  • NAME OF STRUCTURESHEET NO.

    LM-BML, GL-01

    DRAWING NO.

    (BOUNDARY MARKER LOCATION)SHEET CONTENTS

    BOUNDARY MARKER (1/3) LAYOUT PLAN & DETAILS

    LM-BML, GL-03

    LM-BML, GL-02

    1

    2

    3BOUNDARY MARKER (2/3) LAYOUT PLAN & DETAILS

    BOUNDARY MARKER (3/3) LAYOUT PLAN & DETAILS

  • Durian St. (3.4 m)

    Chico S

    t. (4.2 m

    )

    B. Court

    ParkMulti Purpose H

    all

    Day Care Center

    Maricopa St. (3.0 m)

    Aca cia S t. (3 .0 m)

    P . B u r g o s S t . ( 4 . 0 m )

    T

    T

    Industria Ext. (4.0 m)

    Pilapil St.. (4.5 m)

    Kapasi gan Brgy Hal l

    Day Ca re Center

    Fire S tation

    Tantoco Coal M

    ines Com

    pound

    Universal Robina Corporation

    Hercules M

    etal Products Incorporated

    .

    .

    LEGEND:

    BOUNDARY MARKER

    (LAYOUT PLAN)(DETAILS)

    (1/3) LM-BM

    GL 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • Mabunga

    Brgy. Hall

    Open Space

    Parking Space

    T TT T

    C. Santos St ( 5m)

    The Groove Rockwell

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Carwash

    T

    T T

    T

    T

    TT

    T

    TT

    T

    TT

    Piggery

    Piggery

    Piggery

    T

    Tow

    er

    Suarez St .

    TT

    .

    .

    LEGEND:

    BOUNDARY MARKER

    (LAYOUT PLAN)(DETAILS)

    (2/3) LM-BM

    GL 02

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • B. Court

    Bill

    board

    Escuela de Sto. Rosario

    B. Court

    T

    TTT

    TT

    T

    The Gr

    oove R

    ockwel

    lPiggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Republic Glass

    Royal Industrial Development Corporation

    Dowell Container

    & Packaging Corporation

    Vegoil Philippines Inc.

    T T

    Litton

    Mills Incorporated

    Piggery

    Piggery

    Piggery

    6.551

    .

    .

    LEGEND:

    BOUNDARY MARKER

    (LAYOUT PLAN)(DETAILS)

    (3/3) LM-BM

    GL 03

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • NAME OF STRUCTURESHEET NO. DRAWING NO.

    (BACKFILL SITE)SHEET CONTENTS

    LM-BS_CP-01 GENERAL LAYOUT PLAN (KEY PLAN & TYPICAL SECTIONS)

    LM-BS_CP-02 CANAL LOCATION PLAN (KEY PLAN & TYPICAL SECTIONS)

    LM-BS_DE-01 DATUM ELEVATION (EAST)

    LM-BS_DE-02 DATUM ELEVATION (WEST)

    LM-BS_CS-01 CROSS SECTION (STA. 0+000 )

    LM-BS_CS-02 CROSS SECTION (STA. 0+050 )

    LM-BS_CS-03 CROSS SECTION (STA. 0+100 )

    LM-BS_CS-04 CROSS SECTION (STA. 0+150 )

    LM-BS_CS-05 CROSS SECTION (STA. 0+200 )

    LM-BS_CS-06 CROSS SECTION (STA. 0+250 )

    LM-BS_CS-07 CROSS SECTION (STA. 0+300 )

    LM-BS_CS-08 CROSS SECTION (STA. 0+350 )

    LM-BS_CS-09 CROSS SECTION (STA. 0+400 )

    LM-BS_CS-10 CROSS SECTION (STA. 0+450 )

    LM-BS_CS-11 CROSS SECTION (STA. 0+500 )

    LM-BS_CS-12 CROSS SECTION (STA. 0+550 )

    LM-BS_CS-13 CROSS SECTION (STA. 0+600 )

    LM-BS_CS-14 CROSS SECTION (STA. 0+650 )

    LM-BS_DD-01 DRAINAGE DETAILS OUTLET 1 (PLANS & CROSS SECTION)

    LM-BS_DD-02 DRAINAGE DETAILS OUTLET 1 (REINFORCEMENT DETAILS 1/2)

    LM-BS_DD-03 DRAINAGE DETAILS OUTLET 1 (REINFORCEMENT DETAILS 2/2)

    LM-BS_DD-04 DRAINAGE DETAILS OUTLET 2 (PLANS & CROSS SECTION)

    LM-BS_DD-05 DRAINAGE DETAILS OUTLET 2 (REINFORCEMENT DETAILS 1/2)

    LM-BS_DD-06 DRAINAGE DETAILS OUTLET 2 (REINFORCEMENT DETAILS 2/2)

    LM-BS_DD-07 DRAINAGE DETAILS OUTLET 3, 4 & RCPC (PLANS & CROSS SECTION)

    LM-BS_DD-08 DRAINAGE DETAILS OUTLET 3, 4 & RCPC (REINFORCEMENT DETAILS 1/2)

    LM-BS_TS-01 TYPICAL CROSS SECTIONS (EMBANKMENT , BOUNDARY & DRAINAGE CHANNEL)

    LM-BS_PJ-01 PROPOSED JETTY (ELEVATION, PLAN & KEY PLAN) (REFERENCE DRAWING)

    LM-BS_PJ-02 PROPOSED JETTY (SECTION A-A & SECTION B-B) (REFERENCE DRAWING)

    LM-BS_TB-01 TEMPORARY BRIDGE (LAYOUT PLAN, SECTION THRU A-A & SECTION THRU B-B) (REFERENCE DRAWING)

    -BS_TB-02 TEMPORARY BRIDGE (BEARING PILE JOINT, HANDRAIL, JUNCTION & DECKING) (REFERENCE DRAWING)

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    20

    21

    22

    23

    24

    25

    26

    29

    30

    31

    32

    19

    LM-BS_DD-09 DRAINAGE DETAILS OUTLET 3, 4 & RCPC (REINFORCEMENT DETAILS 2/2)27

    28

  • 7 .00

    7.00

    8.00

    8.00

    9.00

    9.001 0 .00

    11.00

    12.00

    1 2 .0 0

    12.00

    12.0

    0

    6.506.50

    6.50

    6.50

    7.50

    7.50

    8.50

    8.509.5010.50

    11.5

    0

    1 1.50

    11.50

    11.50

    11.5

    0

    12.50

    12.50

    12.50

    12.501 2 .5 0

    7.008.00

    12.0

    0

    12.00

    1 2. 0 0

    12.00

    12.00

    1 2.00

    12.00

    12.0

    0

    12.00

    12.00

    12.0

    0 12.00

    12.00

    12.00

    12.00

    12.00

    12.00

    1 2.0

    0

    12. 0

    0

    12.00

    12.00

    6.507.50

    9.00

    11.50

    11.5

    0

    11.50

    11.5

    0

    11.50

    1 1.50

    11.5

    0

    11.50

    11.50

    11.5

    011.50

    12 .50

    12.50

    12.50

    12.

    50

    12.5

    0

    12.50

    12.5

    0

    1 2.5 0

    13.00

    12.50

    12.50

    12.5

    0

    12. 5

    0

    12.50

    12.50

    12.0013 .00

    12 .50

    13.0013.00

    13.0

    0

    14.00

    14.00

    14.00

    15.00

    15.00

    14.50

    13.0013.50

    13.00

    13.00

    13.0012.50

    13.50

    13.00

    14.0014.00

    14.00

    15.00

    15.00

    14.50

    14.50

    15.50

    15.50

    13.00

    14.00

    15.00

    15.00

    16.00

    16.00

    13.5014.5014.50

    14.50

    15.50

    15.50

    14.00

    13.0014.0013.50

    13.50

    13.50

    14.0013.50

    13.50

    13.00

    14.0013

    .50

    14.0013.50

    12.00

    13.0

    0

    LEGEND:

    (KEY PLAN)(TYPICAL SECTIONS)

    GENERAL LAYOUT PLAN

    LM-BSCP 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • 7 .00

    7.00

    8.00

    8.00

    9.00

    9.001 0 .00

    11.00

    12.00

    1 2 .0 0

    12.00

    12.0

    0

    6.506.50

    6.50

    6.50

    7.50

    7.50

    8.50

    8.509.5010.50

    11.5

    0

    1 1.50

    11.50

    11.50

    11.5

    0

    12.50

    12.50

    12.50

    12.501 2 .5 0

    7.008.00

    12.0

    0

    12.00

    1 2. 0 0

    12.00

    12.00

    1 2.00

    12.00

    12.0

    0

    12.00

    12.00

    12.0

    0 12.00

    12.00

    12.00

    12.00

    12.00

    12.00

    1 2.0

    0

    12. 0

    0

    12.00

    12.00

    6.507.50

    9.00

    11.50

    11.5

    0

    11.50

    11.5

    0

    11.50

    1 1.50

    11.5

    0

    11.50

    11.50

    11.5

    011.50

    12 .50

    12.50

    12.50

    12.

    50

    12.5

    0

    12.50

    12.5

    0

    1 2.5 0

    13.00

    12.50

    12.50

    12.5

    0

    12. 5

    0

    12.50

    12.50

    12.0013 .00

    12 .50

    13.00

    13.00

    13.0

    0

    14.00

    14.00

    14.00

    15.00

    15.00

    14.50

    13.0013.50

    13.00

    13.00

    13.0012.50

    13.50

    13.00

    14.0014.00

    14.00

    15.00

    15.00

    14.50

    14.50

    15.50

    15.50

    13.00

    14.00

    15.00

    15.0016.00

    16.00

    13.5014.5014.50

    14.50

    15.5015.50

    14.00

    13.0014.0013.50

    13.50

    13.50

    14.0013.50

    13.50

    13.00

    14.0013.50

    14.0013.50

    12.00

    13.0

    0

    LEGEND:

    (KEY PLAN)(TYPICAL SECTIONS)

    CANAL LOCATION

    (PLAN)LM-BS

    CP 02

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • DATUM ELEVATION(EAST)

    LM-BSDE 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • DATUM ELEVATION(WEST)

    LM-BSDE 02

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+000

    LM-BSCS 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+050

    LM-BSCS 02

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+100

    LM-BSCS 03

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+150

    LM-BSCS 04

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+200

    LM-BSCS 05

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+250

    LM-BSCS 06

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+300

    LM-BSCS 07

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+350

    LM-BSCS 08

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+400

    LM-BSCS 09

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+450

    LM-BSCS 10

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+500

    LM-BSCS 11

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+550

    LM-BSCS 12

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+600

    LM-BSCS 13

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • CROSS SECTIONSTA. 0+650

    LM-BSCS 14

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • EAST SIDE DRAINAGE OUTLET(OUTLET-1)

    (PLAN AND CROSSSECTIONS)

    DRAINAGE DETAILSOUTLET 1

    LM-BSDD 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY(REINFORCEMENT

    DETAILS 1/2)

    DRAINAGE DETAILSOUTLET 1

    LM-BSDD 02

  • (REINFORCEMENTDETAILS 2/2)

    DRAINAGE DETAILSOUTLET 1

    LM-BSDD 03

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • WEST SIDE DRAINAGE OUTLET(OUTLET-2)

    (PLAN AND CROSSSECTIONS)

    DRAINAGE DETAILSOUTLET 2

    LM-BSDD 04

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY(REINFORCEMENT

    DETAILS 1/2)

    DRAINAGE DETAILSOUTLET 2

    LM-BSDD 05

  • (REINFORCEMENTDETAILS 2/2)

    DRAINAGE DETAILSOUTLET 2

    LM-BSDD 06

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • OUTSIDE DRAINAGE OUTLETS AND RCPC(OUTLET-3, OUTLET-4 & RCPC)

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY(PLANS AND CROSS

    SECTIONS)

    DRAINAGE DETAILSOUTLET 3, 4 & RCPC

    LM-BSDD 07

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY(REINFORCEMENT

    DETAILS 1/2)

    DRAINAGE DETAILSOUTLET 3, 4 & RCPC

    LM-BSDD 08

  • (REINFORCEMENTDETAILS 2/2)

    DRAINAGE DETAILSOUTLET 3, 4 & RCPC

    LM-BSDD 09

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • (EMBANKMENT)

    (DRAINAGE CHANNEL)(BOUNDARY)

    TYPICAL SECTIONS

    LM-BSTS 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • B

    A

    A

    B

    N A P I N D A N R I V E R

    THE SITE

    (REFERENCE DRAWING)

    (PLAN)(KEY PLAN)

    PROPOSED JETTY

    (ELEVATION)LM-BS

    PJ 01

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • (SECTION B-B)(REFERENCE DRAWING)

    PROPOSED JETTY

    (SECTION A-A)LM-BS

    PJ 02

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • THE SITE

    TEMPORARY BRIDGE

    (SECTION THRU - A)(SECTION THRU - B)

    (REFERENCE DRAWING)

    (LAYOUT PLAN) LM-BSTB 01

    BACKFILL SITE

    L=5.40KMLOWER MARIKINA RIVER IMPROVEMENT

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • TEMPORARY BRIDGE

    (HAND RAIL & JUNCTION)(DECKING)

    (REFERENCE DRAWING)

    (BEARING PILE JOINT) LM-BS

    TB 02

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    TOYOHIRO TAKAGISTRUCTURAL ENGINEER II

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

  • SHEET NO.

    (DRAINAGE WORKS; LOWER MARIKINA)

    LM-DL, GL-01 LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 1 (1 OF 2)1

    2

    3

    4

    5

    6

    7

    8

    9

    LM-DL, MSL01-01 GENERAL FEATURESLUICEWAY (MSL-1)

    LM-DL, GL-02

    LM-DR, GL-03

    SHEET CONTENTSNAME OF STRUCTUREDRAWING NO.

    LOWER MARIKINA RIVER

    DETAILLM-DL, MSL01-02

    LM-DL, MSL02-01 GENERAL FEATURESLUICEWAY (MSL-2)

    DETAILLM-DL, MSL02-02

    LM-DL, MSL03-01 GENERAL FEATURESLUICEWAY (MSL-3)

    DETAILLM-DL, MSL03-02

    LM-DL, MSL04-01 GENERAL FEATURESLUICEWAY (MSL-4)

    DETAILLM-DL, MSL04-02

    10

    11

    12

    LM-DL, MSL05-01 GENERAL FEATURESLUICEWAY (MSL-5)

    DETAILLM-DL, MSL05-02

    LM-DL, MSL06-01 GENERAL FEATURESLUICEWAY (MSL-6)

    DETAILLM-DL, MSL06-02

    LM-DR, MSR02-01 GENERAL FEATURESLUICEWAY (MSR-2)

    DETAILLM-DR, MSR02-02

    LM-DR, MSR03-01 GENERAL FEATURE

    DETAILLM-DR, MSR03-02SLUICEWAY (MSR-3)

    LM-DR, MSR04-01 GENERAL FEATURE

    DETAILLM-DR, MSR04-02SLUICEWAY (MSR-4)

    13

    14

    15

    16

    17

    18

    19

    20

    LM-DD, BC-01

    LM-DD, BW-01

    BOX CULVERT DETAIL OF BOX CULVERT FOR SLUICEWAY AND BAR SCHEDULE

    BREAST WALL (RIVER SIDE) DETAIL OF BREAST WALL AT RIVER SIDE AND BAR SCHEDULE

    LM-DD, BW-02 BREAST WALL (LAND SIDE) DETAIL OF BREAST WALL AT LAND SIDE AND BAR SCHEDULE

    LM-DD, WW-01 WING WALL DETAIL OF WING WALL AND BAR SCHEDULE

    LM-DD, SSP-01 STEEL SHEET PILE STEEL SHEET PILE SCHEDULE

    LM-DD, OD-01 OTHER DETAILS FOR SLUICEWAY

    DETAIL OF TRASH RACK, DETAIL OF PARTITION WALL, DETAIL OF STEP IRON

    LM-DD, OD-02

    MANHOLE DETAIL OF MANHOLE AND BAR SCHEDULE

    21

    22

    23

    24

    25

    26

    27

    28

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 1 (2 OF 2)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 2 (1 OF 3)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 2 (2 OF 3)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 2 (3 OF 3)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (1 OF 4)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (2 OF 4)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (3 OF 4)

    LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (4 OF 4)

    LM-DR, GL-04

    LM-DR, GL-05

    LM-DL, GL-06

    LM-DL, GL-07

    LM-DL, GL-08

    LM-DL, GL-09

    29

    30

    31

    32

    33

    34

    35 LM-DD, OD-03 MANHOLE MANHOLE SCHEDULE

    OTHER DETAILS

    DETAIL CONCRETE BLOCK RETAINING WALL, DETAIL OF GRAVITY WALL

    EXPANSION JOINT DETAIL, COLLAR DETAIL, CONCRETE BEDDING DETAIL

    BACKFILLING OF COLLECTOR PIPE DETAIL

    BOX CULVERT AND U-DITCH

    DETAIL OF BOX CULVERT AND BAR SCHEDULE, DETAIL OF U-DITCH AND BAR SCHEDULE

    LM-DD, OD-04

    LM-DD, OD-05

    36

    37

    DETAIL OF U-DITCH W/ COVER, DETAIL OF U-DITCH W/O COVER

    PERFORATED COVER DETAIL

    DETAIL OF CONCRETE BASE

  • T

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 1 (1 / 2)

    LM-DL

    GL 01

  • Fire Station

    T

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 1 (2 / 2)

    LM-DL

    GL 02

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 2 (1 / 3)

    LM-DR

    GL 03

  • T

    T T

    T

    T

    TT

    T

    TT

    T

    TT

    T

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 2 (2 / 3)

    LM-DR

    GL 04

  • Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    Piggery

    T

    Piggery

    Piggery

    Piggery

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 2 (3 / 3)

    LM-DR

    GL 05

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 3 (1 /4)

    LM-DL

    GL 06

  • Billbo

    ard

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 3 (2/4)

    LM-DL

    GL 07

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 3 (3 /4)

    LM-DL

    GL 08

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    LOWER MARIKINA PLAN AND PROFILE

    SECTION 3 (4/4)

    LM-DL

    GL 09

  • LOW

    ER

    MA

    RIK

    INA

    RIV

    ER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARYGENERAL SLUICEWAY

    MSL-1STA. 1+104 LB

    LM-DL

    MSL01 01

  • LOWER MARIKINA RIVER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    DETAIL OF SLUICEWAYMSL-1

    STA. 1+104 LB

    LM-DL

    MSL01 02

  • LOW

    ER

    MA

    RIKIN

    A RIVER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    GENERAL SLUICEWAYMSL-2

    STA. 1+323 LB

    LM-DL

    MSL02 01

  • LOWER MARIKINA RIVER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    DETAIL OF SLUICEWAYMSL-2

    STA. 1+323 LB

    LM-DL

    MSL02 02

  • LOW

    ER

    MA

    RIKIN

    A RIVER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    GENERAL SLUICEWAYMSL-3

    STA. 3+945 LB

    LM-DL

    MSL03 01

  • LOWER MARIKINA RIVER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    DETAIL OF SLUICEWAYMSL-3

    STA. 3+945 LB

    LM-DL

    MSL03 02

  • PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SERVICES

    APPROVED BY:

    ROGELIO L. SINGSONSECRETARY

    REPUBLIC OF THE PHILIPPINES

    PROJECT (PHASE III),METRO MANILA

    SHEET CONTENTS

    DESCRIPTION DATEAPPROVEDNO.

    R E V I S I O N S

    SUBMITTED BY:

    SHUJI KAKUTEAM LEADER

    PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.

    SHUJI KAKUTEAM LEADER

    NOTE :

    SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY

    SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF

    THE SECRETARY

    GENERAL SLUICEWAYMSL-4

    STA. 4+221 LB

    LM-DL

    MSL04 01

  • LOWER MARIKINA RIVER

    PROJECT & LOCATION SHEET NO.

    PASIG-MARIKINARIVER CHANNEL

    CHECKED BY:DESIGNED BY:

    IMPROVEMENT

    JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN

    KOHEI TAKAYAMASTRUCTURAL ENGINEER IV

    TOSHIKI KAWAKAMITHE CHECKER

    REVIEWED BY:

    PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC

    DIVISION, BOD

    RECOMMENDING APPROVAL :

    PATRICK B. GATANPROJECT DIRECTOR

    PMO - MFCP

    GILBERTO S. REYESDIRECTOR

    BOD

    RAUL C. ASISUNDERSECRETARY

    FOR TECHNICAL SER