Bord na Móna
Biodiversity Action Plan 2016-2021
2018 Updates
Mark McCorry
14 May 2018
2
Objective 1
To continue to carry out all
works in line with
best practice guidelines
and relevant legislation
across all
Bord na Móna bogs
• Planning, Reporting, Policy, Compliance
Objective 1 Planning, Reporting, Policy,
Compliance
3
• Ongoing advisory role to Bord na Móna BUs re regulation &
planning applications
• New Peat Extraction regs
• North Timahoe Solar, etc
• Ongoing Input to National Peatland Strategy,
• Policy – NBAP, Natural Capital, BITC Q Mark
• Ongoing compliance with relevant environmental legislation
• Non-Compliance?
• Continued internal and external training re
ecological issues (Does and Don’ts)
4
Objective 2:
To survey and identify
potential biodiversity
areas within the Bord na
Móna lands
• Baseline ecology survey,
• Identify and fill information gaps,
• Identify network of core areas of high biodiversity value,
monitoring
Marsh Fritillary
Objective 2: To survey and identify potential biodiversity
areas within the Bord na Móna lands
5
• Continued updates to Baseline Ecological
survey
• GIS maps: land use; current habitats;
potential future habitats; potential biodiversity
value maps for all sites surveyed
• 12 bog sites surveyed in 2017
• Additional ecological surveys to inform
planning projects
• Curlew Monitoring
Narrow-leaved
Marsh Orchid
Finnamores
Lough Boora
Discovery Park
2000
Drinagh SE
Footer title goes here7
2004
Drinagh SE
Footer title goes here8
2009
Drinagh SE
Footer title goes here9
2015
Drinagh SE
10
Marsh Fritillary sites on BnM land – 14 different sites …. so far
New sites in 2017
Turraun
Knockahaw
11
Objective 3:
To promote and develop best practice
in terms of rehabilitation plans for all
Bord na Móna bogs to stabilise
former peat production areas and
enhance biodiversity
• Practical rehabilitation
• Rehabilitation trials
• Rehabilitation plans
12
Rehabilitation Plans
• Bi-annual review of draft rehab
plans completed
• As required by IPC Licences
• All draft plans updated
• 132 individual site rehab plan
reports!
• Several draft plans brought to
final stage
• Ballysorrell
• Knockahaw
• Clonwhelan
Footer title goes here13
Bog Rehab type Status Comment
Area
(ha)
Ballycon deep peat Ongoing 8
Daingean Rathdrum deep peat Complete Bog restoration 36
Lullymore wetland Complete Maintenance to outfall - 2017 95
Cavemount wetland Ongoing
Phased over several years - hydrological
management - east side 145
Cashel deep peat Complete Maintenance required 2018 39
Corlea wetland Complete Local issues - wetland maintenance 8
Clongawney deep peat Complete 28
Killeglan peat peat Ongoing
Full time bog restoration - > 75%
complete 200
Clooniff wetland Ongoing
Ammonia trial – direct water into wetland
in 2018 8
Lough Bannow deep peat Complete Buffer area around Lough Bawn pNHA 31
Coolnagun deep peat Complete
Former sod moss area – adjacent to
River Inny 27
Baunmore
wetland/
dryland Ongoing
Rehab trial - dozing across field drains -
1st phase 100
Ballysorrell deep peat Complete Bog restoration 100
Total 756
Rehabilitation Projects/Trials during 2017
Footer title goes here14
Footer title goes here15
Cashel Bog, Co. Laois
Footer title goes here16
Cashel Bog, Co. Laois
Footer title goes here17
Cavemount Bog Co. Offaly
Footer title goes here18
Cavemount Bog Co. Offaly
Footer title goes here19
Lodge Bog, Co. Kildare – re-wetting trial
Joint project with IPCC
Footer title goes here20
Lodge Bog, Co. Kildare – re-wetting trial
Joint project with IPCC
Footer title goes here21
Lodge Bog – Co. Kildare - re-wetting trial
Footer title goes here22
Sphagnum BeadaMoss trial – Bunihinly, Co Westmeath, May 2017
Footer title goes here23
Sphagnum BeadaMoss trial – Bunihinly May 2017
Footer title goes here24
Blackwater (Co. Offaly) Reedbed trial – 2011
Footer title goes here25
Blackwater (Co. Offaly) Reedbed trial – 2017
Footer title goes here26
Japanese Knotweed Control – Attymon (Co. Galway) 2017
Footer title goes here27
Littleton Rehabilitation
• Lanespark Briquette Factory
closure
• 10 bog units – 4200 ha
• Continued peat production in
Killeens
• Decommissioning and
rehabilitation of remaining sites
• Cutaway re-wetting, where
possible
• Bog restoration where possible
Footer title goes here28
Bruckana
Windfarm
potential for
further
industrial
development?
Littleton Rehabilitation
• Rehab plan drafted for Littleton
• Internal consultation
• Consideration of future land-use
• External circulation of plan –
Summer 2018
• Site visits?
• Timeframe – 3 years
• Initial rehab
trials/implementation
• Phased approach
• BAP Review Feb 2019 - Littleton
Footer title goes here29
Knockahaw Bog, Tipperary/Laois
Bog Restoration
Biodiversity Area
Footer title goes here30
Carrickhill Bog, Co. Tipperary
• Carrickhill
• Typical site
• Pumped drainage
• Bare peat
• Some deep peat
• Variable topography
• Re-wetting peat, where
possible
Footer title goes here31
Carrickhill Bog, Co. Tipperary
Footer title goes here32
Ballysorrell, Littleton, Bog restoration
De-commisioning
Bog restoration at
Ballysorrell
Co. Tipperary
High bog area 100 ha
Overall area 190 ha
Was in milled peat
production in the past
Footer title goes here33
• Two new 8 Tonne Kobelco
excavators ordered in 2017
• Currently being modified for
bog works (track widening)
• One complete – ready to
start now at Clonwhelan
• Brings number of ‘small’
Bord na Móna wide track
excavators dedicated to bog
restoration to 3
• Projected progress - from
150 ha/year to 450 ha per
year
Bog restoration
Objective 4: Communications34
Objective 4
To raise awareness
and create a greater
appreciation of the
biodiversity and
natural heritage of
Bord na Móna
cutaway bogs and
associated lands
Bog of Allen Wildlife Event – 2018
Hosted by IPCC
Footer title goes here35
Government Minister’s visit to Ballydangan – October
Footer title goes here36
Footer title goes here37
Heritage Week – August 2017 Body and Soul!
ONFC – Finnamores - June
38
NBDC – Field Course at Boora - June
Midlands Science Festival – Mountlucas - October
Irish Garden Plant Association - May
Footer title goes here39
Bog of Allen Wildlife Awareness event – Lullymore – July 2017
Footer title goes here40
Botanic Gardens – Bog Garden supplied by Ballycon
Derrygreenagh – not cutting the grass for pollinators
Signage at Lullymore
Art Installation at Derries Bog, LBDP
41
Thank you