(boundary marker location)lm-bs_dd-08 drainage details outlet 3, 4 & rcpc (reinforcement details...
TRANSCRIPT
-
NAME OF STRUCTURESHEET NO.
LM-BML, GL-01
DRAWING NO.
(BOUNDARY MARKER LOCATION)SHEET CONTENTS
BOUNDARY MARKER (1/3) LAYOUT PLAN & DETAILS
LM-BML, GL-03
LM-BML, GL-02
1
2
3BOUNDARY MARKER (2/3) LAYOUT PLAN & DETAILS
BOUNDARY MARKER (3/3) LAYOUT PLAN & DETAILS
-
Durian St. (3.4 m)
Chico S
t. (4.2 m
)
B. Court
ParkMulti Purpose H
all
Day Care Center
Maricopa St. (3.0 m)
Aca cia S t. (3 .0 m)
P . B u r g o s S t . ( 4 . 0 m )
T
T
Industria Ext. (4.0 m)
Pilapil St.. (4.5 m)
Kapasi gan Brgy Hal l
Day Ca re Center
Fire S tation
Tantoco Coal M
ines Com
pound
Universal Robina Corporation
Hercules M
etal Products Incorporated
.
.
LEGEND:
BOUNDARY MARKER
(LAYOUT PLAN)(DETAILS)
(1/3) LM-BM
GL 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
Mabunga
Brgy. Hall
Open Space
Parking Space
T TT T
C. Santos St ( 5m)
The Groove Rockwell
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Carwash
T
T T
T
T
TT
T
TT
T
TT
Piggery
Piggery
Piggery
T
Tow
er
Suarez St .
TT
.
.
LEGEND:
BOUNDARY MARKER
(LAYOUT PLAN)(DETAILS)
(2/3) LM-BM
GL 02
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
B. Court
Bill
board
Escuela de Sto. Rosario
B. Court
T
TTT
TT
T
The Gr
oove R
ockwel
lPiggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Republic Glass
Royal Industrial Development Corporation
Dowell Container
& Packaging Corporation
Vegoil Philippines Inc.
T T
Litton
Mills Incorporated
Piggery
Piggery
Piggery
6.551
.
.
LEGEND:
BOUNDARY MARKER
(LAYOUT PLAN)(DETAILS)
(3/3) LM-BM
GL 03
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
NAME OF STRUCTURESHEET NO. DRAWING NO.
(BACKFILL SITE)SHEET CONTENTS
LM-BS_CP-01 GENERAL LAYOUT PLAN (KEY PLAN & TYPICAL SECTIONS)
LM-BS_CP-02 CANAL LOCATION PLAN (KEY PLAN & TYPICAL SECTIONS)
LM-BS_DE-01 DATUM ELEVATION (EAST)
LM-BS_DE-02 DATUM ELEVATION (WEST)
LM-BS_CS-01 CROSS SECTION (STA. 0+000 )
LM-BS_CS-02 CROSS SECTION (STA. 0+050 )
LM-BS_CS-03 CROSS SECTION (STA. 0+100 )
LM-BS_CS-04 CROSS SECTION (STA. 0+150 )
LM-BS_CS-05 CROSS SECTION (STA. 0+200 )
LM-BS_CS-06 CROSS SECTION (STA. 0+250 )
LM-BS_CS-07 CROSS SECTION (STA. 0+300 )
LM-BS_CS-08 CROSS SECTION (STA. 0+350 )
LM-BS_CS-09 CROSS SECTION (STA. 0+400 )
LM-BS_CS-10 CROSS SECTION (STA. 0+450 )
LM-BS_CS-11 CROSS SECTION (STA. 0+500 )
LM-BS_CS-12 CROSS SECTION (STA. 0+550 )
LM-BS_CS-13 CROSS SECTION (STA. 0+600 )
LM-BS_CS-14 CROSS SECTION (STA. 0+650 )
LM-BS_DD-01 DRAINAGE DETAILS OUTLET 1 (PLANS & CROSS SECTION)
LM-BS_DD-02 DRAINAGE DETAILS OUTLET 1 (REINFORCEMENT DETAILS 1/2)
LM-BS_DD-03 DRAINAGE DETAILS OUTLET 1 (REINFORCEMENT DETAILS 2/2)
LM-BS_DD-04 DRAINAGE DETAILS OUTLET 2 (PLANS & CROSS SECTION)
LM-BS_DD-05 DRAINAGE DETAILS OUTLET 2 (REINFORCEMENT DETAILS 1/2)
LM-BS_DD-06 DRAINAGE DETAILS OUTLET 2 (REINFORCEMENT DETAILS 2/2)
LM-BS_DD-07 DRAINAGE DETAILS OUTLET 3, 4 & RCPC (PLANS & CROSS SECTION)
LM-BS_DD-08 DRAINAGE DETAILS OUTLET 3, 4 & RCPC (REINFORCEMENT DETAILS 1/2)
LM-BS_TS-01 TYPICAL CROSS SECTIONS (EMBANKMENT , BOUNDARY & DRAINAGE CHANNEL)
LM-BS_PJ-01 PROPOSED JETTY (ELEVATION, PLAN & KEY PLAN) (REFERENCE DRAWING)
LM-BS_PJ-02 PROPOSED JETTY (SECTION A-A & SECTION B-B) (REFERENCE DRAWING)
LM-BS_TB-01 TEMPORARY BRIDGE (LAYOUT PLAN, SECTION THRU A-A & SECTION THRU B-B) (REFERENCE DRAWING)
-BS_TB-02 TEMPORARY BRIDGE (BEARING PILE JOINT, HANDRAIL, JUNCTION & DECKING) (REFERENCE DRAWING)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
20
21
22
23
24
25
26
29
30
31
32
19
LM-BS_DD-09 DRAINAGE DETAILS OUTLET 3, 4 & RCPC (REINFORCEMENT DETAILS 2/2)27
28
-
7 .00
7.00
8.00
8.00
9.00
9.001 0 .00
11.00
12.00
1 2 .0 0
12.00
12.0
0
6.506.50
6.50
6.50
7.50
7.50
8.50
8.509.5010.50
11.5
0
1 1.50
11.50
11.50
11.5
0
12.50
12.50
12.50
12.501 2 .5 0
7.008.00
12.0
0
12.00
1 2. 0 0
12.00
12.00
1 2.00
12.00
12.0
0
12.00
12.00
12.0
0 12.00
12.00
12.00
12.00
12.00
12.00
1 2.0
0
12. 0
0
12.00
12.00
6.507.50
9.00
11.50
11.5
0
11.50
11.5
0
11.50
1 1.50
11.5
0
11.50
11.50
11.5
011.50
12 .50
12.50
12.50
12.
50
12.5
0
12.50
12.5
0
1 2.5 0
13.00
12.50
12.50
12.5
0
12. 5
0
12.50
12.50
12.0013 .00
12 .50
13.0013.00
13.0
0
14.00
14.00
14.00
15.00
15.00
14.50
13.0013.50
13.00
13.00
13.0012.50
13.50
13.00
14.0014.00
14.00
15.00
15.00
14.50
14.50
15.50
15.50
13.00
14.00
15.00
15.00
16.00
16.00
13.5014.5014.50
14.50
15.50
15.50
14.00
13.0014.0013.50
13.50
13.50
14.0013.50
13.50
13.00
14.0013
.50
14.0013.50
12.00
13.0
0
LEGEND:
(KEY PLAN)(TYPICAL SECTIONS)
GENERAL LAYOUT PLAN
LM-BSCP 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
7 .00
7.00
8.00
8.00
9.00
9.001 0 .00
11.00
12.00
1 2 .0 0
12.00
12.0
0
6.506.50
6.50
6.50
7.50
7.50
8.50
8.509.5010.50
11.5
0
1 1.50
11.50
11.50
11.5
0
12.50
12.50
12.50
12.501 2 .5 0
7.008.00
12.0
0
12.00
1 2. 0 0
12.00
12.00
1 2.00
12.00
12.0
0
12.00
12.00
12.0
0 12.00
12.00
12.00
12.00
12.00
12.00
1 2.0
0
12. 0
0
12.00
12.00
6.507.50
9.00
11.50
11.5
0
11.50
11.5
0
11.50
1 1.50
11.5
0
11.50
11.50
11.5
011.50
12 .50
12.50
12.50
12.
50
12.5
0
12.50
12.5
0
1 2.5 0
13.00
12.50
12.50
12.5
0
12. 5
0
12.50
12.50
12.0013 .00
12 .50
13.00
13.00
13.0
0
14.00
14.00
14.00
15.00
15.00
14.50
13.0013.50
13.00
13.00
13.0012.50
13.50
13.00
14.0014.00
14.00
15.00
15.00
14.50
14.50
15.50
15.50
13.00
14.00
15.00
15.0016.00
16.00
13.5014.5014.50
14.50
15.5015.50
14.00
13.0014.0013.50
13.50
13.50
14.0013.50
13.50
13.00
14.0013.50
14.0013.50
12.00
13.0
0
LEGEND:
(KEY PLAN)(TYPICAL SECTIONS)
CANAL LOCATION
(PLAN)LM-BS
CP 02
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
DATUM ELEVATION(EAST)
LM-BSDE 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
DATUM ELEVATION(WEST)
LM-BSDE 02
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+000
LM-BSCS 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+050
LM-BSCS 02
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+100
LM-BSCS 03
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+150
LM-BSCS 04
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+200
LM-BSCS 05
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+250
LM-BSCS 06
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+300
LM-BSCS 07
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+350
LM-BSCS 08
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+400
LM-BSCS 09
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+450
LM-BSCS 10
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+500
LM-BSCS 11
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+550
LM-BSCS 12
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+600
LM-BSCS 13
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
CROSS SECTIONSTA. 0+650
LM-BSCS 14
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
EAST SIDE DRAINAGE OUTLET(OUTLET-1)
(PLAN AND CROSSSECTIONS)
DRAINAGE DETAILSOUTLET 1
LM-BSDD 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY(REINFORCEMENT
DETAILS 1/2)
DRAINAGE DETAILSOUTLET 1
LM-BSDD 02
-
(REINFORCEMENTDETAILS 2/2)
DRAINAGE DETAILSOUTLET 1
LM-BSDD 03
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
WEST SIDE DRAINAGE OUTLET(OUTLET-2)
(PLAN AND CROSSSECTIONS)
DRAINAGE DETAILSOUTLET 2
LM-BSDD 04
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY(REINFORCEMENT
DETAILS 1/2)
DRAINAGE DETAILSOUTLET 2
LM-BSDD 05
-
(REINFORCEMENTDETAILS 2/2)
DRAINAGE DETAILSOUTLET 2
LM-BSDD 06
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
OUTSIDE DRAINAGE OUTLETS AND RCPC(OUTLET-3, OUTLET-4 & RCPC)
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY(PLANS AND CROSS
SECTIONS)
DRAINAGE DETAILSOUTLET 3, 4 & RCPC
LM-BSDD 07
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY(REINFORCEMENT
DETAILS 1/2)
DRAINAGE DETAILSOUTLET 3, 4 & RCPC
LM-BSDD 08
-
(REINFORCEMENTDETAILS 2/2)
DRAINAGE DETAILSOUTLET 3, 4 & RCPC
LM-BSDD 09
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
(EMBANKMENT)
(DRAINAGE CHANNEL)(BOUNDARY)
TYPICAL SECTIONS
LM-BSTS 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
B
A
A
B
N A P I N D A N R I V E R
THE SITE
(REFERENCE DRAWING)
(PLAN)(KEY PLAN)
PROPOSED JETTY
(ELEVATION)LM-BS
PJ 01
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
(SECTION B-B)(REFERENCE DRAWING)
PROPOSED JETTY
(SECTION A-A)LM-BS
PJ 02
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
THE SITE
TEMPORARY BRIDGE
(SECTION THRU - A)(SECTION THRU - B)
(REFERENCE DRAWING)
(LAYOUT PLAN) LM-BSTB 01
BACKFILL SITE
L=5.40KMLOWER MARIKINA RIVER IMPROVEMENT
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
TEMPORARY BRIDGE
(HAND RAIL & JUNCTION)(DECKING)
(REFERENCE DRAWING)
(BEARING PILE JOINT) LM-BS
TB 02
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
TOYOHIRO TAKAGISTRUCTURAL ENGINEER II
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
-
SHEET NO.
(DRAINAGE WORKS; LOWER MARIKINA)
LM-DL, GL-01 LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 1 (1 OF 2)1
2
3
4
5
6
7
8
9
LM-DL, MSL01-01 GENERAL FEATURESLUICEWAY (MSL-1)
LM-DL, GL-02
LM-DR, GL-03
SHEET CONTENTSNAME OF STRUCTUREDRAWING NO.
LOWER MARIKINA RIVER
DETAILLM-DL, MSL01-02
LM-DL, MSL02-01 GENERAL FEATURESLUICEWAY (MSL-2)
DETAILLM-DL, MSL02-02
LM-DL, MSL03-01 GENERAL FEATURESLUICEWAY (MSL-3)
DETAILLM-DL, MSL03-02
LM-DL, MSL04-01 GENERAL FEATURESLUICEWAY (MSL-4)
DETAILLM-DL, MSL04-02
10
11
12
LM-DL, MSL05-01 GENERAL FEATURESLUICEWAY (MSL-5)
DETAILLM-DL, MSL05-02
LM-DL, MSL06-01 GENERAL FEATURESLUICEWAY (MSL-6)
DETAILLM-DL, MSL06-02
LM-DR, MSR02-01 GENERAL FEATURESLUICEWAY (MSR-2)
DETAILLM-DR, MSR02-02
LM-DR, MSR03-01 GENERAL FEATURE
DETAILLM-DR, MSR03-02SLUICEWAY (MSR-3)
LM-DR, MSR04-01 GENERAL FEATURE
DETAILLM-DR, MSR04-02SLUICEWAY (MSR-4)
13
14
15
16
17
18
19
20
LM-DD, BC-01
LM-DD, BW-01
BOX CULVERT DETAIL OF BOX CULVERT FOR SLUICEWAY AND BAR SCHEDULE
BREAST WALL (RIVER SIDE) DETAIL OF BREAST WALL AT RIVER SIDE AND BAR SCHEDULE
LM-DD, BW-02 BREAST WALL (LAND SIDE) DETAIL OF BREAST WALL AT LAND SIDE AND BAR SCHEDULE
LM-DD, WW-01 WING WALL DETAIL OF WING WALL AND BAR SCHEDULE
LM-DD, SSP-01 STEEL SHEET PILE STEEL SHEET PILE SCHEDULE
LM-DD, OD-01 OTHER DETAILS FOR SLUICEWAY
DETAIL OF TRASH RACK, DETAIL OF PARTITION WALL, DETAIL OF STEP IRON
LM-DD, OD-02
MANHOLE DETAIL OF MANHOLE AND BAR SCHEDULE
21
22
23
24
25
26
27
28
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 1 (2 OF 2)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 2 (1 OF 3)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 2 (2 OF 3)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 2 (3 OF 3)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (1 OF 4)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (2 OF 4)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (3 OF 4)
LOWER MARIKINA DRAINAGE LAYOUT PLAN AND PROFILE, SECTION 3 (4 OF 4)
LM-DR, GL-04
LM-DR, GL-05
LM-DL, GL-06
LM-DL, GL-07
LM-DL, GL-08
LM-DL, GL-09
29
30
31
32
33
34
35 LM-DD, OD-03 MANHOLE MANHOLE SCHEDULE
OTHER DETAILS
DETAIL CONCRETE BLOCK RETAINING WALL, DETAIL OF GRAVITY WALL
EXPANSION JOINT DETAIL, COLLAR DETAIL, CONCRETE BEDDING DETAIL
BACKFILLING OF COLLECTOR PIPE DETAIL
BOX CULVERT AND U-DITCH
DETAIL OF BOX CULVERT AND BAR SCHEDULE, DETAIL OF U-DITCH AND BAR SCHEDULE
LM-DD, OD-04
LM-DD, OD-05
36
37
DETAIL OF U-DITCH W/ COVER, DETAIL OF U-DITCH W/O COVER
PERFORATED COVER DETAIL
DETAIL OF CONCRETE BASE
-
T
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 1 (1 / 2)
LM-DL
GL 01
-
Fire Station
T
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 1 (2 / 2)
LM-DL
GL 02
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 2 (1 / 3)
LM-DR
GL 03
-
T
T T
T
T
TT
T
TT
T
TT
T
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 2 (2 / 3)
LM-DR
GL 04
-
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
Piggery
T
Piggery
Piggery
Piggery
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 2 (3 / 3)
LM-DR
GL 05
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 3 (1 /4)
LM-DL
GL 06
-
Billbo
ard
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 3 (2/4)
LM-DL
GL 07
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 3 (3 /4)
LM-DL
GL 08
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
LOWER MARIKINA PLAN AND PROFILE
SECTION 3 (4/4)
LM-DL
GL 09
-
LOW
ER
MA
RIK
INA
RIV
ER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARYGENERAL SLUICEWAY
MSL-1STA. 1+104 LB
LM-DL
MSL01 01
-
LOWER MARIKINA RIVER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
DETAIL OF SLUICEWAYMSL-1
STA. 1+104 LB
LM-DL
MSL01 02
-
LOW
ER
MA
RIKIN
A RIVER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
GENERAL SLUICEWAYMSL-2
STA. 1+323 LB
LM-DL
MSL02 01
-
LOWER MARIKINA RIVER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
DETAIL OF SLUICEWAYMSL-2
STA. 1+323 LB
LM-DL
MSL02 02
-
LOW
ER
MA
RIKIN
A RIVER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
GENERAL SLUICEWAYMSL-3
STA. 3+945 LB
LM-DL
MSL03 01
-
LOWER MARIKINA RIVER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
DETAIL OF SLUICEWAYMSL-3
STA. 3+945 LB
LM-DL
MSL03 02
-
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SERVICES
APPROVED BY:
ROGELIO L. SINGSONSECRETARY
REPUBLIC OF THE PHILIPPINES
PROJECT (PHASE III),METRO MANILA
SHEET CONTENTS
DESCRIPTION DATEAPPROVEDNO.
R E V I S I O N S
SUBMITTED BY:
SHUJI KAKUTEAM LEADER
PURSUANT TO SECTION 4 OF ANNEX "A" OF THE REVISED IMPLEMENTING RULESAND REGULATIONS OF R.A. 9184, APPROVAL BY THE AUTHORIZED DPWH OFFICIALSOF DETAILED ENGINEERING SURVEYS AND DESIGN UNDERTAKEN BY CONSULTANTSNEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE TECHNICALINTEGRITY OF THE SURVEYS AND DESIGN NOR TRANSFER ANY PART OF THATRESPONSIBILITY TO THE APPROVING OFFICIALS.
SHUJI KAKUTEAM LEADER
NOTE :
SEE COVER SHEET FOR THESIGNATURE OF THEUNDERSECRETARY
SEE COVER SHEET FOR THESIGNATURE AND APPROVAL OF
THE SECRETARY
GENERAL SLUICEWAYMSL-4
STA. 4+221 LB
LM-DL
MSL04 01
-
LOWER MARIKINA RIVER
PROJECT & LOCATION SHEET NO.
PASIG-MARIKINARIVER CHANNEL
CHECKED BY:DESIGNED BY:
IMPROVEMENT
JICA CONSULTANT FOR DETAILED ENGINEERING DESIGN
KOHEI TAKAYAMASTRUCTURAL ENGINEER IV
TOSHIKI KAWAKAMITHE CHECKER
REVIEWED BY:
PERFECTO L. ZAPLAN, JR.CHIEF, HYDRAULIC
DIVISION, BOD
RECOMMENDING APPROVAL :
PATRICK B. GATANPROJECT DIRECTOR
PMO - MFCP
GILBERTO S. REYESDIRECTOR
BOD
RAUL C. ASISUNDERSECRETARY
FOR TECHNICAL SER