to wet areas to floor m2 291.53 water rf
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 bath 2 2.51 2.51
hall master level 2 shower 0.95 0.95
think tank rm 33.82 33.82
corridor 148.71 148.71
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 1 0.88 0.88
UGD-SL dr in closet 7 0.92 6.44
UGS-L (2) dr in closet 4 0.46 1.84
UGD-DL (1) dr in closet 3 0.92 2.76
UGS-L 1 dr in closet 1 0.46 0.46
UGD-DL 2 dr in closet 1 0.88 0.88UGS dr in closet 1 0.46 0.46
hall master level 2 balcony/ac ledge 3.07 3.07
common area ac led e 2.29 2.29
common area ac s ace 6.85 6.85
common area rc slab 21.61 21.61
291.53
WF7 Wateproofing to wet areas to wall upturn (h=300mm) m 334.38 waterprf
GS-L bath 2 5.39 10.78
DT-08A (2) 0.80 (1.60)
GS bath 1 5.52 5.52
DT-08A (1) 0.80 (0.80)
communical toilet toilet 37.37 37.37FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
hall master level 2 master bath 5.35 5.35
DT-08A (1) 0.80 (0.80)
hall master level 2 bath 2 5.16 5.16
DB-10 (1) 1.00 (1.00)
think tank rm 28.87 28.87
GD-10 (1) 1.00 (1.00)
GS-L dr in closet 2 2.93 5.86
o enin (2) 0.85 (1.70)
GS dr in closet 1 2.93 2.93
o enin (1) 0.85 (0.85)UGD dr in closet 1 5.50 5.50
o enin (1) 1.70 (1.70)
UGD-SL dr in closet 7 6.00 42.00
o enin (7) 1.70 (11.90)
UGS-L 2 dr in closet 4 3.00 12.00
o enin (4) 0.85 (3.40)
UGD-DL (1) dr in closet 3 6.00 18.00
o enin (3) 1.70 (5.10)
UGS-L 1 dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGD-DL 2 dr in closet 1 5.50 5.50
o enin (1) 1.70 (1.70)
UGS dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
hall master level 2 balcon /ac led e 8.34 8.34corridor 192.02 192.02
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (19) 1.00 (19.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
FD2-10 (1) 1.00 (1.00)
334.38
WF7 Wateproofing to wet areas to shower wall (h=1.80m) m 16.13 waterprf
GS-L shower 2 3.35 6.70
GS shower 1 3.13 3.13
hall master level 2 shower 3.46 3.46
hall master level 2 shower 2.84 2.84
16.13
h 8th store
WF8 Wate roofin to wet areas to floor m2 340.63 water rf GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
Page 38 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 39/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 148.71 148.71
GM dr in closet 2 0.46 0.92UGS-L 2 dr in closet 7 0.46 3.22
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 7 0.92 6.44
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 3 0.92 2.76
UGD-DL (2) dr in closet 3 0.88 2.64
common area ac led e 4.58 4.58
common area ac s ace 20.99 20.99
common area rc slab 98.72 98.72
340.63
WF8 Wateproofing to wet areas to wall upturn (h=300mm) m 297.06 waterprf
GM bath 2 5.24 10.48DT-08A (2) 0.80 (1.60)
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet janitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
GM drying closet 2 2.80 5.60
o enin (2) 0.85 (1.70)
UGS-L 2 dr in closet 7 3.00 21.00
(7) 0.85 (5.95)
UGD drying closet 2 5.50 11.00
(2) 1.70 (3.40)
UGD-SL dr in closet 7 6.00 42.00
(7) 1.70 (11.90)UGS dr in closet 1 3.00 3.00
(1) 0.85 (0.85)
UGD-DL 1 dr in closet 3 6.00 18.00
(3) 1.70 (5.10)
UGD-DL (2) dr in closet 3 5.50 16.50
(3) 1.70 (5.10)
corridor 192.28 192.28
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (22) 1.00 (22.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
297.06
WF8 Wateproofing to wet areas to shower wall (h=1.80m) m 6.70 waterprf
GM shower 2 3.35 6.70
6.70
i 9th store
WF9 Wate roofin to wet areas to floor m2 271.76 water rf
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
think tank rm 7 19.65 19.65
corridor 148.71 148.71
GM dr in closet 2 0.46 0.92
UGS-L 2 dr in closet 5 0.46 2.30
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 5 0.92 4.60
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 6 0.92 5.52
UGD-DL (2) dr in closet 2 0.88 1.76
common area ac led e 18.69 18.69
common area ac s ace 4.58 4.58
common area rc slab 13.38 13.38
271.76
WF9 Wateproofing to wet areas to wall upturn (h=300mm) m 246.29 waterprf
GM bath 2 2.00
DT-08A (2) 0.80 (1.60)
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet janitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
think tank rm 7 18.51 18.51
GD-10 (1) 1.00 (1.00)
GM dr in closet 2 2.80 5.60
o enin (2) 0.85 (1.70)UGS-L (2) drying closet 5 3.00 15.00
o enin (5) 0.85 (4.25)
UGD dr in closet 2 5.50 11.00
o enin (2) 5.50 (11.00)
UGD-SL dr in closet 5 6.00 30.00
o enin (5) 5.50 (27.50)
UGS dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGD-DL 1 dr in closet 6 6.00 36.00
o enin (6) 5.50 (33.00)
UGD-DL 2 dr in closet 2 5.50 11.00
o enin (2) 5.50 (11.00)
corridor 192.28 192.28
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (20) 1.00 (20.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
246.29
WF9 Wateproofing to wet areas to shower wall (h=1.80m) m 6.70 waterprf
GM shower 2 3.35 6.70
6.70
10th store
WF10 Wate roofin to wet areas to floor m2 304.09 water rf
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
think tank rm 8 14.30 14.30
think tank rm 9 25.10 25.10
corridor 148.71 148.71
GM dr in closet 2 0.46 0.92
UGD-DL 1 dr in closet 8 0.92 7.36
Page 39 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 40/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 4 0.92 3.68
UGS dr in closet 1 0.46 0.46
UGS-L 2 dr in closet 6 0.46 2.76UGD-DL (2) dr in closet 1 0.88 0.88
UGS-L 1 dr in closet 1 0.46 0.46
common area ac led e 2.29 2.29
common area ac s ace 11.77 11.77
common area rc slab 34.21 34.21
304.09
WF10 Wateproofing to wet areas to wall upturn (h=300mm) m 324.77 waterprf
GM bath 2 5.24 10.48
DT-08A (2) 0.80 (1.60)
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
think tank rm 8 15.05 15.05
GD-10 (1) 1.00 (1.00)
think tank rm 9 20.76 20.76
GD-10 (1) 1.00 (1.00)
GM dr in closet 2 2.80 5.60
o enin (2) 0.85 (1.70)
UGD-DL 1 dr in closet 8 6.00 48.00
o enin (8) 1.70 (13.60)
UGD dr in closet 2 5.50 11.00
o enin (2) 1.70 (3.40)
UGD-SL dr in closet 4 6.00 24.00
o enin (4) 1.70 (6.80)UGS dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
UGS-L 2 dr in closet 6 3.00 18.00
o enin (6) 1.70 (10.20)
UGD-DL (2) dr in closet 1 5.50 5.50
o enin (1) 1.70 (1.70)
UGS-L 1 dr in closet 1 3.00 3.00
o enin (1) 0.85 (0.85)
corridor 192.28 192.28
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (22) 1.00 (22.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)
GD-10 (2) 1.00 (2.00)
324.77
WF10 Wateproofing to wet areas to shower wall (h=1.80m) m 6.70 waterprf
GM shower 2 3.35 6.70
6.70
k 11th store
WF11 Wate roofin to wet areas to floor m2 287.63 water rf communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 137.67 137.67
heat um rm 76.14 76.14
UGD-DL (2) dr in closet 3 0.88 2.64
UGS dr in closet 1 0.46 0.46
UGD dr in closet 2 0.88 1.76
UGD-DL 1 dr in closet 10 0.92 9.20
UGD-SL dr in closet 3 0.92 2.76
UGS-L 2 dr in closet 4 0.46 1.84
UGS-L 1 dr in closet 1 0.46 0.46
common area ac led e 11.77 11.77
287.63
WF11 Wateproofing to wet areas to wall upturn (h=300mm) m 354.75 waterprf
communical toilet toilet 37.37 37.37
FD.5-T10 (1) 1.05 (1.05)
communical toilet anitor 5.41 5.41
o enin (1) 0.70 (0.70)
communical toilet HT 8.82 8.82
FD.5-HT10 (1) 1.05 (1.05)
heat um rm 26.90 26.90
ril (1) 1.38 (1.38)
UGD-DL 2 dr in closet 3 5.50 16.50
5.50 5.50
UGS dr in closet 1 3.00 3.00
0.85 0.85
UGD dr in closet 2 5.50 11.001.70 1.70
UGD-DL (1) dr in closet 10 6.00 60.00
1.70 1.70
UGD-SL dr in closet 3 6.00 18.00
1.70 1.70
UGS-L (2) dr in closet 4 3.00 12.00
0.85 0.85
UGS-L 1 dr in closet 1 3.00 3.00
0.85 0.85
corridor 178.16 178.16
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (20) 1.00 (20.00)FD.5-HM10 (2) 1.00 (2.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
heat um (1) 1.38 (1.38)
354.75
WF11 Wateproofing to wet areas to shower wall (h=1.80m) m Na waterprf
11.4 Heavy duty epoxy polyurenthane floor coating system
a 1st store
Carried Forward
Page 40 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 41/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 21 Floor Finishes Cont'd
11.5 Heavy duty epoxy polyurenthane floor
coatin s stem to skirtina 1st store
11.6 Homo eneous tile
a 1st store
1F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
1F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 10.43 F2
wash rm (m) 2.48 2.48
wash rm (f) 3.09 3.09
handica toilet 4.86 4.86
10.43
1F3 600mm x 600mm non-slip homogenous floor tiles with
cement and sand screed
m2 F3
1F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
1F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
1F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 41.58
letter box 23.55 23.55
securit rm 7.83 7.83
lift lobb 10.20 10.20
41.58
Non-slip homogenous floor tiles with cement and sand
screed
m2 374.59
communal laundr 39.22 39.22
kitchenette 49.37 49.37
hall admin office toilet 3.91 3.91
hall admin office antr rm 7.34 7.34
corridor 274.75 274.75
374.59
RCCF Ceramic floor tiles with cement and sand screed to
Refuse Chute Chamber
m2 1.90
refuse chutte 1.90 1.90
b 2nd store
2F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
2F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 45.67 F2
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 27.04 27.04
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall fellow level 1 owder room 2.38 2.38
45.67
2F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
2F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
2F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 131.89
lift lobb 10.20 10.20GS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
communical toilet store 36.75 36.75
hall fellow level 1 dinin /livin 29.47 29.47
hall fellow level 1 store 3.81 3.81
multi use rm 24.61 24.61
131.89
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 52.80
UGD-DL (2) bed rm 2 17.59 35.18
UGS-L 2 bed rm 2 8.81 17.62
52.80
Non-slip homogenous floor tiles with cement and sand
screed
m2 254.03
hall fellow level 1 kitchen 5.22 5.22
corridor 248.81 248.81
254.03
c 3rd store3F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
3F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 65.14 F2
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bed rm 1 9.01 9.01
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall fellow level 2 bath 1 2.29 2.29
hall fellow level 2 shower 1.01 1.01
65.14
3F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
3F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
3F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 54.49
lift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
hall fellow level 2 hall 6.67 6.67
hall fellow level 2 bed rm 7.71 7.71
hall fellow level 2 master bed rm 11.87 11.87
54.49
Page 41 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 42/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 254.83
UGD-DL 2 bed rm 5 17.59 87.95
UGD-DL (1) bed rm 4 17.62 70.48
UGD-SL bed rm 2 17.55 35.10
UGS bed rm 1 8.68 8.68
UGS-L 1 bed rm 1 8.63 8.63
UGD bed rm 2 17.59 35.18
UGS-L (2) bed rm 1 8.81 8.81
254.83
Non-slip homogenous floor tiles with cement and sand
screed
m2 171.13
corridor 171.13 171.13
171.13
d 4th store
4F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
4F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 62.31 F2
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50communical toilet HT 4.85 4.85
hall master level 1 kitchen 5.71 5.71
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
62.31
4F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
4F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
4F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 79.38
lift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
hall master level 1 dinin /livin 26.92 26.92
hall master level 1 store 3.72 3.72
hall master level 1 bed rm 1 11.49 11.49
79.38
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 334.34
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 2 17.55 35.10
UGS-L (2) bed rm 5 8.81 44.05UGS-L 1 bed rm 1 8.63 8.63
UGD-DL 1 bed rm 10 17.62 176.20
UGD-DL (2) bed rm 2 17.59 35.18
334.34
Non-slip homogenous floor tiles with cement and sand
screed
m2 149.60
corridor 149.60 149.60
149.60
e 5th store
5F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
5F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 60.02 F2
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 shower 1.21 1.21
hall master level 2 shower 0.95 0.95
hall master level 2 master bath 2.52 2.52
hall master level 2 bath 2 2.51 2.51
60.02
5F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
5F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
5F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 78.06
lift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
hall master level 2 hall 6.56 6.56
hall master level 2 stud 4.04 4.04
hall master level 2 master bed rm 16.19 16.19
hall master level 2 bed rm 2 10.86 10.86
78.06
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 298.93
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 4 17.55 70.20
UGS-L 2 bed rm 5 8.81 44.05
UGD-DL (1) bed rm 5 17.62 88.10UGS-L 1 bed rm 1 8.63 8.63
UGD-DL 2 bed rm 3 17.59 52.77
298.93
Non-slip homogenous floor tiles with cement and sand
screed
m2 149.45
corridor 149.45 149.45
149.45
Page 42 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 43/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
f 6th store
6F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
6F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 59.15 F2
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
hall master level 1 kitchen 5.71 5.71
59.15
6F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
6F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
6F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 79.38
lift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
hall master level 1 dinin /livin 26.92 26.92
hall master level 1 store 3.72 3.72
hall master level 1 bed rm 1 11.49 11.49
79.38
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 263.56
UGS-L (2) bed rm 4 8.81 35.24
UGD bed rm 3 17.59 52.77
UGD-SL bed rm 4 17.55 70.20
UGS bed rm 1 8.68 8.68
UGD-DL (1) bed rm 3 17.62 52.86
UGD-DL (2) bed rm 2 17.59 35.18
UGS-L 1 bed rm 1 8.63 8.63
263.56
Non-slip homogenous floor tiles with cement and sand
screed
m2 149.99
corridor 149.99 149.99
149.99
7th store
7F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
7F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 60.02 F2
GS-L bath 2 2.27 4.54
GS-Lshower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 shower 0.95 0.95
hall master level 2 bath 2 2.51 2.51
60.02
7F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
7F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
7F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 74.90
lift lobb 10.20 10.20
GS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
hall master level 2 hall 6.56 6.56
hall master level 2 stud 4.04 4.04
hall master level 2 master bed rm 16.19 16.19
hall master level 2 bed rm 2 10.86 10.86
74.90
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 263.44
UGD bed rm 1 17.59 17.59
UGD-SL bed rm 7 17.55 122.85
UGS-L 2 bed rm 4 8.81 35.24
UGD-DL (1) bed rm 3 17.62 52.86
UGS-L (1) bed rm 1 8.63 8.63
UGD-DL 2 bed rm 1 17.59 17.59
UGS bed rm 1 8.68 8.68
263.44
Non-slip homogenous floor tiles with cement and sand
screed
m2 148.71
corridor 148.71 148.71
148.71
h 8th store
8F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
8F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 49.43 F2
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
49.43
8F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
8F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
8F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 55.58
lift lobb 10.20 10.20
Page 43 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 44/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
GM livin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
55.58
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 334.01
UGS-L 2 bed rm 7 8.81 61.67
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 7 17.55 122.85
UGS bed rm 1 8.68 8.68
UGD-DL 1 bed rm 3 17.62 52.86
UGD-DL 2 bed rm 3 17.59 52.77
334.01
Non-slip homogenous floor tiles with cement and sand
screed
m2 148.71
corridor 148.71 148.71
148.71
i 9th store
9F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
9F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 49.43 F2
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
49.43
9F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
9F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
9F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 55.58
lift lobb 10.20 10.20
GM livin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
55.58
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 316.56
UGS-L 2 bed rm 5 8.81 44.05
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 5 17.55 87.75
UGS bed rm 1 8.68 8.68
UGD-DL 1 bed rm 6 17.62 105.72
UGD-DL (2) bed rm 2 17.59 35.18
316.56
Non-slip homogenous floor tiles with cement and sandscreed
m2 148.71
corridor 148.71 148.71
148.71
10th store
10F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
10F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 49.43 F2
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50communical toilet HT 4.85 4.85
49.43
10F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
10F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
10F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 55.58
lift lobb 10.20 10.20
GMlivin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
55.58
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 334.10
UGD-DL 1 bed rm 8 17.62 140.96
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 4 17.55 70.20
UGS bed rm 1 8.68 8.68
UGS-L 2 bed rm 6 8.81 52.86
UGD-DL 2 bed rm 1 17.59 17.59
UGS-L 1 bed rm 1 8.63 8.63
334.10
Non-slip homogenous floor tiles with cement and sand
screed
m2 148.71
corridor 148.71 148.71
148.71
k 11th store
11F1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
11F2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 42.93 F2
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
42.93
11F4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
11F6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
11F7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 10.20
Page 44 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 45/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
lift lobb 10.20 10.20
10.20
250mm x 250mm Homogenous floor tiles with cement
and sand screed
m2 369.35
UGD-DL 2 bed rm 3 17.59 52.77
UGS bed rm 1 8.68 8.68
UGD bed rm 2 17.59 35.18
UGD-DL 1 bed rm 10 17.62 176.20
UGD-SL bed rm 3 17.55 52.65
UGS-L (2) bed rm 4 8.81 35.24
UGS-L 1 bed rm 1 8.63 8.63
369.35
Non-slip homogenous floor tiles with cement and sand
screed
m2 137.67
corridor 137.67 137.67
137.67
l Roof level
RFF1 600mm x 600mm homogenous floor tiles with cement
and sand screed
m2 F1
RFF2 300mm x 300mm non-slip homogenous floor tiles with
cement and sand screed
m2 F2
RFF4 450mm x 900mm homogeneous tiles with cement and
sand screed
m2 F4
RFF6 300mm x 600mm & 100mm x 600mm non-slip
homo eneous tiles internal
m2 F6
RFF7 450mm x 900mm non-slip homogenous floor tiles with
cement and sand screed internal
m2 F7
Homogenous floor tiles with cement and sand screed m2 10.20
lift lobb 10.20 10.20
10.20
11.7 Heav dut homo eneous tile
a 1st store
b 2nd store
2F16 300mm x 300mm heavy duty non-slip homogenous
floor tiles with cement and sand screed
m2 F1-H
11.8 Homo eneous tile skirtin
S1 100mm high homogenous skirting tile to the following
levels
a 1st storey m 100.96 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
securit rm 10.99 10.99
D-10 (1) 1.00 (1.00)
corridor 105.91 105.91
DL-10 (1) 1.00 (1.00)
DK-10 (1) 1.00 (1.00)
DT-08 (2) 0.80 (1.60)
DHT-10 (1) 1.00 (1.00)
DS-10 (2) 1.00 (2.00)
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD2-12 (1) 1.20 (1.20)
FD2-18 (2) 1.80 (3.60)
D-10 (1) 1.00 (1.00)
FD.5-20 (1) 2.00 (2.00)
SGD-12 (1) 1.20 (1.20)
100.96
b 2nd storey m 301.15 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GS-L bed rm 2 12.63 25.26
DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)GS bed rm 1 12.71 12.71
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
communical toilet store 14.49 14.49
D-10 (1) 1.00 (1.00)
hall fellow level 1 dinin /livin 21.54 21.54
DHM-10 (1) 1.00 (1.00)
GD-07 (1) 0.70 (0.70)
D-S08 (1) 0.80 (0.80)
DT-08A (1) 0.80 (0.80)
hall fellow level 1 store 7.07 7.07
D-S08 (1) 0.80 (0.80)
UGD-DL 2 bed rm 2 19.60 39.20
DHM-10 (2) 2.00 (4.00)
o enin (2) 1.70 (3.40)UGS-L 2 bed rm 2 12.50 25.00
DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)
hall fellow level 1 kitchen 7.54 7.54
corridor 194.07 194.07
DHM-10 (7) 1.00 (7.00)
FD.5-HM10 (1) 1.00 (1.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
FD.5-15A (1) 1.50 (1.50)
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
o enin (1) 8.29 (8.29)
301.15
c 3rd storey m 437.18 frl-sktg
GS bed rm 1 12.71 12.71
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
Page 45 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 46/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GS-L bed rm 2 12.63 25.26DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)
hall fellow level 2 hall 8.60 8.60
DB-10 (2) 1.00 (2.00)
DT-08A (1) 0.80 (0.80)
DHM-10 (1) 1.00 (1.00)
hall fellow level 2 bed rm 12.01 12.01
DB-10 (1) 1.00 (1.00)
hall fellow level 2 master bed rm 14.72 14.72
DB-10 (1) 1.00 (1.00)
UGD-DL 2 bed rm 5 19.60 98.00
DHM-10 (5) 2.00 (10.00)
o enin (5) 1.70 (8.50)
UGD-DL 1 bed rm 4 19.60 78.40
DHM-10 (4) 1.00 (4.00)o enin (4) 1.70 (6.80)
UGD-SL bed rm 2 19.67 39.34
DHM-10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGS-L (1) bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD bed rm 2 1.60 3.20
FD.5-HM10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)
UGS-L 2 bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
opening (1) 0.85 (0.85)
corridor 197.62 197.62
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
FD.5-12 (1) 1.20 (1.20)
DS-08 (1) 0.80 (0.80)
DHM-10 (21) 1.00 (21.00)
FD.5-HM10 (4) 1.00 (4.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-09 (1) 0.90 (0.90)
437.18
d 4th storey m 581.68 frl-sktg
hall master level 1 kitchen 12.10 12.10
o enin (1) 0.85 (0.85)
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GS-L bed rm 2 12.63 25.26
DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)
GS bed rm 1 12.71 12.71FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
hall master level 1 dinin /livin 27.10 27.10
DHM-10 (1) 1.00 (1.00)
D-S08 (1) 0.80 (0.80)
hall master level 1 store 6.84 6.84
D-S08 (1) 0.80 (0.80)
hall master level 1 bed rm 1 14.40 14.40
DB-10 (1) 1.00 (1.00)
SGD-07 (1) 1.80 (1.80)
UGD bed rm 2 19.60 39.20
FD.5-HM10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)
UGD-SL bed rm 2 19.67 39.34
DHM-10 (2) 1.00 (2.00)o enin (2) 1.70 (3.40)
UGS-L 2 bed rm 5 12.50 62.50
DHM-10 (5) 1.00 (5.00)
o enin (5) 0.85 (4.25)
UGS-L (1) bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD-DL (1) bed rm 10 19.60 196.00
DHM-10 (10) 1.00 (10.00)
o enin (10) 1.70 (17.00)
UGD-DL 2 bed rm 2 19.60 39.20
DHM-10 (2) 2.00 (4.00)
o enin (2) 1.70 (3.40)
corridor 197.62 197.62
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (25) 1.00 (25.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
581.68
e 5th storey m 530.36 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GS-L bed rm 2 12.63 25.26
DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)
GS bed rm 1 12.71 12.71
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
hall master level 2 hall 8.45 8.45
DB-10 (2) 1.00 (2.00)
DHM-10 (1) 1.00 (1.00)
hall master level 2 stud 8.34 8.34
o enin 1.35 1.35hall master level 2 master bed rm 19.77 19.77
DB-10 (1) 1.00 (1.00)
SGD-27 (1) 2.70 (2.70)
DT-08A (1) 0.80 (0.80)
hall master level 2 bed rm 2 13.50 13.50
DB-10 (1) 1.00 (1.00)
DT-08A (1) 0.80 (0.80)
UGD bed rm 2 19.60 39.20
FD.5-HM10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)
UGD-SL bed rm 4 19.67 78.68
DHM-10 (4) 1.00 (4.00)
o enin (4) 1.70 (6.80)
Page 46 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 47/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
UGS-L (2) bed rm 5 12.50 62.50
DHM-10 (5) 1.00 (5.00)
o enin (5) 0.85 (4.25)
UGD-DL 1 bed rm 5 19.60 98.00DHM-10 (5) 1.00 (5.00)
o enin (5) 1.70 (8.50)
UGS-L 1 bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD-DL 2 bed rm 3 19.60 58.80
DHM-10 (3) 2.00 (6.00)
o enin (3) 1.70 (5.10)
corridor 192.04 192.04
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (26) 1.00 (26.00)
FD.5-HM10 (1) 1.00 (1.00)FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
530.36
f 6th storey m 513.53 frl-sktg
hall master level 1 kitchen 12.10 12.10
o enin (1) 0.85 (0.85)
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GS-L bed rm 2 12.63 25.26
DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)
GS bed rm 1 12.71 12.71
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
hall master level 1 dining/living 27.10 27.10
DHM-10 (1) 1.00 (1.00)
D-S08 (1) 0.80 (0.80)
hall master level 1 store 6.84 6.84
D-S08 (1) 0.80 (0.80)
hall master level 1 bed rm 1 14.40 14.40
DB-10 (1) 1.00 (1.00)SGD-07 (1) 1.80 (1.80)
UGS-L 2 bed rm 4 12.50 50.00
DHM-10 (4) 1.00 (4.00)
o enin (4) 0.85 (3.40)
UGD bed rm 3 19.60 58.80
FD.5-HM10 (3) 1.00 (3.00)
o enin (3) 1.70 (5.10)
UGD-SL bed rm 4 19.67 78.68
DHM-10 (4) 1.00 (4.00)
o enin (4) 1.70 (6.80)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD-DL 1 bed rm 3 19.60 58.80
DHM-10 (3) 1.00 (3.00)opening (3) 1.70 (5.10)
UGD-DL 2 bed rm 2 19.60 39.20
DHM-10 (2) 2.00 (4.00)
o enin (2) 1.70 (3.40)
UGS-L 1 bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
corridor 195.92 195.92
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (22) 1.00 (22.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)
GD-10 (2) 1.00 (2.00)
GD-09 (1) 0.90 (0.90)
513.53
g 7th storey m 491.41 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)FD.5-10 (1) 1.05 (1.05)
GS-L bed rm 2 12.63 25.26
DHM-10 (2) 1.00 (2.00)
o enin (2) 0.85 (1.70)
GS bed rm 1 12.71 12.71
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
hall master level 2 hall 8.45 8.45
DB-10 (2) 1.00 (2.00)
DHM-10 (1) 1.00 (1.00)
hall master level 2 stud 8.34 8.34
o enin 1.35 1.35
hall master level 2 master bed rm 19.77 19.77
DB-10 (1) 1.00 (1.00)
SGD-27 (1) 2.70 (2.70)
DT-08A (1) 0.80 (0.80)
hall master level 2 bed rm 2 13.50 13.50
DB-10 (1) 1.00 (1.00)
DT-08A (1) 0.80 (0.80)
UGD bed rm 1 19.60 19.60
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 1.70 (1.70)
UGD-SL bed rm 7 19.67 137.69
DHM-10 (4) 1.00 (4.00)
o enin (4) 1.70 (6.80)
UGS-L 2 bed rm 4 12.50 50.00
DHM-10 (4) 1.00 (4.00)
o enin (4) 0.85 (3.40)
UGD-DL 1 bed rm 3 19.60 58.80
DHM-10 (4) 1.00 (4.00)
o enin (4) 1.70 (6.80)UGS-L 1 bed rm 1 12.50 12.50
DHM-10 (4) 1.00 (4.00)
o enin (4) 0.85 (3.40)
UGD-DL (2) bed rm 1 19.60 19.60
DHM-10 (4) 2.00 (8.00)
o enin (4) 1.70 (6.80)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
corridor 192.02 192.02
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
Page 47 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 48/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
DS-08 (1) 0.80 (0.80)
DHM-10 (19) 1.00 (19.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
FD2-10 (1) 1.00 (1.00)
491.41
h 8th storey m 547.47 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)FD.5-10 (1) 1.05 (1.05)
GM living/dining/kitchen 2 15.82 31.64
DHM-10 (2) 1.00 (2.00)
DB-09 (2) 0.90 (1.80)
GM bed rm 2 13.67 27.34
DB-09 (2) 0.90 (1.80)
DT-08A (2) 0.80 (1.60)
o enin (2) 0.85 (1.70)
UGS-L (2) bed rm 7 12.50 87.50
DHM-10 (7) 1.00 (7.00)
o enin (7) 0.85 (5.95)
UGD bed rm 2 19.60 39.20
FD.5-HM10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)
UGD-SL bed rm 7 19.67 137.69DHM-10 (7) 1.00 (7.00)
o enin (7) 1.70 (11.90)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD-DL 1 bed rm 3 19.60 58.80
DHM-10 (3) 1.00 (3.00)
o enin (3) 1.70 (5.10)
UGD-DL 2 bed rm 3 19.60 58.80
DHM-10 (3) 2.00 (6.00)
o enin (3) 1.70 (5.10)
corridor 192.28 192.28
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)DHM-10 (22) 1.00 (22.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
547.47
i 9th storey m 528.03 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GM livin /dinin /kitchen 2 15.82 31.64
DHM-10 (2) 1.00 (2.00)
DB-09 (2) 0.90 (1.80)
GM bed rm 2 13.67 27.34
DB-09 (2) 0.90 (1.80)
DT-08A (2) 0.80 (1.60)
o enin (2) 0.85 (1.70)
UGS-L 2 bed rm 5 12.50 62.50
DHM-10 (5) 1.00 (5.00)
o enin (5) 0.85 (4.25)
UGD bed rm 2 19.60 39.20
FD.5-HM10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)UGD-SL bed rm 5 19.67 98.35
DHM-10 (5) 1.00 (5.00)
o enin (5) 1.70 (8.50)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD-DL (1) bed rm 6 19.60 117.60
DHM-10 (6) 1.00 (6.00)
o enin (6) 1.70 (10.20)
UGD-DL (2) bed rm 2 19.60 39.20
DHM-10 (2) 2.00 (4.00)
o enin (2) 1.70 (3.40)
corridor 192.28 192.28
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (20) 1.00 (20.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (1) 1.00 (1.00)
528.03
j 10th storey m 541.31 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
GM livin /dinin /kitchen 2 15.82 31.64
DHM-10 (2) 1.00 (2.00)
DB-09 (2) 0.90 (1.80)
GM bed rm 2 13.67 27.34
DB-09 (2) 0.90 (1.80)
DT-08A (2) 0.80 (1.60)
o enin (2) 0.85 (1.70)
UGD-DL 1 bed rm 8 19.60 156.80
DHM-10 (8) 1.00 (8.00)
o enin (8) 1.70 (13.60)
UGD bed rm 2 19.60 39.20FD.5-HM10 (2) 1.00 (2.00)
o enin (2) 1.70 (3.40)
UGD-SL bed rm 4 19.67 78.68
DHM-10 (4) 1.00 (4.00)
o enin (4) 1.70 (6.80)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGS-L (2) bed rm 6 12.50 75.00
DHM-10 (6) 1.00 (6.00)
o enin (6) 1.70 (10.20)
UGD-DL 2 bed rm 1 19.60 19.60
DHM-10 (1) 2.00 (2.00)
Page 48 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 49/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
o enin (1) 1.70 (1.70)
UGS-L 1 bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
o enin (1) 1.70 (1.70)corridor 192.28 192.28
FD.5-S06 (5) 0.60 (3.00)
FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (22) 1.00 (22.00)
FD.5-HM10 (3) 1.00 (3.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
GD-10 (2) 1.00 (2.00)
541.31
k 11th storey m 509.76 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
UGD-DL 2 bed rm 3 19.60 58.80
DHM-10 (3) 2.00 (6.00)
o enin (3) 1.70 (5.10)
UGS bed rm 1 12.41 12.41
FD.5-HM10 (1) 1.00 (1.00)
o enin (1) 0.85 (0.85)
UGD bed rm 2 19.60 39.20
FD.5-HM10 (2) 1.00 (2.00)o enin (2) 1.70 (3.40)
UGD-DL (1) bed rm 10 19.60 196.00
DHM-10 (10) 1.00 (10.00)
o enin (10) 1.70 (17.00)
UGD-SL bed rm 3 19.67 59.01
DHM-10 (3) 1.00 (3.00)
o enin (3) 1.70 (5.10)
UGS-L 2 bed rm 4 12.50 50.00
DHM-10 (4) 1.00 (4.00)
o enin (4) 1.70 (6.80)
UGS-L 1 bed rm 1 12.50 12.50
DHM-10 (1) 1.00 (1.00)
o enin (1) 1.70 (1.70)
corridor 178.16 178.16
FD.5-S06 (5) 0.60 (3.00)FD.5-S10 (3) 1.00 (3.00)
FD.5-10 (2) 1.05 (2.10)
DS-08 (1) 0.80 (0.80)
DHM-10 (20) 1.00 (20.00)
FD.5-HM10 (2) 1.00 (2.00)
FD.5-T10 (1) 1.05 (1.05)
FD.5-HT10 (1) 1.05 (1.05)
heat um (1) 1.38 (1.38)
509.76
l Roof level m 5.01 frl-sktg
lift lobb 12.26 12.26
o enin (2) 1.70 (3.40)
DS-06 (1) 0.60 (0.60)
DS-10A (1) 1.00 (1.00)
DS-12 (1) 1.20 (1.20)
FD.5-10 (1) 1.05 (1.05)
5.01
Carried Forward
Page 49 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 50/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 22 Floor Finishes Cont'd
11.9 Granite tile
a 1st store
b 2nd store
c 3rd store
d 4th store
e 5th store
f 6th store
7th store
h 8th store
i 9th store
10th store
k 11th store
l Roof level
11.10 Vin l floor tilea 2nd store
b 4th store
c 5th store
d 6th store
e 7th store
f 8th store
9th store
h 10th store
l Roof
11.11 Car et tile
a 1st store
1F5 Car et tile floor with cement and sand screed m2 82.68 car ethall admin office meetin rm 9.42 9.42
hall admin office store rm 4.07 4.07
hall admin office rece tion 17.96 17.96
hall admin office hall officer 40.24 40.24
hall admin office head office 10.99 10.99
82.68
2F5 Car et tile floor with cement and sand screed m2 24.61 car et
2nd storethink tank rm 24.61 24.61
24.61
3F5 Car et tile floor with cement and sand screed m2 14.82 car et
3rd storeIncubation od IP3 14.82 14.82
14.82
4F5 Car et tile floor with cement and sand screed m2 25.10 car et
4th storethink tank rm 2 25.10 25.10
25.10
5F5 Car et tile floor with cement and sand screed m2 14.00 car et
5th storethink tank rm 3 14.00 14.00
14.00
6F5 Car et tile floor with cement and sand screed m2 71.49 car et
6th storethink tank rm 4 30.32 30.32
think tank rm 5 25.41 25.41
Incubation od IP2 15.76 15.76
71.49
7F5 Car et tile floor with cement and sand screed m2 33.82 car et
7th storethink tank rm 6 33.82 33.82
33.82
8F5 Car et tile floor with cement and sand screed m2 Na car et
9F5 Car et tile floor with cement and sand screed m2 19.65 car et
9th storethink tank rm 7 19.65 19.65
19.65
10F5 Car et tile floor with cement and sand screed m2 39.40 car et
10th storethink tank rm 8 14.30 14.30
think tank rm 9 25.10 25.10
39.40
11F5 Car et tile floor with cement and sand screed m2 car et
11.12 Insulated raised floor s stem
a 7th store
1F11 Raised floor insulated to LAN Room ELVS Room m2 10.20 raised flrLAN rm 10.20 10.20
10.20
7F11 Raised floor insulated to LAN Room ELVS Room m2 Na raised flr
11.13 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a Scupper drain with MS grating (w=150mm) to Refuse
Chute Chamber L=1.30m
nos scupper
b Other skirtin
S2 30mm x 15mm recessed powder coated aluminium
channel 2mm thk skirtin
m Alum-sktg
c
Carried Forward
Page 50 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 51/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 23 Ceilin Finishes
12.1 Skim coating and vinyl co-polymer emulsion
aintina 1st store m2 430.78 Skim Coat
wash rm (m) 2.48 2.48
wash rm (f) 3.09 3.09
handica toilet 4.86 4.86
letter box 23.55 23.55
refuse chutte 1.90 1.90
securit rm 7.83 7.83
corridor 274.75 274.75
lv switch rm 7.67 7.67
low level transfer tank
rm73.17 73.17
elv s stem rm 31.48 31.48
430.78
b 2nd store m2 489.52 Skim CoatGS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
UGD-DL (2) bed rm 2 17.59 35.18
UGS-L 2 bed rm 2 8.81 17.62
communical toilet toilet 27.04 27.04
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
communical toilet store 36.75 36.75
hall fellow level 1 dinin /livin 29.47 29.47
hall fellow level 1 kitchen 5.22 5.22
hall fellow level 1 store 3.81 3.81
corridor 248.81 248.81common area 47.00 47.00
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD-DL (2) dr in closet 2 0.88 1.76
UGS-L 2 dr in closet 2 0.46 0.92
hall fellow level 1 ac led e 1.10 1.10
489.52
c 3rd store m2 570.16 Skim CoatGS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
UGD-DL (2) bed rm 5 17.59 87.95
UGD-DL 1 bed rm 4 17.62 70.48
UGD-SL bed rm 2 17.55 35.10UGS bed rm 1 8.68 8.68
UGS-L (1) bed rm 1 8.63 8.63
UGD bed rm 2 17.59 35.18
UGS-L 2 bed rm 1 8.81 8.81
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall fellow level 2 hall 6.67 6.67
hall fellow level 2 bed rm 7.71 7.71
hall fellow level 2 master bed rm 11.87 11.87
corridor 171.13 171.13
common area 28.72 28.72
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD-DL (2) dr in closet 5 0.88 4.40
UGD-DL 1 dr in closet 4 0.92 3.68
UGD-SL dr in closet 2 0.92 1.84
UGS dr in closet 1 0.46 0.46
UGS-L (1) dr in closet 1 0.46 0.46
UGD drying closet 2 0.88 1.76
UGS-L 2 dr in closet 1 0.46 0.46
hall fellow level 2 ac led e 1.98 1.98
hall fellow level 2 balcon 2.77 2.77
570.16
d 4th store m2 690.76 Skim CoatGS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 2 17.55 35.10UGS-L 2 bed rm 5 8.81 44.05
UGS-L (1) bed rm 1 8.63 8.63
UGD-DL 1 bed rm 10 17.62 176.20
UGD-DL 2 bed rm 2 17.59 35.18
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 1 dinin /livin 26.92 26.92
hall master level 1 kitchen 5.71 5.71
hall master level 1 store 3.72 3.72
hall master level 1 bed rm 1 11.49 11.49
corridor 149.60 149.60
common area 68.07 68.07
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 2 0.92 1.84
UGS-L 2 dr in closet 5 0.46 2.30
UGS-L (1) dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 10 0.92 9.20
UGD-DL 2 dr in closet 2 0.88 1.76
hall master balcon /ac led e 2.17 2.17
690.76
e 5th store m2 624.35 Skim CoatGS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 4 17.55 70.20UGS-L 2 bed rm 5 8.81 44.05
UGD-DL (1) bed rm 5 17.62 88.10
UGS-L (1) bed rm 1 8.63 8.63
UGD-DL 2 bed rm 3 17.59 52.77
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 hall 6.56 6.56
hall master level 2 stud 4.04 4.04
hall master level 2 master bed rm 16.19 16.19
hall master level 2 bed rm 2 10.86 10.86
corridor 149.45 149.45
common area 48.39 48.39
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 4 0.92 3.68
UGS-L 2 dr in closet 5 0.46 2.30
UGD-DL (1) dr in closet 5 0.92 4.60
UGS-L (1) drying closet 1 0.46 0.46
UGD-DL 2 dr in closet 3 0.88 2.64
hall master level 2 balcon /ac led e 3.07 3.07
624.35
f 6th store m2 608.99 Skim CoatGS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
UGS-L (2) bed rm 4 8.81 35.24
Page 51 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 52/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
UGD bed rm 3 17.59 52.77
UGD-SL bed rm 4 17.55 70.20
UGS bed rm 1 8.68 8.68
UGD-DL 1 bed rm 3 17.62 52.86UGD-DL 2 bed rm 2 17.59 35.18
UGS-L 1 bed rm 1 8.63 8.63
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 1 dinin /livin 26.92 26.92
hall master level 1 kitchen 5.71 5.71
hall master level 1 store 3.72 3.72
hall master level 1 bed rm 1 11.49 11.49
corridor 149.99 149.99
common area 60.41 60.41
GS-L dr in closet 2 0.48 0.96
GS drying closet 1 0.48 0.48
UGS-L 2 dr in closet 4 0.46 1.84
UGD dr in closet 3 0.88 2.64UGD-SL dr in closet 4 0.92 3.68
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 3 0.92 2.76
UGD-DL 2 dr in closet 2 0.88 1.76
UGS-L 1 dr in closet 1 0.46 0.46
hall master level 1 balcon /ac led e 2.17 2.17
608.99
7th store m2 576.45 Skim CoatGS-L bed rm 2 9.02 18.04
GS bed rm 1 9.01 9.01
UGD bed rm 1 17.59 17.59
UGD-SL bed rm 7 17.55 122.85
UGS-L (2) bed rm 4 8.81 35.24UGD-DL 1 bed rm 3 17.62 52.86
UGS-L 1 bed rm 1 8.63 8.63
UGD-DL 2 bed rm 1 17.59 17.59
UGS bed rm 1 8.68 8.68
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
hall master level 2 hall 6.56 6.56
hall master level 2 stud 4.04 4.04
hall master level 2 master bed rm 16.19 16.19
hall master level 2 bed rm 2 10.86 10.86
corridor 148.71 148.71
common area 38.44 38.44
GS-L dr in closet 2 0.48 0.96
GS dr in closet 1 0.48 0.48
UGD dr in closet 1 0.88 0.88
UGD-SL dr in closet 7 0.92 6.44
UGS-L (2) drying closet 4 0.46 1.84
UGD-DL 1 dr in closet 3 0.92 2.76
UGS-L 1 dr in closet 1 0.46 0.46
UGD-DL (2) dr in closet 1 0.88 0.88
UGS dr in closet 1 0.46 0.46
hall master level 2 balcon /ac led e 3.07 3.07
576.45
h 8th store m2 721.28 Skim CoatGM livin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
UGS-L (2) bed rm 7 8.81 61.67
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 7 17.55 122.85
UGS bed rm 1 8.68 8.68
UGD-DL 1 bed rm 3 17.62 52.86
UGD-DL (2) bed rm 3 17.59 52.77
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 148.71 148.71
common area 132.05 132.05
GM dr in closet 2 0.46 0.92
UGS-L 2 dr in closet 7 0.46 3.22
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 7 0.92 6.44
UGS dr in closet 1 0.46 0.46
UGD-DL 1 dr in closet 3 0.92 2.76UGD-DL 2 dr in closet 3 0.88 2.64
721.28
i 9th store m2 615.11 Skim CoatGM livin /dinin /kitchen 2 12.42 24.84
GM bed rm 2 10.27 20.54
UGS-L 2 bed rm 5 8.81 44.05
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 5 17.55 87.75
UGS bed rm 1 8.68 8.68
UGD-DL 1 bed rm 6 17.62 105.72
UGD-DL 2 bed rm 2 17.59 35.18
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50communical toilet HT 4.85 4.85
corridor 148.71 148.71
common area 44.21 44.21
GM dr in closet 2 0.46 0.92
UGS-L (2) dr in closet 5 0.46 2.30
UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 5 0.92 4.60
UGS dr in closet 1 0.46 0.46
UGD-DL (1) dr in closet 6 0.92 5.52
UGD-DL 2 dr in closet 2 0.88 1.76
615.11
10th store m2 645.37 Skim Coat
GM livin /dinin /kitchen 2 12.42 24.84GM bed rm 2 10.27 20.54
UGD-DL 1 bed rm 8 17.62 140.96
UGD bed rm 2 17.59 35.18
UGD-SL bed rm 4 17.55 70.20
UGS bed rm 1 8.68 8.68
UGS-L (2) bed rm 6 8.81 52.86
UGD-DL (2) bed rm 1 17.59 17.59
UGS-L 1 bed rm 1 8.63 8.63
communical toilet toilet 36.58 36.58
communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 148.71 148.71
common area 55.97 55.97
GM dr in closet 2 0.46 0.92
UGD-DL (1) dr in closet 8 0.92 7.36UGD dr in closet 2 0.88 1.76
UGD-SL dr in closet 4 0.92 3.68
UGS dr in closet 1 0.46 0.46
UGS-L (2) dr in closet 6 0.46 2.76
UGD-DL (2) drying closet 1 0.88 0.88
UGS-L 1 dr in closet 1 0.46 0.46
645.37
k 11th store m2 588.00 Skim CoatUGD-DL 2 bed rm 3 17.59 52.77
UGS bed rm 1 8.68 8.68
UGD bed rm 2 17.59 35.18
UGD-DL (1) bed rm 10 17.62 176.20
Page 52 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 53/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
UGD-SL bed rm 3 17.55 52.65
UGS-L (2) bed rm 4 8.81 35.24
UGS-L 1 bed rm 1 8.63 8.63
communical toilet toilet 36.58 36.58communical toilet anitor 1.50 1.50
communical toilet HT 4.85 4.85
corridor 137.67 137.67
common area 18.93 18.93
UGD-DL 2 dr in closet 3 0.88 2.64
UGS dr in closet 1 0.46 0.46
UGD dr in closet 2 0.88 1.76
UGD-DL 1 dr in closet 10 0.92 9.20
UGD-SL dr in closet 3 0.92 2.76
UGS-L (2) dr in closet 4 0.46 1.84
UGS-L 1 dr in closet 1 0.46 0.46
588.00
l Roof level m2 22.83 Skim Coatcommon area 22.83 22.83
22.83
12.2 Plasterin and aintin
C1 Plaster and aint to ceilin
a 1st store m2 laster
b 2nd store m2 laster
c 3rd store m2 laster
d 4th store m2 laster
e 5th store m2 laster
f 6th store m2 laster7th store m2 laster
h 8th store m2 laster
i 9th store m2 laster
10th store m2 laster
k 11th store m2 laster
l Roof level m2 laster
12.3 Moisture resistance gypsum plaster suspended
ceilin boarda 1st store
1C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
m2 21.45 ceiling
lift lobb 10.20 10.20
hall admin office toilet 3.91 3.91
hall admin office antr rm 7.34 7.34
21.45
1C4 12mm thk perforated gypsum board (with fleece &
rockwool insulation) with paint finish to Common
Kitchenette, Big Common Lounge, Cafe Lounge,
Collaborative spaces- Incubation Pods/ Think Tank,
m2 48.41 ceiling
communal laundr 23.09 23.09
kitchenette 25.32 25.32
48.41
b 2nd store
2C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
m2 22.48 ceiling
lift lobb 10.20 10.20
hall fellow level 1 owder room 2.38 2.38
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
22.48
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 15.35
think tank rm 1 15.35 15.35
15.35
12mm tnk erforated sum board m2 24.61multi use rm 24.61 24.61
24.61
c 3rd store
3C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
m2 23.40 ceiling
lift lobb 10.20 10.20
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
hall fellow level 2 bath 1 2.29 2.29
hall fellow level 2 shower 1.01 1.01
23.40
d 4th store
4C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
m2 23.87 ceiling
lift lobb 10.20 10.20
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
23.87
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 13.28
think tank rm 2 13.28 13.28
13.28
e 5th store
5C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
at S orts Com lex
m2 27.29 ceiling
lift lobb 10.20 10.20
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
Page 53 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 54/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 shower 0.95 0.95
hall master level 2 bath 2 2.51 2.51
27.29
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 7.33
think tank rm 3 7.33 7.33
7.33
f 6th store
6C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
at S orts Com lex
m2 ceiling
lift lobb 10.20 10.20
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
hall master level 1 bath 1 2.56 2.56
hall master level 1 shower 1.21 1.21
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 29.45
think tank rm 4 16.17 16.17
think tank rm 5 13.28 13.28
29.45
7th store
7C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
at S orts Com lex
m2 27.29 ceiling
lift lobb 10.20 10.20
GS-L bath 2 2.27 4.54
GS-L shower 2 1.10 2.20
GS bath 1 2.32 2.32
GS shower 1 0.84 0.84
hall master level 2 master bath 2.52 2.52
hall master level 2 shower 1.21 1.21
hall master level 2 bath 2 2.51 2.51
hall master level 2 shower 0.95 0.95
27.29
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 18.30
think tank rm 18.30 18.30
18.30
h 8th store
Page 54 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 55/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
8C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
at S orts Com lex
m2 16.70 ceiling
lift lobb 10.20 10.20GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
16.70
i 9th store
9C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
m2 16.70 ceiling
lift lobb 10.20 10.20
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
16.70
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 10.15
think tank rm 7 10.15 10.15
10.15
10th store
10C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
at S orts Com lex
m2 16.70 ceiling
lift lobb 10.20 10.20
GM bath 2 2.15 4.30
GM shower 2 1.10 2.20
16.70
12mm thk perforated gypsum board ceiling with
acoustic insulation and aint finish
m2 20.71
think tank rm 8 7.39 7.39
think tank rm 9 13.32 13.32
20.71
k 11th store
11C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
at S orts Com lex
m2 86.34 ceiling
lift lobb 10.20 10.20
heat um rm 76.14 76.14
86.34
l Roof level
RFC2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby
m2 129.43 ceiling
lift lobb 10.20 10.20
water tank 119.23 119.23
129.43
Carried Forward
Page 55 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 56/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 24 Ceilin Finishes Cont'd
12.4 Moisture resistance gypsum plasterboard for
box -u areaa 1st store
b 2nd store
c 3rd store
d 4th store
e 5th store
f 6th store
7th store
h 8th store
i 9th store
10th store
k 11th store
l Roof level
12.5 Moisture resistance mineral fibre suspended
ceilin board
C3a 9mm thk fibrous plasterboard with paint finish
combined with 12mm thk perforated gypsum board
(with fleece & rockwool insulation) with paint finish to
Incubation Pods/ Think Tank Rooms; Aluminium ceiling
panel strip metal of 300mm width profile as per
a 1st store m2 40.18 ceilincommunal laundr 16.13 16.13
kitchenette 24.05 24.05
40.18
b 2nd store m2 14.65 ceilinthink tank rm 1 14.65 14.65
14.65
c 3rd store m2 26.64 ceilinthink tank rm 2 11.82 11.82
Incubation od IP3 14.82 14.82
26.64
d 4th store m2 Na ceilin
e 5th store m2 6.67 ceilinthink tank rm 3 6.67 6.67
6.67
f 6th store m2 42.04 ceilinthink tank rm 4 14.15 14.15
think tank rm 5 12.13 12.13
Incubation od IP2 15.76 15.76
42.04
7th store m2 15.52 ceilinthink tank rm 6 15.52 15.52
15.52
h 8th store m2 Na ceilin
i 9th store m2 9.50 ceilinthink tank rm 7 9.50 9.50
9.50
10th store m2 18.69 ceilinthink tank rm 8 6.91 6.91
think tank rm 9 11.78 11.78
18.69
k 11th store m2 Na ceilin
l Roof level m2 Na ceilin
12.6 Moisture resistance mineral fibre board for box-
u areaa 1st store m2
12.7 Thermally insulated ceiling panel with fibrous
plaster board on concealed suspension system
a 1st store
b 2nd store
c 3rd store
d 4th store
Carried Forward
Page 56 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 57/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 25 Ceilin Finishes Cont'd
12.7 Thermally insulated ceiling panel with fibrous
plaster board on concealed suspension system
'e 5th store
f 6th store
7th store
h 8th store
i 9th store
10th store
k 11th store
12.8 Mineral fibre insulated suspended ceiling board
a 7th store
1C8 Mineral fibreboard with insulation batts above to LAN
Room ELVS Room
m2 10.20 ceiling
LAN rm 10.20 10.20
10.20
7C8 Mineral fibreboard with insulation batts above to LAN
Room ELVS Room
m2 Na ceiling
12.9 Acoustically absorptive mineral fibre suspended
ceilin boarda 1st store
1C5 Acoustically absorptive mineral fibre board to Common
Laundr , Hall Admin, SC Admin
m2 82.68 ceiling
hall admin office meetin rm 9.42 9.42
hall admin office store rm 4.07 4.07
hall admin office rece tion 17.96 17.96
hall admin office hall officer 40.24 40.24
hall admin office head office 10.99 10.99
82.68
b 2nd store
c 3rd store
d 4th store
e 5th store
f 6th store
7th store
h 8th storei 9th store
10th store
k 11th store
l Roof level
12.10 Acoustic lasswool sus ended ceilin board
Note Acoustic ceiling as per Schedule of Finishes is 75mm
thk acoustic cell spray treatment, quantities are
included in Others Item 12.11
a 1st store
b 2nd store
c 3rd store
d 4th store
e 5th storef 6th store
7th store
h 8th store
i 9th store
10th store
k 11th store
l Roof level
Carried Forward
Page 57 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 58/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 26-A Ceilin Finishes Cont'd
12.11 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a Access anels to ceilin 600mm x 600mm nos 40 ceilin
1st st 1 1.00
2nd st 4 4.00
3rd st 5 5.00
4th st 5 5.00
5th st 6 6.00
6th st 5 5.00
7th st 6 6.00
8th st 3 3.00
9th st 3 3.0010th st 1 1.00
11th st 1 1.00
40.00
b Other ceilin finishes
C7 75mm thk acoustic cel l spray treatment to Corridor;
Sprayed acoustic treatment to soffit of slab to
Corridors as per Tender Clarification 2, Architectural
m2 ceiling
C7a 75mm thk acoustic cell spray treatment to Kitchen,
Dishwash & Potwash areas, Indoor Sports Hall, Toilet,
Lockers Famil Room
m2 ceiling
GSM GS mesh with GS supports over opening to FA, SPR,
TEL DT PW NW Duct
m2 ceiling
c
Fittin and Furnishin
13.1 Cabinet
a Kitchen hood & hob Included in PC Sums
Note As per Tender Clarification 2, Architectural Item A15,
cooker and hob are b NSC As per Tender Clarification 2, Architectural Item A58, 4
burner induction hob burners and 3 speed telescopicull hood are b NSC
13.2 Cat ladder
Catladder to Water Tank nos metal-wk
SS access door anel to Water Tank nos metal-wk
Grab bar near access anel to Water Tank nos metal-wk
Catladder with ca e uard nos metal-wk
Slidin access tra door 1150mm x 1150mm nos metal-wk
Aluminium handrail 2 nos sets metal-wk
Catladder to Lift Pit h=1.80~3.0m nos metal-wk
300mmW x 300mmD x 300mmH sump pit with GS
ratin to Lift Pit
nos metal-wk
13.3 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a
b
c
Sanitar A liances
Note For sanitary wares specifications, please refer to
Tender Corri endum No 1
14.1 Pedestal water closet
Pedestal water closet with flush valves sets 87 S-wares
Ditto, to Handica Toilet with flush valves sets 11 S-wares
14.2 S uattin an S-wares
14.3 WC conceal cistern nos S-wares
14.4 Urinal S-wares
14.5 Urinal sensor flush valve S-wares
14.6 Soa dis enser nos 40 S-wares
Carried Forward
Page 58 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 59/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 27-A Sanitar A liances Cont'd
14.7 Waste rece tacle nos S-wares
14.8 Hand dr er nos 10 S-wares
14.9 Toilet a er holder nos 98 S-wares
14.10 Hook on back of door nos 124 S-wares
14.11 Sanitar bin nos S-wares
14.12 Bidet s ra 98 S-wares
14.13 Bib ta nos S-wares
14.14 Janitor sink nos 10 S-wares
14.15 Ta for anitor sink nos 10 S-wares
14.16 Shower head nos 73 S-wares
14.17 Shower mixer set S-wares
14.18 Mirror
Communal Toilet nos 10 mirror
Handica Toilet nos 11 mirror
Washrooms nos 2 mirror
Graduate Sin le nos 18 mirror
Graduate Married nos 6 mirror
Hall - Fellow nos 2 mirror
Hall- Master nos 6 mirror
14.19 Hot water dis enser LS others
14.20 Fli -u s s rab bar shower seat
Shower seat to Handica Toilet nos 10 S-wares
Handica rab bar sets 11 S-wares
14.21 S s horizontal bar fixed to door nos 11 S-wares
14.22 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,shall be deemed to be included or absorbed in the
a Other works in relation with Toilets
Wash basin c w ta sets 75 S-wares
Ditto, to Handica Toilet sets 11 S-wares
Kitchen sin le sink c w ta L=0.90m sets S-wares
Kitchen single sink c/w tap (L=1.70m) to Think Tank
Room 7
sets 1 S-wares
Kitchen sin le sink c w ta to Pantr sets 10 S-wares
Kitchen double sink c w ta to Communal Laundr sets S-wares
Kitchen double sink c/w tap to Communal Kitchenette sets S-wares
Floor tra with UPVc ratin nos 163
Floor waste nos 135
Scu er drain to toilets w=150mm m scu er
Toilet cubicles- solid compact laminated panel &
doorCubicle for Janitor with door sets 10 Toilet-Cub
3 shower cubicles with 3 doors and 2 common
artitions
sets 19 Toilet-Cub
3 toilet cubicles with 3 doors and 2 common partitions sets 1 Toilet-Cub
6 toilet cubicles with 6 doors and 5 common partitions sets 9 Toilet-Cub
Vanit to c w bracket- Solid ol ester
Communal Toilet L=3.425m, w=0.60mm nos 10 V-to
Pantr L=1.50m, w=0.60m nos 10 V-to
b Laundry troughs to Common Laundry - required as per
Schedule of Finishes Item No 1.4.3
LS others
c Shower screens
GS, GM Shower / glass screen with slid ing door to Graduate
Sin le, Graduate Married
sets 24 Shower-S
HF, HM Shower / glass screen with sl iding door to Hall Fel low
and Hall Master
sets 7 Shower-S
Carried Forward
Page 59 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 60/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 1 - BLOCK X1
1.00
Pa e No Descri tion Drw No. t e location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate
Brou ht Forward
BC S1 28-A Sundries
15.1 Earthin work LS earthin
15.2 Li htnin rotection work LS li htnin
15.3 Builders work in connection with M&E work LS Builder
15.4 Fire extin uisher nos 51 Fire-Ext
Ditto, to Think Tank Rooms nos 9 Fire-Ext
15.5 Letter box
Aluminium letter boxes nos 360 others
15.6 Fire extin uishers with com artment LS 23 Fire-Ext
15.7 Hose reel com artments & access anel LS 33 Fire-ExtBreeching inlet compartments & access panel; door
measured se aratel
nos others
15.8 Fencin
Fencing for Tank Room (h=3.90m including RC kerb)
to Blks X1 Y1 & Z1
m 32.00 metal-wk
consists of:
- 100 x 500mm hot di ed GS RHS in aint finish
- GS ex anded mesh screen in owder coated finish
- 10mm thk hot dipped GS plate in paint finish pre-
welded to ex anded metal mesh- 200 x 100 x 12mm thk hot dipped GS T-bar in paint
finish32.00 32.00
Ditto on to of ara et wall h=2.90m m 18.00 metal-wk
consists of:
- 100 x 500mm hot di ed GS RHS in aint finish
- GS ex anded mesh screen in owder coated finish
- 10mm thk hot dipped GS plate in paint finish pre-
welded to ex anded metal mesh- 200 x 100 x 12mm thk hot dipped GS T-bar in paint
finish18.00 18.00
Extra over for double leaf ate nos 1 metal-wk
Expanded mesh screen fencing to Heat Pump Room,
11th St h=1.10m as er Elevation
m 25.60 metal-wk
11th St Heat Pum Room, 25.60 25.60
Double leaf ate nos 1 metal-wk
15.9 Galvanised T- ole laundr han in line w=1.20m m metal-wk
15.10 Timber seating to Sky Garden (w=0.50m, h=0.50m) m 24.30 timber
24.3 24.30
15.11 Tactile tiles warnin indicator 300mm x 300mm nos 4 Tactile
15.10 Others
Works not l isted above but are necessary to complete
the works as a whole (if not stated and allowed herein,
shall be deemed to be included or absorbed in the
a Refuse Chute
Refuse hopper (2nd Sty to Roof Level) for Blks X1, Y1
and Z1 and 3rd to 11 St for Blks X2 and Z2
nos 1 Precast-RC
Aluminium inspection cover over Refuse Chute Roof
1.0m x 1.0m
nos 1 metal-wk
Safet mesh below roof 600mm x 700mm nos 1 metal-wk
Wiremesh to cover ventilation opening at Roof (700mm
x 200mm
nos 1 metal-wk
b Insect screen to Housin Units m2 metal-wk
c Fan hook nos 347 metal-wk
d Timber table and bench at 1st Sty, near Letter Boxes opposite to letter box &
securit roomnos 3 timber
e Refuse chute com actor nos 1
Total Carried to Summary of Tender Page
ST/1 Item 3.1
Page 60 of 110 S1-Blk X1
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 61/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total Amount
CFA m2
BC S4 1 1 Sub-structure
1.1 Pileca includin excavation, formwork, concrete and rebar
a Excavation m3 excb Backfill m3 Backfillc Lean concrete - 50mm thick G15 m2 G15
d Concrete G40 m3 G40e Reinforcement k Rebarf Formwork m2 Fwk
Excavation to basement0-2m m3 exc2m-4m m3 exc
h Backfill to workin area m3 Backfill
i Remove sur lus off site m3 Remove
1.2 Column stuma Concrete G40 m3 G40b Reinforcement k Rebar
c Formwork m2 Fwk
Lift it walla Excavation m3 exc
b Concrete G40 m3 G40c Reinforcement k Rebard Formwork m2 Fwk
Basement walla Concrete G40 m3 G40
b Reinforcement k Rebarc Formwork m2 Fwk
1.3 Ground beam - 1st sta Excavation m3 excb Lean concrete - 50mm thick G15 m2 G15
c Concrete G40 m3 G40d Reinforcement k Rebare Formwork m2 Fwk
1.4 Ground slaba Excavation
to basement level m3 excto 1st st m3 exc
b Lean concrete - 50mm thick G15to basement level m2 G15
to 1st st m2 G15c Concrete G40
to basement level m3 G40
to 1st st m3 G40d Reinforcement
to basement level k Rebarto 1st st k Rebar
e Formwork 150mm thick slab ed e m 150-fwk
1.5 Plinth
1.6 Waterproofing system to sub-structure in contact with ground
25mm thick cement sand rotection screed
to round slab m2 water rf to round beam m2 water rf to lift it wall m2 water rf to basement wall m2 water rf
Water roofin membraneto round slab m2 water rf to round beam m2 water rf
to lift it wall m2 water rf to basement wall m2 water rf
Dam roof membrane
to round slab m2 water rf to round beam m2 water rf to lift it wall m2 water rf to basement wall m2 water rf
H drotite CJ0720-2K swellable water sto to lift it wall m water rf H drotite CJ0720-2K swellable water sto to basement wall m water rf
1.7 Anti-termite treatment m2 Anti-Termite
1.8 Others
Works not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
abc
Carried Forward
Page 61 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 62/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 2 2 Frame
2.1 Concrete in column - G40a 1st store m3 G40b 2nd store m3 G40c 3rd store m3 G40d 4th store m3 G40e 5th store m3 G40f 6th store m3 G40
7th store m3 G40h 8th store m3 G40i 9th store m3 G40
10th store m3 G40k 11th store m3 G40l Roof level
2.2 Concrete in sus ended ed e beam - G40
a 1st store m3 G40b 2nd store m3 G40c 3rd store m3 G40d 4th store m3 G40e 5th store m3 G40f 6th store m3 G40
7th store m3 G40h 8th store m3 G40i 9th store m3 G40
10th store m3 G40k 11th store m3 G40l Roof level
2.3 Reinforcement in columna 1st store k rebar
b 2nd store k rebar
c 3rd store k rebard 4th store k rebar
e 5th store k rebar
f 6th store k rebar
7th store k rebar
h 8th store k rebar
i 9th store k rebar
Carried Forward
Page 62 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 63/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 3 2 Frame Cont'd
2.3 Reinforcement in column Cont'd10th store k rebar
k 11th store k rebar
l Roof level
2.4 Reinforcement in sus ended ed e beama 1st store k rebar
b 2nd store k rebar
c 3rd store k rebar
d 4th store k rebar
e 5th store k rebar
f 6th store k rebar
7th store k rebar
h 8th store k rebar
i 9th store k rebar
10th store k rebark 11th store k rebar
l Roof level
2.5 Formwork to columna 1st store m2 fwk
b 2nd store m2 fwk
c 3rd store m2 fwk
d 4th store m2 fwk
e 5th store m2 fwk
f 6th store m2 fwk
7th store m2 fwk
h 8th store m2 fwk
i 9th store m2 fwk
10th store m2 fwk
k 11th store m2 fwk
l Roof level
Carried Forward
Page 63 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 64/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 4 2 Frame Cont'd
2.6 Formwork to sus ended ed e beama 1st store m2 fwk
b 2nd store m2 fwk
c 3rd store m2 fwk
d 4th store m2 fwk
e 5th store m2 fwk
f 6th store m2 fwk
7th store m2 fwk
h 8th store m2 fwk
i 9th store m2 fwk
10th store m2 fwk
k 11th store m2 fwk
l Roof level
2.7 Others
Works not lis ted above but are necessary to complete theworks as a whole (if not stated and allowed herein, shall be
abc
3 U er Floor
3.1 Concrete to sus ended slab - G40a 1st store m3 G40
b 2nd store m3 G40
c 3rd store m3 G40
d 4th store m3 G40
e 5th store m3 G40
f 6th store m3 G40
7th store m3 G40
h 8th store m3 G40
i 9th store m3 G40
10th store m3 G40
k 11th store m3 G40
l Roof level
Concrete to RC led e - G40a 2nd store m3 G40
b 3rd store m3 G40
c 4th store m3 G40
d 5th store m3 G40
e 6th store m3 G40
f 7th store m3 G408th store m3 G40
h 9th store m3 G40
i 10th store m3 G40
11th store m3 G40
k Roof level m3 G40
Carried Forward
Page 64 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 65/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 5 3 U er Floor Cont'd
3.2 Reinforcement to sus ended slab
a 1st store k rebar
b 2nd store k rebar
c 3rd store k rebar
d 4th store k rebar
e 5th store k rebar
f 6th store k rebar
7th store k rebar
h 8th store k rebar
i 9th store k rebar
10th store k rebar
k 11th store k rebar
l Roof level
Reinforcement to RC led e
a 2nd store k rebarb 3rd store k rebar
c 4th store k rebar
d 5th store k rebar
e 6th store k rebar
f 7th store k rebar
8th store k rebar
h 9th store k rebar
i 10th store k rebar
11th store k rebar
k Roof level k rebar
3.3 Formwork to sus ended slab
a 1st store m2 fwk
b 2nd store m2 fwk
c 3rd store m2 fwk d 4th store m2 fwk
e 5th store m2 fwk
f 6th store m2 fwk
7th store m2 fwk
h 8th store m2 fwk
i 9th store m2 fwk
10th store m2 fwk
k 11th store m2 fwk
l Roof level
20mm thick slab ed e
b 3rd store m 20-fwk
c 4th store m 20-fwk
d 5th store m 20-fwk
e 6th store m 20-fwk
f 7th store m 20-fwk 8th store m 20-fwk
h 9th store m 20-fwk
i 10th store m 20-fwk
11th store m 20-fwk
50mm thick slab ed eb 3rd store m 50-fwk
c 4th store m 50-fwk
d 5th store m 50-fwk
e 6th store m 50-fwk
f 7th store m 50-fwk
8th store m 50-fwk
h 9th store m 50-fwk
i 10th store m 50-fwk
11th store m 50-fwk
Formwork to RC led ea 2nd store m2 fwk
b 3rd store m2 fwk
c 4th store m2 fwk
d 5th store m2 fwk
e 6th store m2 fwk
f 7th store m2 fwk
8th store m2 fwk
h 9th store m2 fwk
i 10th store m2 fwk
11th store m2 fwk
k Roof level m2 fwk
Ditto 150mm thick slab ed e to RC led e
a 2nd store m 150-fwk b 3rd store m 150-fwk
c 4th store m 150-fwk
d 5th store m 150-fwk
e 6th store m 150-fwk
f 7th store m 150-fwk
8th store m 150-fwk
h 9th store m 150-fwk
i 10th store m 150-fwk
11th store m 150-fwk
k Roof level m 150-fwk
3.4 Water roofin s stem to structural works as s ecifieda 1st storeb 2nd store
c 3rd stored 4th storee 5th storef 6th store
Carried Forward
Page 65 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 66/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 6 3 U er Floor Cont'd
nil3.4 Waterproofing system to structural works as specified (Cont'd)
7th storeh 8th storei 9th store
10th store
k 11th storel Roof level
3.5 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
ab
c
4 Structural Wall
4.1 Concrete to structural wall - G40a 1st store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
b 2nd storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
c 3rd storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
d 4th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
e 5th storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
f 6th storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
7th storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
h 8th storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
i 9th storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
10th store
to lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
k 11th storeto lift wall m3 G40
to staircase wall m3 G40
to internal rc wall m3 G40
l Roof levelto lift wall m3 G40
to staircase wall m3 G40
Carried Forward
Page 66 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 67/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 7 4 Structural Wall Cont'd
4.2 Reinforcement to structural walla 1st store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
b 2nd store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
c 3rd storeto lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
d 4th store
to lift wall k rebar
to staircase wall k rebarto internal rc wall k rebar
e 5th storeto lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
f 6th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
7th storeto lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
h 8th store
to lift wall k rebarto staircase wall k rebar
to internal rc wall k rebar
i 9th storeto lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
10th store
to lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
k 11th storeto lift wall k rebar
to staircase wall k rebar
to internal rc wall k rebar
l Roof level
to lift wall k rebarto staircase wall k rebar
4.3 Formwork to structural wall
a 1st storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
b 2nd storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
c 3rd storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk d 4th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
e 5th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
f 6th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
7th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk h 8th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
i 9th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
10th store
to lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
k 11th storeto lift wall m2 fwk
to staircase wall m2 fwk
to internal rc wall m2 fwk
l Roof level
to lift wall m2 fwk
to staircase wall m2 fwk
4.4 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a
bc
Carried Forward
Page 67 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 68/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 8 5 Structural work to roof
5.1 Concrete roof slaba Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
5.2 Sus ended roof beama Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
5.3 Stum column at roof a Concrete G40b Reinforcementc Formwork
5.4 Roof finishesa Profile steel roofin
MDS Metal deck standin seam with insulation & reflective foil m2 roof
b Insulation
c Water roofin
Note There are 2 details for waterproofing to RC Flat Roof, please
use whichever is a licable
RF Wate roofin to RC Flat Roof m2 water rf Detail 1 consists of:
- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded- 6mm thk under-screed draina e sheet- 1000 x 1000 x 50mm thk c/s panel roofing reinforced with
- Pol sul hide sealant- 50mm wide welded la
Detail 2 Wate roofin to RC Flat Roof consists of:
- cement and sand screed to fall- wate roofin membrane- under-screed draina e mat- Extruded ol st rene insulation- Se aration la er- 600 x 600 x 50mm thk PC anel
RF1 Wate roofin to RC Flat Roof non insulated m2 water rf
RFU Wate roofin to RC Flat Roof- u turn m water rf consists of:
- 1.2mm thk EVA PVC water roofin membrane bonded- 25mm thk c s rotection screed with GI mesh- membrane terminated into groove-line & sealed with
ol urethane sealant
Water roofin to Non-Insulated Deck m2 water rf consists of:
- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded- 6mm thk under-screed draina e sheet
- finishes and rotection screed measured se aratel
WFST Water roofin to Landsca e Deck to Sk Terrace, 6th St m2 water rf consists of:
- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded- 25mm thk c s rotection screed- 100 sm eotextile se aration la er- 30mm thk interlockin sub-soil draina e modules- 100 sm eotextile filter fabric- 50mm thk coarse washed sand- growth media to Landscape Architect's detail (Softscape is
Waterproofing works to planters- 30mm thk modular subsoil
Planter floor m2 water rf Planter walls m2 water rf
d Perforated aluminum trellisRoof Trellis Aluminium ex anded mesh screen to roof m2 metal-wk
Note Area measured is not only mesh area but including the metal
consists of:- 600 x 300 GS- 200 x 100 x 8mm thk hot di ed GS RHS in aint finish- 6mm thk hot di ed GS late in aint finish- Aluminium ex anded mesh screen in owder coated finish- 50 x 75 x 6mm thk hot di ed GS L-an le in aint finish
e Green roofin s stem B Others included included includedNote Green roofing system by NSC as per Schedule of Finishes,
f Roof draina e with accessoriesSi honic rainwater outlet diam not iven nos si honicRWD diam not iven m draina eRoof sci er drain with ratin w=0.50m m draina e
Scupper drain to Corridor near AC Ledges- 150mm wide x
m scupper
Truss to su ort li hts & fansSteel structure k steelPaintin m2 steel
M16 bolt no. steelM20 cast-in bolt no. steel
h Timber deckinEF9 Seasoned ironwood for timber decking to Communal Sky
m2 tbr deck
Note WT-Timber flooring system (iron wood); Size: 150 x50mm thk,
Colour: dark mahogany, Finish: natural stain look alike as per
EF9a Timber finish to seats/ bench at Communal Sky Terrace and
Roof Garden (Hostel Block); external, irregular shaped, total
m2 timber
i Granite slab with ste in stone
Plinth
k Roof avilion
5.5 Built in Gondola s stem Gondola
5.6 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Planters at Sk TerraceCut to size x 20mm thk granite with backing scree to planter
m2 granite
Plaster and aint to lanter walls external m2 laster
200 x 300 x 30mm thk ranite co in to lanters m ranite
b SunshadeSteel structure k steelPaintin m2 steelM16 bolt no. steel
c
Carried Forward
Page 68 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 69/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 9 6 Staircase
6.1 Staircase fli ht
a Precast concrete staircaseb Reinforced Concrete to in structure
Concrete G40 m3 G40Reinforcement k rebar
Formwork m2 fwk
6.2 Sus ended landin slaba Concrete G40
b Reinforcementc Formwork
6.3 Sus ended landin rakin ed e beama Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
6.4 Ex ended mesh screen staircase railin
SR1 MS railin to Staircase h=0.90m to all blocks m Railin
consists of:- 40 x 100mm thk MS late in enamel aint finish- 40 x 10mm thk MS plate in enamel paint f inish @ max 100mm
- 50 x 150 x 6mm thk MS an le in enamel aint finish
- SS ex ansion bolt
SR2b GS expanded mesh screen/ railing in powder coated f inish
h=1.675m to Staircase Landin for Blks X2 and Y2
m Railing
Note As per drawing title, Blks X2 and Z2 are not included,
assumin similar railin are to be used for Blks X2 and Z2
consists of:- 10mm thk hot di ed GS late in owder coated finish
- 50 x 30mm thk hot di ed GS RHS in owder coated finish- 10mm thk hot dipped GS folded plate in powder coated finish
- 10mm thk hot dipped GS flat plate baluster in powder coated
- 10mm thk hot dipped GS L-angle pre-welded to G/S expanded
- GS ex anded mesh screen in owder coated finish
- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate
-- 10mm thk hot di ed GS late in owder coated finish
- Countersunk anchor bolt
- 20 x 20mm aluminium U-channel in owder coated finish- 10mm thk hot di ed GS late in owder coated finish
SR2c Ditto h=1.20m as measured on elevation m railin
6.5 Timber stud wall to staircase railin
6.6 Stair finishes
Floor Finishes
SF1 Self levelin screed to common staircasesLandin m2 screed
Riser 167.7mm hi h m S-riserTreads 250mm wide m S-tread
Nosin tiles m S-Nosin -T
Wall FinishesSW Plaster and aint to staircase wall m2 laster
Ceilin FinishesSC1 Plaster and aint to staircase ceilin m2 laster
6.7 Others
Works not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
ab
c
7 External Wall and Finishes
7.1 Brickwalla 1st store
1BRW100E 100mm thk brickwall external m2 100-bwk 1BRW200E 200mm thk brickwall external m2 200-bwk
b 2nd store -
2BRW100E 100mm thk brickwall external m2 100-bwk - 2BRW200E 200mm thk brickwall external m2 200-bwk -
c 3rd store -
3BRW100E 100mm thk brickwall external m2 100-bwk
3BRW200E 200mm thk brickwall external m2 200-bwk
d 4th store - 4BRW100E 100mm thk brickwall external m2 100-bwk
4BRW200E 200mm thk brickwall external m2 200-bwk -
e 5th store - 5BRW100E 100mm thk brickwall external m2 100-bwk
5BRW200E 200mm thk brickwall external m2 200-bwk
Carried Forward
Page 69 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 70/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 10 7 External Wall and Finishes Cont'd
7.1 Brickwall Cont'df 6th store -
6BRW100E 100mm thk brickwall external m2 100-bwk 6BRW200E 200mm thk brickwall external m2 200-bwk -
7th store - 7BRW100E 100mm thk brickwall external m2 100-bwk 7BRW200E 200mm thk brickwall external m2 200-bwk -
h 8th store - 8BRW100E 100mm thk brickwall external m2 100-bwk 8BRW200E 200mm thk brickwall external m2 200-bwk -
i 9th store - 9BRW100E 100mm thk brickwall external m2 100-bwk - 9BRW200E 200mm thk brickwall external m2 200-bwk -
10th store - 10BRW100E 100mm thk brickwall external m2 100-bwk - 10BRW200E 200mm thk brickwall external m2 200-bwk -
k 11th store - 11BRW100E 100mm thk brickwall external m2 100-bwk - 11BRW200E 200mm thk brickwall external m2 200-bwk -
l Roof level - RFBRW100E 100mm thk brickwall external m2 100-bwk RFBRW200E 200mm thk brickwall external m2 200-bwk -
7.2 Glass wall anel com lete with su ortin frame
a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th store
7.3 Perforated anel Com osite Panel MeshNote Steel support for rainscreens / sunshades are measured
se aratel lease refer to Item 5.6ba 1st store
b 2nd store Aluminium expanded mesh sunshade/ sunshade window fin
=
m GS-mesh
GS expanded mesh screen in powder coated finish (w=0.60m)
c 3rd store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
d 4th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
e 5th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
f 6th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
7th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
h 8th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
i 9th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
10th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
k 11th store Aluminium expanded mesh sunshade/ sunshade window fin
=
m railing
GS expanded mesh screen in powder coated finish (w=0.60m)
l Roof
Carried Forward
Page 70 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 71/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 11 7 External Wall and Finishes Cont'd
7.4 RC ara et wall low walla 1st store
b 2nd store
c 3rd storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
d 4th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
e 5th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
f 6th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
7th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
h 8th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
i 9th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
10th storeConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
k 11th store
Concrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
l Roof Concrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
7.5 Precast anel wall
PW 160mm thk precast RC wall (some drawings shown 140mm
thk others 150mm thk external
a 1st store m2 Precast-W - - - b 2nd store m2 Precast-W - - - c 3rd store m2 Precast-W - - - d 4th store m2 Precast-W - - - e 5th store m2 Precast-W - - - f 6th store m2 Precast-W - - -
7th store m2 Precast-W - - - h 8th store m2 Precast-W - - - i 9th store m2 Precast-W - - -
10th store m2 Precast-W - - - k 11th store m2 Precast-W - - - l Roof m2 Precast-W - - -
7.6 Perforated Ex anded mesh railin
Note For all railings below, please follow detail descriptions as
R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1consists of:
- 10mm thk hot di ed GS late in owder coated finish- 10mm thk hot dipped GS folded plate in powder coated finish
- 40mm diam hot di ed GS CHS in owder coated finish- 10mm thk hot dipped GS flat plate baluster in powder coated
- 10mm thk hot dipped GS L-angle pre-welded to aluminium
- Aluminium ex anded mesh with owder coated finish- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate
re-welded to u ri ht balusters in aint finish
- 10mm thk hot dipped GS angle plate in powder coated finish
- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in owder coated finish- 10mm thk hot di ed GS late in owder coated finish
R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
consists of:
- 10mm thk hot di ed GS late in owder coated finish- 10mm thk hot dipped GS folded plate in powder coated finish
- 40mm diam hot di ed GS CHS in owder coated finish- 10mm thk hot dipped GS flat plate baluster in powder coated
finish- 10mm thk hot dipped GS L-angle pre-welded to aluminium
ex anded mesh with owder coated finish- Aluminium ex anded mesh with owder coated finish- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate
-- 10mm thk hot dipped GS angle plate in powder coated finish
- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in owder coated finish- 10mm thk hot di ed GS late in owder coated finish
a 1st storeb 2nd store
c 3rd store -
R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2, Z1 m railin -
R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
m railing -
d 4th store -
R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
m railing -
e 5th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
Blks X2 & Z2
m railing -
f 6th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
m railing -
R4 Glass railin h=0.90m to Sk Terrace for Blks X2 & Z2 m railin - R4 Glass railin h=1.10m to Sk Terrace for Blks X2 & Z2
consists of:- 25 x 25 x 2mm ss ca in- 10mm thk hot di ed GS T-bar in owder coated finish- 20mm thk full tem ered laminated lass- 10mm thk hot dipped GS L-angle prewelded to channeleed
7th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
m railing -
h 8th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2, Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
Blks X2 & Z2
m railing -
i 9th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
m railing -
10th store - R2b Ditto h=1.50m to AC Led e for Blks X2 and Z2 Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
m railing -
k 11th store -
Page 71 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 72/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountR2b Ditto h=1.50m to AC Led e for Blks X2 and Z2, Z1 m railin - R3 Aluminium expanded mesh screen (h=1.675m) to Balcony for
Blks X2 & Z2
m railing -
l Roof
Carried Forward
Page 72 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 73/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 12 7.7 M&E louvre
a 1st storePV 12 Aluminium louvre vent nos windowPV 15 Aluminium louvre vent nos window
b 2nd store
c Roof PV 21 Aluminium louvre vent to Lift Motor Room nos window
7.8 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Precast refuse chute wall m3 Precast-RC
Refuse chut roof rc wallConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
Refuse chut roof slabConcrete G40 m3 G40Formwork m2 Fwk Rebar k Rebar
b WindowsWindows to Service A artmentsFacult Service A artments1-Bedroom
AV/06 Glass louvres vents to Utility Room & Bath/WC; 1-Bedroom
nos window
CWF/06 Casement window with fixed tempered glass panel to Living/
Dinin 1-Bedroom Service A artments
nos window
CWF/37 Casement window with fixed tempered glass panel to Master
Bedroom Bedroom 1-Bedroom Service A artments
nos window
2-BedroomCWF/06A Casement window with fixed tempered glass panel to Master
-
nos window
CWF/12 Casement window with fixed tempered glass panel to
-
nos window
CWF/30 Casement window with fixed tempered glass panel to Master
-
nos window
AV/03 Glass louvres vents to Utility Room & Bath/WC; 2-Bedroom
Service A artments
nos window
3-BedroomCWF/06 Casement window with fixed tempered glass panel to Living/
Dinin 3-Bedroom Service A artments
nos window
CWF/06A Casement window with fixed tempered glass panel to Master
-
nos window
CWF/30 Casement window with fixed tempered glass panel to Master
-
nos window
AV/06 Glass louvres vents to Utility Room & Bath/WC ; 3-Bedroom
nos window
GL/06 Adjustable glass louvred window to Kitchen; 3-Bedroom
Service A artments
nos window
b
c
8 Internal Wall and Partition
8.1 Brickwall excludin wall finishes - a 1st store -
1BLW100 100mm thk blockwall internal m2 100-blk - 1BLW200 200mm thk blockwall internal m2 200-blk - 1BRW100 100mm thk brickwall internal m2 100-bwk - 1BRW200 100mm thk brickwall internal m2 200-bwk -
b 2nd store - 2BLW100 100mm thk blockwall internal m2 100-blk - 2BLW200 200mm thk blockwall internal m2 200-blk - 2BRW100 100mm thk brickwall internal m2 100-bwk - 2BRW200 100mm thk brickwall internal m2 200-bwk -
c 3rd store - 3BLW100 100mm thk blockwall internal m2 100-blk - 3BLW200 200mm thk blockwall internal m2 200-blk - 3BRW100 100mm thk brickwall internal m2 100-bwk - 3BRW200 200mm thk brickwall internal m2 200-bwk -
d 4th store - 4BLW100 100mm thk blockwall internal m2 100-blk - 4BLW200 200mm thk blockwall internal m2 200-blk - 4BRW100 100mm thk brickwall internal m2 100-bwk - 4BRW200 200mm thk brickwall internal m2 200-bwk -
e 5th store - 5BLW100 100mm thk blockwall internal m2 100-blk - 5BLW200 200mm thk blockwall internal m2 200-blk - 5BRW100 100mm thk brickwall internal m2 100-bwk - 5BRW200 200mm thk brickwall internal m2 200-bwk -
f 6th store - 6BLW100 100mm thk blockwall internal m2 100-blk - 6BLW200 200mm thk blockwall internal m2 200-blk - 6BRW100 100mm thk brickwall internal m2 100-bwk - 6BRW200 200mm thk brickwall internal m2 200-bwk -
7th store - 7BLW100 100mm thk blockwall internal m2 100-blk - 7BLW200 200mm thk blockwall internal m2 200-blk - 7BRW100 100mm thk brickwall internal m2 100-bwk - 7BRW200 200mm thk brickwall internal m2 200-bwk -
h 8th store - 8BLW100 100mm thk blockwall internal m2 100-blk - 8BLW200 200mm thk blockwall internal m2 200-blk - 8BRW100 100mm thk brickwall internal m2 100-bwk - 8BRW200 200mm thk brickwall internal m2 200-bwk -
i 9th store - 9BLW100 100mm thk blockwall internal m2 100-blk - 9BLW200 200mm thk blockwall internal m2 200-blk - 9BRW100 100mm thk brickwall internal m2 100-bwk - 9BRW200 200mm thk brickwall internal m2 200-bwk -
10th store -
10BLW100 100mm thk blockwall internal m2 100-blk - 10BLW200 200mm thk blockwall internal m2 200-blk - 10BRW100 100mm thk brickwall internal m2 100-bwk - 10BRW200 200mm thk brickwall internal m2 200-bwk -
k 11th store -
11BLW100 100mm thk blockwall internal m2 100-blk - 11BLW200 200mm thk blockwall internal m2 200-blk - 11BRW100 100mm thk brickwall internal m2 100-bwk - 11BRW200 200mm thk brickwall internal m2 200-bwk -
l Roof - RFBLW100 100mm thk blockwall internal m2 100-blk - RFBLW200 200mm thk blockwall internal m2 200-blk - RFBRW100 100mm thk brickwall internal m2 100-bwk - RFBRW200 200mm thk brickwall internal m2 200-bwk -
8.2 Hollow core light weight wall system excluding wall -
HCW Hollow core with C-glass continous monofilament fibres tissue
for joint to Hostel and Service Apartments as per Schedule of
Finishes, 110mm thk hollow core precast wall as per enlarged
a 1st store m2 Hollow-C - - b 2nd store m2 Hollow-C - - c 3rd store m2 Hollow-C - d 4th store m2 Hollow-C - e 5th store m2 Hollow-C - f 6th store m2 Hollow-C -
7th store m2 Hollow-C - h 8th store m2 Hollow-C - i 9th store m2 Hollow-C -
10th store m2 Hollow-C - k 11th store m2 Hollow-C - l Roof m2 Hollow-C - -
Carried Forward
Page 73 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 74/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 13 8 Internal Wall and Partition Cont'd
8.3 Glass wall anel com lete with su ortin frameNote Included in item 7.2
a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof
8.4 Acoustic wall panel lining including fabric wall covering system
a 1st storeb 7th store
8.5 Steel concrete lintols to brickwall dr walla 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof level
8.6 OthersWorks not lis ted above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Other railin s
40mm diam GS handrail to be provided all round where to Bio-
Pond ad acent and Ram
m metal-wk
Ditto wall mounted to Ram m metal-wk
50.8mm diam (OD) x 2mm thk SS pipe railing with SS supportnot more than 1000c/c to Irrigation Pump Room, 1st Sty
m metal-wk
bc
Carried Forward
Page 74 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 75/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 14 9 Door and Ironmon er
Note All 6mm thk wired clear glass panel are 100mm x 600mm
No given ironmongery schedule, only Specifications, please
include supply and installation of ironmongery to the door
9.1 Fire rated steel door in powder coated impact resistant
satin coating finished c/w exposed/concealed door
frame, mullion, ironmongery etc including fixing
a 1st storeFD2/12 Two hour fire rated steel door (double leaf) and frame
(powder coated impact resistant satin coating finish) to B in
Centre, PABX, LV Switchroom, LT S/W Room (Emergency),
Low Level Transfer Tank Room, Bin Transit Room, ELV Room,
MDF Room, Pool Filtraction Room, Ejector Pump Room,
Generator Room, Newater Tank Riinm Storage, Irrigation
nos Metal-Dr
FD2/18 Two hour fire rated steel door (double leaf) and frame
(powder coated impact resistant satin coating finish) to B in
Centre, PABX, LV Switchroom, LT S/W Room (Emergency),
Low Level Transfer Tank Room, Bin Transit Room, ELV Room,
MDF Room, Pool Filtraction Room, Ejector Pump Room,
Generator Room, Newater Tank Riinm Storage, Irrigation
nos Metal-Dr
FD2/18 Two hour fire rated steel door (double leaf) and frame
(powder coated impact resistant satin coating finish) to MDF
Room, Pool Filtration Room, Ejector Pump Roon, Generator
Room, Newater Transfer Tank Room/ Hosereel Tank Pump
nos Metal-Dr
FD2/RC14 Two hour fire rated steel door and frame (powder coated
impact resistant satin coating finish) to Refuse Chute Chamber
nos Metal-Dr
b 2nd storec 3rd stored 4th store
e 5th storef 6th store
7th store
FD2/10 Two hour fire rated steel door and frame (powder coated
impact resistant satin coating finish) to LAN Roon, PABX
nos Metal-Dr
h 8th storei 9th store
10th storek 11th store
l Roof level
9.2 Fire rated steel door in powder coated finished c/w
exposed/concealed door frame, mullion, ironmongery
a 1st storeb 2nd store
c 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof
Carried Forward
Page 75 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 76/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 15 9 Door and Ironmon er Cont'd
9.3 Non fire rated steel door in powder coated finished
c/w exposed/concealed door frame, mullion,
a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof level
9.4 Fire rated solid timber door in laminate finished c/w
door frame, mullion, push/kick plate, viewing panel,
a 1st store
FD.5/S06 Half hour fire rated solid core door with HPMR laminates to
DT TEL SPR FA HR FE SP ST
nos tbr-dr
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
b 2nd store
c 3rd storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to to
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 1-Bedroom Service A artment
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 2-Bedroom Service A artment
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to-
nos tbr-dr
d 4th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to to
TEL near StaircaseFD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 1-Bedroom Service A artment
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 2-Bedroom Service A artment
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
e 5th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to toTEL near Staircase
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 1-Bedroom Service A artment
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 2-Bedroom Service A artment
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
Main Entrance 3-Bedroom Service A artment
nos tbr-dr
f 6th storeFD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
nosHostel and Facult Service A artments
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
tbr-dr
nos7th store
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
tbr-dr
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
nosHostel and Facult Service A artments nos
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
tbr-dr
h 8th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to to
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
i 9th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to to
Page 76 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 77/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountFD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
10th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to to
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
k 11th storeFD.5 S08 Door to TEL near Staircase sin le leaf nos tbr-dr
Half hour fire rated solid core door with HPMR laminates to to
FD.5/S10 Half hour fire rated timber door (double leaf) with HPMR
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD.5/S12 Half hour fire rated timber door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW
nos tbr-dr
Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR/FE, ELV, ELECT, DR/SFH, PW, HR/FE/DR/SFH
FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
Hostel and Facult Service A artmentsFD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
FD1/AM10 One hour fire rated solid core door with HPMR laminates to
-
nos tbr-dr
l Roof FD1/10 One hour fire rated timber door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to
nos tbr-dr
9.5 Non fire rated / Timber door in laminate finished c/w
door frame, mullion, finger/push/kick plate, viewing
panel, louvred panel, ironmongery, etc includinq fixinq
a 1st storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
b 2nd store
c 3rd store
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
Bedroom Service A artmentDAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
2-Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track
-
d 4th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
Bedroom 1 2-Bedroom Service A artment
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
Bedroom Service A artment
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track
to Bedroom 1-Bedroom Service A artment
e 5th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
Page 77 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 78/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountDS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track -
f 6th store
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artments
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
Bedroom Service A artment
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
Bedroom Service A artmentDAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
3-Bedroom Service A artment
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
Bedroom 1 & 2 3-Bedroom Service A artment
nos tbr-dr
Carried Forward
Page 78 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 79/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 16 9 Door and Ironmon er Cont'd
9.5 Non fire rated / Timber door in laminate finished c/w
door frame, mullion, finger/push/kick plate, viewing
panel, louvred panel, ironmongery, etc including fixing
'7th store
DS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/08 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
3-Bedroom Service A artment
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
Bedroom 1 & 2 3-Bedroom Service A artment
nos tbr-dr
h 8th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
Bedroom Service A artment
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
Bedroom Service A artmentDAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track
-
i 9th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
2-Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
3-Bedroom Service A artment
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
Bedroom 1 2-Bedroom Service A artment
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
Bedroom 1 & 2 3-Bedroom Service A artment
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track
-
10th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS fingerpush and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3
nos tbr-dr
Timber door (double leaf) with HPMR laminate to Closet ; 3-
DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track
to Bedroom 1-Bedroom Service A artment
k 11th storeDS/04 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/12 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water
nos tbr-dr
Hostel and Facult Service A artmentsD/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard; 1-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 2-Bedroom Service
nos tbr-dr
D/08 Timber door with HPMR laminate and 3mm thk SS finger
push and kick plates to Service Yard ; 3-Bedroom Service
nos tbr-dr
DAL/10 Solid core door (double leaf) with HPMR laminate to Closet ; 3 nos tbr-dr
Page 79 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 80/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total Amount
Timber door (double leaf) with HPMR laminate to Closet ; 3-
DAU/10 Bi-folding door with veneer laminated to Utility Room ; 3-
Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Bath/WC; 1-Bedroom
Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
2-Bedroom Service A artment
nos tbr-dr
DT/08A Laminated semi-solid timber door to Master Bath, Bath/WC ;
3-Bedroom Service A artment
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
Bedroom 1 2-Bedroom Service A artment
nos tbr-dr
DB/10 Semi solid door with timber veneer to Master Bedroom,
-
nos tbr-dr
DB/10A Sliding timber door with HPMR laminate to Bedroom; 1-
nos tbr-dr
Sliding timber door with HPMR laminate, top hung sliding track
-
l Roof level
9.6 Frameless glass door c/w ironmongery, etc including
fixin accessoriesa 1st storeb 2nd store
c 3rd stored 4th storee 5th store
f 6th store7th store
h 8th store
i 9th store10th store
k 11th store
l Roof level
9.7 Aluminium framed glass door c/w frame, ironmongery,
etc includin fixin accessoriesa 1st storeb 2nd store
c 3rd storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
d 4th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
e 5th store
SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
f 6th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
7th store
SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
h 8th store
SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
i 9th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
10th storeSGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
k 11th store
SGD/38 Sliding glass door to Balcony ; 3-Bedroom Service Apartment nos Glass-dr
l Roof level
Carried Forward
Page 80 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 81/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 17 9 Door and Ironmon er Cont'd
9.8 Metal gate c/w frame, ironmongery etc including fixing
a Roof level
9.9 Fire rated motorised roller shutter in powder coated finished
c/o ironmongery, shutter box cover/hood, side guides, bottom
rail, locking system, barrel, removable centre mullion where
necessary, ventilation holes, etc. including fixing accessories
a 1st storeb 2nd store
9.10 Non fire rated motorised roller shutter in powder coated
finished c/o ironmongery, shutter box cover/hood, side guides,
bottom rail, locking system, barrel, removable centre mullion
where necessary, ventilation holes, etc. including fixing
a 1st store
b 2nd store
9.11 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
abc
10 Wall Finishes
10.1 Plasterin and vin l co- ol mer emulsion aintin
W1a Plaster and aint to wall
a 1st store m2 laster - - b 2nd store m2 laster - - c 3rd store m2 laster - -
d 4th store m2 laster - - e 5th store m2 laster - - f 6th store m2 laster - -
7th store m2 laster - - h 8th store m2 laster - -
i 9th store m2 laster - - 10th store m2 laster - -
k 11th store m2 laster - - l Roof m2 laster -
Carried Forward
Page 81 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 82/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 18 10 Wall Finishes cont'd
10.2 Skim coatin and vin l co- ol mer emulsion
W1 5mm skim coated and aint finished to wallsNote Plaster and paint as per Schedule of Finishes, finishes above
a 1st store m2 skim coat - - b 2nd store m2 skim coat - - c 3rd store m2 skim coat - -
d 4th store m2 skim coat - - e 5th store m2 skim coat - - f 6th store m2 skim coat - -
7th store m2 skim coat - - h 8th store m2 skim coat - - i 9th store m2 skim coat - -
10th store m2 skim coat - - k 11th store m2 skim coat - - l Roof m2 skim coat - -
10.3 Homogeneous wall tile including cement sand backing -
W2 300mm x 600mm homogeneous wall tiles with backing screed
a 1st store m2 wall tile - b 2nd store m2 wall tile - c 3rd store m2 wall tile -
d 4th store m2 wall tile - e 5th store m2 wall tile -
f 6th store m2 wall tile - 7th store m2 wall tile -
h 8th store m2 wall tile - i 9th store m2 wall tile -
10th store m2 wall tile - k 11th store m2 wall tile -
l Roof m2 wall tile -
10.4 Glazed ceramic wall tile including cement sand
backin screed with adhesivea 1st store
RCCW Glazed wall tiles with backing screed to Refuse Chute m2 GWT
b 2nd storec 3rd store
d 4th storee 5th storef 6th store
7th store
Carried Forward
Page 82 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 83/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 19 10 Wall Finishes cont'd
10.4 Glazed ceramic wall tile including cement sand
'h 8th storei 9th store
10th store
k 11th storel Roof
10.5 Granite tile includin cement sand backin screeda 1st storeb 2nd storec 3rd stored 4th storee 5th store
f 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof
10.6 Others
Works not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Green Feature Wall to Sk Terrace 6th to 7th St m2 others
External Facade to Riser at Sky Terrace, 6th to 7th Sty,
m2 others
b Other wall finishesW8 Stud wall with insulation (self adhesive polyurethene sheet
vapour barrier and 50mm thk rockwool insulation complete
with 12mm thk non-combustible calcium silicate baord) to LAN
m2 partition
EWF Skim coat and smooth textured aint finish external m2 skim coat
Grooveline w=20mm m others
11 Floor Finishes11.1 Cement and sand screed with adhesive -
a 1st store m2 screed - - b 2nd store m2 screed - -
c 3rd store m2 screed - - d 4th store m2 screed - - e 5th store m2 screed - -
- -
Carried Forward
Page 83 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 84/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 20 11 Floor Finishes Cont'd
11.1 Cement and sand screed with adhesive Cont'df 6th store m2 screed
7th store m2 screedh 8th store m2 screedi 9th store m2 screed
10th store m2 screedk 11th store m2 screedl Roof m2 screed -
11.2 Cement and sand screed with floor hardener - a 1st store m2 flr hard - b 2nd store m2 flr hard - c 3rd store m2 flr hard - d 4th store m2 flr hard - e 5th store m2 flr hard - f 6th store m2 flr hard -
7th store m2 flr hard - h 8th store m2 flr hard - i 9th store m2 flr hard -
10th store m2 flr hard - k 11th store m2 flr hard - l Roof m2 flr hard -
11.3 Li uid -a lied water roofin membranea 1st store
Wate roofin to wet areas to floor m2 water rf Flexible cementitous waterproof coating; rc slab surface
minimum wood trowelled smooth to receive waterproofing
coating, finishes and 25mm thk c/s protection screed
Wate roofin to wet areas to wall u turn h=300mm m water rf Flexible cementitous waterproof coating; rc slab surface
minimum wood trowelled smooth to receive waterproofing
coating, finishes and 20mm thk c/s protection screed
Wate roofin to wet areas to shower wall h=1.80m m water rf - Flexible cementitous waterproof coating on c/s leveling render,
finishes and 20mm thk c/s protection screed measured
Wate roofin to Sum PitFlexible cementitous waterproof coating with 25mm thk c/s
Floor m2 water rf Wall m2 water rf
Wate roofin to Water Tank Flexible cementitous waterproof coating with 25mm thk c/s
protection screed; rc slab surface minimum wood trowelled
Floor m2 water rf Wall m2 water rf
WFL Wate roofin to Lift Pit - floor m2 water rf WFL Wate roofin to Lift Pit - wall m2 water rf
b 2nd store - WF2 Wate roofin to wet areas to floor m2 water rf - WF2 Wate roofin to wet areas to wall u turn h=300mm m water rf - WF2 Wate roofin to wet areas to shower wall h=1.80m m water rf -
c 3rd store - WF3 Wate roofin to wet areas to floor m2 water rf WF3 Wate roofin to wet areas to wall u turn h=300mm m water rf WF3 Wate roofin to wet areas to shower wall h=1.80m m water rf
d 4th store - WF4 Wate roofin to wet areas to floor m2 water rf WF4 Wate roofin to wet areas to wall u turn h=300mm m water rf WF4 Wate roofin to wet areas to shower wall h=1.80m m water rf
e 5th store - WF5 Wate roofin to wet areas to floor m2 water rf WF5 Wate roofin to wet areas to wall u turn h=300mm m water rf WF5 Wate roofin to wet areas to shower wall h=1.80m m water rf
f 6th store - WF6 Wate roofin to wet areas to floor m2 water rf WF6 Wate roofin to wet areas to wall u turn h=300mm m water rf WF6 Wate roofin to wet areas to shower wall h=1.80m m water rf
7th store - WF7 Wate roofin to wet areas to floor m2 water rf WF7 Wate roofin to wet areas to wall u turn h=300mm m water rf WF7 Wate roofin to wet areas to shower wall h=1.80m m water rf
h 8th store -
WF8 Wate roofin to wet areas to floor m2 water rf WF8 Wate roofin to wet areas to wall u turn h=300mm m water rf WF8 Wate roofin to wet areas to shower wall h=1.80m m water rf
i 9th store - WF9 Wate roofin to wet areas to floor m2 water rf WF9 Wate roofin to wet areas to wall u turn h=300mm m water rf WF9 Wate roofin to wet areas to shower wall h=1.80m m water rf
10th store - WF10 Wate roofin to wet areas to floor m2 water rf WF10 Wate roofin to wet areas to wall u turn h=300mm m water rf WF10 Wate roofin to wet areas to shower wall h=1.80m m water rf
k 11th store - WF11 Wate roofin to wet areas to floor m2 water rf
WF11 Wate roofin to wet areas to wall u turn h=300mm m water rf WF11 Wate roofin to wet areas to shower wall h=1.80m m water rf
11.4 Heavy duty epoxy polyurenthane floor coating system
a 1st store
Carried Forward
Page 84 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 85/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 21 11 Floor Finishes Cont'd
11.5 Heavy duty epoxy polyurenthane floor coating
a 1st store
11.6 Homo eneous tile - a 1st store -
1F1 600mm x 600mm homogenous floor tiles with cement and
m2 F1 -
1F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2 -
1F3 600mm x 600mm non-slip homogenous floor tiles with cement
m2 F3 -
1F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
1F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
1F4 450mm x 900mm homogeneous tiles with cement and sand
screed
m2 F4 -
1F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
tiles internal
m2 F6 -
1F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7 -
b 2nd store - 2F1 600mm x 600mm homogenous floor tiles with cement and
m2 F1 -
2F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2 -
2F3a 600mm x 600mm non-slip homogenous floor tiles with cementand sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
2F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
tiles internal
m2 F6 -
2F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7 -
c 3rd store - 3F1 600mm x 600mm homogenous floor tiles with cement and
m2 F1
3F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2
3F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
3F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
tiles internal
m2 F6 -
3F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7
d 4th store - 4F1 600mm x 600mm homogenous floor tiles with cement and
m2 F1
4F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2
4F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
4F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
tiles internal
m2 F6 -
4F7 450mm x 900mm non-slip homogenous floor tiles with cementand sand screed internal
m2 F7
e 5th store - 5F1 600mm x 600mm homogenous floor tiles with cement and
m2 F1
5F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2
5F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
5F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
tiles internal
m2 F6 -
5F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7
f 6th store - 6F1 600mm x 600mm homogenous floor tiles with cement and
sand screed
m2 F1
6F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2
6F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A
6F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
m2 F6 -
6F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7
7th store - 7F1 600mm x 600mm homogenous floor tiles with cement and
sand screed
m2 F1
7F2 300mm x 300mm non-slip homogenous floor tiles with cement
m2 F2
7F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A
7F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
m2 F6 -
7F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7
h 8th store - 8F1 600mm x 600mm homogenous floor tiles with cement and
sand screed
m2 F1
8F2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2
8F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A
8F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
m2 F6 -
8F7 450mm x 900mm non-slip homogenous floor tiles with cement
m2 F7
i 9th store - 9F1 600mm x 600mm homogenous floor tiles with cement and
sand screed
m2 F1
9F2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2
9F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A
9F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
m2 F6 -
9F7 450mm x 900mm non-slip homogenous floor tiles with cement
m2 F7
10th store - 11F1 600mm x 600mm homogenous floor tiles with cement and
sand screed
m2 F1
11F2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2
11F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A -
11F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
m2 F6 -
11F7 450mm x 900mm non-slip homogenous floor tiles with cement
m2 F7
k 11th store - 10F1 600mm x 600mm homogenous floor tiles with cement and
sand screed
m2 F1
10F2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2
10F3a 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed to Balcony as per Floor Finishes Plan
m2 F3A
10F6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
m2 F6 -
10F7 450mm x 900mm non-slip homogenous floor tiles with cement
m2 F7
l Roof - RFF1 600mm x 600mm homogenous floor tiles with cement and
m2 F1 -
RFF2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2 -
RFF6 300mm x 600mm & 100mm x 600mm non-slip homogeneous
tiles internal
m2 F6 -
RFF7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7 -
11.7 Heav dut homo eneous tilea 1st storeb 2nd store
11.8 Homo eneous tile skirtin -
Page 85 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 86/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountS1 100mm high homogenous skirting tile to the following levels
a 1st store m frl-skt - - b 2nd store m frl-skt - - c 3rd store m frl-skt - d 4th store m frl-skt - e 5th store m frl-skt - f 6th store m frl-skt -
7th store m frl-skt - h 8th store m frl-skt - i 9th store m frl-skt -
10th store m frl-skt - k 11th store m frl-skt - l Roof m frl-skt - -
Carried Forward
Page 86 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 87/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 22 11 Floor Finishes Cont'd
11.9 Granite tilea 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof level
11.10 Car et tile
a 1st storeb 2nd store
11.11 Insulated raised floor s stema 7th store
F11 Raised floor insulated to LAN Room ELVS Room raised flr
11.12 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Scupper drain with MS grating (w=150mm) to Refuse Chute
=
nos scupper
b Other floor finishesConcrete im rint timber look at 1st St m2 Conc-Im
RCCF Ceramic floor tiles with cement and sand screed to Refuse
Chute Chamber
m2
c Other skirtinS2 30mm x 15mm recessed powder coated aluminium channel
m Alum-sktg
Ceilin Finishes
12.1 Skim coatin and vin l co- ol mer emulsion aintin - a 1st store m2 Skim Coatb 2nd store m2 Skim Coat - - c 3rd store m2 Skim Coat - d 4th store m2 Skim Coat -
e 5th store m2 Skim Coat - f 6th store m2 Skim Coat -
Carried Forward
Page 87 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 88/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 23 12 Ceilin Finishes Cont'd
12.1 Skim coating and vinyl co-polymer emulsion painting
'7th store m2 Skim Coat
h 8th store m2 Skim Coati 9th store m2 Skim Coat
10th store m2 Skim Coatk 11th store m2 Skim Coatl Roof level m2 Skim Coat - -
12.2 Plasterin and aintin
C1 Plaster and aint to ceilin -
a 1st store m2 laster - b 2nd store m2 laster -
c 3rd store m2 laster - d 4th store m2 laster - e 5th store m2 laster - f 6th store m2 laster -
7th store m2 laster - h 8th store m2 laster -
i 9th store m2 laster - 10th store m2 laster -
k 11th store m2 laster - l Roof level m2 laster -
12.3 Moisture resistance gypsum plaster suspended ceiling
board
C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports
-
a 1st store m2 ceilin - b 2nd store m2 ceilin - c 3rd store m2 ceilin - d 4th store m2 ceilin - e 5th store m2 ceilin -
f 6th store m2 ceilin - 7th store m2 ceilin -
h 8th store m2 ceilin - i 9th store m2 ceilin -
10th store m2 ceilin - k 11th store m2 ceilin -
l Roof level m2 ceilin - -
Carried Forward
Page 88 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 89/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 24 12 Ceilin Finishes Cont'd
12.4 Moisture resistance gypsum plasterboard for box -up
a 1st store Includedb 2nd store Includedc 3rd store Includedd 4th store Included
e 5th store Includedf 6th store Included
7th store Includedh 8th store Includedi 9th store Included
10th store Includedk 11th store Included
l Roof level Included
12.5 Moisture resistance mineral fibre suspended ceilingboard
-
C3 9mm thk fibrous plasterboard with paint finish to Bedrooms at
Faculty Service Apartment (Blks X2 and Z2) as per Tender
a 1st store m2 ceilin - - b 2nd store m2 ceilin - - c 3rd store m2 ceilin - - d 4th store m2 ceilin - -
e 5th store m2 ceilin - - f 6th store m2 ceilin - -
7th store m2 ceilin - - h 8th store m2 ceilin - -
i 9th store m2 ceilin - - 10th store m2 ceilin - - k 11th store m2 ceilin - -
l Roof level m2 ceilin - -
12.6 Moisture resistance mineral fibre board for box-up
a 1st store m2
12.7 Thermally insulated ceiling panel with fibrous plaster
a 1st storeb 2nd storec 3rd stored 4th store
Carried Forward
Page 89 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 90/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 25 12 Ceilin Finishes Cont'd
12.7 Thermally insulated ceiling panel with fibrous plaster
'e 5th storef 6th store
7th store
h 8th storei 9th store
10th storek 11th store
12.8 Mineral fibre insulated sus ended ceilin boarda 7th store
C8 Mineral fibreboard with insulation batts above to LAN Room /
m2 ceiling
12.9 Acoustically absorptive mineral fibre suspended ceiling
a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th storel Roof level
12.10 Acoustic lasswool sus ended ceilin boardNote Acoustic ceiling as per Schedule of Finishes is 75mm thk
acoustic cell spray treatment, quantities are included in
a 1st storeb 2nd storec 3rd stored 4th storee 5th storef 6th store
7th storeh 8th storei 9th store
10th storek 11th store
l Roof level
Carried Forward
Page 90 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 91/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 26- 12 Ceilin Finishes Cont'd
12.11 Others
Works not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Access anels to ceilin 600mm x 600mm nos ceilin
b Other ceilin finishesC7 75mm thk acoustic cell spray treatment to Corridor; Sprayed
acoustic treatment to soffit of slab to Corridors as per Tender
m2 ceiling
C7a 75mm thk acoustic cell spray treatment to Kitchen, Dishwash
& Potwash areas, Indoor Sports Hall, Toilet, Lockers, Family
m2 ceiling
6C14 Aluminium expanded metal mesh ceiling in powder coated
finish (ceiling height=5.40m) as per Schedule of Finishes but
concealed ceiling as per Reflected Ceiling Plan to Sky Terrace
m2 ceiling
C15 No ceiling to Balcony (Blks X2 and Z2) as per Tender
Clarif ication 2, Architectural Item A34; assuming skim coat
m2 ceiling
GSM GS mesh with GS supports over opening to FA, SPR, TEL, DT,
PW NW Duct
m2 ceiling
6C3b 9mm thk fibrous plasterboard with paint finish (ceiling
height=5.0m ~5.11m) to Sky Terrace; flat area was measured
m2 ceiling
b
c
13 Fittin and Furnishin13.1 Cabinet
a Kitchen hood & hob Included in PC SumsNote As per Tender Clarification 2, Architectural Item A15, cooker
and hob are b NSC As per Tender Clarification 2, Architectural Item A58, 4 burner
induction hob burners and 3 speed telescopic pull hood are by
13.2 Cat ladderCatladder with ca e uard nos metal-wk
Slidin access tra door 1150mm x 1150mm nos metal-wk Aluminium handrail 2 nos sets metal-wk
Catladder to Lift Pit h=1.80~3.0m nos metal-wk
300mmW x 300mmD x 300mmH sump pit with GS grating to
nos metal-wk
13.3 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
abc
14 Sanitar A liancesNote For sanitary wares specifications, please refer to Tender
14.1 Pedestal water closetMaster water closet to Staff A artment sets S-wares
14.2 S uattin an S-wares
14.3 WC conceal cistern nos S-wares
14.4 Urinal S-wares
14.5 Urinal sensor flush valve S-wares
14.6 Soa dis enser S-wares
Carried Forward
Page 91 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 92/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 27- 14 Sanitar A liances Cont'd
14.7 Waste rece tacle S-wares
14.8 Hand dr er S-wares
14.9 Toilet a er holder nos S-wares
14.10 Hook on back of door nos S-wares
14.11 Sanitar bin S-wares
14.12 Bidet s ra S-wares
14.13 Bib ta S-wares
14.14 Janitor sink S-wares
14.15 Ta for anitor sink S-wares
14.16 Shower headMaster Shower to Staff A artment sets S-waresCommon Shower to Staff A artment sets S-wares
14.17 Shower mixer nos S-waresTowel rail to Staff A artment nos S-wares
14.18 Mirror
Facult A artment- 1 Bedroom nos mirrorFacult A artment- 2 Bedroom nos mirrorFacult A artment- 3 Bedroom nos mirror
14.19 Hot water dis enser S-wares
14.20 Fli -u s s rab bar shower seatShower seat nos S-wares
14.21 S s horizontal bar fixed to door S-wares
14.22 OthersWorks not listed above but are necessary to complete the
works as a whole ( if not stated and allowed herein, shall be
a Other works in relation with Toilets
Master Basin to Staff A artment sets S-waresCommon Basin to Staff A artment sets S-wares
Kitchen sin le sink c w ta L=0.50m to Staff A artment sets S-wares
Floor tra with UPVc ratin nos S-waresFloor waste nos S-wares
b Shower screens1BR Shower / glass screen with sliding door to 1-Bedroom Faculty sets Shower-S
2BR Shower / glass screen with sliding door to 2-Bedroom Faculty
A artment L-sha ed
sets Shower-S
3BR Shower / glass screen with sliding door to 3-Bedroom Faculty
A artment
sets Shower-S
Carried Forward
Page 92 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 93/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 4 - BLOCK X21.00
Pa e No Item Descri tion Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qt Unit t Code Rate Sub-Amount Sub-Amount Total AmountBrou ht Forward
BC S4 28- 15 Sundries
15.1 Earthin work LS earthin
15.2 Li htnin rotection work LS li htnin
15.3 Builders work in connection with M&E work LS Builder
15.4 Fire extin uisher nos Fire-Ext
15.5 Letter box Aluminium letter boxes nos metal-wk
15.6 Fire extin uishers with com artment LS Fire-Ext
15.7 Hose reel com artments & access anel LS Fire-ExtBreeching inlet compartments & access panel; door measured nos others
15.8 Tactile tiles warnin indicator 300mm x 300mm nos flr-tile
15.9 OthersWorks not listed above but are necessary to complete the
works as a whole (if not stated and allowed herein, shall be
a Refuse ChuteRefuse hopper (2nd Sty to Roof Level) for Blks X1, Y1 and Z1
nos precast
Aluminium inspection cover over Refuse Chute Roof (1.0m x nos metal-wk
Safet mesh below roof 600mm x 700mm nos metal-wk Wiremesh to cover ventilation opening at Roof (700mm x nos metal-wk
b 2mm thk aluminium ca in w=210mm to Blks X2 & Z2 m metal-wk
c Insect screen to Housin Units m2 metal-wk
d Refuse chute com actor
Total Carried to Summary of Tender Page
ST 1 Item 3.4
Page 93 of 110 S4-Blk X2
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 94/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount
CFA m2
BC S7 1 1 Sub-structure
1.1 Basement excavation and backfillin
Excavation
0m-2m m3 exc2m-4m m3 exc4m-6m m3 excExcavation to lift it wall m3 exc
Backfillin m3 backfill
Remove sur lus off site m3 remove
1.2 Pileca includin excavation formwork concrete and rebar
a Excavation m3 exc
b Backfill m3 backfillc Lean concrete - 50mm thick G15 m2 G15
d Concrete G40 m3 G40
e Reinforcement k rebar
f Formwork m2 fwk
1.3 Basement wall column
a Concrete G40
to basement retainin wall m3 G40
to lift it wall m3 G40
to staircase wall stum m3 G40
to basement column m3 G40
to Storm water tank wall m3 G40
to E ector um room wall m3 G40
to column stum m3 G40
b Reinforcementto basement retainin wall k rebar
to lift it wall k rebar
to staircase wall stum k rebar
to basement column k rebar
to Storm water tank wall k rebar
to E ector um room wall k rebar
to column stum k rebar
c Formwork
to basement retainin wall m2 fwk
to lift it wall m2 fwk
to staircase wall stum m2 fwk
to basement column m2 fwk
to Storm water tank wall m2 fwk
to E ector um room wall m2 fwk
to column stum m2 fwk
Ditto but curved on lan
to basement column m2 fwk-co
1.4 Basement beam Ground beam
a Excavation m3 exc
b Lean concrete - 50mm thick G15 m2 G15
c Concrete G40 m3 G40
d Reinforcement k rebar
e Formwork m2 fwk
1.5 Ground slab Included basement slab
a Excavation m3 exc
b Lean concrete - 50mm thick G15 m2 G15
c Concrete G40 m3 G40
d Reinforcement k rebare Formwork nil
1.6 Water roofin s stem to sub-structure in contact with round
25mm thick cement sand rotection screed
to basement beam round beam m2 water rf
to basement slab round slab m2 water rf
to basement retainin wall m2 water rf
to lift it wall m2 water rf
Water roofin membrane
to basement beam round beam m2 water rf
to basement slab round slab m2 water rf
to basement retainin wall m2 water rf
to lift it wall m2 water rf
Dam roof membrane
to basement beam round beam m2 water rf
to basement slab round slab m2 water rf
to basement retainin wall m2 water rf
to lift it wall m2 water rf
Hydrotite CJ0720-2K swellable water stop to basement retaining
wall
m waterprf
H drotite CJ0720-2K swellable water sto to lift it wall m water rf
1.7 Anti-termite treatment m2 Anti-Termite
1.8 Dewatering and other necessary water table monitoring for deep
excavation as directed b the S.O.
Item
Drw No. Level / Grid location ddt No. Side Area L W D/H Sub-Qty
Page 94 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 95/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-1.9 Others
Works not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
be included or absorbed in the above items .a
b
c
Carried Forward
Page 95 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 96/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 2 2 Frame
2.1 Column
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
d Ditto but curved on lan m2 fwk-co
2.2 Cast-in-situ sus ended beam
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
2.3 Reinforcement in column
a Concrete G40 m3
b Reinforcement k
c Formwork m2d Post-tension tendons
2.4 Others
Works not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a
b
c
3 U er Floor
3.1 Cast-in-situ slab
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk
Carried Forward
Page 96 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 97/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total AmountDrw No. Level / Grid location ddt No. Side Area L W D/H Sub-QtBrou ht Forward
BC S7 3 2 Frame Cont'd
3.2 Post tension slab
a Concrete G40 nilb Reinforcement nil
c Formwork nil
d Post-tension tendons
3.3 Water roofin to all wet area Included in Floor Finishes
3.4 OthersWorks not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
ab
c
4 Structural Wall
4.1 Structural wall
a Concrete G40
to internal rc wall m3 G40to staircase wall m3 G40
to lift wall m3 G40
b Reinforcement
to internal rc wall k rebar
to staircase wall k rebarto lift wall k rebar
c Formwork
to internal rc wall m2 fwk
to staircase wall m2 fwk to lift wall m2 fwk
4.2 OthersWorks not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a
bc
Carried Forward
Page 97 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 98/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 4 5 Structural work to roof
5.1 Sus ended roof beam
a Concrete G40 m3 G40
b Reinforcement k rebarc Formwork m2 fwk
5.2 Post-tensioned roof beam
a Concrete G40 m3 G40
b Reinforcement k rebar
c Formwork m2 fwk d Post-tensionin Item Post-Ten
5.3 Concrete roof slab
a Concrete G40 m3 G40b Reinforcement k rebar
c Formwork m2 fwk
5.4 Post-tensioned roof slab
a Concrete G40 m3 G40
b Reinforcement k rebarc Formwork m2 fwk
d Post-tensionin Item
5.5 Roof finishes
a Profile steel roofin
Roof claddin to S orts Com lex
Aluminum standin seam roofin with SS cables for cree ers m2 roof Flashin + Gutter etc sum roof
Note Approximate areas were measured, roof and ceiling are irregular/
curved shaped. For accurate areas, please check with the
roof
Aluminium com osite faceted soffit claddin ceilin m2 othersPerforated aluminium composite panels with 12mm x 12mm
erforations and min 50% ventilation o enin s ceilin
Note Approximate areas were measured, roof and ceiling are irregular/
curved shaped. For accurate areas, please check with the
b Insulation
c Waterproofing system
RF Wate roofin to RC Flat Roof m2 NILconsists of:
- min 25mm thk c s screed to fall
- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded
- 6mm thk under-screed draina e sheet
- 1000 x 1000 x 50mm thk c/s panel roofing reinforced with BRC
3315 mesh ol sul hide oints ever 10m c c- Pol sul hide sealant
- 50mm wide welded la
RF1 Wateproofing to RC Flat Roof, non insulated (to Roof over Stairs
and LMR m2 waterprf
RFU Wate roofin to RC Flat Roof- u turn mconsists of:
- 1.2mm thk EVA PVC water roofin membrane bonded
- 25mm thk c s rotection screed with GI mesh
- membrane terminated into groove-line & sealed with
ol urethane sealant
Water roofin to Non-Insulated Deck m2consists of:
- min 25mm thk c s screed to fall
- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded
- 6mm thk under-screed draina e sheet
- finishes and rotection screed measured se aratel
Water roofin to Landsca e Deck m2 water rf consists of:
- min 25mm thk c s screed to fall- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded- 25mm thk c s rotection screed
- 100 sm eotextile se aration la er
- 30mm thk interlockin sub-soil draina e modules
- 100 sm eotextile filter fabric
- 50mm thk coarse washed sand
- growth media to Landscape Architect 's detail (Softscape is
included in PC Provisional Sums
d Roof tennis court
Water roofin to Tennis Court Insulated m2 water rf
consists of:- min 25mm thk c s screed to fall
- 2.2mm thk EVA/PVC fleece-backed waterproofing membrane
bonded- 6mm thk under-screed draina e sheet
- 50mm thk extruded ol st rene insulation board
- 100 sm eotextile se aration la er
Ditto, to access from Staircases/Ramp, assuming similar to
Tennis Court Wate roofin s stem
m2 waterprf
Finishes to Tennis Court as er enlar ed detail m2 s ortsconsists of:
- 50mm thk RC rotection RC to in
- 50mm thk w1 as halt remix
F18 - acr lic coatinTennis Post no s orts
e Green roofin s stem with fencin
Note Green roofing system by NSC as per Schedule of Finishes, Item
1.7.7
Tennis Court Fencin h=4.0m m s ortsconsists of:
- 10mmthk hot di ed GS late in aint finish
- Galv "U" cli holdin roll to anel
- 5mm thk hot di ed GS L-an le in aint finish
- 75 x 25x 5mm diam polyester powder-coated welded wire mesh
roll-to fencin
- 150 x 50 x 12mm thk hot di ed GS T-bar in aint finish
- 12mm thk hot di ed GS base late in aint finish
- 150mm ht RC kerb with laster and aint finish
Extra over for double leaf ate 1.50mW x 2.20mH nos s orts
Si honic draina e outlet 450mm x 450mm nos si honic
Drain with reinforced stone grating (w=400mm) to Landscape
Deck m others
Scu er drain with GS ratin m scu er
f Roof draina e with accessories LS draina e
Truss to su ort li hts & fans
Steel structure k steelPaintin m2 steel
M10 bolt no. steelM12 bolt no. steel
M20(cast-in bolt) no. steel
M24 cast-in bolt bolt no. steel
DROP-OFF POINT
Steel structure k steel
Paintin m2 steelM16 bolt no. steel
2ND STOREY INTERMEDIATE STEEL STRUCTURE
Steel structure k steelPaintin m2 steel
M12 bolt no. steel
h Cree er on cable
i Fall Arrester LS fall-A
j Timber deckingto access from Staircases/Ramp, as partly shown
on Lift Lobb enlar ed drawin
m2 tbr deck
40 x 9 x 1200mm thk natural t imber grouped in modular panel
sixe 630mm x 1200mm
k Smoke vent (include testing, PE endorsement, testing and
commissionin and 12 months DLP maintenancenos others
Carried Forward
Page 98 of 108 S7-Sports Comple
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 99/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 5 5 Structural work to roof Cont'd
5.6 Others
Works not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a
b
c
6 Staircase
6.1 Structural works to staircase
a Precast concrete staircase
b Reinforced Concrete to in structure
Concrete G40 m3 G40
Reinforcement k rebarFormwork m2 fwk
6.2 Staircase handrail and balustrade
SR6 MS railing to Staircase (h=0.90m) to Sports Complex m railing
consists of:
- 40 x 100mm thk MS plate in enamel paint finish
- 40 x 10mm thk MS plate in enamel paint fin ish @ max 100mm
- 50 x 150 x 6mm thk MS angle in enamel paint finish
- SS expansion bolt
SR6a Ditto, (h=1.10m) to Sports Complex m railing
SR7 GS handrail (wall mounted) at Staircase and Ramp to Sports
m railing
Note Galv as per description, stainless steel as per details
consists of:
- 40mm diam CHS SS handrail (Grade 43) welded to GS supports
- 45mm diam SS supports at not more than 1000 c/c
SR8 Tempered laminated glass railing to Staircase (h=1.675m) to m railing
consists of:
- 25 x 25 x 2mm thk SS capping
- 10mm thk hot dipped GS folded plate in powder coated finish
- 30 x 50mm thk hot dipped GS RHS in powder coated finish
-10mm thk hot dipped GS T-bar in powder coated finish
- 10mm thk hot dipped GS L-angle in paint finish
- Countersunk anchor bolt
- 20x 20mm aluminium U-channel in powder coated finish
SR9 50mm diam GS handrail, (h=0.90m) to Pool Area m railing
SR10 GS railing measured from FFL, (h=1.0m) to Stairs near Squash m railing
6mm thk hot dipped GS plate in powder coated finish with
SR11 Guardrail below Staircase- 45mm wide x 9mm thk SS flat bar
h=0.55m
m railing
6.3 Stair finishes
Floor Finishes
SF5 Cement and sand screed finish with dustproofer as per
enlarged drawing while self level ing screed as per Schedule of
FinishesLandin m2 screedRiser 142.86~172.92mm hi h m S-riserTreads 250~300mm wide m S-treadTactile nosin m S-Nosin -T
Ste s to S uash Court, no iven finishes
Riser 166.67mm hi h m flr-tile-R Treads 300mm wide m flr-tile-T
Ste s to Entrance Fo er assumin similar finishes
F7 450mm x 900mm non-slip homogenous floor tiles with cementand sand screed internalRiser 143.75mm hi h m flr-tile-R Treads 450mm wide m flr-tile-T
Wall Finishes
SW Plaster and aint to staircase wall m2 laster
Ceilin Finishes
SC1 Plaster and aint to staircase ceilin m2 laster
6.4 Sunscreen shadin
6.5 Others
Works not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a
b
c
Carried Forward
Page 99 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 100/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 6 7 External Wall and Finishes
7.1 Brickwall
a 1st store
1BRW200E 200mm thk brickwall external m2 200-bwk
b 2nd store
2BRW100E 110mm thk brickwall external m2 100-bwk
c Roof
7.2 Glass Front Wall
a 1st storeb 2nd store
7.3 M&E louvre
a 1st store
b 2nd store
PV 30 Aluminium louvre vent nos window
PV1 15 Louvred window to Generator Room at 2nd St nos window
PV 15B Aluminium louvre vent nos window
c Roof
PV 21 Aluminium louvre vent to Lift Motor Room nos window
7.4 Ex anded MS mesh
a 1st store
R5 GS expanded mesh screen railing (h=1.675m) to Sports
Com lex
m railing
Aluminium expanded mesh screen railing (h=1.675m) to Sports
Com lexconsists of:
- 10mm thk hot di ed GS late in owder coated finish
- 10mm thk hot di ed GS folded late in owder coated finish
- 40mm diam hot di ed GS CHS in owder coated finish
- 10mm thk hot dipped GS flat plate baluster in powder coated
finish- 10mm thk hot dipped GS L-angle pre-welded to aluminium
ex anded mesh with owder coated finish- Aluminium ex anded mesh with owder coated finish
- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-
welded to u ri ht balusters in aint finish
- 10mm thk hot di ed GS an le late in owder coated finish
- Countersunk anchor bolt
- 20 x 20mm aluminium U-channel in owder coated finish
- 10mm thk hot di ed GS late in owder coated finish
Faceted facade wall to S orts Com lex
Note Approximate areas were measured, walls are irregular/ curved
shaped. For accurate areas, please check with the Specialist
1.5mm thk expanded mesh in powder coated finish to wall
(aluminium as per Tender Clarification 2, Architectural Item A8)
m2 railing
b 2nd store
R5 GS expanded mesh screen railing (h=1.675m) to Sports
Com lex
m railing
Aluminium expanded mesh screen railing (h=1.675m) to Sports
Com lexconsists of:
- 10mm thk hot di ed GS late in owder coated finish
- 10mm thk hot di ed GS folded late in owder coated finish
- 40mm diam hot di ed GS CHS in owder coated finish
- 10mm thk hot dipped GS flat plate baluster in powder coated
finish- 10mm thk hot dipped GS L-angle pre-welded to aluminium
ex anded mesh with owder coated finish
- Aluminium ex anded mesh with owder coated finish
- 300mm (L) x 50mm (W) 10mm thk hot dipped GS flat plate pre-
welded to u ri ht balusters in aint finish- 10mm thk hot di ed GS an le late in owder coated finish
- Countersunk anchor bolt- 20 x 20mm aluminium U-channel in owder coated finish
- 10mm thk hot di ed GS late in owder coated finish
c Roof -
7.5 PVDF Aluminium Claddin
a 1st store
b 2nd store Aluminium composite panels to parapet, Grid SC-G/SC-6 to SC-7
(total girth wall until ceiling below as per detail drawing was used
m2 Cladding
Aluminium com osite anels to walls columns m2 Claddin
Aluminium composite panels at Grid SC-A/SC-7 to SC-10 as shon
2nd St Plan
m2 Cladding
c Roof Aluminium composite panels to roof over Viewing Gallery as
shown on Sections A B and C Grid SC-G SC-1 to SC-11
m2 Cladding
Ditto to beam Grid SC-G SC-6 to SC-7 m2 Claddin Aluminium composite panels to beam, Grid SC-G/SC-6 to SC-7
7.6 Insitu ara et wall
a 1st store
b 2nd store
c Roof lanter walls
Concrete G40 m3 G40
Formwork m2 fwk Rebar k rebar
7.7 Railing
Note Other railin s are included in Staircases
a 1st store
b 2nd store
R6 Tempered laminated glass railing (h=1.675m) to Sports
Com lex
m Railing
Aluminium expanded mesh parapet (h=1.10m) as shown on floor
lan to Corridor
R7 GS flat railing (h=1.10m) to void near Lifeguard Room, 1st Sty m Railing
Tem ered laminated clear lass ara et to VIP seatin m railinTempered laminated clear glass parapet to VIP seating
h=1.10m
c Roof
Carried Forward
Page 100 of 108 S7-Sports Comple
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 101/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 7 7 External Wall and Finishes
7.8 Others
Works not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a
b
c
8 Internal Wall and Partition
8.1 100mm thk brickwall excludin wall finishes
a 1st store
1BRW200 200mm thk brickwall internal m2 200-bwk
b 2nd store2BRW100 100mm thk brickwall internal m2 100-bwk
c Roof
RFBRW100 100mm thk brickwall internal m2 100-bwk
8.2 200mm thk brickwall excludin wall finishes
a 1st store
b 2nd store
c Roof
8.3 Fibreglass panel on hot-dipped galvanised SHS steel
frame Rock climbin wall non-climbable
a 1st store
Climbing Rock Wall, Bouldering Wall & Abseiling Station
w=15.0m Grid SC-F SC-2 to SC-4 1st St
sets Rock wall
b 2nd store
c Roof
8.4 Glass wall panel complete with window frame, mullion,
hardware etc
Note For lass anel details, lease refer to drawin
For details lease refer to ID Drawin s
For Curtain wall/ glass panels to to Student Common Lounge,
lease refer to Facade Drawin s
a 1st store
TGP 25 Glass anel with vertical lass fins to Aerobics 1 at 1st St nos lazin
TGP/26 Glass panel with vertical glass fins to Fitness Centre 1 at 1st Sty nos glazing
TGP/27 Glass panel with vertical glass fins to Fitness Centre 1 at 1st Sty nos glazing
TGP 33 Glass anel to Indoor S orts Hall at 1st St nos lazin
TGP 34 Glass anel with sin le leaf door to S uash Court at 1st St nos lazin
b 2nd store
TGP/35 Glass panel with vert ical glass fins to Multi Purpose Room 1,
Aerobics 2 at 2nd St
nos glazing
TGP 36 Glass anel to Aerobics 2 at 2nd St nos lazin
TGP 37 Glass anel to Control Room at 2nd St nos lazin
TGP 38 Glass anel to Control Room at 2nd St nos lazin
TGP 39 Glass anel to Control Room at 2nd St nos lazin
TGP 40 Glass anel to Indoor S orts Hall 1 & 2 at 2nd St nos lazin
TGP 41 Glass anel to Indoor S orts Hall 2 at 2nd St nos lazin
TGP 42 Glass anel to Administration Room at 2nd St nos lazin
TGP 44 Glass anel to Administration Room at 2nd St nos lazinTGP 45 Glass anel to Administration Room at 2nd St nos lazin
Note h=2.85m as per floor plan, h=3.0m as per enlarged detail,
assumin h=2.85m as er Corri endum 1Double glazed Low E glass panels with 900mm high motorised
glazed top hung window to Indoor Sports Hall 2 (as shown on
nos glazing
Double glazed Low E glass panels with 900mm high motorised
lazed to hun window to Indoor S orts Hall 1
nos glazing
c Roof
8.5 Corridor composite locker wall c/w timber doors and
shelved, hardwares, glossy/ matt paint finish to all
a 1st storey
4 tierred matt laminate finish lockers c/w all accessories in
number lock s stem
sets locker
b 2nd storey
4 tierred matt laminate finish lockers c/w all accessories in
number lock s stem
sets locker
Basement
Locker outside wash room at Basement (4 tier to each column as
per Tender Clarification 2, Architectural Item A22), quantities are
nos locker
Carried Forward
Page 101 of 108 S7-Sports Comple
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 102/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 8 7 External Wall and Finishes Cont'd
8.6 O erable wall
a 1st store
O erable slidin anel at Indoor S orts Hall 1 & 2 nos O er-wallNote Total hei ht includin the to wall of slidin door
b 2nd store -
Relocation from existin dover cam us to new s orts com ex
8.7 Toilet artition cubicles c w toilet door cubicle
a 1st storeb 2nd store
8.8 Steel concrete lintols to brickwall dr wall
a 1st store nilb 2nd store
Concrete G40 m3 G40
Reinforcement k rebarFormwork m2 fwk
c Roof
Concrete G40 m3 G40Reinforcement k rebar
Formwork m2 fwk
8.9 Others
Works not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a Windows
Windows to Common Areas
SW 23 Slidin window to Life uard Room nos windowSW 36 Slidin window to Life uard Room nos window
SW 44 Slidin window to Life uard Room nos windowSW 72 Slidin window to Administration Room, 2nd St nos window
b Fencin and ate
Note As per 1st Sty floor plan, fencing is broken line, not sure if to be
rovidedBRC fencing near Transformer Room, Grid SC-G/SC-2 to SC-4, 1st
St
m metal-wk
Extra over for double leaf ate nos metal-wk
c Dr wall artition to Admin Office 2nd store m2 artition
9 Door and Ironmongery
Note All 6mm thk wired clear glass panel are 100mm x 600mm unless
notedNo given ironmongery schedule, only Specifications, please
include supply and installation of ironmongery to the door pricing
9.1 Metal door c e ex osed concealed door frame
a 1st store
FD2/10 Two hour fire rated steel door and frame (powder coated impact
resistant satin coating finish) to LAN Roon, PABX Room, AHU,
nos metal-dr
FD2/18 Two hour fire rated steel door (double leaf) and frame (powdercoated impact resistant satin coating finish) to Bin Centre, PABX,
LV Switchroom, LT S/W Room (Emergency), Low Level Transfer
Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool
Filtraction Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos metal-dr
FD2/20 Two hour fire rated steel door (double leaf) and frame (powder
coated impact resistant satin coating finish) to Bin Centre, PABX,
LV Switchroom, LT S/W Room (Emergency), Low Level Transfer
Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool
Filtraction Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos metal-dr
FD2/22 Two hour fire rated steel door (double leaf) and frame (powder
coated impact resistant satin coating finish) to Bin Centre, PABX,
LV Switchroom, LT S/W Room (Emergency), Low Level Transfer
Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool
Filtraction Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos metal-dr
FD2/LT20 Two hour fire rated steel door (double leaf) and frame to
Transformer Room LT & HT Switchroom
nos metal-dr
FD2/TR29 Two hour fire rated steel door (double leaf) and frame to
Transformer Room LT & HT Switchroom
nos metal-dr
Basement
FD2/10 Two hour fire rated steel door and frame (powder coated impact
resistant satin coating finish) to LAN Roon, PABX Room, AHU,
nos metal-dr
FD2/18 Two hour fire rated steel door (double leaf) and frame (powder
coated impact resistant satin coating finish) to Bin Centre, PABX,LV Switchroom, LT S/W Room (Emergency), Low Level Transfer
Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool
Filtraction Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos metal-dr
FD2/20 Two hour fire rated steel door (double leaf) and frame (powder
coated impact resistant satin coating finish) to Bin Centre, PABX,
LV Switchroom, LT S/W Room (Emergency), Low Level Transfer
Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool
Filtraction Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos metal-dr
Page 102 of 108 S7-Sports Comple
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 103/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-
b 2nd store
FD2/10 Two hour fire rated steel door and frame (powder coated impact
resistant satin coating finish) to LAN Roon, PABX Room, AHU,
nos metal-dr
FD2/22 Two hour fire rated steel door (double leaf) and frame (powder
coated impact resistant satin coating finish) to Bin Centre, PABX,
LV Switchroom, LT S/W Room (Emergency), Low Level Transfer
Tank Room, Bin Transit Room, ELV Room, MDF Room, Pool
Filtraction Room, Ejector Pump Room, Generator Room, Newater
Tank Riinm Storage, Irrigation Pump Room
nos metal-dr
c Roof
9.2 Acoustic door c w door frame mullion
a 1st store
b 2nd store
c Roof
Carried Forward
Page 103 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 104/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 9 9 Door and Ironmon er Cont'd
9.3 Anodies aluminium louvred door type LD1 to LD3 c/w
door framed mullion ironmon eries etca 1st store
ADB/08 Aluminium panel door with 2 coats powder coat (red) to
Breechin Inletnos others
b 2nd store
c Roof
9.4 Glass door c w door frame mullion ironmon eries etc
a 1st store
GD 10 Tem ered lass door, frameless to Life Guard Room nos Glass-dr
b 2nd store
GD 10 Tem ered lass door, frameless to Admin Room nos Glass-dr
9.5 2 hours fire-rated motorised roller shutter
a 1st store
b 2nd store
9.6 Non fire-rated, motorised roller shutter
a 1st storeRoller shutter to Cafe as shown on lan w=1.80m nos Roller-SRoller shutter to Cafe as shown on lan w=2.60m nos Roller-S
b 2nd store
9.7 OthersWorks not listed above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed tobe included or absorbed in the above items .
a Other doors/ gates shown on plan but not included in the
scheduleMG22 Metal ate near Staircase 4 double leaf nos metal-wk
Timber doors
FD.5/10 Half hour fire rated solid core door with HPMR laminates, 6mm
thk wired clear glass panel and self-closing device to Protected
nos tbr-dr
FD.5/10A Half hour fire rated solid core door with HPMR laminates to Store
Room Control Room Air Lock nos tbr-dr
FD.5/15 Half hour fire rated solid core door (one and half leaf) with HPMR
laminates, 6mm thk wired clear glass panel and self-closing
device to Staircase 1,2,3 & 4, Multi-use Room, SSL (Smoke Stop
nos tbr-dr
FD.5/20 2 hour fire rated timber door with HPMR laminate with 6mm thk
aired clear glass panel (2 nos) and self closing device to Lift
nos tbr-dr
FD.5/22 Half hour fire rated solid core door (double leaf) with HPMR
laminates, 6mm thk wired clear glass panel (2 nos) and 3mm
thk SS finger push and kick plates to Mult i Purpose Room 1 & 2
nos tbr-dr
FD.5/EM22 Half hour fire rated solid core door (double leaf, automatic) with
3mm thk SS finger plates, 6mm thk wired clear glass panel (2
nos), automatically opens to let in fressh air when smokes
nos tbr-dr
FD.5/S06 Half hour fire rated solid core door with HPMR laminates to DT,
TEL SPR FA HR FE SP ST
nos tbr-dr
FD.5/S09 Half hour fire rated solid core door with HPMR laminates to DT,
TEL SPR FA HR FE SP STnos tbr-dr
FD.5/S12 Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW HR FE DR SFH
nos tbr-dr
FD.5/S15 Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW HR FE DR SFHnos tbr-dr
FD.5/S20 Half hour fire rated solid core door (double leaf) with HPMR
laminates to HR FE ELV ELECT DR SFH PW HR FE DR SFH
nos tbr-dr
FD.5/T10 Half hour fire rated solid core door with HPMR laminate with 3mm
thk SS fin er and kick lates to Communal Toiletnos tbr-dr
D/10 Timber door with HPMR laminate and 3mm thk SS finger push
and kick plates to Head Officer, Store, Storage, Photo Copy ,
Office , Meeting Room, Service Yard, Cafe, Security Room
nos tbr-dr
DHT/10 Laminated semi-solid timber door with timber louvred below to
Handica Toilet
nos tbr-dr
DS/03 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FE
nos tbr-dr
DS/06 Timber dor with HPMR laminates to Stack Duct, Refuse Chute
Ho er External IR DT FA SPR TEL HR FEnos tbr-dr
DS/10 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Risernos tbr-dr
DS 10 Timber door double leaf to SFAP, CWR nos tbr-dr
DS/15 Timber door (double leaf) to PW/NW, PW, DR/SFH,
HR/SFH/DR/FE, SFAP, ELV, ELECT, Breeching Inlet, Water Risernos tbr-dr
b Securit rilles ate next to Cafe nos Metal-wk
cd
10 Wall Finishes
10.1 Cement laster and aintin to brick concrete
W1a Plaster and aint to wall
a 1st storey plaster
b 2nd storey plaster
c Roof plaster
10.2 Paintin to dr wall
a 1st store m2
b 2nd store m2 aintin
Carried Forward
Page 104 of 108 S7-Sports Comple
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 105/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 10 10 Wall Finishes Cont'd
10.3 Ceramic wall tiles including cement sand backing screed
a 1st store
1W2 300mm x 600mm homo eneous wall tiles with backin screed m2 wall tile
1W5 450mm x 900mm homo enous wall tiles with backin screed m2 wall tile
b 2nd store
2W2 300mm x 600mm homo eneous wall tiles with backin screed m2 wall tile
2W5 450mm x 900mm homo enous wall tiles with backin screed m2 wall tile
2W12 200mm x 200mm matt homogeneous wall tiles with backing
screed
m2 wall tile
10.4 Im ack Resistant Acoustic Panel
a 1st store
1W8 Stud wall with insulation (self adhesive polyurethene sheetvapour barrier and 50mm thk rockwool insulation complete with
12mm thk non-combustible calcium silicate baord) to LAN Room /
m2 partition
1W11 Acoustic perforated gypsum board (12.5mm thk) with rockwool
insulation to non- lazed walls to Indoor S orts Hall
m2 partition
b 2nd store
2W8 Stud wall with insulation (self adhesive polyurethene sheet
vapour barrier and 50mm thk rockwool insulation complete with
12mm thk non-combustible calcium silicate baord) to LAN Room /
m2 partition
10.5 Anti-static e ox finish
a 1st storeb 2nd store
c Roof
10.6 Others
Works not l isted above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a Other wall finishes
EWF Skim coat and smooth textured aint finish external m2 skim coat
b
c
11 Floor Finishes
11.1 Cement and sand screed
a 1st store
1F20 Cement and sand screed to M&E Rooms at S ort Com lex m2 screed
b 2nd store
2F20 Cement and sand screed to M&E Rooms at S ort Com lex m2 screed
c Roof
RFF20 Cement and sand screed to M&E Rooms at S ort Com lex m2 screed
11.2 Li uid -a lied water roofin membrane
a 1st store
Wate roofin to wet areas to floor m2 water rf Flexible cementitous waterproof coating; rc slab surface
min imum wood trowelled smooth to receive waterproofing
coating, finishes and 25mm thk c/s protection screed measured
Wate roofin to wet areas to wall u turn h=300mm m water rf Flexible cementitous waterproof coating; rc slab surface
min imum wood trowelled smooth to receive waterproofing
coating, finishes and 20mm thk c/s protection screed measured
Wate roofin to wet areas to shower wall h=1.80m m water rf Flexible cementitous waterproof coating on c/s leveling render,
finishes and 20mm thk c/s protection screed measured
Wate roofin to Sum Pit
Flexible cementitous waterproof coating with 25mm thk c/srotection screed
Floor m2 water rf Wall m2 water rf
Wate roofin to Water Tank
Flexible cementitous waterproof coating with 25mm thk c/s
protection screed; rc slab surface minimum wood trowelled
Floor m2 water rf Wall m2 water rf
WFL Wate roofin to Lift Pit - floor m2 water rf
WFL Wate roofin to Lift Pit - wall m2 water rf
b 2nd store
Wate roofin to wet areas to floor m2 water rf Wate roofin to wet areas to wall u turn h=300mm m water rf Wate roofin to wet areas to shower wall h=1.80m m water rf
c Roof waterprf
Carried Forward
Page 105 of 108 S7-Sports Comple
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 106/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 11 11 Floor Finishes Cont'd
11.3 Cement and sand screed with floor hardener
a 1st store
b 2nd store
c Roof
11.4 Heav dut anti-sli ol urenthane screed
a 1st store
b 2nd store
c Roof
11.5 Vin l floorin
a 1st store
b 2nd store
11.6 Foam backin s orts floorina 1st store
b 2nd store
11.7 Floatin s orts floor s stem
a 1st store
1F15 Floating sports timber floor m2 Float-flr
b 2nd store
2F15 Floating sports timber floor m2 Float-flr
c Roof
11.8 300 x 300mm heav dut homo eneous tile
a 1st store
1F1 600mm x 600mm homogenous floor tiles with cement and sandscreed
m2 F1
b 2nd store
2F14 200mm x 200mm heavy duty non-s lip homogenous floor tiles
with cement and sand screed to BOH
m2 F14
c Roof
11.9 300 x 300mm heav dut non-sli homo eneous tile
a 1st store
1F2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2
1F3 600mm x 600mm non-slip homogenous floor tiles with cement
and sand screed
m2 F3
1F7 450mm x 900mm non-slip homogenous floor tiles with cementand sand screed internal
m2 F7
1F16 300mm x 300mm heavy duty non-s lip homogenous floor tiles
with cement and sand screed
m2 F1-H
b 2nd store
2F2 300mm x 300mm non-slip homogenous floor tiles with cement
and sand screed
m2 F2
2F7 450mm x 900mm non-slip homogenous floor tiles with cement
and sand screed internal
m2 F7
2F16 300mm x 300mm heavy duty non-s lip homogenous floor tiles
with cement and sand screed
m2 F1-H
c Roof NIL
11.10 85mm hi h homo eneous tile skirtina 1st store
1S1 110mm high homogenous skirting tile m frl-sktg
b 2nd store
2S1 110mm high homogenous skirting tile m frl-sktg
c Roof NIL
Carried Forward
Page 106 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 107/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 12 12 Floor Finishes Cont'd
11.11 85mm hi h anti-sli ol urethane recessed skirtin
a 1st store
b 2nd store
S2 30mm x 15mm recessed powder coated alumin ium channel
2mm thk skirtin
m Alum-sktg
c Roof
11.14 Others
Works not l isted above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a Other floor finishes
2F5 Car et tile floor with cement and sand screed m2 car et
1F11 Raised floor (insulated) to LAN Room / ELVS Room m2 raised flr
2F11 Raised floor (insulated) to LAN Room / ELVS Room m2 raised flr
b
c
Ceilin Finishes
12.1 Perforated G sum board on sus ension s stem
a 1st store
1C4a 12mm thk perforated gypsum board (with fleece & rockwool
insulation) with paint finish with semi-concealed suspension grid
to SC Fitness Centre Aerobics Multi- ur ose Room
m2 ceiling
b 2nd store
2C4a 12mm thk perforated gypsum board (with fleece & rockwool
insulation) with paint finish with semi-concealed suspension grid
-
m2 ceiling
12.2 Acoustic Panel S stem
a 1st store
b 2nd store
2C12 Aluminium composite ceiling with non-staining silicon to all
claddin oints to Hall of Fame 2nd St
m2 ceiling
C10 Aluminium baffle ceilin to Indoor S orts Hall 2 St hi h m2 ceilin
12.3 Im act resistant Acoustic anel s stem
a 1st store
1C5 Acoustically absorptive mineral fibre board to Common Laundry,
Hall Admin SC Admin
m2 ceiling
b 2nd store
2C5 Acousticall absor tive mineral fibre board to SC Admin m2 ceilin
12.4 Fibrous plasterboard ceiling on suspension system
a 1st store
b 2nd store
12.5 Thermally insulated ceiling panel with fibrous plaster
board on concealed sus ension s stem
a 1st store
b 2nd store
Carried Forward
Page 107 of 108 S7-Sports Complex
7/31/2019 BQ - SUTD Housing & Sports Facilites - (Kl Staff) 020412
http://slidepdf.com/reader/full/bq-sutd-housing-sports-facilites-kl-staff-020412 108/108
SUTD HOUSING AND SPORTS COMPLEX (PHASE 1)
SECTION 7- SPORTS COMPLEX 1.00
Pa e No Item Descri tion Unit t Code Rate Sub-Amount Sub-Amount Total Amount-Brou ht Forward
BC S7 13-A 12 Ceilin Finishes Cont'd
12.6 Skim coat with emulsion aint
a 1st store
1C1 Plaster and aint to ceilin m2 Skim Coat
b 2nd store
2C1 Plaster and aint to ceilin m2 laster
2C1a Plaster and paint (vinyl co-polymer emuls ion paint) finish to
ceilin
m2 plaster
c Roof
RFC1 Plaster and aint to ceilin m2 laster
12.7 Others
Works not l isted above but are necessary to complete the works
as a whole (if not stated and allowed herein, shall be deemed to
a Other ceilin finishes
GSM GS mesh with GS supports over opening to FA, SPR, TEL, DT,
PW NW Duct
m2 ceiling
1C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports
m2 ceiling
2C2 9mm thk moisture resistant calcium silicate board to
Bathrooms, Toilets, Lockers, Family Room, Lift Lobby at Sports
m2 ceiling
1C7 75mm thk acoust ic cell spray treatment to Corridor; Sprayed
acoustic treatment to soffit of s lab to Corridors as per Tender
m2 ceiling
2C7 75mm thk acoust ic cell spray treatment to Corridor; Sprayed
acoustic treatment to soffit of s lab to Corridors as per Tender
m2 ceiling
1C7a 75mm thk acoustic cel l spray treatment to MPH, Indoor Sports
Hall Toilet Lockers Famil Room
m2 ceiling
1C8 Mineral fibreboard with insulation batts above to LAN Room /
ELVS Room
m2 ceiling
2C8 Mineral fibreboard with insulation batts above to LAN Room /
ELVS Room
m2 ceiling
1C11 9mm thk calcium sil icate board to Entrance Foyer, 1st Sty,
F&B Cafe
m2 ceiling
2C11 9mm thk calcium sil icate board to Entrance Foyer, 1st Sty,
F&B Cafe
m2 ceiling
C11a 15mm thk calcium silicate board to S uash Courts m2 ceilin
b
c
13 Fittin and Furnishin
13.1 Cabinet
a Locker
13.2 White board/ Pin-up board by NSC
13.3 Retractable screen by NSC
13.4 Motorised ro ection screen b NSC
13.3 Hose reel com artment & access anel LS fire-ext
13.4 Catladder
Catladder to Lift Pit h=1.80~3.0m nos metal-wk 300mmW x 300mmD x 300mmH sump pit with GS grating to Lift
Pit
nos metal-wk
Catladder to Sprinkler Tank Room (h=1.85m)- aluminium alloy nos metal-wk
Watertight access panel (1.20m x 0.60m) to Sprinkler Tank Room nos metal-wk
Catladder to Balancin Tank at Basement nos metal-wk Access anel 10.0m x 1.0m nos metal-wk
Aluminium chequered plate with pull handle to Ejector Pump
2.0m x 2.0m
nos metal-wk
Aluminium cat ladder h=3.50m nos metal-wk Handrail nos others
Metal platform/ Catwalk behind expanded mesh, Grid SC-A/SC-1
to SC-7
m metal-wk
Railin to catwalk m metal-wk Catladder sets metal-wk
13.5 Dro anel LS
13.6 Retractable basketball ost
Retractable ceilin mounted basketball net nos s ortsMulti-sports electronic scoreboard c/w 2 nos of 24 seconds shot
clock
nos sports
13.7 Portable volle ball, netball & badminton ost LS s orts
13.8 Cast-in sleeves LSS uash court LS s orts
Carried Forward