Borough of Wyomissing Infrastructure Committee Meeting Agenda February 16, 2021 – 3:00 pm 1. Call to Order 2. Roll Call 3. Public Comment - All public comments shall be related to the subject matter jurisdiction of the Borough Council, Committee, or Board conducting the virtual public meeting, and shall be limited to matters of public concern, official action, or deliberations that are, or may come, before the Borough Council, Committee, or Board. 4. Zoning/Codes Report 5. 2011 Lincoln Drainage Issues McCarthy performed field inspection of pipes from Lincoln to the ponds & upper 3 ponds. Pipes at this time do not need replacement. Sediment accumulation was approximately 10”-15” in all 4 ponds. At this time, the lowest pond outlet pipe and embankment needs repair/replacement. Homeowners are responsible for all pond maintenance. Letters sent to homeowners Owners of 2011 Lincoln are on call to present a cost-share proposal to Borough. 6. Sanitary Sewer A. 2020 Sanitary Sewer Rehabilitation & Televising Project Awarded to Mr. Rehab, Inc. for $159,797.86 on October 13, 2020 Work started January 4 Payment App #1 – Mr. Rehab - $81,498.40; Engineer recommends payment (see attached) B. 2021 Sanitary Sewer Rehabilitation & Televising Project Preparing bid documents C. 2021 Pump Station Project (Berkshire Blvd.) Preparing bid documents DEP Permit Part II 7. Water A. 2021 Water Main Replacement Advertised 1/29 Bids opened 2/11

Upload: others

Post on 28-Apr-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Borough of Wyomissing Infrastructure Committee Meeting

Borough of Wyomissing

Infrastructure Committee Meeting Agenda

February 16, 2021 – 3:00 pm

1. Call to Order

2. Roll Call

3. Public Comment - All public comments shall be related to the subject matter jurisdiction of the

Borough Council, Committee, or Board conducting the virtual public meeting, and shall be

limited to matters of public concern, official action, or deliberations that are, or may come,

before the Borough Council, Committee, or Board.

4. Zoning/Codes Report

5. 2011 Lincoln Drainage Issues

• McCarthy performed field inspection of pipes from Lincoln to the ponds & upper 3 ponds.

• Pipes at this time do not need replacement.

• Sediment accumulation was approximately 10”-15” in all 4 ponds.

• At this time, the lowest pond outlet pipe and embankment needs repair/replacement. Homeowners are responsible for all pond maintenance.

• Letters sent to homeowners

• Owners of 2011 Lincoln are on call to present a cost-share proposal to Borough.

6. Sanitary Sewer

A. 2020 Sanitary Sewer Rehabilitation & Televising Project

• Awarded to Mr. Rehab, Inc. for $159,797.86 on October 13, 2020

• Work started January 4

• Payment App #1 – Mr. Rehab - $81,498.40; Engineer recommends payment (see attached)

B. 2021 Sanitary Sewer Rehabilitation & Televising Project

• Preparing bid documents

C. 2021 Pump Station Project (Berkshire Blvd.)

• Preparing bid documents

• DEP Permit Part II

7. Water

A. 2021 Water Main Replacement

• Advertised 1/29

• Bids opened 2/11

Page 2: Borough of Wyomissing Infrastructure Committee Meeting

Infrastructure Committee Meeting Agenda – February 16, 2021 Page 2

• Barrasso Excavation, Inc. was low bidder at $97,720 for base bid

8. Streets

A. 50/50 Sidewalk Repairs

• Authorized to bid

• Likely to advertise in summer, once resident participation is determined

B. 2021 Street Improvements

• Portion of project in West Reading at the intersection of Hill Av. & 8th Av. to be repaid later – amount to be determined

• Awarded to H&K Group, Inc. (2nd lowest bidder) for $387,409.43.

• Curb payment plan – Borough sent curb notices giving residents time to replace curb prior to April 15, 2021.

• Pre-Construction meeting planned for spring

C. 4th Street Extension/Multi-Modal - Tower Health

• Awarded to Barwis Construction for $1,737,444 on July 14.

• Revised by Change Order 1 to $1,751,325.14 due to PADOT ECMS let/work order #115227 reduced scope & cost.

• Revised by Change Order 2 to $1,763,680.00 mainly for sidewalk changes

• Revised by Change Order 3 to $1,785,481.40 for the addition of stone base

• Roundabout curbing along Innovation Way is under construction.

• Wearing courses scheduled for May 11

• Reimbursement from DCED received on 12/21/20 for $264,770 which included Pay App. # 1 and 2. Engineering invoices have been submitted for reimbursement with payment expected to follow within a few days.

• Payment App #4 – Barwis Construction - $116,938.13

9. YR/Wyo Creek Pedestrian Bridge

• All permits have been obtained for construction, expiring June 30, 2021

• PennDOT has approved including the bridge under the scope of work for the MTF grant and has provided a letter of non-prejudice

• Grant requires PADOT review and authorization to advertise for bids

• May need time extension requested for the DEP permit

10. Public Works Facility

• RAC-P Grant proposal for $1.7 million was submitted August 10, 2020

• Total project amount is $3,546,384

• The Borough did not receive the award.

• Will be resubmitted for 2021 grant round

11. Storm / Flood Damage

• Brandywine/Lincoln pipe-lining rough estimate was $1.2 million.

Page 3: Borough of Wyomissing Infrastructure Committee Meeting

Infrastructure Committee Meeting Agenda – February 16, 2021 Page 3

• Public Works will be installing larger pipes and additional inlets at Lincoln and Brandywine this winter.

• All other drainage improvements are on hold.

12. Verizon – WCF – Solicitor review

• Zoning officer and solicitor draft language for aesthetic regulations (attached for

review and comment)

• PC reviewed at 2/8/21 meeting

13. Wyomissing Area School District – Woodland Road Signal

• The revised agreement has been sent to WASD for execution. The revision removed the language making the WASD responsible for maintenance of the signals.

P:\04_Wyomissing\2021\Mun Infra Comm\Agendas\210216-Infra Agenda.docx - 2/11/2021 2:43:14 PM

Page 4: Borough of Wyomissing Infrastructure Committee Meeting

555 Van Reed Road • Wyomissing, PA 19610 610.373.8001 • www.McCarthy-Engineering.com

MEMORANDUM

TO: JIM BABB, PUBLIC WORKS MANAGER / BOROUGH OF WYOMISSING

FROM: JIM MCCARTHY, P.E.

SUBJECT: 2020 SANITARY SEWER REHABILITATION AND TELEVISING PROJECT

PAYMENT APPLICATION NO. 1

RECOMMENDATION TO PAY

MCCARTHY FILE 200004 07

DATE: FEBRUARY 11, 2021

CC: FILE

Original Project Budget/Amount: $159,797.86 Revised/Contract Amount: N/A

Please be advised that we have received Contractor’s Application of Payment No. 1 from Mr. Rehab, LLC for the above-referenced project. The Payment Application for $81,498.40 is dated February 5, 2021 and includes work completed from January 4, 2021 to February 5, 2021. Based on our review, Wyomissing Borough field observations of the completed work, we have determined that everything is in order; therefore, we recommend payment to Mr. Rehab, LLC in the amount of $81,498.40, as indicated on the Contractor’s “Payment Application.” The contractual retainage for this project to date is $9,055.38 (10 %). The remaining percentage of completion is 50%. Attachment

Page 5: Borough of Wyomissing Infrastructure Committee Meeting
Page 6: Borough of Wyomissing Infrastructure Committee Meeting
Page 7: Borough of Wyomissing Infrastructure Committee Meeting

Bo

rou

gh

of

Wy

om

issi

ng

20

21

Wa

ter

Ma

in R

ep

lace

me

nt

Bid

Op

en

ing

- F

eb

rua

ry 1

1,

20

21

McC

art

hy

En

gin

ee

rin

g

Pro

ject

21

00

04

-5

Pa

ge

1o

f 2

Item

No

.T

yp

eD

escri

pti

on

UN

ITQ

TY

Barr

asso

Excavati

on

, In

c.

Co

nstr

ucti

on

Maste

rs

Serv

ices,

LL

C

All

gyer

En

terp

rises,

LL

C

Passeri

ni

& S

on

s,

Inc.

1B

AS

EM

obili

zation a

nd S

ite P

repara

tion

LS

1$1,8

00.0

0$5,8

00.0

0$2,5

00.0

0$12,0

00.0

0

2B

AS

EB

onds a

nd Insura

nce

LS

1$2,0

00.0

0$1.0

0$6,0

00.0

0$9,0

00.0

0

3B

AS

ET

raff

ic C

ontr

ol and M

ain

tenance

LS

1$500.0

0$3,0

00.0

0$3,0

00.0

0$5,0

00.0

0

4B

AS

EF

urn

ish a

nd insta

ll 6”

Cla

ss 5

2 C

em

ent-

Lin

ed

Pip

e (

DIP

) by

Open T

renchin

gLF

545

$32,7

00.0

0$61,3

94.2

5$40,8

75.0

0$64,3

10.0

0

5B

AS

ET

ie-in to e

xisting 8

” m

ain

inclu

din

g 8

” C

em

ent-

Lin

ed P

ipe (

DIP

), 2

Ductile

Iro

n 4

Fittings w

ith

Concre

te T

hru

st B

locks, 6”

DI G

ate

Valv

e &

Valv

e B

ox,

& 8

”x6”x

6”

DI T

ee @

Monro

e &

Fore

st A

ves.

LS

1$5,9

00.0

0$6,9

00.0

0$10,0

00.0

0$7,0

00.0

0

6B

AS

EF

urn

ish a

nd insta

ll 8”

DIP

tap c

onnection to

exi

sting lin

e w

est @

Wyo

min

g A

v., inclu

din

g o

ne

DI T

ee F

itting, T

hru

st B

lock, one 8

” re

ducer,

and

one 6

" D

I G

ate

Valv

eLS

1$10,4

00.0

0$8,7

50.0

0$9,0

00.0

0$9,0

00.0

0

7B

AS

EC

ut and C

ap e

xisting 8

” W

ate

r M

ain

“T

” w

ith

Megalu

g R

estr

ain

ts &

Thru

st B

lock @

Wyo

min

g

Av.

EA

1$1,9

50.0

0$2,1

00.0

0$3,5

00.0

0$3,5

00.0

0

8B

AS

EF

ill a

bandoned m

ain

ends w

ith c

oncre

teE

A5

$1,5

00.0

0$1,5

00.0

0$17,5

00.0

0$6,0

00.0

0

9B

AS

EF

urn

ish &

insta

ll 6”

bra

nch p

ipin

g, 6”

Valv

e,

6”x

6”x

6”

DI “T

”, &

Thru

st B

lock f

or

connection to

exi

sting f

ire h

ydra

nt

EA

2$9,7

00.0

0$10,0

00.0

0$12,0

00.0

0$9,0

00.0

0

10

BA

SE

Furn

ish a

nd insta

ll 3/4

” C

opper

Serv

ice L

ine

Ext

ensio

nLF

90

$4,5

00.0

0$6,7

50.0

0$5,4

00.0

0$810.0

0

11

BA

SE

Furn

ish a

nd insta

ll 3/4

” S

erv

ice C

ouplin

gE

A13

$1,6

25.0

0$4,9

40.0

0$780.0

0$3,2

50.0

0

12

BA

SE

Furn

ish a

nd insta

ll 3/4

” C

orp

ora

tion S

top

EA

13

$2,9

25.0

0$6,0

45.0

0$3,9

00.0

0$9,7

50.0

0

13

BA

SE

Tre

nch R

esto

ration; F

urn

ish a

nd insta

ll F

lexi

ble

Pavem

ent w

ith S

eal E

dges; In

clu

des 5

” of

25m

m

Bin

der

& 1

.5”

9.5

mm

Wearing C

ours

eS

Y385

$18,4

80.0

0$29,2

60.0

0$33,8

80.0

0$23,1

00.0

0

14

BA

SE

Flo

wable

Fill

(N

ot in

dra

win

g, as d

irecte

d b

y

Engin

eer/

Ow

ner)

CY

10

$1,2

50.0

0$2,2

00.0

0$1,7

50.0

0$3,0

00.0

0

15

BA

SE

Vert

ical C

urb

, 8”

w, 24”

d to m

atc

h (

Not in

dra

win

g, as d

irecte

d b

y E

ngin

eer/

Ow

ner)

LF

10

$400.0

0$1,2

75.0

0$2,0

00.0

0$2,5

00.0

0

16

BA

SE

Furn

ish a

nd insta

ll 3/4

” C

urb

Sto

p a

nd V

alv

e

Box

Repla

cem

ent (N

ot in

dra

win

g, as d

irecte

d

by

Engin

eer/

Ow

ner)

EA

1$390.0

0$1,0

00.0

0$750.0

0$900.0

0

Page 8: Borough of Wyomissing Infrastructure Committee Meeting

Bo

rou

gh

of

Wy

om

issi

ng

20

21

Wa

ter

Ma

in R

ep

lace

me

nt

Bid

Op

en

ing

- F

eb

rua

ry 1

1,

20

21

McC

art

hy

En

gin

ee

rin

g

Pro

ject

21

00

04

-5

Pa

ge

2o

f 2

Item

No

.T

yp

eD

escri

pti

on

UN

ITQ

TY

Barr

asso

Excavati

on

, In

c.

Co

nstr

ucti

on

Maste

rs

Serv

ices,

LL

C

All

gyer

En

terp

rises,

LL

C

Passeri

ni

& S

on

s,

Inc.

17

BA

SE

Furn

ish a

nd insta

ll 1”

Copper

Serv

ice L

ine (

Not

in d

raw

ing, as d

irecte

d b

y E

ngin

eer/

Ow

ner)

LF

10

$1,2

50.0

0$770.0

0$700.0

0$180.0

0

18

BA

SE

Furn

ish a

nd insta

ll 1”

Serv

ice C

ouplin

g; (N

ot in

dra

win

g, as d

irecte

d b

y E

ngin

eer/

Ow

ner)

EA

1$125.0

0$1,6

50.0

0$65.0

0$300.0

0

19

BA

SE

Furn

ish a

nd insta

ll 1”

Corp

ora

tion S

top (

Not in

dra

win

g, as d

irecte

d b

y E

ngin

eer/

Ow

ner)

EA

1$325.0

0$860.0

0$310.0

0$1,0

00.0

0

20

ALT

Insta

ll 8”

Insert

ion V

alv

e w

ith V

alv

e B

ox

@

Gre

enw

ood M

all

EA

2$16,8

00.0

0$24,3

00.0

0$25,5

00.0

0$36,0

00.0

0

21

ALT

Rem

ove V

alv

e/V

alv

e S

tem

/Box

& L

id &

Backfill

@ G

reenw

ood M

all

EA

2$1,0

00.0

0$3,6

50.0

0$7,0

00.0

0$1,5

00.0

0

22

ALT

Cut &

cap e

xisting W

ate

r M

ain

“T

” (6

” sid

e)

with

Megalu

g R

estr

ain

ts &

Thru

st B

lock @

Gre

enw

ood M

all

EA

2$2,6

00.0

0$3,7

60.0

0$9,0

00.0

0$7,0

00.0

0

$97,7

20.0

0$154,1

95.2

5$153,9

10.0

0$169,6

00.0

0

$118,1

20.0

0$185,9

05.2

5$195,4

10.0

0$214,1

00.0

0

Em

pire S

erv

ices

Eagle

Contr

acting, In

c.

TO

TA

L B

ase B

id -

Ite

ms 1

th

rou

gh

19

Ad

dit

ion

al B

idd

ers

:

TO

TA

L A

ll O

pti

on

s

Page 9: Borough of Wyomissing Infrastructure Committee Meeting

345,966.38

297,928.98

0.00

0.00

345,966.38

48,037.40

Page 10: Borough of Wyomissing Infrastructure Committee Meeting

1 2 3 4 5 6 7 8 9 10

11

12

13

14

15

16

17

18

19

20

21

22

23

AB

CD

EF

GH

IJ

K

4th

Str

eet

Exte

nsio

n W

yo

miisin

g

No

.

PA

DO

T

co

de

De

sc

rip

tio

n:

CO

Re

v

Qty

Un

it

Ori

gin

al U

nit

Pri

ce

Ad

jus

ted

Ba

rwis

To

tal

Co

mp

lete

d

Qty

Pre

vio

us

Ap

pl

Co

mp

lete

d

Am

t

Pre

vio

us

Ap

pl

Co

mp

lete

d

Qty

Th

is

Pe

rio

d

Co

mp

lete

d

Am

t T

his

pe

rio

dT

ota

l

BA

SE

10

20

1-0

00

1C

LE

AR

ING

AN

D G

RU

BB

ING

1E

A$

4,2

17

.52

4,2

17

.52

$

1.0

0$

4,2

17

.52

0.0

0$

0.0

0

29

20

1-0

00

1

CL

EA

RIN

G A

ND

GR

UB

BIN

G (

LE

VE

L / G

RA

DE

/ R

EM

OV

E

ST

ON

E)*

50

5S

Y$

12

.24

6,1

81

.20

$

50

5.0

0$

6,1

81

.20

0.0

0$

0.0

0

40

20

3-0

00

1C

LA

SS

1 E

XC

AV

AT

ION

30

CY

$4

6.0

71

,38

2.1

0$

16

.00

$7

37

.12

0.0

0$

0.0

0

50

20

3-0

00

4C

LA

SS

1B

EX

CA

VA

TIO

N2

07

CY

$5

8.8

11

2,1

73

.67

$

$0

.00

0.0

0$

0.0

0

60

31

3-0

52

8

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, B

AS

E

CO

UR

SE

, P

G 6

4S

-22

, 3

TO

< 1

0 M

ILL

ION

ES

AL

s, 2

5.0

MM

MIX

, 7

" D

EP

TH

33

6S

Y$

32

.82

11

,02

7.5

2$

$0

.00

0.0

0$

0.0

0

70

35

0-0

10

8S

UB

BA

SE

8"

DE

PT

H (

NO

. 2

A)

35

6S

Y$

13

.76

4,8

98

.56

$

14

.00

$1

92

.64

0.0

0$

0.0

0

84

41

3-0

19

5

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, W

EA

RIN

G

CO

UR

SE

, P

G 6

4S

-22

, <

0.3

MIL

LIO

N E

SA

LS

, 9

.5 M

M M

IX,

1"

DE

PT

H, S

RL

-L5

05

SY

$7

.98

4,0

29

.90

$

$0

.00

0.0

0$

0.0

0

90

41

3-0

29

8

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, W

EA

RIN

G

CO

UR

SE

, P

G 6

4S

-22

, 3

TO

< 1

0 M

ILL

ION

ES

AL

S, 9

.5 M

M

MIX

, 1

1/2

" D

EP

TH

, S

RL

-H5

98

SY

$8

.68

5,1

90

.64

$

$0

.00

0.0

0$

0.0

0

10

04

13

-60

30

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, B

IND

ER

CO

UR

SE

, P

G 6

4S

-22

, <

0.3

MIL

LIO

N E

SA

LS

, 2

5.0

MM

MIX

, 3

" D

EP

TH

50

5S

Y$

15

.37

7,7

61

.85

$

57

8.0

0$

8,8

83

.86

0.0

0$

0.0

0

11

04

13

-60

55

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, B

IND

ER

CO

UR

SE

, P

G 6

4S

-22

, 3

TO

< 1

0 M

ILL

ION

ES

AL

S, 1

9.0

MM

MIX

, 2

1/2

" D

EP

TH

33

6S

Y$

12

.84

4,3

14

.24

$

$0

.00

0.0

0$

0.0

0

12

04

60

-00

01

BIT

UM

INO

US

TA

CK

CO

AT

59

8S

Y$

0.4

12

45

.18

$

$0

.00

0.0

0$

0.0

0

14

05

01

-00

20

PL

AIN

CE

ME

NT

CO

NC

RE

TE

PA

VE

ME

NT

, 4

" D

EP

TH

53

SY

$1

04

.94

5,5

61

.82

$

$0

.00

0.0

0$

0.0

0

15

06

08

-00

01

MO

BIL

IZA

TIO

N1

EA

$1

5,3

35

.00

15

,33

5.0

0$

0.6

0$

9,2

01

.00

0.0

0$

0.0

0

16

06

30

-00

01

PL

AIN

CE

ME

NT

CO

NC

RE

TE

CU

RB

, 2

4"

18

9L

F$

53

.12

10

,03

9.6

8$

25

4.0

0$

13

,49

2.4

80

.00

$0

.00

17

06

33

-02

25

PL

AIN

CO

NC

RE

TE

MO

UN

TA

BL

E C

UR

B, T

YP

E B

56

LF

$5

7.8

33

,23

8.4

8$

$0

.00

0.0

0$

0.0

0

18

06

76

-00

01

CE

ME

NT

CO

NC

RE

TE

SID

EW

AL

K1

75

SY

$9

2.7

51

6,2

31

.25

$

$0

.00

0.0

0$

0.0

0

19

06

86

-00

10

CO

NS

TR

UC

TIO

N S

UR

VE

YIN

G, T

YP

E A

1E

A$

6,4

00

.00

6,4

00

.00

$

0.5

0$

3,2

00

.00

0.0

0$

0.0

0

20

06

95

-00

04

DE

TE

CT

AB

LE

WA

RN

ING

SU

RF

AC

E, P

OL

YM

ER

CO

MP

OS

ITE

60

SF

$4

3.2

92

,59

7.4

0$

$0

.00

0.0

0$

0.0

0

21

08

67

-00

12

CO

MP

OS

T F

ILT

ER

SO

CK

, 1

2"

DIA

ME

TE

R3

16

LF

$7

.04

2,2

24

.64

$

26

6.0

0$

1,8

72

.64

0.0

0$

0.0

0

22

99

01

-00

01

MA

INT

EN

AN

CE

AN

D P

RO

TE

CT

ION

OF

TR

AF

FIC

*1

EA

$3

5,0

80

.00

35

,08

0.0

0$

0.5

0$

17

,54

0.0

00

.00

$0

.00

Ap

plicati

on

#4

Peri

od

to

:1/3

1/2

021

Page 11: Borough of Wyomissing Infrastructure Committee Meeting

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

AB

CD

EF

GH

IJ

K

23

09

31

-00

01

PO

ST

MO

UN

TE

D S

IGN

S, T

YP

E B

10

1S

F$

38

.09

3,8

47

.09

$

$0

.00

0.0

0$

0.0

0

24

09

35

-00

01

PO

ST

MO

UN

TE

D S

IGN

S, T

YP

E F

25

SF

$1

1.5

42

88

.50

$

$0

.00

0.0

0$

0.0

0

25

09

36

-02

00

ST

RU

CT

UR

E M

OU

NT

ED

FL

AT

SH

EE

T A

LU

MIN

UM

SIG

NS

63

SF

$6

0.0

23

,78

1.2

6$

$0

.00

0.0

0$

0.0

0

26

09

55

-19

50

TR

AF

FIC

SIG

NA

L H

EA

D P

RO

GR

AM

MA

BL

E L

OU

VE

R1

EA

$1

55

.83

15

5.8

3$

$0

.00

0.0

0$

0.0

0

27

09

56

-07

90

PE

DE

ST

RIA

N P

US

H B

UT

TO

N, W

ITH

IN

DIC

AT

ION

LIG

HT

AN

D T

ON

E2

EA

$4

90

.57

98

1.1

4$

$0

.00

0.0

0$

0.0

0

28

09

51

-01

35

TR

AF

FIC

SIG

NA

L S

UP

PO

RT

, 3

5' M

AS

T A

RM

1E

A$

21

,58

4.0

02

1,5

84

.00

$

$0

.00

0.0

0$

0.0

0

29

09

51

-01

40

TR

AF

FIC

SIG

NA

L S

UP

PO

RT

, 4

0' M

AS

T A

RM

2E

A$

25

,05

0.0

05

0,1

00

.00

$

$0

.00

0.0

0$

0.0

0

30

09

54

-02

01

SIG

NA

L C

AB

LE

, 1

4 A

WG

, 3

CO

ND

UC

TO

R2

40

LF

$1

.39

33

3.6

0$

$0

.00

0.0

0$

0.0

0

31

49

56

-08

01

OP

TIC

AL

PR

EE

MP

TIO

N S

YS

TE

M, M

OD

IFIE

D*

1E

A$

1,5

60

.00

1,5

60

.00

$

$0

.00

0.0

0$

0.0

0

32

09

54

-02

02

SIG

NA

L C

AB

LE

, 1

4 A

WG

, 5

CO

ND

UC

TO

R2

95

LF

$1

.44

42

4.8

0$

$0

.00

0.0

0$

0.0

0

33

09

55

-28

05

VE

HIC

UL

AR

SIG

NA

L H

EA

D, T

HR

EE

8"

SE

CT

ION

S (

LE

D)

1E

A$

74

0.0

07

40

.00

$

$0

.00

0.0

0$

0.0

0

34

09

55

-32

08

VE

HIC

UL

AR

SIG

NA

L H

EA

D, T

HR

EE

12

" S

EC

TIO

NS

(LE

D)

4E

A$

89

5.0

03

,58

0.0

0$

$0

.00

0.0

0$

0.0

0

35

09

56

-00

01

DE

TE

CT

OR

LE

AD

IN

CA

BL

E1

50

LF

$1

.21

18

1.5

0$

$0

.00

0.0

0$

0.0

0

36

09

56

-01

01

LO

OP

SE

NS

OR

11

0L

F$

13

.85

1,5

23

.50

$

$0

.00

0.0

0$

0.0

0

37

09

56

-01

21

LO

OP

AM

PL

IFIE

R, 1

CH

AN

NE

L, S

HE

LF

MO

UN

TE

D W

ITH

TIM

ER

1E

A$

34

7.0

03

47

.00

$

$0

.00

0.0

0$

0.0

0

38

09

60

-00

05

6"

WH

ITE

HO

T T

HE

RM

OP

LA

ST

IC P

AV

EM

EN

T

MA

RK

ING

S3

10

LF

$3

.46

1,0

72

.60

$

$0

.00

0.0

0$

0.0

0

39

09

60

-00

21

24

" W

HIT

E H

OT

TH

ER

MO

PL

AS

TIC

PA

VE

ME

NT

MA

RK

ING

S6

84

LF

$1

1.5

47

,89

3.3

6$

$0

.00

0.0

0$

0.0

0

45

09

62

-10

00

4"

WH

ITE

WA

TE

RB

OR

NE

PA

VE

ME

NT

MA

RK

ING

S1

00

LF

$0

.29

29

.00

$

$0

.00

0.0

0$

0.0

0

46

09

62

-10

01

6"

WH

ITE

WA

TE

RB

OR

NE

PA

VE

ME

NT

MA

RK

ING

S1

10

LF

$1

.15

12

6.5

0$

$0

.00

0.0

0$

0.0

0

47

09

62

-10

05

4"

YE

LL

OW

WA

TE

RB

OR

NE

PA

VE

ME

NT

MA

RK

ING

S6

30

LF

$0

.29

18

2.7

0$

$0

.00

0.0

0$

0.0

0

49

09

63

-00

10

PA

VE

ME

NT

MA

RK

ING

RE

MO

VA

L (

LE

GE

ND

S A

ND

SY

MB

OL

S)

4E

A$

86

.57

34

6.2

8$

$0

.00

0.0

0$

0.0

0

50

09

71

-00

01

RE

MO

VE

PO

ST

MO

UN

TE

D S

IGN

S, T

YP

E B

5E

A$

14

4.2

87

21

.40

$

$0

.00

0.0

0$

0.0

0

51

90

00

-00

01

LA

ND

SC

AP

ING

*1

EA

$3

4,9

00

.00

34

,90

0.0

0$

$0

.00

0.0

0$

0.0

0

52

90

00

-00

02

SIG

NA

L C

ON

TR

OL

LE

R T

IMIN

G A

DJU

ST

ME

NT

*2

EA

$3

,00

0.0

06

,00

0.0

0$

$0

.00

0.0

0$

0.0

0

53

90

00

-00

03

BIK

E R

AC

KS

(5

/ 7

-BIK

E)*

2E

A$

1,6

67

.00

3,3

34

.00

$

$0

.00

0.0

0$

0.0

0

Ba

se

Bid

To

tal

30

2,1

64

.71

$

AL

TE

RN

AT

E 2

57

92

01

-00

02

CL

EA

RIN

G A

ND

GR

UB

BIN

G (

DE

MO

)*1

EA

$9

7,8

49

.89

97

,84

9.8

9$

0.9

0$

88

,06

4.9

00

.10

$9

,78

4.9

9

Page 12: Borough of Wyomissing Infrastructure Committee Meeting

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

AB

CD

EF

GH

IJ

K

58

03

13

-03

22

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, B

AS

E

CO

UR

SE

, P

G 6

4S

-22

, <

0.3

MIL

LIO

N E

SA

Ls, 2

5.0

MM

MIX

, 4

" D

EP

TH

28

30

SY

$1

8.8

55

3,3

45

.50

$

$0

.00

0.0

0$

0.0

0

59

03

50

-01

08

SU

BB

AS

E 8

" D

EP

TH

(N

O. 2

A)

28

30

SY

$1

2.8

73

6,4

22

.10

$

55

0.0

0$

7,0

78

.50

24

21

.00

$3

1,1

58

.27

60

04

13

-01

92

SU

PE

RP

AV

E A

SP

HA

LT

MIX

TU

RE

DE

SIG

N, W

EA

RIN

G

CO

UR

SE

, P

G 6

4S

-22

, <

0.3

MIL

LIO

N E

SA

LS

, 9

.5 M

M M

IX,

1 1

/2"

DE

PT

H, S

RL

-H5

00

0S

Y$

8.2

74

1,3

50

.00

$

$0

.00

0.0

0$

0.0

0

61

04

91

-00

12

MIL

LIN

G O

F A

SP

HA

LT

PA

VE

ME

NT

SU

RF

AC

E, 1

1/2

"

DE

PT

H, M

ILL

ED

MA

TE

RIA

L R

ET

AIN

ED

BY

CO

NT

RA

CT

OR

45

7S

Y$

11

.51

5,2

60

.07

$

$0

.00

0.0

0$

0.0

0

62

06

01

-03

51

12

" T

HE

RM

OP

LA

ST

IC P

IPE

, G

RO

UP

III, 8

'-2

' FIL

L1

30

LF

$7

8.5

61

0,2

12

.80

$

13

0.0

0$

10

,21

2.8

00

.00

$0

.00

63

06

01

-03

59

36

" T

HE

RM

OP

LA

ST

IC P

IPE

, G

RO

UP

III, 8

'-2

' FIL

L7

3L

F$

90

.96

6,6

40

.08

$

73

.00

$6

,64

0.0

80

.00

$0

.00

64

06

05

-26

20

TY

PE

D-W

EN

DW

AL

L2

EA

$2

,55

4.0

05

,10

8.0

0$

2.0

0$

5,1

08

.00

0.0

0$

0.0

0

65

06

05

-27

11

TY

PE

C C

ON

CR

ET

E T

OP

UN

IT A

ND

BIC

YC

LE

SA

FE

GR

AT

E3

SE

T$

1,3

00

.00

3,9

00

.00

$

3.0

0$

3,9

00

.00

0.0

0$

0.0

0

66

06

05

-28

54

TY

PE

4 IN

LE

T B

OX

, H

EIG

HT

< /=

10

'3

EA

$2

,12

7.0

06

,38

1.0

0$

3.0

0$

6,3

81

.00

0.0

0$

0.0

0

67

06

06

-01

50

GR

AD

E A

DJU

ST

ME

NT

OF

EX

IST

ING

MA

NH

OL

ES

6E

A$

52

0.0

03

,12

0.0

0$

$0

.00

0.0

0$

0.0

0

68

06

06

-01

60

GR

AD

E A

DJU

ST

ME

NT

OF

EX

IST

ING

VA

LV

ES

9E

A$

21

8.0

01

,96

2.0

0$

$0

.00

0.0

0$

0.0

0

69

06

08

-00

01

MO

BIL

IZA

TIO

N1

EA

$3

3,8

00

.00

33

,80

0.0

0$

0.5

5$

18

,59

0.0

00

.10

$3

,38

0.0

0

71

06

33

-02

30

PL

AIN

CO

NC

RE

TE

MO

UN

TA

BL

E C

UR

B, R

OU

ND

AB

OU

T

TR

UC

K A

PR

ON

CU

RB

23

5L

F$

56

.05

13

,17

1.7

5$

$0

.00

0.0

0$

0.0

0

72

06

76

-00

01

CE

ME

NT

CO

NC

RE

TE

SID

EW

AL

K9

28

SY

$1

17

.88

10

9,3

92

.64

$

27

5.0

0$

32

,41

7.0

08

4.0

0$

9,9

01

.92

73

96

76

-00

01

CE

ME

NT

CO

NC

RE

TE

SID

EW

AL

K A

DA

CU

RB

RA

MP

S,

MO

DIF

IED

*3

0E

A$

2,6

10

.00

78

,30

0.0

0$

14

.00

$3

6,5

40

.00

1.0

0$

2,6

10

.00

74

08

10

-00

52

SE

LE

CT

TR

EE

RE

MO

VA

L1

0E

A$

1,6

00

.00

16

,00

0.0

0$

10

.00

$1

6,0

00

.00

0.0

0$

0.0

0

75

99

01

-00

01

MA

INT

EN

AN

CE

AN

D P

RO

TE

CT

ION

OF

TR

AF

FIC

*1

EA

$2

4,5

15

.00

24

,51

5.0

0$

0.4

0$

9,8

06

.00

0.1

0$

2,4

51

.50

76

49

31

-00

01

PO

ST

MO

UN

TE

D S

IGN

S, T

YP

E B

(S

TO

P/Y

IEL

D)

13

EA

$2

51

.63

3,2

71

.19

$

$0

.00

0.0

0$

0.0

0

78

90

00

-00

04

RE

MO

VE

/ R

EL

OC

AT

E U

TIL

ITY

PO

LE

(S)

1E

A$

3,9

00

.00

3,9

00

.00

$

1.0

0$

3,9

00

.00

0.0

0$

0.0

0

79

90

00

-00

05

SA

WC

UT

*9

20

LF

$1

.44

1,3

24

.80

$

32

0.0

0$

46

0.8

00

.00

$0

.00

80

90

00

-00

06

LA

ND

SC

AP

ING

*1

EA

$1

33

,18

4.0

01

33

,18

4.0

0$

$0

.00

0.0

0$

0.0

0

81

90

00

-00

07

ER

OS

ION

AN

D S

ED

IME

NT

CO

NT

RO

L*

1E

A$

9,8

85

.00

9,8

85

.00

$

0.7

0$

6,9

19

.50

0.0

0$

0.0

0

82

09

62

-10

05

4"

YE

LL

OW

WA

TE

RB

OR

NE

PA

VE

ME

NT

MA

RK

ING

S4

00

LF

$1

.15

46

0.0

0$

$0

.00

0.0

0$

0.0

0

83

09

60

-11

21

WH

ITE

HO

T T

HE

RM

OP

LA

ST

IC L

EG

EN

D, S

HA

RE

D L

AN

E

MA

RK

ING

24

0E

A$

31

7.4

37

6,1

83

.20

$

$0

.00

0.0

0$

0.0

0

84

90

00

-00

04

BIK

E B

OX

MA

RK

ING

3E

A$

2,3

08

.00

6,9

24

.00

$

$0

.00

0.0

0$

0.0

0

85

90

00

-00

05

BIK

E R

OU

TE

SIG

NS

17

2E

A$

16

3.8

82

8,1

87

.36

$

$0

.00

0.0

0$

0.0

0

86

90

00

-00

06

LIG

HT

FIX

TU

RE

S1

9E

A$

9,8

11

.28

18

6,4

14

.32

$

$0

.00

1.0

0$

9,8

11

.28

Page 13: Borough of Wyomissing Infrastructure Committee Meeting

80

81

82

83

84

85

86

87

88

89

90

91

92

93

94

95

96

97

98

99

100

101

102

103

104

105

106

107

108

109

110

111

AB

CD

EF

GH

IJ

K

88

05

01

-00

20

PL

AIN

CE

ME

NT

CO

NC

RE

TE

PA

VE

ME

NT

, 4

" D

EP

TH

(Me

dia

ns)

10

5S

Y$

74

.51

7,8

23

.55

$

$0

.00

0.0

0$

0.0

0

89

96

05

-28

54

TY

PE

C IN

LE

T M

OD

IFIC

AT

ION

S1

EA

$1

,95

0.0

01

,95

0.0

0$

1.0

0$

1,9

50

.00

0.0

0$

0.0

0

90

02

03

-00

01

CL

AS

S 1

EX

CA

VA

TIO

N6

60

CY

$1

5.3

61

0,1

37

.60

$

66

0.0

0$

10

,13

7.6

00

.00

$0

.00

Alt. 2

To

tal

1,0

16

,37

5.8

5$

AL

TE

RN

AT

E 3

91

90

00

-00

07

BO

LL

AR

DS

, P

ER

DE

SIG

N D

ET

AIL

44

EA

$3

,69

4.0

0$

16

2,5

36

.00

$0

.00

1.0

0$

3,6

94

.00

CO

#1

ne

w ite

ms

06

30

-00

10

18

" C

ON

CR

ET

E C

UR

B1

81

3L

F$

31

.25

56

,65

6.2

5$

12

5.0

0$

3,9

06

.25

15

70

.00

$4

9,0

62

.50

06

33

-02

00

TY

PE

A M

OU

NT

AB

LE

CU

RB

29

3L

F$

57

.83

16

,94

4.1

9$

$0

.00

0.0

0$

0.0

0

05

01

-00

32

PL

AIN

CE

ME

NT

CO

NC

RE

TE

PA

VE

ME

NT

, 1

0"

DE

PT

H

(Tru

ck A

pro

n, R

C-2

1M

/65

M)

24

0S

Y$

17

5.0

04

2,0

00

.00

$

$0

.00

0.0

0$

0.0

0

08

65

-00

01

18

" S

ilt B

arr

ier

Fe

nce

10

2L

F$

5.0

05

10

.00

$

10

2.0

0$

51

0.0

00

.00

$0

.00

08

60

-00

02

Inle

t filte

rs5

EA

$2

75

.00

1,3

75

.00

$

5.0

0$

1,3

75

.00

0.0

0$

0.0

0

Ne

w5

.5"

Mill

& 4

" 2

5m

m b

ase

20

20

SY

$3

6.5

07

3,7

30

.00

$

20

50

.00

$7

4,8

25

.00

0.0

0$

0.0

0

PR

OJE

CT

AC

CE

LE

RA

TIO

N1

LS

$8

0,7

68

.00

80

,76

8.0

0$

0.3

0$

24

,23

0.4

00

.10

$8

,07

6.8

0

CO

#2

ne

w ite

ms

Cu

rb d

em

olit

ion

20

LF

$1

5.0

03

00

.00

$

20

.00

$3

00

.00

0.0

0$

0.0

0

De

pre

sse

d c

urb

(tr

an

siti

on

)8

LF

$4

0.0

03

20

.00

$

8.0

0$

32

0.0

00

.00

$0

.00

Re

pla

ce

C-t

op

with

M-t

op

In

let (2

' x 6

')1

EA

$9

80

.00

98

0.0

0$

1.0

0$

98

0.0

00

.00

$0

.00

Sto

p b

ars

4E

A$

25

0.0

01

,00

0.0

0$

$0

.00

0.0

0$

0.0

0

De

mo

lish

& r

em

ove

larg

e e

xistin

g li

gh

t fixt

ure

1E

A$

2,8

00

.00

2,8

00

.00

$

1.0

0$

2,8

00

.00

0.0

0$

0.0

0

14

' drive

wa

y a

pro

n1

LS

$5

,22

0.0

05

,22

0.0

0$

1.0

0$

5,2

20

.00

0.0

0$

0.0

0

CO

#3

ne

w ite

ms

Ne

w

4"

Su

bb

ase

Re

mo

va

l & P

lace

4' 2

A S

ton

e1

78

7S

Y$

12

.20

21

,80

1.4

0$

17

87

.00

$2

1,8

01

.40

0.0

0$

0.0

0

TO

TA

L1

,78

5,4

81

.40

$

0.0

0$

46

5,8

92

.69

$1

29

,93

1.2

6

CO

#1

NE

T c

ha

ng

e$

13

,88

1.1

4T

ota

l co

mp

[lete

d to

Da

te$

59

5,8

23

.95

CO

#2

NE

T c

ha

ng

e$

12

,35

4.8

6

CO

#3

NE

T c

ha

ng

e$

21

,80

1.4

0

To

tal N

ET

Ch

an

ge

s

$4

8,0

37

.40