box contracting - prefab site facilities

22
Quality Site Solutions

Upload: nicolai-sorensen

Post on 11-Aug-2015

214 views

Category:

Engineering


0 download

TRANSCRIPT

Page 1: BOX Contracting - Prefab Site Facilities

Quality Site Solutions

Page 2: BOX Contracting - Prefab Site Facilities

Turn-Key provider of remote site solutions

•Established 2008 in Dubai•Licensed in Denmark in January 2012•Completed more than 10,000m2 of prefabricated buildings on 4 continents•Specialized in working in rural, remote areas•Vision:

•to provide turn-key solutions, enabling our clients to focus on their mission•to provide quality site solutions at low cost•to provide safe and sustainable constructions to cope with the challenging environments

Site Offices Dining Facilities SecurityPermanent Offices Kitchens/Laundry

CampsMedicalEducation ...and much more

Page 3: BOX Contracting - Prefab Site Facilities

Design & Engineering

Production

Procurement & QALogistics

Installation

Turn-Key

Page 4: BOX Contracting - Prefab Site Facilities

Production

The core of all BOX projects are our Modular Prefabricated Containers.

Floor BaseFloor Cover:    1.8mm heavy duty vinyl Floor:               18 mm fibre cement boardInsulation:          100 mm mineral wool - non combustibleK-Value:            0.34 W/m2K.Load Capacity: 300kg/m2 

WallsExternal finish: 0.5mm steel sheet Insulation:          60 mm mineral wool

(density 38 - 40 kg/m3)Internal Finish:   0.5mm steel sheet K-Value:          0.41 W/m2K.Load Capacity: 60kg/m2 

Roof / Ceiling ElementRoof Cover:     0.5mm steel sheet with envelope slope Insulation:        60 mm mineral wool - non combustibleCeiling Panel: 40mm steel plate sandwich panels (EPS)    K-Value:          0.34 W/m2K.Load Capacity: 100kg/m2 

Page 5: BOX Contracting - Prefab Site Facilities

Every project is special and custom madeA large variety of modular accessories ensures the building suits each client and purpose

Electrical installations

Doors and Windows

Steel stairs, walkways and roofs

Accessories

Electrical installations are pre-engineered and flush mounted.Designed to required standards (EU/BS/US).Easy to plug n play – no electrician required.

Page 6: BOX Contracting - Prefab Site Facilities

Aircondition

Foundation

Plumbing

Turn - Key

Point, line or base depending on the levels of buildings

Split and window type with several options for installation

Water, sewer and sanitary installation – internal and external

The majority of our projects are executed as Turn-key solutions- leaving our clients to focus on their mission

Page 7: BOX Contracting - Prefab Site Facilities

Electrical

Kitchens

Furniture

Turn - Key

Installations to required standards (UK/EU/US)

Laundry

Complete kitchens and cold rooms in partnership with PKL Group (UK)

Fitted laundry rooms in partnership with PKL Group (UK)

Furniture for every room and purpose from IKEA and JYSK

Page 8: BOX Contracting - Prefab Site Facilities

Transport and lifetime advantage

Site

Ship

Road

Logistics

Next site and next site...

120 m2 complete building on 1 truck

Easy to relocateEasy handling and storage at site

Shipped as 20ft SOC

With a lifespan of +20 years the buildings become an investment. After end use at one site it can easily be relocated either fully erected or flat-packed to new destinations world-wide.

Page 9: BOX Contracting - Prefab Site Facilities

Local workforce – allways when available !

Installation

Page 10: BOX Contracting - Prefab Site Facilities

Management

Professional Project Managers and Supervisors

Page 11: BOX Contracting - Prefab Site Facilities

NGOs

Contractors and Consultants

Others

Our Clients

Page 12: BOX Contracting - Prefab Site Facilities

Oman is in the midst of major expansion programmes at two of the sultanate’s international airports, Muscat and Salalah. COWI has been involved in nearly every aspect of the projects.Pr

ojects

90m2 site office (12 BOXIT Modules) housing COWI site team on the Seeb Airport Construction site, Muscat, Oman, 2009

Page 13: BOX Contracting - Prefab Site Facilities

\

Projects

Through an invited tender BOXITs proposal was found both technical as well as financial most competitive.

The contract included totally 140 BOXIT Modules (2,100m2 buildings) designed, engineered and installed as a Turn-key Base Camp in Port-au-Prince, Haiti, including:

•Private living units with bathroom and AC•120 man dining facility•Conference rooms•Toilet units•Leisure rooms •Utility room

•2000A electrical distribution system•Water & sewer system•Civil work•Complete furnishing

Page 14: BOX Contracting - Prefab Site Facilities

Projects

Dear Nicolai and team

Just briefly here but many thanks for your professional work and friendship.

I saw daily how committed you were to stick to an ambitious schedule regardless of the great heat and dust and dirt in the camp. I can assure you that everybody feels so much more quality in their Base Camp experience and enjoys closing their personal door and finally feeling the privacy an adult person deserves after too many months in very hard conditions.

The fact that you will be back and assuming more work for the Red Cross family is testimony for your products and personal professionalism along with that of your team.

I am certainly looking forward to seeing you and John again soon and wish you a well deserved break until then.My best wishes only!

Eddie, Country Director, IFRC

Link

Page 15: BOX Contracting - Prefab Site Facilities

Projects

Approx 3600m2 of site office buildings – 242 BOXIT Modules configured to site offices, ablutions, prayer rooms, canteen and various purposes for Al Habtoor/ Murray & Roberts at the new Sayeed University construction site, Abu Dhabi, UAE

Page 16: BOX Contracting - Prefab Site Facilities

Projects

”We chose the BOXIT Prefabs mainly because the structures of their prefab containers were made only by use of NON-combustible materials as required to obtain approval from Civil Defence. But also due to the modular structure of the buildings which have allowed us to make alterations to the layout fairly easy as the requirement of the interior layout often changes during the period of our contract”

“The buildings were delivered and handed over to us within agreed time - and we are pleased with the robust quality of the prefab containers and have no objections recommending the BOXIT Prefab Containers”

Ian Taylor, Project Director

Page 17: BOX Contracting - Prefab Site Facilities

Projects

“..it has been a pleasure to work with you and your team and we all have appreciated your availability, your professionalism and your kindness. Ps: I share this e-mail with management and colleagues involved in this successful project. Thanks' again and see you soon in Haïti,”

Best regards,

Martin LALANNE, Logisticien Achat / Procurement LogisticianÌ Croix-Rouge Française / French Red Cross

Page 18: BOX Contracting - Prefab Site Facilities

Projects

Page 19: BOX Contracting - Prefab Site Facilities

Projects

Page 20: BOX Contracting - Prefab Site Facilities

Projects

Page 21: BOX Contracting - Prefab Site Facilities

Converted SEA Containers - Denmark

Page 22: BOX Contracting - Prefab Site Facilities

For more information – visit...

www.boxitcontracting.com