botany road

1
195 195 200 286 208 1/200 204 195 A A A A B B C C 3.0 3.0 3.4 3.4 3.6 2.5 5.1 1.8 1.8 4.3 4.3 1.1 3.1 3.0 3.4 3.1 4.9 1.0 3.0 3.0 3.0 3.0 4.2 3.0 3.4 3.2 2.8 TRAFFIC ENGINEERING SOLUTIONS LIMITED Traffic Engineering Solutions Limited PO Box 7237, Wellesley Street, Auckland 1036 P: 0800 837 583, E: [email protected] AUCKLAND TRANSPORT BOTANY, CASCADES ROAD INTERSECTION IMPROVEMENTS T18092 R1-002 A DETAILED DESIGN S.SUM D.YU J.DALY I.JURISICH 12/03/2019 A FIRST ISSUE SS DY IJ 01/19 Plot Date: Cad File No: 12 March 2019 - 4:56 PM G:\Traffic Projects\T18 Projects\T18092 Botany Cascades Millhouse\AutoCAD\Botany Cascades\Botany Cascades.dwg Date Date Approved Checked Drawn Revision No A3 Original Size Project Client Check Designed Approved Drawn Scale Design FOR: BY: Rev: Project No: Note: * indicates signatures on original issue of drawing or last revision of drawing Check Drafting Drawing No: LAYOUT PLAN WITH CRITICAL DIMENSIONS R1-002 1:500 @ A3 SIZE CASCADES ROAD BOTANY ROAD BOTANY ROAD

Upload: others

Post on 23-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

1

9

5

1

9

5

2

0

0

2

8

6

2

0

8

1

/

2

0

0

2

0

4

1

9

5

A

A

A

A

B

B

C

C

3

.

0

3.0

3.4

3.43.6

2.5

5

.

1

1.8

1.8

4

.3

4

.3

1.1

3.1

3.0

3.4

3.1

4

.

9

1

.

0

3

.

0

3.0

3.0

3.0

4.2

3.0

3.4

3.2

2.8

TRAFFIC

ENGINEERING

SOLUTIONS LIMITED

Traffic Engineering Solutions Limited

PO Box 7237, Wellesley Street, Auckland 1036

P: 0800 837 583, E: [email protected]

AUCKLAND TRANSPORT

BOTANY, CASCADES ROAD

INTERSECTION IMPROVEMENTS

T18092 R1-002

A

DETAILED DESIGN

S.SUM D.YU

J.DALY I.JURISICH

12/03/2019

A FIRST ISSUE SS DY IJ 01/19

Plot Date: Cad File No:12 March 2019 - 4:56 PM G:\Traffic Projects\T18 Projects\T18092 Botany Cascades Millhouse\AutoCAD\Botany Cascades\Botany Cascades.dwg

Date

DateApproved

CheckedDrawnRevisionNo A3

Original Size

Project

Client

Check

Designed

Approved

Drawn

Scale

Design

FOR: BY:

Rev:

Project No:

Note: * indicates signatures on original issue of drawing or last revision of drawing

Check

Drafting

Drawing No:

LAYOUT PLAN WITH CRITICAL DIMENSIONS

R1-002

1:500 @ A3 SIZE

CA

SC

AD

ES

R

OA

D

BOTANY ROAD

BO

TA

NY

RO

AD

AutoCAD SHX Text
EXTENT OF WORK
AutoCAD SHX Text
EXISTING KERB NEW KERB KERB TO BE REMOVED EXISTING ROADMARKING NEW ROADMARKING ROADMARKING TO BE REMOVED EXISTING FOOTPATH NEW FOOTPATH FOOTPATH TO BE REMOVED NEW PRAM CROSSING NEW TACTILE PAVERS NEW TRAFFIC ISLAND
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text
EXISTING SIGN NEW SIGN SIGN TO BE REMOVED STREETLIGHT POWERPOLE SERVICE COVER CATCHPIT NEW SIGNAL POST EXISTING TREE REMOVE / PRUNE EXISTING TREE EXISTING FENCE NEW FENCE
AutoCAD SHX Text
0
AutoCAD SHX Text
15m
AutoCAD SHX Text
5
AutoCAD SHX Text
10
AutoCAD SHX Text
SCALE 1:500 @ A3 SIZE
AutoCAD SHX Text
EXCAVATE BERM AND BREAKOUT EXISTING FOOTPATH. CONSTRUCT NEW 100mm THICK 20MPa CONCRETE FOOTPATH WITH BROOM FINISH ON 100mm AP40 BASECOURSE AND AS PER ATCOP FP001; REGRADE GRASS BERM AS REQUIRED
AutoCAD SHX Text
INSTALL NEW TOPSOIL WITH GRASS SEED BATTER BERM. TO TIE INTO FINISHED LEVELS
AutoCAD SHX Text
REMOVE EXISTING TREE. COUNCIL ARBORIST TO BE CONSULTED
AutoCAD SHX Text
BREAKOUT AND REMOVE EXISTING KERB AND CHANNEL. INSTALL NEW EXTRUDED TYPE 3 STANDARD KERB AND CHANNEL WITH SUBSOIL DRAIN AS PER ATCOP STANDARD DETAIL GD009
AutoCAD SHX Text
INSTALL NEW TOPSOIL WITH GRASS SEED. BATTER BERM TO TIE INTO FINISHED LEVELS
AutoCAD SHX Text
EXCAVATE BERM AND BREAKOUT EXISTING FOOTPATH. CONSTRUCT NEW 100mm THICK 20MPa CONCRETE FOOTPATH WITH BROOM FINISH ON 100mm AP40 BASECOURSE AND AS PER ATCOP FP001; REGRADE GRASS BERM AS REQUIRED
AutoCAD SHX Text
CONSTRUCT NEW 3m WIDE PRAM CROSSING WITH WARNING AND DIRECTIONAL TACTILE PAVERS AS PER ATCOP STANDARD DETAIL FP009 (GRADE AT 1 IN 12)
AutoCAD SHX Text
RESURFACE PAVEMENT SURFACE (PEDESTRIAN CUT-THROUGH) WITH 25mm(MIN) MIX10 (TNZ-M/10) BLACK ASPHALTIC CONCRETE AND INSTALL NEW WARNING TACTILE PAVERS. ENSURE PATH IS SLOPING WEST TOWARDS CARRIAGEWAY
AutoCAD SHX Text
BREAKOUT EXISTING TRAFFIC ISLANDS; CONSTRUCT NEW 180mm THICK 20MPa UNREINFORCED EXPOSED MCCALLUM CHIP CONCRETE WITH 3kg/m RED OXIDE 3 RED OXIDE TRAFFIC ISLANDS, MOUNTABLE KERB AND STUB AS PER ATCOP STANDARD DETAIL GD007
AutoCAD SHX Text
BREAKOUT AND REMOVE EXISTING TRAFFIC ISLAND
AutoCAD SHX Text
BREAKOUT AND REMOVE EXISTING PRAM CROSSING. CONSTRUCT NEW 3m WIDE PRAM CROSSING WITH WARNING AND DIRECTIONAL TACTILE PAVERS AS PER ATCOP STANDARD DETAIL FP009 (GRADE AT 1 IN 12)
AutoCAD SHX Text
EXCAVATE BERM AND BREAKOUT EXISTING FOOTPATH. CONSTRUCT NEW 100mm THICK 20MPa CONCRETE FOOTPATH WITH BROOM FINISH ON 100mm AP40 BASECOURSE AND AS PER ATCOP FP001; REGRADE GRASS BERM AS REQUIRED
AutoCAD SHX Text
BREAKOUT AND REMOVE EXISTING PRAM CROSSING. CONSTRUCT NEW 2.5m WIDE PRAM CROSSING WITH WARNING AND DIRECTIONAL TACTILE PAVERS AS PER ATCOP STANDARD DETAIL FP009 (GRADE AT 1 IN 12)
AutoCAD SHX Text
INSTALL NEW CUSTOM SERVICE COVER WITH TACTILE PAVERS CUT INTO PLACE (AS PER RTS14)
AutoCAD SHX Text
PLANT NEW TREES AS PER ARBORIST'S METHODOLOGY
AutoCAD SHX Text
BREAKOUT AND REMOVE EXISTING PRAM CROSSING. CONSTRUCT NEW 2.5m WIDE PRAM CROSSING WITH WARNING AND DIRECTIONAL TACTILE PAVERS AS PER ATCOP STANDARD DETAIL FP009 (GRADE AT 1 IN 12)
AutoCAD SHX Text
INSTALL NEW 4.0m x 0.9m 100mm THICK 20MPa CONCRETE CYCLE RAMP WITH BROOM FINISH ON 100mm GAP40 BASECOURSE. CYCLE RAMP TO BE 1:20 SLOPE AT A 45° TO THE KERB.
AutoCAD SHX Text
INSTALL NEW 1.0m CYCLE HAND RAIL AS PER ATCOP STANDARD DETAIL CD012
AutoCAD SHX Text
INSTALL NEW 4.0m x 0.9m 100mm THICK 20MPa CONCRETE CYCLE RAMP WITH BROOM FINISH ON 100mm GAP40 BASECOURSE. CYCLE RAMP TO BE 1:20 SLOPE AT A 45° TO THE KERB.
AutoCAD SHX Text
BREAKOUT EXISTING VEHICLE CROSSINGS; CONSTRUCT NEW 150mm THICK 20MPa CONCRETE INDUSTRIAL VEHICLE CROSSING WITH BROOM FINISH ON 100mm GAP40 BASECOURSE AS PER ATCOP STANDARD DETAIL GD019
AutoCAD SHX Text
INSTALL NEW WIRE FENCE AS PER ATCOP RR009
AutoCAD SHX Text
INSTALL NEW 4.0m x 0.9m 100mm THICK 20MPa CONCRETE CYCLE RAMP WITH BROOM FINISH ON 100mm GAP40 BASECOURSE. CYCLE RAMP TO BE 1:20 SLOPE AT A 45° TO THE KERB.
AutoCAD SHX Text
BREAKOUT EXISTING VEHICLE CROSSINGS; CONSTRUCT NEW 150mm THICK 20MPa CONCRETE RESIDENTIAL VEHICLE CROSSING WITH BROOM FINISH ON 100mm GAP40 BASECOURSE AS PER ATCOP STANDARD DETAIL GD017
AutoCAD SHX Text
INSTALL NEW KERB BUILDOUT AS PER DETAIL B (REF DWG R5-002). REFER TO DRAWING SET R6 FOR LONG SECTIONS AND CROSS SECTIONS
AutoCAD SHX Text
INSTALL NEW KERB BUILDOUT AS PER DETAIL C (REF DWG R5-003). REFER TO DRAWING SET R6 FOR LONG SECTIONS AND CROSS SECTIONS
AutoCAD SHX Text
INSTALL NEW WIRE FENCE AS PER ATCOP RR009