Institutional Master Plan Notification Form For First Amendment to the Boston University Charles River submitted by: Trustees of Boston University submitted to: Boston Redevelopment Authority prepared by: Fort Point Associates, Inc. July 29, 2013 Boston University 610 Commonwealth Avenue Campus 2013 - 2023 Institutional Master Plan

Upload: lydan

Post on 09-Feb-2017

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Boston University 610 Commonwealth Avenue

Institutional Master Plan Notification FormFor First Amendment to the Boston University Charles River

submitted by: Trustees of Boston University

submitted to: Boston Redevelopment Authority

prepared by: Fort Point Associates, Inc.

July 29, 2013

Boston University610 Commonwealth Avenue

Campus 2013 - 2023 Institutional Master Plan

Page 2: Boston University 610 Commonwealth Avenue
Page 3: Boston University 610 Commonwealth Avenue

BOSTON UNIVERSITY 610 COMMONWEALTH AVENUE

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM FOR FIRST AMENDMENT TO THE BOSTON UNIVERSITY CHARLES RIVER CAMPUS

2013 – 2023 INSTITUTIONAL MASTER PLAN TABLE OF CONTENTS SECTION 1 INTRODUCTION

1.1 INSTITUTIONAL MASTER PLAN PROGRESS 1.2 THE NEED FOR AN IMP AMENDMENT

SECTION 2 BOSTON UNIVERSITY MISSION AND GOALS SECTION 3 PROGRESS ON THE 2013-2023 IMP

3.1 ENROLLMENT 3.2 STUDENT HOUSING

SECTION 4 PROPOSED INSTITUTIONAL PROJECT 4.1 CENTER FOR INTEGRATED LIFE SCIENCES AND ENGINEERING

Page 4: Boston University 610 Commonwealth Avenue
Page 5: Boston University 610 Commonwealth Avenue

SECTION 1

INTRODUCTION

Page 6: Boston University 610 Commonwealth Avenue
Page 7: Boston University 610 Commonwealth Avenue

Introduction1-1

1.0 INTRODUCTION

Boston University (the “University”) was the first university in the City of Boston to prepare an Institutional Master Plan. The first Master Plan was approved in 1986, followed by the second in 1997, third in 2003, and the most recent in 2013. In September of 2011, the University began preparation of the 2013 – 2023 Charles River Campus Institutional Master Plan (the "2013-2023 IMP"). From the fall of 2011 to the fall of 2012, the University undertook a comprehensive planning initiative to define the University’s needs and establish institutional goals for the coming decade and beyond. The 2013-2023 IMP was a product of these strategic planning efforts and responds to the call to strengthen scholarship and research throughout the campus, expand and enhance the College of Arts & Sciences, and improve the residential campus and student life experience. With the support of the Boston University Community Task Force, the 2013-2023 IMP was approved by the Boston Redevelopment Authority (“BRA”) in January 2013 and by the Boston Zoning Commission in February 2013.

The Master Plan development objectives of the University for the 2013-2023 IMP include the completion of seven building projects, involving academic, residential, and research facilities. The purpose of this document is to amend the existing 2013-2023 IMP to include a new building project, the Center for Integrated Life Sciences and Engineering at 610 Commonwealth Avenue. Further details can be found in Section 4.0, Proposed Institutional Project.

1.1 INSTITUTIONAL MASTER PLAN PROGRESS

As the 2013-2023 IMP was approved only six months ago, most of the planned projects have not yet been commenced. However, the Boston University School of Law Building is under construction with the foundation work complete and steel structure being erected. Projects approved in prior IMPs are underway or completed, including the new East Campus Student Services Center, which opened in August 2012, the new Admissions Reception Center, which is now under construction with an anticipated completion date of early 2014, and the New Balance Field at Boston University at 278 Babcock Street, which will be completed in August 2013. Since the 2013-2023 IMP was approved the University has purchased 910 Commonwealth Avenue in Brookline, which was originally listed as a potential development site in the 2013-2023 IMP.

1.2 THE NEED FOR AN IMP AMENDMENT

The Boston University 2013-2023 IMP lists a total of seven building projects in the City of Boston that the University plans to construct over the next decade (see

Page 8: Boston University 610 Commonwealth Avenue

Boston University Institutional Master Plan Notification Form

Introduction 1-2

Sections 5.2 and 5.3 of the 2013-2023 IMP). In the intervening months since the approval of the 2013-2023 IMP, the University has determined that it has a unique opportunity to advance the University's program in the life sciences through the construction of a new laboratory and research building. After considering a number of potential building sites, the University selected 610 Commonwealth Avenue as the preferred location for the Center for Integrated Life Sciences and Engineering. This site is located adjacent to the University's science and engineering campus, allowing for a full interdisciplinary integration with research activities in other science and engineering programs. At this time, no other changes to the approved Institutional Master Plan are proposed.

Page 9: Boston University 610 Commonwealth Avenue

SECTION 2

BOSTON UNIVERSITY MISSION AND GOALS

Page 10: Boston University 610 Commonwealth Avenue
Page 11: Boston University 610 Commonwealth Avenue

Boston University Mission and Goals 2-1

2.0 BOSTON UNIVERSITY MISSION AND GOALS

Boston University is an international, comprehensive, private research university, committed to educating students to be reflective, resourceful individuals ready to live, adapt, and lead in the interconnected world. Boston University is committed to generating new knowledge to benefit society.

The University remains dedicated to its founding principles: that higher education should be accessible to all and that research, scholarship, artistic creation, and professional practice should be conducted in the service of the wider community – local and international. These principles endure in Boston University’s insistence on the value of diversity, in its tradition and standards of excellence, and in its dynamic engagement with the City of Boston and the world.

Boston University comprises a remarkable range of undergraduate, graduate, and professional programs built on a strong foundation of the liberal arts and sciences. With the support and oversight of the Board of Trustees, Boston University, through its faculty, continually innovates in education and research to ensure that it meets the needs of students and an ever-changing world.

In 2007, Boston University completed the “Boston University Strategic Plan – Choosing to be Great”. The plan includes eight concrete goals in support of Boston University’s mission, with each goal being the product of extensive discussions undertaken as a community involving its students, faculty, alumni and friends.

Boston University’s goals include:

1. To support and enhance a world-class faculty whose members are dedicated to teaching and engaged in research, scholarship, and their professions.

2. To continue to develop the special undergraduate educational environment that combines its commitment to a liberal arts and sciences education with professional opportunities, while creating flexible educational opportunities to leverage the depth of the College of Arts and Sciences and our other schools and colleges. To continue its commitment to inclusiveness based on merit for all students, irrespective of race, religion, or economic status, and to raise the financial aid needed to do this.

3. To expand and enhance the College of Arts and Sciences (CAS) as the core of Boston University and its undergraduate programs. Boston University is committed to increasing the number of CAS faculty members and expanding and renewing the College’s facilities.

Page 12: Boston University 610 Commonwealth Avenue

Boston University Institutional Master Plan Notification Form

Boston University Mission and Goals 2-2

4. To enhance the residential campus and student life experience for its undergraduate students in the special urban environment of Boston.

5. To strengthen scholarship and research throughout Boston University by support of key disciplinary graduate programs.

6. To enhance its nationally recognized professional schools and colleges, including Medicine, Management, Law, and Fine Arts. Boston University’s commitments to Medicine, Law, and Management are key to its prominence as a major urban research university. The College of Fine Arts offers a special opportunity for projecting Boston University on campus, in the city, and around the world.

7. To increase its emphasis on interdisciplinary research and graduate education in order to expand its leadership in important fields and the collaborative atmosphere across our campuses.

8. To continue to foster the engagement of Boston University in the city and the world, through public service and by extending the reach of its educational programs, including both study-abroad opportunities for Boston-based students and the creation of new opportunities for students from around the world to experience a Boston University education.

Page 13: Boston University 610 Commonwealth Avenue

SECTION 3

PROGRESS ON THE 2013 – 2023 IMP

Page 14: Boston University 610 Commonwealth Avenue
Page 15: Boston University 610 Commonwealth Avenue

Progress on the 2013-2023 IMP 3-1

3.0 PROGRESS ON THE 2013-2023 IMP

3.1 ENROLLMENT

Since the 2003 IMP and 2010 Amendment/Renewal, there has been a small increase in full-time undergraduate enrollment at the Charles River Campus from 15,064 students in 2002 to 15,419 students in 2012 (see Table 3-1, Full-Time Undergraduate Students). Due to Boston University’s growing prestige and international reputation, the number of interested applicants has increased substantially.

Between the fall of 2013 and fall of 2017, full-time undergraduate enrollment is expected to be relatively static, as shown in Table 3-2, Projected Full-Time Undergraduate Enrollment. Boston University will continue its policy of selectivity throughout the term of this master plan. Consequently, the composition of the enrolled student body will change over time with an increased proportion of continuing and transfer students and a decreased share of incoming freshmen.

Table 3-1, Full-Time Undergraduate Students

Full-Time Undergraduate Students Fall 2010

Actual Fall 2011

Actual Fall 2012

Actual Freshman Class 4,409 4,022 3,877 Continuing and Transfer Students 11,164 11,518 11,542 Total Full-Time Undergraduates 15,573 15,540 15,419 Full-Time Undergraduates Forecast* 15,376 15,311 15,331 # of Students Above (Below) Forecast 197 229 88 % Above (Below) Forecast 1% 1% 1% * Forecast from 2010 IMP Amendment/Renewal

Table 3-2, Projected Full-Time Undergraduate Enrollment

Fall Enrollment Freshman Class Size 2013 15,674 3,800

2014 15,575 3,800

2015 15,577 3,800

2016 15,488 3,800 2017 15,488 3,800

*Forecast data as of April 2012

Page 16: Boston University 610 Commonwealth Avenue

Boston University Institutional Master Plan Notification Form

Progress on the 2013-2023 IMP 3-2

3.2 STUDENT HOUSING

In response to concerns of the City and the surrounding neighborhoods, Boston University has been and remains committed to increasing the amount of on-campus housing available to and occupied by undergraduate students. Boston University was challenged to create housing that would be attractive to upperclassmen who are most likely to reside off campus. Boston University has made great strides in increasing the availability and variety of on-campus housing options. With the construction of two new residential buildings at 10 Buick Street and 33 Harry Agganis Way and a number of other housing and dining improvement projects, including historically sensitive renovation of Bay State undergraduate residences, Boston University has increased the number of students housed on campus from 67% in 1994 to 76% in 2012. See Table 3-3, Students Housed On Campus. Boston University will continue to work toward increasing on-campus housing opportunities.

Table 3-3, Students Housed On Campus

Year (Fall) Enrollment*

Undergraduate Occupancy

Students Needing Housing

Percent Housed

Freshman Class Size

2002 15,064 10,978 14,308 77% 4,560 2003 14,976 10,650 14,059 76% 3,961 2004 15,186 10,746 14,397 75% 4,352 2005 15,690 10,860 14,774 74% 4,209 2006 15,681 10,879 14,678 74% 4,124 2007 15,771 10,675 14,723 73% 4,163 2008 15,540 10,629 14,486 73% 4,131 2009 15,386 10,825 14,288 76% 4,130 2010 15,573 11,128 14,635 76% 4,409 2011 15,540 11,109 14,465 77% 4,022 2012 15,419 10,986 14,486 76% 3,877 *Student enrollment data is reported as of the University’s official mid-semester enrollment census date, and is consistent with Federal and City requirements.

Page 17: Boston University 610 Commonwealth Avenue

SECTION 4

PROPOSED INSTITUTIONAL PROJECT

Page 18: Boston University 610 Commonwealth Avenue
Page 19: Boston University 610 Commonwealth Avenue

Proposed Institutional Project 4-1

4.0 PROPOSED INSTITUTIONAL PROJECT

4.1 CENTER FOR INTEGRATED LIFE SCIENCES & ENGINEERING BUILDING

The 2003 IMP documented the University’s desire to keep pace with the burgeoning bioengineering industry, which was projected to triple in size over the early part of the 21st century. In response, the University constructed a new Life Science and Engineering building at 24 Cummington Mall that opened in 2005. The 188,500 square foot building provides laboratory and research space for the University’s expanding programs. The University’s programs in life sciences and engineering have continued to thrive, which has led to the need for additional research and laboratory space.

This Institutional Master Plan Notification Form for a First Amendment to the 2013 – 2023 IMP, proposes a new Center for Integrated Life Sciences and Engineering (the “Proposed Institutional Project”) at 610 Commonwealth Avenue will provide additional interdisciplinary research space for faculty and students in neuroscience and systems/synthetic biology. See Figure 4-1, Proposed Institutional Project, which identifies the location of the proposed building. The Proposed Institutional Project will be located on the site of an existing surface parking lot that will directly abut the existing Morse Auditorium to the east, existing biology research laboratories to the south, and University open space to the west associated with the College of Communications located at 640 Commonwealth Avenue.

The Proposed Institutional Project an up to 149,500 gross square foot (“gsf”) building with seven occupiable floors above grade plus a basement and a mechanical penthouse. Including the mechanical penthouse, the building envelope will reach a maximum height of 140 feet. While the Proposed Institutional Project is taller than the directly adjacent Morse Auditorium (74’) and the University’s College of Communications (50’), the building is of modest height in comparison to other buildings along Commonwealth Avenue and the science and engineering campus. The School of Management at 595 Commonwealth Avenue (166') and Warren Towers at 700 Commonwealth Avenue (196') are significantly higher. The University’s nearby Department of Biomedical Engineering located at 44 Cummington Mall reaches a height of 121 feet, while the University’s Life Science and Engineering Building located at 24 Cummington Mall reaches a height of 167 feet.

The University’s intent is to respect the historical integrity of 600 Commonwealth Avenue (Morse Auditorium) and enable future, improved access to the auditorium in a way that may also enhance the functionality of 600 Commonwealth Avenue as a meeting space. The seven floors above grade will include an array of space for research and collaboration. The mechanical penthouse above the seventh floor will

Page 20: Boston University 610 Commonwealth Avenue

Boston University Institutional Master Plan Notification Form

Proposed Institutional Project 4-2

be used to house the machinery necessary to support the new research space. The average floor-to-floor height will be around 15 feet, excluding the mechanical penthouse, which will have an estimated height of 30 feet.

Location: 610 Commonwealth Avenue

Site Size: +/- 23,000 square feet

Existing Use: Surface parking lot

Proposed Use: University use, including academic, research, office and administrative uses

Proposed Maximum Height: 140 feet

Proposed Maximum Building Area: 149,500 gross square feet

Proposed Maximum FAR: 5.1

Current Zoning: H-4

Page 21: Boston University 610 Commonwealth Avenue

610 Commonwealth AvenueBoston, MA

Trustees of Boston University IMP Notification Form

ESSE

X

MASON STREET

ROAD

EUSTON

STR

EET

LENOX STREET

STR

EET

MOUNTFORT

BOSTONBROOKLINE

UN

IVER

SIT

Y R

OA

D

SOLDIERS FIELD ROAD

BO

STON

UN

IVER

SITY

BR

IDG

E

MU

DD

Y

BOYL

STO

N

ST. M

AR

Y'S

CA

RLT

ON

MEDFIELD

MO

NM

OU

TH CO

URT

MONMOUTH

STREET

METR

OPOLITAN TR

ANSIT A

UTHORITY A

ND ALB

ANY RAILROAD

BOSTO

N

BROO

KLINE

MUDDY RIV

ER

STREET

BUSWELL

ST. MARY'S COURT

STREET

STREET

STREET

STREET

KESWICK STREET

ST. MARY'S

PARK DRIVE

CIRCLE

AUDUBON

DRIVE

ABERDEEN

STREET

BOYLSTON

BRO

OKL

INE

STREET

PETERBOROUGH

STREET

KILMARN

OCK

FULLERTON

STREET STRE

ET

MIN

ER STREET

VAN NESS WAY

YAWKEY

QUEENSBERRY

PARK

STREET

MUDDY RIVER

BOYLSTON

STREET

DR

IVE

IPSWICH

STREET

STREET

BACK

BAY

FEN

S

BAY

FEN

WA

Y

BAY STATE

WA

Y

CU

MM

ING

TON

STR

EET

MASSACHUSETTS

STREET

STR

EET

STREET

BO

STO

NB

RO

OK

LINE

MOUNTFORT

STREET

PARK ARUN

DEL STREET

NEW YORK CENTRAL RAILROAD

TURNPIKE

CUMMINGTON

BABBITT STREET

GR

AN

BY

STR

EET

COMMONWEALTH

HIN

SDA

LE

AVEN

UE

BLA

ND

FOR

D S

TREE

T

BEACON STREET

MAITLAN

D STREET

STREET

STREET

BRO

OKL

INE

SILB

ER

AVENUE

BAY STATE ROAD

KENMORESQUARE

DEERFIELD

STREET

STORROW DRIVE BACK STREET

STORROW

DRIVE

CH

AR

LESGA

TE

RIVERROAD

BOSTON

IPSWICH STREET

IPSW

ICH

STRE

ET

NEWBURY

STRE

ET

BA

CK

CHARLESGATE EAST

KEN

MO

RE

STREET STREET

COMMONWEALTH AVENUE

STREET

COMMONWEALTH AVENUE

BEACON

WEST

TURNPIKE EXTENSION

EAST

CH

AR

LESGA

TE

(EASTBOUND)

(WESTBOUND)

MASS AVE

BACK

RA

LEIGH

STREET

MU

DD

Y

MARLBOROUGH

STREET

STREET

MBTA BUS

TERMINAL

BA

BC

OC

KST

REE

T

AVENUE

BU

ICK

STR

EET

MASSACHUSETTS TURNPIKE

HA

RR

Y A

GG

AN

IS W

AY

CHARLES RIVER

BEACON

PR

ESC

OT

T

GIBBSSTREET

CO

OLI

DG

E ST

REE

T

MANCHESTER

NA

PLES

STREET

ROAD

BROWNE STREET

STREET

STIL

L ST

REE

T

ROAD

ROA

D

ST. PAU

L

FREEMAN

THATCHER

ST. P

AU

L

STREET

AMO

RY

STREET

POW

ELL

STREET FREEMAN STREET EXTENSION

AM

OR

Y

EWE STREET

STREET

CO

TTA

GE

CHURCHILL STREET

CH

ILTO

N

IVY

WIN

SLO

W R

OA

D

HAMILT

ON ROAD

BRO

OKL

INE

BOST

ON

ABBOTTSFORD

FULLER

OSBORNE ROAD

RO

AD

GARDNER

COM

MO

NWEA

LTH

MA

LVER

N

AVENUE

ALC

OR

N

STREET

ASHFORD

STR

EET

STR

EET

STREET

PLEA

SAN

T

BABC

OC

K STREET

CRO

WN

INSH

IELD

COPLEY STREET

ELBA STREET

ADAMS STREET

STREET

EGMONT

DUMMER

STR

EET

COMMONWEALTH

BOSTONBROOKLINE

CA

RLTON

STREET BRID

GE

STREET

FAR

M

WORTHINGTON

STR

EET

RO

AD

STREET

SQUAREWINTHROP

TOWNOF

BROOKLINE

PLAYGROUND

1110

1080

11001090

1070

24

70

64

68

74

HALL'SPOND

18

12

98

35

40

1110

11201124

1114

1118

1116

222

230

1079

1104

1108

1106

1089

1035

1037

1047

10501090

1082

1086

1066 1056

10651075 1055

1040

1034

1030

1032

240

1022

1024

1028

1016

1018

1020

1039

1045

1027

1033

270

76

217

35

29

38

227

23121

26

3910

35

2721 9 5

222

15

2428 1620

2529 19

12

226

9

115

957

963

961

971

969

975

989

1001

997

1005

241

1010 996 966972 950

936

930 910 900

163

49 39

30

23

58

122

16

9

880

872

874

179

860

870

845

835

499

7476

TEMPLE

18

132

1015

1017

1019

18

1057

1073

10751071

47 49

5553

917

1311

12

1614

1037

3739

10411043

105710551059

10611067

1069

1063

1065

45

4143

1053

1060

1056

1039

59

737169

61

7775

1021

1031

10331035

10291027

1023

1025

74

8078

82

76

24

143

32

101

34

134 22

262830

24

20

920999

10210021517

1026

102871

104810501052

1054

67

1036104410421046

1030

1032

75

232529 27

1024A

1001

1003

100510091011

1013

1007

1008A1008

1014101810161020

1020A10221022A

1024

21

10121010

1004

1006

8995

100 96

111

111101 93

924922100

87

17

464

12

466

923921

126

128

130

124

57

1611

15

17 1614

129

10

14

919

915917

909

68

903

907905

468901

899

458

447

455

460462

457

463

459461

25

45127

19

2321

900

912914918916

910

906908

42

344038 500

504

49

896

867869

879

465

873871875877

12

15

911 14

20

7810

866868872

874

870

864

847849

857

851855853

70

1311

1313

1315

136157

1373184-176

1395

196

1399

200

194

192-186

SEARS AND ROEBUCK 1371

159161

163

138

MARTIN MILMORE

ELEMENTARY SCHOOL1358

105

1360

84 - 100

85

8082

78

7476

S.D.A.72

1325

1341 - 1355

136916

PARKING AREA

1316

1320-1324

1302-1310

1312

72

PARKING AREAPARKING AREA

28

149

155

130132

141145

133

25

7843

90

124

1295

PARKING AREA

1309

13031305 1301

1299

1279

19

1290

51

26

4036

107111

105

108

35112

32

3731

29

65

20

24

25

16

61

55

50

86

46

3640

42

39

82

45 41

7835

31

21

15

19

11

41

35

3129

2725

1261

1256

126412701268

1266

1274

12841286

1282

1280

1272

1271

126012581262

1265

11

15

115

1

12541252

1250

1245

2

20

125112551253

203

FIR

E A

LAR

M H

EAD

QU

AR

TER

S

76

595-603

113

115

117

111

131

135

137

143

145

147

133

11912

1

125

201

838

744

16

121 36 24 1822

131

141

3325 19 1521

138

50

812 24

3735

711

49

35

4543 47

120150 3941 37

15

22

3

2127

3331

29

512

506

24

503

22

515

518

519 100

13

17

509

15

7911

5

96

856858

18

844848

854852

850

842840

6

11A

2 46

86110

112

100 96 7880 7072

111

6064 48

766 750 742

736

738 730

726

728

722

765

745

771

755

763

767

735

685725

710

714

712

718 704

708

700

665

236

264270

232

675

226

214

212

204

202

208

206

210

225233

216

211213

203

209

207

205

640

834832

833829

836

821

806

826830828

820824822

3044 38 28 20

5

2

3

716

693

677665

24

617

619

621

623

627

629

625

635

602

170

168

166

174

172

182

192

194

196

198

200

186

184

188

190

178

176

180

183

195

193

199

197 18

518

718

919

1

179

177

175

181

169

167

165

173

171

152

160

158

156

154

164

162

155

157

161

159

163 15

3

140

139

141

533

560

595 575

645 20

548

540

539

541

537535

565

120

126

124

128

122

129

127

110

116

114

118

112

10

1911

96 88 869294 90 78808284

619

58

99

53-57

97

91 77798183

397

401

395

391

587467

468

530532

536

496 486

470476480478

482484

472474

638636

650

660

654656

648

58

6670 687274

606264 56 632

52

481479483

485

477

495

497

487

491

493

30

475

471469

591589

466 464

461

465463

585583

416390

409

403407405

502501

435

41

59

71 69

75 73 616367 65

532

454347

313735

3339

252927

152119

1723

91113

513511

7

447445449

456455

442440

452450448454

446444

393

451453

523527

535

531

525

441439

437443

515517519521

520

503505509507

512

518

504506608

436438

385383387

389

434432

427429431

433497

499

493491

664

50

500

275

273

32

277

32

285

159

6

590

592

594 586

706

702

698700584 566580

645

25

10

925 915

12

33

928

FENWAY PARK

8

890 888

100

30

29

35

1921

20

45

63

72

34

44

AMORY

1120

1124

1126

11361134

1087

1089

1091/1093

107910851083

1081

291

295

299

68

785

9082

83

845

44

90

485052

39

45

55

47

4143

2

347

775

1

10641077

926

860862

53

25

300

316

120100

278

284

881 871 855949

1019

1023

983

985

940

920

922

916

918

10

24

834846 808

37

143

25

132

10

135

1

287

Student Village Residence III

School of Law

Academic Building

Academic Building Addition

Science and Engineering Research Building

Academic / Administration

Building

Myles Standish Residence Hall Renovation

Center for Integrated Life Sciences and Engineering

AABB

CC

DDEE

FFGG

HH

N

2013 IMP Amendment Notification Form

0

100’ 600’

200’

July 29, 2013

Figure 4-1, Proposed Institutional Projects

Boston University Charles River Campus

Map Legend

610 Commonwealth Avenue

Proposed Institutional Projects

Boston University Properties

Figure 4-1Proposed Institutional Projects

Source: Fort Point Associates, Inc., 2013