boq type 72 permata kemang residence

Upload: j

Post on 06-Jul-2018

228 views

Category:

Documents


3 download

TRANSCRIPT

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    1/78

    DAFTAR HARGA SATUAN BAHAN BANGUNAN

    NO MATERIAL SAT HARGA (Rp)

    A. AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA

    1 Pasir Urug m3 175,300.00

    2 Tanah Urug Pilihan m3 89,200.00

    3 Sirtu m3 203,500.00

    4 Pasir Teras m3 174,200.00

    5 Pasir Pasang Kali m3 233,400.00

    6 Pasir Betn m3 255,400.00

    7 !"u Batu m3 259,000.00

    8 Batu #s$ % !&ung ' $g 29,600.00

    9 Batu Pe(ah )esin 1*2 m3 223,600.00

    10 Batu Pe(ah )esin 2*3 m3 211,100.00

    11 Batu Pe(ah )esin 3*5 m3 205,000.0012 Batu Pe(ah )esin 5*7 m3 196,000.00

    13 Batu Belah Pn+asi m3 205,500.00

    14 Batu Brnl % Untu$ Brnng ' m3 180,800.00

    15 Batu Kral Betn Kali m3 172,600.00

    16 Batu Tem&el -itam m3 96,600.00

    17 Batu Pinggir Betn 10 20 35 "h 14,100.00

    18 Batu Pinggir Betn 15 35 50 % K/225 ' "h 73,700.00

    19 Batu Telr m3 97,800.00

    20 Bata$ Ke(il 8 10 20 "h 2,000.00

    21 Bata$ Besar 8 20 30 "h 2,400.00

    22 n Bl$ 8 20 40 "h 5,400.00

    23 Bata )erah Ba$ar $elas "h 775.0024 Bata )erah Ba$ar $elas "h 675.00

    25 Bata )erah en % Kling$er ' "h 1,800.00

    26 ster Betn 20 20 "h 14,800.00

    27 ster Betn 30 30 "h 15,500.00

    28 #rass Bl$ 20 20 "h 9,700.00

    29 #rass Bl$ 30 30 "h 22,500.00

    30 Paing Bl$ atural 8 (m m2 81,100.00

    31 Paing Bl$ arna 8 (m m2 108,600.00

    32 Paing Bl$ atural 6 (m m2 76,000.00

    33 Paing Bl$ arna 6 (m m2 86,000.00

    34 anstin Paing Bl$ m1 34,900.00

    35 Semen P *50 $g a$ 70,300.001,406.00

    36 Semen Putih a$ 92,700.00

    37 Kanstin alan U$uran Besar % Bina )arga ' 1"h 60(m "h 58,900.00

    38 ea+:mi Betn K500, Tan&a Pm&a % Selang ' m3 1,105,000.00

    39 ea+:mi Betn K400, Tan&a Pm&a % Selang ' m3 903,500.00

    40 ea+:mi Betn K350, Tan&a Pm&a % Selang ' m3 877,500.00

    41 ea+:mi Betn K300, Tan&a Pm&a % Selang ' m3 925,000.00

    42 ea+:mi Betn K225, Tan&a Pm&a % Selang ' m3 850,000.00

    43 ea+:mi Betn K175, Tan&a Pm&a % Selang ' m3 825,000.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    2/78

    44 Ka&ur Pasang * Ka&ur Tem"$ m3 353,300.00

    45 Ka&ur Sirih $g 18,300.00

    46 Semen arna $g 15,700.00

    47 Tanah liat m3 31,300.00

    48 !ir ltr 3.00

    49 ;rmite*s&a(er "h 2,500.00

    50 -lln ?an ?in+ing ' lt 75,000.00

    4 at Tem"$ @inile $g 25,000.00

    5 at ?asar untu$ nterir % 2 Pela&is ' lt 75,000.00

    6 at Tem"$ Sanle$ $g 20,000.00

    7 at ?asar $g 30,000.00

    8 at Tahan !sam lt 40,000.00

    9 Pela&is !l$ali % at ?asar Betn =$terir ' $g 90,000.0010 at )ar$a * S&tlight $g 185,000.00

    11 ater Pr>ing =mulsin ml 70,000.00

    12 ater Pr>ing )em"ran(e "h 62,500.00

    13 l at Tem"$ "h 32,500.00

    14 Ka&e Tem"$ "h 8,500.00

    15 Ka&e Ka:u 5 lt 10,000.00

    16 Sligneum 1 Ble$ $g 25,000.00

    17 Plin(te m3 29,000.00

    18 Penara % + ;iller ' lt 37,700.00

    29 ?em&ul a+i $g 35,800.00

    30 Plitur lt 48,000.00

    31 Plitur a+i lt 112,700.00

    32 Ter&entin $g 19,500.00

    33 Tiner ! $g 23,900.0034 Tiner B $g 21,400.00

    35 Kum&n l"r 30,800.00

    36 )elami$ $g 52,500.00

    37 ?em&ul Plasti$ $g 39,200.00

    38 ?em&ul ?u( $g 35,800.00

    39 !m&elas l"r 5,000.00

    40 ?em&ul Ka:u a& Ku(ing $g 24,400.00

    41 )eni Ka:u * Besi $g 30,400.00

    42 Sin(rmat $g 40,900.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    3/78

    43 at Ka:u Siee lt 41,700.00

    44 at Besi lt 44,000.00

    45 at Besi ?u( ?anagls * "h 76,300.00

    46 at Brn $g 67,700.00

    47 Karet lis "h 3,300.00

    48 )in:a$ (at $g 38,400.00

    49 #lass "eet $g 50,100.00

    50 esi+u lt 8,100.00

    C BAHAN KAYU BERIKUT BAHAN JADINYA

    1 Bam"u 5 s.+ 7 "t 17,700.00

    2 Bam"u 7 s.+ 10 "t 25,000.00

    3 Bam"u #m"ng "t 37,200.00

    4 Ka:u Kam&er Sing$il * Ka&ur % Ka:u Samarin+a $ls ' m3 7,094,450.00

    5 Ka:u Bal$ Brne Su&er m3 5,280,000.00

    6 Ka:u Pa&an Brne Su&er m3 5,595,800.00

    7 Ka:u Bal$ Kam&er )e+an %Kruing ' m3 5,692,600.00

    8 Ka:u Pa&an Kam&er )e+an %Kruing ' m3 5,823,400.00

    9 Ka:u Bal$ Kam&er Banar m3 6,363,600.00

    10 Ka:u Pa&an Kam&er Banar m3 6,645,300.0011 Ka:u Bal$ Kam&er Samarin+a m3 8,633,700.00

    12 Ka:u Pa&an Kam&er Samarin+a m3 8,724,300.00

    13 Ka:u Bal$ asamala m3 2,658,000.00

    14 Ka:u ati atim Tua +ia. 40 (m m3 20,772,000.00

    15 Ka:u ati ateng Tua +ia. 40 (m m3 22,188,400.00

    16 Ka:u ati a"ar Tua +ia. 40 (m m3 13,625,400.00

    17 Ka:u ati a"ar Tua +ia. 40 (m $e"a

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    4/78

    44 is&lang a+i 0,10 2,44 l"r 18,500.00

    D BAHAN PENUTUP RANGKA PLAFOND

    1 Pla>n+ =nternit 4 mm m2 17,400.00

    2 Pla>n+ har+&le$s 5 mm 120 240 l"r 62,400.00

    3 Pla>n+ !s"es Semen 5 mm m2 22,500.00

    4 Pla>n+ !s"es Semen 3,5 mm m2 19,500.00

    5 #:&sum 120 240 t 9 mm e ? l"r 79,800.006 #:&sum 120 240 t 9 mm e uar l"r 83,800.00

    7 Te&ung g:&sum $g 12,500.00

    8 !(usti$ !mstrng 60 120 l"r 132,800.00

    9 ttn Plester "h 15,000.00

    10 # %120 240' (m, t 4 mm l"r 67,500.00

    11 rni(e um&un+ a$ 75,000.00

    12 ist g:&sum mC 8,500.00

    E BAHAN KAYU LAPIS

    1 Tri&le$ 3 mm 120 240 l"r 61,700.00

    2 Tri&le$ 4 mm 120 240 l"r 64,400.00

    3 Tri&le$ 4 mm u$uran Pintu l"r 56,200.004 Tri&le$ 6 mm 120 240 l"r 92,000.00

    5 Tri&le$ 9 mm 120 240 l"r 166,600.00

    6 a"ar + 4 mm l"r 119,000.00

    7 Bili$ Bam"u % tan&a $ulit ' m2 19,800.00

    8 Bili$ Bam"u % +engan $ulit ' m2 22,700.00

    9 Bili$ Bam"u -itam @ariasi m2 34,200.00

    10 all &a&er m2 55,700.00

    11 )ultiPle$ 9 mm 120 240 l"r 151,100.00

    12 )ultiPle$ 12 mm 120 240 l"r 195,000.00

    13 )ultiPle$ 18 mm 120 240 l"r 255,400.00

    14 Pl: + 18 mm 120 240 l"r 323,900.00

    15 Pl: + 9 mm 120 240 l"r 235,000.0016 Pl: + 4 mm 120 240 l"r 140,000.00

    17 Tea$ + 3 mm 120 240 l"r 129,100.00

    18 Tea$ + 4 mm 120 240 l"r 131,700.00

    19 Tea$ + 3 mm 120 240 u$uran Pintu l"r 127,200.00

    20 Tea$ + u$uran Pintu 4 mm l"r 114,700.00

    21 Ta(n % Tahan Ba$ar ' m2 128,200.00

    22 Su&er(n m2 57,900.00

    23 )elamin 4 mm 120 240 l"r 89,200.00

    24 )elamin TK 4 mm l"r 133,400.00

    25 ;rmi$a 120 240 l"r 170,000.00

    26 ;rmi$a u$uran Pintu l"r 132,900.00

    27 ;rmi$a arna 4A 8A l"r 238,100.00

    F BAHAN LANTAI DAN PELAPIS DINDING

    1 Tegel P 20 20 "h 3,400.00

    2 Plin Tegel P 10 20 "h 2,400.00

    3 Tegel P 30 30 "h 3,400.00

    4 Plin Tegel P 15 30 "h 2,800.00

    5 Tegel arna 20 20 "h 3,600.00

    6 Plin Tegel arna 10 20 "h 3,400.00

    7 Tegel arna 30 30 "h 5,700.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    5/78

    8 Plin Tegel arna 15 30 "h 6,300.00

    9 Tegel a>el P 20 20 "h 3,200.00

    10 Tegel a>el arna 20 20 "h 2,500.00

    11 Tegel Ba+a$ P 30 30 "h 4,100.00

    12 Pslin 11 11 arna Stan+ar ? m2 63,300.00

    13 Pslin 11 11 arna $husus ? m2 67,300.00

    14 Kerami$ 10 20 +an 20 20 K ? Putih * Pls )ulia m2 54,500.00

    15 Kerami$ 10 20 K ? ra$*arna*!nti Sli& )ulia m2 56,000.0016 Kerami$ 20 20 %K)' K ? ra$*arna *!nti Sli& )ulia m2 62,500.00

    17 Kerami$ 20 20 %K)' K ? Putih Pls )ulia m2 54,500.00

    18 Kerami$ 20 25 ?in+ing K) K ? ra$ )ulia m2 62,500.00

    19 Kerami$ 30 30 K ? Putih Pls )ulia m2 53,000.00

    20 Kerami$ 30 30 K ? arna*ra$ %!T SP' )ulia m2 58,000.00

    21 Kerami$ 40 40 K ? Putih Pls )ulia m2 56,800.00

    22 Kerami$ 40 40 K ? arna*ra$ %!T SP' )ulia m2 65,500.00

    23 Kerami$ 10 20 +an 20 20 K ? Putih * Pls man m2 64,400.00

    24 Kerami$ 10 20 K ? ra$*arna*!nti Sli& man m2 72,200.00

    25 Kerami$ 20 20 %K)' K ? ra$*arna*!nti Sli& man m2 75,200.00

    26 Kerami$ 20 20 %K)' K ? Putih Pls man m2 72,900.00

    27 Kerami$ 20 25 ?in+ing K) K ? ra$ man m2 75,200.0028 Kerami$ 20 25 K ? Putih Pls man m2 72,900.00

    29 Kerami$ 30 30 K ? Pls man m2 68,900.00

    30 Kerami$ 30 30 K ? arna*ra$ %!T SP' man m2 76,600.00

    31 Kerami$ 40 40 K ? Pls man m2 72,500.00

    32 Kerami$ 40 40 K ? arna*ra$ %!T SP' man m2 77,000.00

    33 @in:l antai Stan+ar m2 56,000.00

    34 Kar&et Kelas Bai$ m2 1,025,500.00

    35 Kar&et Kelas Se+ang m2 353,500.00

    36 ParDuet ati m2 375,400.00

    37 Stairnsing Kerami$ 10*20 "h 13,700.00

    38 Stairnsing ;i"er m 25,000.00

    39 Taras Kerang 30 30 m2 31,800.0040 Plin Taras 10 30 "h 13,500.00

    41 #ranit !lam U$uran Besar m2 1,848,400.00

    42 #ranit !lam U$uran Ke(il m2 1,612,900.00

    43 #ranit !lam ? U$uran Besar m2 1,331,100.00

    44 #ranit !lam ? U$uran Ke(il m2 1,299,400.00

    45 #ranit Tile =ssena U$uran 40 40 Plis m2 345,000.00

    46 #ranit Tile =ssena U$uran 30 30 m2 322,800.00

    47 #ranit Tile =ssena U$uran 40 40 UnPlis m2 204,900.00

    48 )armer m2 550,000.00

    49 )armer !lam am&ung U$uran Besar m2 550,200.00

    50 )armer !lam am&ung U$uran $e(il m2 345,700.00

    51 )armer !lam itatah U$uran Besar m2 340,800.0052 )armer !lam itatah U$uran Ke(il m2 237,600.00

    53 )armer Sintetis m2 157,900.00

    54 #ranit Tile =ssena 60 60 Plis m2 358,100.00

    55 #ranit Tile =ssena 60 60 UnPlis m2 231,800.00

    56 Batu Tem&el -itam m2 96,500.00

    57 Bata Kara

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    6/78

    61 Plint $erami$ 10 30 "h 3,500.00

    62 Plint $erami$ 10 40 "h 4,000.00

    63 Plint $erami$ 15 30 "h 4,500.00

    64 Plint $erami$ 15 40 "h 5,250.00

    65 Plint granit 10 30 "h 25,900.00

    66 Plint granit 10 40 "h 27,600.00

    67 Plint granit 15 30 "h 31,100.00

    68 Plint granit 15 40 "h 41,300.00

    G BAHAN SALURAN AIR KOTOR / BERSIH

    1 #ra>el U 20 (mC m1 44,300.00

    2 #ra>el U 30 (mC m1 56,400.00

    3 #ra>el U 40 (mC m1 74,200.00

    4 Buis Betn 20 (m % 1 )C ' m1 49,200.00

    5 Buis Betn 30 (m % 1 )C ' m1 61,700.00

    6 Buis Betn 40 (m % 1 )C ' m1 80,900.00

    7 Buis Betn 50 (m % 1 )C ' st$ 94,300.00

    8 Buis Betn 60 (m % 1 )C ' st$ 130,900.00

    9 Buis Betn 100 (m % 0.50 )C ' st$ 299,800.00

    10 Buis Betn 80 (m % 0.50 )C ' st$ 298,500.0011 BuisTanah 10 (m % 0.50 )C ' st$ 9,600.00

    12 BuisTanah 15 (m % 0.50 )C ' st$ 12,700.00

    13 BuisTanah 20 (m % 0.50 )C ' st$ 16,800.00

    14 BuisTanah 25 (m % 0.50 )C ' st$ 22,800.00

    15 nu$ $g 17,400.00

    H BAHAN LOGAM DAN BAHAN JADINYA

    1 Besi Betn U/24 ata/rata $g 16,500.00

    2 Besi Betn U/39 * U/32 ata/rata $g 20,700.00

    3 Pagar B leng$a& tiang % Tan&a Pn+asi ' m2 171,300.00

    4 Bn+e$ m2 185,000.00

    5 Besi ; = ? S $g 24,000.006 Besi ; = e&ang $g 23,900.00

    7 Besi Pr>il ? S $g 18,300.00

    8 Besi Pr>il = $g 21,600.00

    9 Besi i& hanel $g 19,200.00

    10 ng$s #al>anis Besi $g 10,600.00

    11 Ka

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    7/78

    27 am n:amu$ !lumunium m2 32,400.00

    28 Plat Sri& E 2 30 mm % 6 m1 ' "t 33,000.00

    29 Plat Sri& E 3 30 mm % 6 m1 ' "t 33,100.00

    30 Plat Stri& "t 18,200.00

    31 Besi Stri& $g 26,800.00

    32 Plat !lumunium 0.2 mm m2 89,800.00

    33 Plat !lumunium 0.3 mm m2 110,500.00

    34 Plat !lumunium 0.4 mm m2 141,400.0035 Plat !lumunium 0.5 mm m2 143,100.00

    36 Plat !lumunium 0.6 mm m2 171,800.00

    37 Plat !lumunium 0.1 mm m2 56,300.00

    38 Kusen !lumunium atural 1.3 mm t 1,3 mm % 4 A ' m1 151,100.00

    39 Kusen !lumunium arna 1.3 mm t 1,3 mm % 4 A ' m1 163,000.00

    40 Kusen !lumunium atural 1.3 mm t 1,3 mm % 3 A ' m1 81,000.00

    41 Kusen !lumunium arna 1.3 mm t 1,3 mm % 3 A ' m1 102,000.00

    42 ?aun en+ela !lumunium atural % tan&a $a(a +an a((essries ' m2 98,800.00

    43 ?aun en+ela !lumunium arna % tan&a $a(a +an a((essries ' m2 148,800.00

    44 ?aun Pintu !lumunium atural % tan&a $a(a +an a((essries ' m2 211,800.00

    45 ?aun Pintu !lumunium arna % tan&a $a(a +an a((essries ' m2 207,500.00

    46 -an+le !lumunium % Tari$an Pintu !lumunium ' "h 345,200.0047 Kait !ngin !lumunium &s 104,500.00

    48 Karet !sisris Kusen * Pintu !lumunium m1 7,500.00

    49 alusi !lluminium mC 35,000.00

    50 Suns(reen !lmunium m2 380,200.00

    51 Seng Plat BS 30 60 (m % 100 m1 ' rll 1,581,500.00

    52 Seng Plat BS 30 90 (m % 100 m1 ' rll 2,080,100.00

    53 Plat Besi Ti&is 1 mm $g 16,800.00

    54 Plat Besi Ti&is 0.5 mm $g 17,700.00

    55 Plat Besi 2 mm s*+ 5 mm $g 14,100.00

    56 Plat Besi 6 mms*+ 10 mm $g 14,100.00

    57 Plat Besi 10 mm $eatas $g 14,700.00

    58 Ka"el &resstresse+ &ls $g 26,700.0059 aring Ka

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    8/78

    80 en+ela na$ $a(a "ening F tralis 8 $li&s set 230,000.00

    81 en+ela na$ $a(a "ening F tralis 10 $li&s set 300,000.00

    I BAHAN KACA

    1 Ka(a Pls 2 mm % !S!- ' m2 69,000.00

    2 Ka(a Pls 3 mm % !S!- ' m2 87,400.00

    3 Ka(a Pls 5 mm % !S!- ' m2 111,000.00

    4 Ka(a Pls 8 mm % !S!- ' m2 183,100.005 Ka(a a:"an+ 5 mm % !S!- ' m2 148,700.00

    6 Ka(a a:"an+ 8 mm % !S!- ' m2 323,400.00

    7 Ka(a a:"an+ 12 mm % !S!- ' m2 627,000.00

    8 Ka(a (ermin 5 mm m2 150,500.00

    9 Ka(a (ermin 6 mm m2 186,400.00

    10 Ka(a (ermin 8 mm m2 234,300.00

    11 Ka(a Patri $al Ter&asang % !S!- ' m2 1,621,100.00

    12 Ka(a Patri = uar egeri Ter&asang m2 3,425,700.00

    13 Ka(a 6 mm #raer m2 1,263,900.00

    14 #lass Bl($ ? 20 20 % Ke+aier "h 250.00

    K BAHAN PERPIPAAN1 Besi Pi&a Untu$ -:+rant BSP 1A "t 166,700.00

    2 Besi Pi&a Untu$ -:+rant BSP 1.25A "t 210,200.00

    3 Besi Pi&a Untu$ -:+rant BSP 1.5A "t 298,000.00

    4 Besi Pi&a Untu$ -:+rant BSP 2A "t 351,800.00

    5 Besi Pi&a Untu$ -:+rant BSP 2.5A "t 439,300.00

    6 Besi Pi&a Untu$ -:+rant BSP 3A "t 595,000.00

    7 Besi Pi&a Untu$ -:+rant BSP 4A "t 869,600.00

    8 Besi Pi&a Untu$ -:+rant BSP 6A "t 1,423,400.00

    9 Besi Pi&a -itam 1A t 2 mm "t 172,300.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    9/78

    10 Besi Pi&a -itam 2A t 2 mm "t 227,900.00

    11 Besi Pi&a -itam 3A t 2mm "t 365,800.00

    12 Besi Pi&a -itam 4A t 2 mm "t 573,100.00

    13 Besi Pi&a -itam 6A t 2 mm "t 772,400.00

    14 Pi&a #P )e+ium ! 1*2A % 6 m1 ' "t 109,100.00

    15 Pi&a #P )e+ium ! 3*4A % 6 m1 ' "t 159,400.00

    16 Pi&a #P )e+ium ! 1A % 6 m1 ' "t 181,500.00

    17 Pi&a #P )e+ium ! 1 1*4A % 6 m1 ' "t 259,300.0018 Pi&a #P )e+ium ! 1 1*2A % 6 m1 ' "t 280,500.00

    19 Pi&a #P )e+ium ! 1 3*4A % 6 m1 ' "t 326,400.00

    20 Pi&a #P )e+ium ! 2A % 6 m1 ' "t 467,400.00

    21 Pi&a #P )e+ium ! 2 1*2A % 6 m1 ' "t 672,100.00

    22 Pi&a #P )e+ium ! 3A % 6 m1 ' "t 849,900.00

    23 Pi&a #P )e+ium ! 4A % 6 m1 ' "t 920,300.00

    24 )a(am2 Sam"ungan #P 1*2A "h 6,300.00

    25 )a(am2 Sam"ungan #P 3*4A "h 8,600.00

    26 )a(am2 Sam"ungan #P 1A "h 16,700.00

    27 )a(am2 Sam"ungan #P 1 1*4A "h 19,800.00

    28 )a(am2 Sam"ungan #P 1 1*2A "h 20,700.00

    29 )a(am2 Sam"ungan #P 1 3*4A "h 22,700.0030 )a(am2 Sam"ungan #P 2A "h 51,200.00

    31 )a(am2 Sam"ungan #P 2 1*2A "h 60,400.00

    32 )a(am2 Sam"ungan #P 3A "h 75,900.00

    33 )a(am2 Sam"ungan #P 4A "h 118,600.00

    34 Pi&a P@ UK! t:&e ! 1*2A "t 40,100.00

    35 Pi&a P@ UK! t:&e ! 3*4A "t 52,200.00

    36 Pi&a P@ UK! t:&e ! 1A "t 63,200.00

    37 Pi&a P@ UK! t:&e ! 1 1*4A "t 79,900.00

    38 Pi&a P@ UK! t:&e ! 1 1*2A "t 105,900.00

    39 Pi&a P@ UK! t:&e ! 2A "t 110,700.00

    40 Pi&a P@ UK! t:&e ! 2 1*2A "t 167,100.00

    41 Pi&a P@ UK! t:&e ! 3A "t 205,100.0042 Pi&a P@ UK! t:&e ! 4A "t 347,900.00

    43 Pi&a P@ UK! t:&e ! 6A "t 640,000.00

    44 Pi&a P@ UK! t:&e ! 8A "t 818,300.00

    45 Pi&a P@ )!SP !BU % ! ' 1*2A "t 22,500.00

    46 Pi&a P@ )!SP !BU % ! ' 3*4A "t 27,800.00

    47 Pi&a P@ )!SP !BU % ! ' 1A "t 40,500.00

    48 Pi&a P@ )!SP !BU % ! ' 1 1*4A "t 58,500.00

    49 Pi&a P@ )!SP !BU % ! ' 1 1*2A "t 60,200.00

    50 Pi&a P@ )!SP !BU % ! ' 2A "t 75,800.00

    51 Pi&a P@ )!SP !BU % ! ' 2 1*2A "t 126,300.00

    52 Pi&a P@ )!SP !BU % ! ' 3A "t 145,700.00

    53 Pi&a P@ )!SP !BU % ! ' 4A "t 256,800.0054 )a(am2 Sam"ungan Paraln 1*2A "h 4,400.00

    55 )a(am2 Sam"ungan Paraln 3*4A "h 4,700.00

    56 )a(am2 Sam"ungan Paraln 1A "h 4,900.00

    57 )a(am2 Sam"ungan Paraln 1 1*4A "h 7,200.00

    58 )a(am2 Sam"ungan Paraln 1 1*2A "h 9,500.00

    59 )a(am2 Sam"ungan Paraln 1 3*4A "h 13,500.00

    60 )a(am2 Sam"ungan Paraln 2A "h 15,800.00

    61 )a(am2 Sam"ungan Paraln 2 1*2A "h 26,400.00

    62 )a(am2 Sam"ungan Paraln 3A "h 29,700.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    10/78

    63 )a(am2 Sam"ungan Paraln 4A "h 34,000.00

    64 Sam"ungan Pi&a P@ enis ! 4A TG "h 89,900.00

    65 em Paraln t" 10,100.00

    66 Slati& e+eng gl 4,200.00

    67 Pi&a P@ 4A Berl"ang enis ! m1 36,700.00

    68 P@ aterst& le"ar 150 m1 53,500.00

    69 P@ aterst& le"ar 200 m1 57,900.00

    70 P@ aterst& le"ar 230 m1 65,700.0071 P@ aterst& le"ar 250 m1 74,700.00

    72 P@ aterst& le"ar 300 m1 83,600.00

    73 P@ aterst& le"ar 320 m1 92,500.00

    L BAHAN SANITAIR 

    1 St& Kran 3*4A KT "h 103,900.00

    2 St& Kran 1A KT "h 124,200.00

    3 St& Kran 1 1*2A KT "h 208,000.00

    4 St& Kran 2A KT "h 267,900.00

    5 St& Kran 2 1*2A KT "h 713,200.00

    6 St& Kran 3A KT "h 830,300.00

    7 he($ @ale 1*2A "h 86,400.008 ?u"le e&le 1*2A "h 32,400.00

    9 ater )ur 1*2A "h 40,200.00

    10 #ate el eng$a& TT 230 unit 1,012,700.00

    24 asta>el eng$a& ! unit 699,900.00

    25 lset ng$$ Pslin arna TT unit 205,600.00

    26 lset ng$$ Stan+ar+ Putih Pslin TT unit 188,200.00

    27 lset ng$$ eng$a& Sistem et TT unit 2,032,900.00

    28 lset ?u+u$ arna Stan+ar+ TT 240 eng$a& unit 1,724,700.00

    29 asta>el Bulat arna Stan+ar+ eng$a& unit 910,800.00

    30 lset ?u+u$ arna Stan+ar+ ! eng$a& "h 1,272,100.00

    31 Urinir eng$a& TT arna Stan+ar+ eng$a& unit 1,773,400.0032 Pen:e$at Pslin Urinar TT l"r 495,900.00

    33 Kit(hen Hin$ Stainless Stan+ar+ $al % 1 u"ang ' "h 397,800.00

    34 Kit(hen Hin$ Stainless n Stan+ar+ ;ran$e % 1 u"ang ' "h 1,272,300.00

    35 Kit(hen Hin$ Stainless n Stan+ar+ ;ran$e % 2 u"ang ' "h 1,650,200.00

    36 Talang P@ U / 15 (m "tng 60,000.00

    M BAHAN PENUTUP ATAP

    1 !ta& Plasti$ #elm"ang 80 180 l"r 33,100.00

    2 !ta& ;i"er #lass Ti&is 80 180 % #elm"ang ' l"r 47,100.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    11/78

    3 !ta& ;i"er #lass Te"al 80 180 % #elm"ang ' l"r 100,000.00

    4 !ta& !lumunium atural US 26 % !? ' m2 140,600.00

    5 !ta& !lumunium arna US 26 % !? ' m2 164,700.00

    6 !ta& !s"es #el. Ke(il 80 180 4 mm l"r 77,200.00

    7 !ta& !s"es #el. Besar 80 180 5 mm l"r 111,100.00

    8 !ta& Seng #elm"ang 80 (m 180 (m 3 mm l"r 62,900.00

    9 !ta& Seng #elm"ang 80 (m 180 (m 5 mm l"r 83,100.00

    10 !ta& Seng #elm"ang 270 (m 105 (m 4mm l"r 73,300.0011 !ta& Seng #elm"ang 240 (m 105 (m 4mm l"r 65,900.00

    12 !ta& Seng #elm"ang 210 (m 105 (m 4mm l"r 58,500.00

    13 !ta& Seng #elm"ang 150 (m 105 (m 4mm l"r 42,300.00

    14 !ta& Seng #elm"ang 150 (m 102 (m 5mm l"r 78,500.00

    15 !ta& Seng #elm"ang 180 (m 102 (m 5mm l"r 97,200.00

    16 !ta& !s"es #elm"ang 300 (m 105 (m 4 mm l"r 80,000.00

    17 !ta& Tegla Ku"ta, leng$a& m2 487,100.00

    18 !ta& Tegla K ' m2 203,100.00

    27 #enteng )etal -ana m2 172,700.00

    28 $ !tas )etal % ain"< > ' l"r 138,500.00

    29 $ !tas )etal -ana l"r 80,900.00

    30 $ Pingir )etal % ain"< > ' l"r 105,300.00

    31 $ Pingir )etal -ana l"r 100,800.00

    32 all ;lasing % ain"< > ' l"r 83,900.00

    33 all ;lasing -ana l"r 88,700.00

    34 !ta& #enteng Betn arna 14.5*m2 m2 96,700.0035 #enteng Betn atural "h 8,500.00

    36 Sira& Kelas % 80 * m2 ' m2 26,400.00

    37 #enteng Kerami$ atural ntan 14.5 * m2 m2 112,400.00

    38 #enteng Kerami$ #lasur Stan+ar+ 14.5 *m2 m2 142,200.00

    39 #enteng Kerami$ #lasur S&e(ial 14.5 *m2 m2 139,300.00

    40 #enteng Kerami$ #lasur Premium 14.5 *m2 m2 145,100.00

    41 #enteng )uran+ atural 1m2 18 "h "h 2,700.00

    42 #enteng )uran+ #lasur 1m2 18 "h "h 4,000.00

    43 Bu"ung )uran+ atural "h 7,500.00

    44 Bu"ung )uran+ #lasur "h 10,700.00

    45 Bu"ungan #enteng Kerami$ "h 10,000.00

    46 !ta& #enteng K+$ "h 3,000.0047 Bu"ungan #enteng K+$ "h 4,500.00

    48 Bu"ungan #enteng Plentng "h 6,000.00

    49 Bu"ungan Stel #elm"ang "h 7,500.00

    50 $ Stel #elm"ang l"r 38,100.00

    51 $ !ta& Seng l"r 37,500.00

    52 $ stan+ar 40 (m 18, S# 22 m2 75,000.00

    53 Pelat !s"es te"al 4 mm l"r 21,000.00

    54 Pelat !s"es te"al 3.5 mm l"r 16,400.00

    55 Trusses H!)/75 t0.8 ang$a Utama m1 34,500.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    12/78

    56 Trusses H!)/75 t0.5 ang$a Utama m1 22,000.00

    57 eng 16/?B > Battens t0.48 mm m1 11,000.00

    58 ;t Plate t 1.22 mm m1 7,200.00

    59 P? / ?ia>ragma Plate "h 2,200.00

    60 ? Bra(ing m1 1,700.00

    61 Tensiner % Penga$u Tali angin ' "h 7,200.00

    N BAHAN MEKANIKAL1 ($e: Pum& $a&. 80 gln*menit 100 m1 % 18.6 $ ' unit 71,396,400.00

    2 =le(tri(al Pum& $a&. 750 gln*menit 120 m1 % 90 $ ' unit 216,358,900.00

    3 ?iesel Pum& $a&. 750 gln*menit 120 m1 % 105 $ ' unit 591,647,100.00

    4 Presure Tan$ $a&. 500 liter leng$a& unit 36,997,300.00

    5 -:+ran B +lm #e+ung % eng$a& ' unit 6,854,400.00

    6 ;ire -use 1.5 30 m F nse unit 4,866,100.00

    7 =hse ;an - 360 60 60 (m unit 6,862,900.00

    8 =hse ;an - 380 ;) 55 55 (m unit 5,491,100.00

    9 =hse ;an - 100 40 40 (m unit 1,092,600.00

    10 ! S&lit 3 PK Setara TS-B! unit 30,791,800.00

    11 ! S&lit 2 PK Setara TS-B! unit 21,926,500.00

    12 ! S&lit 1 PK Setara TS-B! unit 5,174,100.0013 )esin ! S&lit ?!K % n+r * ut+r Unit ' 1 BTU 4,200,000.00

    O BAHAN ELEKTRIKAL

    1 Ka"el G! 1 1.5 Prima % 1 rl 50 mC ' 102,700.00

    2 Ka"el G! 1 2.5 Prima % 1 rl 50 mC ' 151,700.00

    3 Ka"el G) 2 1.5 Prima % 1 rl 50 mC ' mC 6,600.00

    4 Ka"el G) 3 1.5 Prima % 1 rl 50 mC ' mC 7,600.00

    5 Ka"el G) 2 2.5 Prima % 1 rl 50 mC ' mC 4,900.00

    6 Ka"el G) 3 2.5 Prima % 1 rl 50 mC ' mC 10,900.00

    7 Ka"el G) 4 2.5 Prima % 1 rl 50 mC ' mC 7,600.00

    8 Ka"el G) 2 4 Prima % 1 rl 50 mC ' mC 6,300.00

    9 Ka"el G) 3 4 Prima % 1 rl 50 mC ' mC 15,400.0010 Ka"el G) 4 4 Prima % 1 rl 50 mC ' mC 20,700.00

    11 Ka"el G) 2 6 Su&reme % 1 rl 50 mC ' mC 11,800.00

    12 Ka"el G) 3 6 Su&reme % 1 rl 50 mC ' mC 13,700.00

    13 Ka"el G) 4 6 Su&reme % 1 rl 50 mC ' mC 18,600.00

    14 Ka"el G) 2 10 Su&reme % 1 rl 50 mC ' mC 17,600.00

    15 Ka"el G) 3 10 Su&reme % 1 rl 50 mC ' mC 119,700.00

    16 Ka"el G) 4 10 Su&reme % 1 rl 50 mC ' mC 26,500.00

    17 Ka"el G) 4 16 Su&reme % 1 rl 50 mC ' mC 29,700.00

    18 Ka"el GG 2 4 Su&reme % 1 rl 50 mC ' mC 12,000.00

    19 Ka"el GG 3 4 Su&reme % 1 rl 50 mC ' mC 19,300.00

    20 Ka"el GG 4 4 Su&reme % 1 rl 50 mC ' mC 23,800.00

    21 Ka"el GG 2 6 Su&reme % 1 rl 50 mC ' mC 14,500.0022 Ka"el GG 3 6 Su&reme % 1 rl 50 mC ' mC 19,200.00

    23 Ka"el GG 4 6 Su&reme % 1 rl 50 mC ' mC 18,500.00

    24 Ka"el GG 2 10 Su&reme % 1 rl 50 mC ' mC 20,400.00

    25 Ka"el GG 3 10 Su&reme % 1 rl 50 mC ' mC 25,800.00

    26 Ka"el GG 4 10 Su&reme % 1 rl 50 mC ' mC 35,500.00

    27 Ka"el GG 4 16 Su&reme % 1 rl 50 mC ' mC 41,900.00

    28 S;B ;U =! / 100 ! "h 841,900.00

    29 S;B ;U =! / 150 ! "h 2,182,600.00

    30 umah Panel 30 60 (m % Ksng ' unt 153,500.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    13/78

    31 S$ring Kas 2 gr& Biasa unt 204,800.00

    32 S$ring Kas 3 gr& Biasa unt 222,600.00

    33 S$ring Kas 5 gr& Biasa unt 468,800.00

    34 )B 1 P!S "h 55,100.00

    35 )B 3 P!S "h 106,000.00

    36 Tahanan 50 ! )er$ ;ui "h 521,100.00

    37 Sa$lar Br$ Tunggal Stan+ar+ % 1 Phase ' "h 23,800.00

    38 Sa$lar Br$ Seri Stan+ar+ % 1 Phase ' "h 26,300.0039 St& Knta$ Br$ Stan+ar+ % 1 Phase ' "h 23,800.00

    40 St& Knta$ Br$ 3 Phase %ut B

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    14/78

    18 -a$ !ngin Kait en+ela Biasa &s 7,100.00

    19 -a$ !ngin en+ela !nti$ &s 29,000.00

    20 -a$ !ngin Sen+$ Stainless * Kuningan "h 32,200.00

    21 Slt Pintu Beri$ut antai "h 31,500.00

    22 Slt en+ela Tunggal "h 33,000.00

    23 =ngsel Pintu Uniln Stan+ar+ &s 21,000.00

    24 =ngsel en+ela Uniln &s 15,000.00

    25 =ngsel Patrun &s 13,700.0026 =ngsel -armni$a m1 9,100.00

    27 ?r lser Kelas Stan+ar+ % Kelas Se+ang ' unt 420,000.00

    28 ?r lser Kelas Stan+ar+ % Kelas Bai$ ' unt 597,500.00

    29 ?r lser Kelas en+ah unt 200,000.00

    30 ?r -l+er unt 205,400.00

    31 ?r St&er unt 255,500.00

    32 Tari$an !lmari ata/rata "h 19,500.00

    33 Seng BS 30 e"ar 60 (m % 1 rl 50 mC ' m1 43,500.00

    34 Seng BS 30 e"ar 90 (m % 1 rl 50 mC ' m1 53,500.00

    35 Seng BS 30 * 3 0.3 mm l"r 86,900.00

    36 Seng Plat l"r 50,100.00

    37 aterst& e"ar 200 mm m1 57,900.00

    Q BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN

    1 !s&al Bitumen $g 12,459.00

    2 !s&al =mulsi $g 12,459.00

    3 !s&al urah $g 10,890.00

    4 !s&al n(rete * astn% ! /' tn 1,348,300.00

    5 !s&al Threate+ Base % !TB ' tn 1,200,200.00

    6 atastn *-t lls Sheet % -S ' tn 1,666,900.00

    R BAHAN PENGISAP AIR SUMUR DALAM

    1 Pm&a K+$ unit 172,600.00

    2 Pm&a ?ragn Tegal unit 243,800.003 Pm&a ?ragn !sli unit 718,500.00

    4 )esin Pm&a !ir 100 / San: unit 1,100,200.00

    5 )esin Pm&a !ir 150 / San: unit 1,890,700.00

    6 Pm&a Het Pum& 250 / San: unit 4,961,500.00

    7 Pm&a Het Pum& 450 / San: unit 7,878,000.00

    8 Pm&a Su"mersi"le $a&. 150 liter * menit 3 K unit 27,151,200.00

    9 #ear Pum& Ka&. 60 liter * menit unit 15,702,700.00

    10 ?ee& ell +engan $eleng$a&ann:a $a&. 150 liter * menit unit 172,052,500.00

    11 -an+ il Pum& unit 5,195,300.00

    S BAHAN PENAMPUNG AIR 

    1 Tang$i !ir ;i"er #lass 0.5 m3 % =(el ' "h 1,172,500.002 Tang$i !ir ;i"er #lass 1 m3 % =(el ' "h 1,316,400.00

    3 Tang$i !ir ;i"er #lass 2 m3 % =(el ' "h 1,954,200.00

    4 Ba$ K) ;i"er 60 60 "h 255,300.00

    5 Ba$ Taras 40 40 "h 118,500.00

    6 Ba$ K) Taras 60 60 "h 161,100.00

    T ALAT TUKANG

    1 Palu 0.5 $g "h 39,300.00

    2 ang$ul "h 24,500.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    15/78

    3 Sing$u& "h 41,400.00

    4 Se$r& "h 50,100.00

    5 Peng$i "h 12,300.00

    6 inggis "h 41,700.00

    7 l )eter 30 meter % Bahan Plasti$ ' "h 101,000.00

    8 l )eter 5 meter % Bahan Besi ' "h 37,800.00

    9 Selang Plasti$ untu$ ater Pas +ia. 0.5 (m m 1,600.00

    10 ater Pas !lumunium 60 (m "h 88,200.00

    U BAHAN BAKAR DAN PELUMAS

    1 )in:a$ Tanah lt 18,000.00

    2 Ka:u Ba$ar +ari Ka:u Karet m3 151,100.00

    3 Bahan Ba$ar esi+u lt 28,435.00

    4 )in:a$ Slar lt 7,150.00

    5 Bensin Premium lt 7,800.00

    6 Plus il lt 3,300.00

    7 il )esran 40 S!= lt 55,000.00

    8 =l&ii * "tl 15 $g 104,600.00

    9 !sitilin * Btl 15.1 $g "tl 88,900.00

    10 !ngin % 2 ' * "tl "tl 66,400.0011 Kar"it $g 19,400.00

    12 )in:a$ Be$isting ltr 40,500.00

    13 a&i+rant #ln 15,700.00

    14 S+a !&i $g 35,600.00

    15 Sa"un $g 2,400.00

    16 !rang Ka:u $g 11,100.00

    17 Ka

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    16/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    17/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    18/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    19/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    20/78

    50

    40

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    21/78

    33.3

    25

    22.2

    16.7

    33.333333

    25

    22.222222

    16.666667

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    22/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    23/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    24/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    25/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    26/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    27/78

    = kurang angka 0

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    28/78

    107200   ###

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    29/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    30/78

     

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    31/78

    URAIAN PEKERJAAN SAT VOL

    PEKERJAAN PERSIAPAN

    1M' PENGUKURAN DAN PEMASANGAN BOUWPLANK

    Kayu 5/7 Albasia m3 0.010

    Paku biasa 2"-5" kg 0.020

    Kayu papan 3/20 Albasia m3 0.007

    Tukang /! 0.100

    Pkr#a /! 0.100

    Kpala $ukang /! 0.010

    %an&r /! 0.005

    T$al

    'ibula$kan

    1M2 PEMBERSIHAN LAPANGAN DAN PERATAAN

    Pkr#a /! 0.100

    %an&r /! 0.050

    T$al

    'ibula$kan

    1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHAN

    Kayu Albasia! m( 0.0)0

    Paku 4 - 7 kg 0.250

    *ng +lb ,* 2) )0 1)0 m lbr 0.620

    Tripl 3 mm lbr 0.500

    P 50 kg ak 0.100

    Pasir pasang m( 0.250

    ,a$ak Prss b! 11.000

    ngks Pasang ls 0.1500

    T$al

    'ibula$kan

    PEKERJAAN GALIAN & URUGAN

    1M3 GALIAN TANAH KERAS SEDALAM 1M

    Pkr#a /! 0.625

    %an&r /! 0.062

    T$al'ibula$kan

    1M3 URUGAN KEMBALI

    Pkr#a /! 0.12

    %an&r /! 0.01

    T$al

    'ibula$kan

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    32/78

    1M3 PEMADATAN TANAH

    Pkr#a /! 0.300

    %an&r /! 0.030

    T$al

    'ibula$kan

    1M3 URUGAN PASIR

    Pasir rug m3 1.200

    Pkr#a /! 0.300

    %an&r /! 0.010

    T$al

    'ibula$kan

    PEKERJAAN STRUKTUR

    1M3 PASANG PONDASI BATU KALI 1PC:5 PS

    ,a$u bla! 15/20 m3 1.100

    *mn Pr$lan& 50kg kg 136.000

    Pasir pasang m3 0.544

    Pkr#a /! 1.500

    Tukang ba$u /! 0.600

    Kpala Tukang /! 0.060

    %an&r /! 0.075

    T$al

    'ibula$kan

    1M3 MEBUAT LANTAI KERJA 1PC:3PS:5KR TEBAL 5CM

    *mn Pr$lan& kg 21).000

    Pasir pasang m3 0.520

    *pli$ / Kral ,$n 2/3 m3 0.)70

    Pkr#a /! 1.650

    Tukang ba$u 1/2 $rampil /! 0.200

    Kpala Tukang ,a$u /! 0.025

    %an&r /! 0.0)0

    Prala$an Kr#a $ 0.075

    T$al

    'ibula$kan

    1 M3 Mem!"# K$%$m P"#() Be#$* Be#!%"*+ 12,12 -m . 1// + e)( 0 e,kis$ing Albasia! %3 0.400

    Paku ,iasa 5" - 7" Kg 4.000

    %inyak ,kis$ing $r 0.400

    ,si ,$n Pls Kg 100.000

    Ka8a$ ,$n Kg 1.)00

    *mn Pr$lan& kg 323.000

    Pasir ,$n %3 0.520

    ,a$u Pa! 2/3 %3 0.7)0

    'lkn 'ia. )-10/4m ,$g 20.000

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    33/78

    %uil$ipl mm 120 240 lbr 1.000

    Pkr#a /! 3.000

    Tukang ,a$u /! 0.350

    Tukang Kayu /! 1.040

    Tukang ,si /! 1.050

    Kpala Tukang /! 0.245

    %an&r  /! 0.123T$al

    'ibula$kan

    1 M3 Mem!"# S%$$ Be#$* Be#!%"*+ 15,2/ -m . 1//+ e)( 0 e()#(*+

    ,kis$ing Albasia! %3 0.270

    Paku ,iasa 5" - 7" Kg 1.500

    %inyak ,kis$ing $r 0.400

    ,si ,$n Pls Kg 100.000

    Ka8a$ ,$n Kg 2.250

    *mn Pr$lan& Kg 323.000

    Pasir ,$n %3 0.520,a$u Pa! 2/3 %3 0.7)0

    Pkr#a /! 3.000

    Tukang ,a$u /! 0.350

    Tukang Kayu /! 1.040

    Tukang ,si /! 1.050

    Kpala Tukang /! 0.245

    %an&r  /! 0.123

    T$al

    'ibula$kan

    1M3 MEMBUAT BETON DENGAN MUTU K225

    *mn Pr$lan& 50 kg kg 3)).000

    Pasir b$n m3 0.40

    *pli$ Pa! %sin 2/3 m3 0.)10

     Air l$r 215.000

    Pkr#a /! 1.500

    Tukang ba$u 1/2 Trampil /! 0.500

    Kpala Tukang ,a$u /! 0.050

    %an&r /! 0.070

    T$al

    'ibula$kan

    1M2 PASANG BEKISTING UNTUK LANTAI

    Kayu Albasia!9 Papan m3 0.0020

    Paku biasa 2"-5" kg 0.4000

    %inyak bks$ing l$ 0.2000

    Kayu ,alk Albasia! m3 0.0150

    %ul$ipl $bal mm 120 240 lbr 0.3500

    'lkn kayu galam &ia)-10/4m b$g 4.0000

    Pkr#a /! 0.3000

    Tukang bsi /! 0.3300

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    34/78

    Kpala $ukang /! 0.0330

    %an&r /! 0.0060

    T$al

    'ibula$kan

    1 M3 Mem!"# P%"# L"*#"( Be#$* Be#!%"*+ . 4/ K+ Be)( 0 Be()#(*+

    ,$n br$ulang a&. 1P : 2 Ps : 3 Kr %3 1.000Pasang ,kis$ing un$uk lan$ai %2 10.000

    ,si ,$n Pls Kg 0.000

    T$al

    'ibula$kan

    PEKERJAAN DINDING13)6.000

    1M2 PASANG BATAKOPRESS 1/2/6/ 1PC:3PS

    ,a$ak Prss 102040 b! 11.000

    *mn Pr$lan& kg 13.)00

    Pasir pasang m3 0.03)

    Pkr#a /! 0.300

    Tukang ba$u /! 0.100

    Kpala Tukang /! 0.010

    %an&r /! 0.015

    T$al

    'ibula$kan

    1M2 PASANG BATA MERAH TEBAL 1BATA 1PC:5PS

    ,a$a %ra! b! 140.000

    *mn Pr$lan& kg 22.200

    Pasir pasang m3 0.102

    Pkr#a /! 0.650

    Tukang ba$u /! 0.200

    Kpala Tukang /! 0.020

    %an&r /! 0.030

    T$al

    'ibula$kan

    1M2 PLESTERAN 1PC:3PS 7 TEBAL 15MM

    *mn Pr$lan& kg 6.4)0

    Pasir pasang m3 0.01

    Pkr#a /! 0.200

    Tukang ba$u /! 0.150Kpala Tukang /! 0.015

    %an&r /! 0.010

    T$al

    'ibula$kan

    1M2 PLESTERAN 1PC:5PS 7 TEBAL 15MM 0 ACIAN

    *mn Pr$lan& kg 4.320

    Pasir pasang m3 0.022

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    35/78

    Pkr#a /! 0.200

    Tukang ba$u /! 0.150

    Kpala Tukang /! 0.015

    %an&r /! 0.010

    T$al

    'ibula$kan

    1 M2 PASANG DINDING BUATAN URAT KA8U

    *mn Pr$lan& kg 7.20

    Pasir Pasang m3 0.036

    Pkr#a /! 0.200

    Tukang A!li /! 0.250

    Kpala $ukang /! 0.025

    %an&r /! 0.030

    T$al

    'ibula$kan

    1 m2 PASANG DINDING BUATAN SERAT KASAR

    *mn Pr$lan& kg 7.20

    Pasir Pasang m3 0.026

    Pkr#a /! 0.100

    Tukang ,a$u /! 0.200

    Kpala $ukang /! 0.020

    %an&r /! 0.025

    T$al

    'ibula$kan

    PEKERJAAN ATAP

    1 m3 PASANG KUDAKUDA ATAP BENTANG MA9 ;m KA8U JATI MAS

    Kayu balk a$i mas m3 1.100

    Paku biasa 2"9 5"9 7" kg 3.000

    Paku biasa 10"-12" kg 2.000

    ,si *$rip kg 15.000

    Pkr#a /! 6.000

    Tukang kayu /! 1).000

    Kpala Tukang /! 1.)00

    %an&r /! 0.300

    T$al'ibula$kan

    1 m2 PASANG KASO 0 RENG ATAP ETER GELOMBANG 16 KA8U BORNEO

    Kayu balk brn supr m3 0.012

    Paku biasa 2"9 5"9 7" ; ,au$ kg 0.150

    Pkr#a /! 0.150

    Tukang kayu /! 0.100

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    36/78

    Kpala Tukang /! 0.010

    %an&r /! 0.00)

    T$al

    'ibula$kan

    1 m3 PASANG GORDING KA8U BORNEO SUPER

    Kayu balk brn supr m3 1.100

    ,au$ pr kg/pak kg 2.200

    Pkr#a /! 2.400

    Tukang kayu /! 7.000

    Kpala Tukang /! 0.700

    %an&r /! 0.120

    T$al

    'ibula$kan

    1 m2 PASANG ATAP ETER 16 6mm .1/5/1

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    37/78

    ?ll8 4/4 @inrma$ ,$g 0.415

    ?ll8 2/4 @inrma$ ,$g 0.150

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    38/78

    Kpala $ukang /! 0.035

    %an&r /! 0.030

    T$al

    'ibula$kan

    1 M2 PASANG LANTAI KERAMIK 6/96/CM

    bin kramik 40B40m b! ).000

    *mn$ pr$lan& kg 11.3)0

    Pasir pasang m3 0.042

    *mn 8arna kg 1.500

    Pkr#a /! 0.620

    Tukang ba$u /! 0.350

    Kpala $ukang /! 0.035

    %an&r /! 0.030

    T$al

    'ibula$kan

    1 M2 PASANG LANTAI KERAMIK 6/96/CM TERAS

    bin kramik 40B40m b! ).000

    *mn$ pr$lan& kg 11.3)0

    Pasir pasang m3 0.042

    *mn 8arna kg 1.500

    Pkr#a /! 0.620

    Tukang ba$u /! 0.350

    Kpala $ukang /! 0.035

    %an&r /! 0.030

    T$al

    'ibula$kan

    PEKERJAAN PENGECATAN

    Plamir  kg 0.1000

    a$ 'asar  kg 0.1000

    a$ Pnu$up 2 Kali kg 0.2600

    Pkr#a /! 0.0200

    Tukang a$ /! 0.0630

    Kpala Tukang /! 0.0063

    %an&r  /! 0.0025

    T$al

    'ibula$kan

    Plamir  kg 0.1000

    a$ 'asar  kg 0.1000

    a$ Pnu$up 2 Kali kg 0.2600

    Pkr#a /! 0.0200

    Tukang a$ /! 0.0630

    Kpala Tukang /! 0.0063

    1 M2 Pe*+e-"#"* Tem$ B"! INTERIOR .1 L"?() P%"m(7 1 L"?() C"# D")"

    1 M2 Pe*+e-"#"* Tem$ B"! EKSTERIOR .1 L"?() P%"m(7 1 L"?() C"# D"

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    39/78

    %an&r  /! 0.0025

    T$al

    'ibula$kan

    1 M2 Pe*+e-"#"* P%"$*@ . 3

    a$ $mbk Kg 0.2000

    Plamir $mbk Kg 0.1600l a$ ,! 0.0100

    *$gr 8rk s 1.0000

     Amplas br 0.5000

    Pkr#a /! 0.2000

    Tukang a$ /! 0.3000

    Kpala $ukang /! 0.0300

    %an&r  /! 0.0100

    T$al

    'ibula$kan

    a$ %ni Kg 0.2000

    Plamir Kg 0.1500

    a$ 'asar Kg 0.1700

    a$ Pnu$up 2 Kali Kg 0.2600

    Pkr#a /! 0.0700

    Tukang a$ /! 0.000

    Kpala Tukang /! 0.0060

    %an&r  /! 0.0025

    T$al

    'ibula$kan

    1 U*(# K%$)e# @!@!

    Kls$ &u&uk ,! 1.0000

    Prlngkapan 6 C ls 1.0000

    Pkr#a /!   3.3000

    Tukang ,a$u /!   1.1000

    Kpala Tukang /!   0.0010

    %an&r  /!   0.1600

    T$al

    'ibula$kan

    1 U*(# Mem")"*+ K"* A( 

    Kran *$ainlss b! 1.2000Prlngkapan 35 C ls 1.0000

    Pkr#a /!   0.0)10

    Tukang ,a$u /!   0.1350

    Kpala $ukang /!   0.0135

    %an&r  /!   0.0041

    T$al

    'ibula$kan

    1 M2 Pe*+e-"#"* B(@"*+ K"! B"! .1 L"?() P%"m(7 2 %"?() -"# ?e*!#!?

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    40/78

    1 U*(# Mem")"*+ =%$$D"(*

    Dlr &rain ,! 1.0000

    Pkr#a /!   0.0100

    Tukang ,a$u /!   0.1000

    Kpala $ukang /!   0.0100

    %an&r  /!   0.0050

    T$al

    'ibula$kan

    1 U*(# B" m"*@( (e+%"))

    ,ak K% Dibr 60 60 b! 1.0000

    Prlngkapan 1) C ls 1.0000

    Pkr#a /!   0.000

    Tukang ,a$u /!   1.3500

    Kpala $ukang /!   0.2700

    %an&r  /!   0.0550

    T$al

    'ibula$kan

    1 M' MEMASANG PIPA PVC TIPE AW 6

    Pipa PE 4" m1 1.2000

    Prlngkapan 35 C ls 1.0000

    Pkr#a /!   0.0360

    Tukang ,a$u /!   0.0600

    Kpala $ukang /!   0.0060

    %an&r  /!   0.001)

    T$al

    'ibula$kan

    1 M' MEMASANG PIPA PVC TIPE AW 3

    Pipa PE 3" m1 1.2000

    Prlngkapan 35 C ls 1.0000

    Pkr#a /!   0.0360

    Tukang ,a$u /!   0.0600

    Kpala $ukang /!   0.0060

    %an&r  /!   0.001)

    T$al

    'ibula$kan

    1 M' MEMASANG PIPA PVC TIPE AW 3,6 & 1,2

    Pipa PE 3/4" F 1/2" m1 1.2000

    Prlngkapan 35 C ls 1.0000

    Pkr#a /!   0.0360

    Tukang ,a$u /!   0.0600

    Kpala $ukang /!   0.0060

    %an&r  /!   0.001)

    T$al

    'ibula$kan

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    41/78

     HARGA SAT JUMLAH HARGA . R?

    . R? BAHAN UPAH TOTAL

    19)709500.00 1)9705.00

    239500.00 470.00

    290719700.00 149501.0

    )09000.00 )9000.00

    509000.00 59000.00

    1009000.00 19000.00

    1109000.00 550.00

    339676.0 149550.00 4)9227

    6

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    42/78

      509000.00 159000.00

    1109000.00 39300.00

    1)9300.00 1)9300

    1

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    43/78

      1519100.00 1519100.00509000.00 1509000.00)09000.00 2)9000.00)09000.00 )39200.00)09000.00 )49000.00

    1009000.00 249500.00

    1109000.00 139475.0049)))9566.00 3)39175.00 592719741

    57217//

    29)509000.00 769500.00239400.00 359100.00409500.00 169200.00209700.00 290709000.00279700.00 629325.00195)0.00 5109340.00

    2559400.00 1329)0).002119100.00 164965).00509000.00 1509000.00)09000.00 2)9000.00)09000.00 )39200.00)09000.00 )49000.00

    1009000.00 249500.00

    1109000.00 139475.00

    39760931.00 3)39175.00 491449106

    6716671//

    195)0.00 6139040.00

    2559400.00 1259146.00

    2119100.00 17091.00

    15.00 39225.00

    509000.00 759000.00

    )09000.00 409000.00

    1009000.00 59000.00

    1109000.00 79700.00

    129402.00 1279700.00 190409102

    17/6/71//

    29)509000.00 59700.00

    239400.00 9360.00

    409500.00 )9100.00

    19)709500.00 2)9057.50

    1519100.00 529))5.00

    2)9000.00 1129000.00

    509000.00 159000.00

    )09000.00 269400.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    44/78

      1009000.00 39300.00

    1109000.00 660.00

    2169102.50 459360.00 2619463

    2;175//

    190409100.002619500.00

    209700.00

    193229300.00 193229300

    1732273//

    39300.00 369300.00 Kal ba$a

    195)0.00 219)04.00 'an un$uk

    2339400.00 )9)6.20

    509000.00 159000.00

    )09000.00 )9000.00

    1009000.00 19000.00

    1109000.00 19650.00

    66973.20 259650.00 29623

    427;//

    650.00 19000.00

    195)0.00 359076.00

    2339400.00 239)06.)0

    509000.00 329500.00

    )09000.00 169000.00

    1009000.00 29000.00

    1109000.00 39300.00

    149))2.)0 539)00.00 20396)3

    2/37//

    195)0.00 10923).40

    2339400.00 49434.60

    509000.00 109000.00

    )09000.00 129000.001009000.00 19500.00

    1109000.00 19100.00

    149673.00 249600.00 39273

    3473//

    195)0.00 69)25.60

    2339400.00 59134.)0

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    45/78

      509000.00 109000.00

    )09000.00 129000.00

    1009000.00 19500.00

    1109000.00 19100.00

    11960.40 249600.00 369560

    3;7;//

    195)0.00 11951).20

    2339400.00 )9402.40

    509000.00 109000.00

    )09000.00 209000.00

    1009000.00 29500.00

    1109000.00 39300.00

    1920.60 359)00.00 559721

    557//

    195)0.00 11951).20

    2339400.00 6906).40

    509000.00 59000.00

    )09000.00 169000.00

    1009000.00 29000.00

    1109000.00 29750.00

    1795)6.60 259750.00 439337

    6373//

    19)709500.00 290579550.00

    239500.00 709500.00

    239500.00 479000.00

    269)00.00 4029000.00

    509000.00 3009000.00

    )09000.00 194409000.00

    1009000.00 1)09000.00

    1109000.00 339000.00

    295779050.00 19539000.00 4953090506753/71//

    SUPER

      592)09000.00 639360.00

    269)00.00 49020.00

    509000.00 79500.00

    )09000.00 )9000.00

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    46/78

      1009000.00 19000.00

    1109000.00 )25.00

    6793)0.00 179325.00 )49705

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    47/78

      2)9500.00 119)27.50259000.00 39750.00209000.00 129000.00

    750.00 1)9750.0069500.00 269000.00

    109000.00 720.00

    29000.00 39625.00509000.00 59000.00)09000.00 49000.00

    1009000.00 500.00

    1109000.00 550.00

    769672.50 109050.00 )69723

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    48/78

      1009000.00 39500.00

    1109000.00 39300.00

    19403.20 659)00.00 1579203

    1572//

    69750.00 549000.00

    195)0.00 179)0.40

    2339400.00 9)02.)0

    195)0.00 29370.00

    509000.00 319000.00

    )09000.00 2)9000.00

    1009000.00 39500.00

    1109000.00 39300.00

    )49153.20 659)00.00 14953

    15/7///

    69750.00 549000.00

    195)0.00 179)0.40

    2339400.00 9)02.)0

    195)0.00 29370.00

    509000.00 319000.00

    )09000.00 2)9000.00

    1009000.00 39500.00

    1109000.00 39300.00

    )49153.20 659)00.00 14953

    15/7///

    19700.00 1970.00

    249500.00 29450.00

    209)00.00 5940).00

    509000.00 19000.00

    )09000.00 59040.00

    1009000.00 630.00

    1109000.00 275.00

    9)2).00 6945.00 169773

    1;7

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    49/78

      1109000.00 275.00

    14960.00 6945.00 219635

    217;//

    249500.00 4900.00

    19700.00 39152.00

    359500.00 355.00

    39000.00 39000.00

    49500.00 29250.00

    509000.00 109000.00

    )09000.00 249000.00

    1009000.00 39000.00

    1109000.00 19100.00

    139657.00 3)9100.00 519757

    517

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    50/78

      609)00.00 609)00.00509000.00 500.00)09000.00 )9000.00

    1009000.00 19000.00

    1109000.00 550.00

    609)00.00 109050.00 709)50

    /74//

    2459000.00 2459000.00

    449100.00 449100.00

    509000.00 459000.00)09000.00 10)9000.00

    1009000.00 279000.00

    1109000.00 69050.00

    2)9100.00 1)69050.00 4759150

    6572//

    629000.00 749400.00

    219700.00 219700.00

    509000.00 19)00.00

    )09000.00 49)00.00

    1009000.00 600.00

    1109000.00 1).00

    69100.00 793).00 10394)

    1/375//

    349375.00 419250.00

    129031.25 129031.25

    509000.00 19)00.00

    )09000.00 49)00.00

    1009000.00 600.00

    1109000.00 1).00

    5392)1.25 793).00 60967

    ;/7//

    69550.00 79)60.002922.50 2922.50

    509000.00 19)00.00

    )09000.00 49)00.00

    1009000.00 600.00

    1109000.00 1).00

    109152.50 793).00 179551

    17;//

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    51/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    52/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    53/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    54/78

      ra! kuran 51122 p. 6509- / Ps

      ,angun ruma! $yp 30 &i bu$u!kan

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    55/78

    Panang &r>il $u+a/$u+a

    Batang te&i luar &r>il gan+a

    .!"# $%

    4  Batang 1 +an 4 %2 1,72 m' 2 6,88 m

    5  Batang 2 +an 3 %2 2,332 m' 2 9,328 m

    6  Batang 5 +an 8 %2 1 m' 2 4 m

    7  Batang 6 +an 7 %2 2 m' 2 8 m

    )  Batang 9 +an 13 2 1,4 m 2,8 m

      Batang 10 +an 12 2 2,441 m 4,882 m

    10  Batang 11 1 2,6 m 2,6 m F

    11  Panang Ttal 38,49 m

    @lume "atang ttal Panang ttal 0,12 m 0,2 m

      38,49 m 0,12 m 0,2 m

     

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    56/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    57/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    58/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    59/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    60/78

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    61/78

    Re"?(#!%")( A*"%()"P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    N$ JENIS PEKERJAAN S"#!"*SPESI=IKASI HARGA SATUAN

    MATERIAL B8OWNER

    I PEKERJAAN PERSIAPAN

    1 Pmbrsian a!an m2 %anual p 139750.00

    2 Pngukuran ; Pas.,u8plank m1 Kas ; Papan ,rn p 569000.00

    3 Air F is$rik Kr#a s  p 5009000.00

    II PEKERJAAN GALIAN & URUGAN

    1 +alian Tana! Pn&asi ; lag m3 %anual p 29000.00

    2 rugan Tana!

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    62/78

    Re"?(#!%")( A*"%()"P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    V PEKERJAAN ATAP

    1 Pas. A$ap +n$ng ,$n m2 +n$ng Dla$ .%u$iara p -

    2 Pas. A$ap +n$ng Kaa m2 +n$ng Kaa p -

    3 angka A$ap m2 ,alk 6129 Kas 579 ang 34 p -

    4 ,ubungan m1 >k

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    63/78

    Re"?(#!%")( A*"%()"P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    5 'in&ing Kramik 2025 m2 Kramik KHA/*$ara p 1259000.00

    I9 PEKERJAAN PENGECATAN

    1 Pnga$an 'in&ing Hn$rir m2 *upr Einil/*$ara p 229500.00

    2 Pnga$an 'in&ing yala ampu Ti$ik J% 32.5mm/*$ara p -

    2 Hns$alasi Ti$ik >yala 'aya Ti$ik J% 32.5mm/*$ara p -

    3 *aklar Tunggal ,! ,r p -

    4 *aklar +an&a ,! ,r p -

    5 *$pkn$ak ,! ,r p -

    6 , Panl ni$ ?als p -

    7 ampu ,! P!ilips/*$ara p -

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR

    1 ls$ 'u&uk ni$ ls$ &u&uk A p -

    2 Kran Air ,! Kran Air A p -

    3 Dlr 'rain ,! D'

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    64/78

    Re"?(#!%")( A*"%()"P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

     p

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    65/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e ;5

    N$ JENIS PEKERJAAN V$%!me S"#!"*SPESI=IKASI

    HARSATMATERIAL

    I PEKERJAAN PERSIAPAN

    1 Pmbrsian a!an 144.000 m2 %anual p 109500

    2 Pngukuran ; Pas.,u8plank 32.000 m1 Kas ; Papan ,rn p 4)9200

    3 Air F is$rik Kr#a 1.000 s  p 7509000

    Sub.Jumlah

    II PEKERJAAN GALIAN & URUGAN

    1 +alian Tana! Pn&asi ; lag 15.74) m3 %anual p 3)9100

    2 rugan Tana!

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    66/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e ;5

    Sub.Jumlah

    V PEKERJAAN ATAP

    1 Pas. A$ap +n$ng ,$n )1.600 m2 +n$ng Dla$ .%u$iara p 559000

    2 Pas. A$ap +n$ng Kaa 2.000 ,! +n$ng Kaa p 559000

    3 angka A$ap )1.600 m2 ,alk 6129 Kas 579 ang 34 p 495309100

    4 ,ubungan 5.500 m1 >k

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    67/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e ;5

    Sub.Jumlah

    I9 PEKERJAAN PENGECATAN

    1 Pnga$an 'in&ing Hn$rir  163.)01 m2 *upr Einil/*$ara p 169)00

    2 Pnga$an 'in&ing yala ampu .000 Ti$ik J% 32.5mm/*$ara p 1509000

    2 Hns$alasi Ti$ik >yala 'aya 5.000 Ti$ik J% 32.5mm/*$ara p 1509000

    3 *aklar Tunggal 4.000 ,! ,r p 229500

    4 *aklar +an&a 3.000 ,! ,r p 359000

    5 *$pkn$ak 5.000 ,! ,r p 229500

    6 , Panl 1.000 ni$ ?als p 3509000

    7 ampu .000 ,! P!ilips/*$ara p 159000Sub.Jumlah

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR

    1 ls$ 'u&uk 1.000 ni$ ls$ &u&uk A p 19539500

    2 Kran Air 2.000 ,! Kran Air A p )49100

    3 Dlr 'rain 1.000 ,! D'

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    68/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e ;5

    4 Pk.arpr$ 0.360 m3 aba$ ,$n p 19040910

    Sub.Jumlah

    Total Pekerjaan

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    69/78

    Re"?(#!%")( A*++""* B(""P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e ;5

    N$ JENIS PEKERJAANBOBOT TOTAL

    PEKERJAAN  HARGA

    I PEKERJAAN PERSIAPAN 0.726C p 39)049400.00

    II PEKERJAAN GALIAN & URUGAN 0.16C p ))397.65

    III PEKERJAAN STRUKTUR 7.5)3C p 397359065.76

    IV PEKERJAAN DINDING 10.03C p 529))6901.20

    V PEKERJAAN ATAP 72.10C p 3779)4)9304.00

    VI PEKERJAAN PLA=OND 0.07C p 497559215.00

    VII PEKERJAAN KUSEN7 JENDELA7 PINTU & RAILING 3.621C p 1)9759000.00

    VIII PEKERJAAN =INISHING LANTAI 0 KERAMIK 2.12)C p 1191539010.00

    I9 PEKERJAAN PENGECATAN 0.700C p 396659646.00

    9 PEKERJAAN INSTALASI LISTRIK 0.40C p 291429500.00

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR 1.352C p 790)69300.009II PEKERJAAN LAIN 0.202C p 1905792).40

    TOTAL 100C  R? 5237443766//1

    HARGA BORONGAN PERMETER PERSEGI ADALAH > TOTAL BIA8A BANGUNAN DIBAGI LUAS BANGUNAN

    TTA P 10C  p 52939344.00

    +A>' TTA  p 57693297)4.01

    P  p 5769329)00.00

    HARGA BORONGAN  R?

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    70/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 65

    N$ JENIS PEKERJAANBOBOT TOTAL

    PEKERJAAN  HARGA

    I PEKERJAAN PERSIAPAN

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    71/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3;

    N$ JENIS PEKERJAAN V$%!me S"#!"*SPESI=IKASI

    HARSATMATERIAL

    I PEKERJAAN PERSIAPAN

    1 Pmbrsian a!an 72.000 m2 %anual p 109500

    2 Pngukuran ; Pas.,u8plank 24.000 m1 Kas ; Papan ,rn p 4)9200

    3 Air F is$rik Kr#a 1.000 s  p 7509000

    Sub.Jumlah

    II PEKERJAAN GALIAN & URUGAN

    1 +alian Tana! Pn&asi ; lag 16.5 m3 %anual p 3)9100

    2 rugan Tana!

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    72/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3;

    2 Pas. A$ap +n$ng Kaa 2.000 b! +n$ng Kaa p 559000

    3 angka A$ap 50.)00 m2 ,alk 6129 Kas 579 ang 34 p 495309100

    4 ,ubungan 5.500 m1 >k

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    73/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3;

    5 Pnga$an is$plank 2.10 m2 a$ %inyak/*$ara p 2)9100

    6 Pnga$an Tpi ,$n 10.500 m2 Einil/*$ara p 219600

    Sub.Jumlah

    9 PEKERJAAN INSTALASI LISTRIK

    1 Hns$alasi Ti$ik >yala ampu 7.000 Ti$ik J% 32.5mm/*$ara p 1509000

    2 Hns$alasi Ti$ik >yala 'aya 4.000 Ti$ik J% 32.5mm/*$ara p 1509000

    3 *aklar Tunggal 3.000 ,! ,r p 229500

    4 *aklar +an&a 2.000 ,! ,r p 359000

    5 *$pkn$ak 4.000 ,! ,r p 229500

    6 , Panl 1.000 ni$ ?als p 3509000

    7 ampu 7.000 ,! P!ilips/*$ara p 159000

    Sub.Jumlah

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR

    1 ls$ 'u&uk 1.000 ni$ ls$ &u&uk

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    74/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3;

    N$ JENIS PEKERJAANBOBOT TOTAL

    PEKERJAAN  HARGA

    I PEKERJAAN PERSIAPAN 0.762C p 296629)00.00

    II PEKERJAAN GALIAN & URUGAN 0.326C p 1913795)6.13

    III PEKERJAAN STRUKTUR ).065C p 2)917493)1.14

    IV PEKERJAAN DINDING 11.24C p 3945496)0.45

    V PEKERJAAN ATAP 67.547C p 23596595.00

    VI PEKERJAAN PLA=OND 1.07C p 39)319431.25

    VII PEKERJAAN KUSEN7 JENDELA7 PINTU & RAILING 4.4)0C p 1596509000.00

    VIII PEKERJAAN =INISHING LANTAI 0 KERAMIK 2.30C p )934)9310.00

    I9 PEKERJAAN PENGECATAN 1.3)6C p 49)4193)7.30

    9 PEKERJAAN INSTALASI LISTRIK 0.66)C p 293329500.00

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR 1.7)C p 692509200.009II PEKERJAAN LAIN 0.17C p 6))9556.21

    TOTAL 100C  R? 36473376316

    HARGA BORONGAN PERMETER PERSEGI ADALAH > TOTAL BIA8A BANGUNAN DIBAGI LUAS BANGUNAN

    TTA P 10C  p 349339743.15

    +A>' TTA  p 3)492719174.62

    P  p 3)492719200.00

    HARGA BORONGAN  R? 1/7;672////

    Terbilang :

    B"*+(F(7

    'ia#ukanKn$rak$r 

    'irk$ur 

    'ia#ukanKn$rak$r 

    'irk$ur 

    'ia#ukanKn$rak$r 

    'irk$ur 

    'is$u#ui'Ilpr 

    'irk$ur 

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    75/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3/

    N$ JENIS PEKERJAAN V$%!me S"#!"*SPESI=IKASI

    HMATERIAL

    I PEKERJAAN PERSIAPAN

    1 Pmbrsian a!an )0.000 m2 %anual p

    2 Pngukuran ; Pas.,u8plank 41.150 m1 Kas ; Papan ,rn p

    3 Air F is$rik Kr#a 1.000 s  p

    Sub.Jum

    II PEKERJAAN GALIAN & URUGAN

    1 +alian Tana! Pn&asi ; lag 14.112 m3 %anual p

    2 rugan Tana! n Asbs

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    76/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3/

    7 Pas. Dlasing ,a#a apis *ng ,* 30 3.000 m1 ,a$ak Prss 1:5 p

    Sub.Jum

    VI PEKERJAAN PLA=OND

    1 PlaGn& 'alam

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    77/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3/

    2 Hns$alasi Ti$ik >yala 'aya 4.000 Ti$ik J% 32.5mm/*$ara p

    3 *aklar Tunggal 3.000 ,! Panasni / *$ara p

    4 *aklar +an&a 2.000 ,! Panasni / *$ara p

    5 *$pkn$ak 4.000 ,! Panasni / *$ara p

    6 , Panl 1.000 ni$ ?als p

    7 ampu 7.000 ,! P!ilips/*$ara p

    Sub.Jum

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR

    1 ls$ ngkk 1.000 ni$ ls$ ngkk

  • 8/18/2019 BoQ TYPE 72 Permata Kemang Residence

    78/78

    B(%% O !"*#(# .B$P$e : Pe!m""* PESONA SAMAWA

    L$")( : JL GARUDA SUMBAWA BESAR

    R!m" T?e 3/

    N$ JENIS PEKERJAANBOBOT TOTAL

    PEKERJAAN  HARGA

    I PEKERJAAN PERSIAPAN 5.704C p 393239430.00

    II PEKERJAAN GALIAN & URUGAN 1.712C p 79341.1)

    III PEKERJAAN STRUKTUR 13.1))C p 796)49453.25

    IV PEKERJAAN DINDING 1).047C p 1095169027.40

    V PEKERJAAN ATAP 16.5)6C p 9664932.40

    VI PEKERJAAN PLA=OND 4.242C p 294719627.00

    VII PEKERJAAN KUSEN7 JENDELA7 PINTU & RAILING 16.)1)C p 9)009000.00

    VIII PEKERJAAN =INISHING LANTAI 0 KERAMIK 3.301C p 19239465.00

    I9 PEKERJAAN PENGECATAN 7.1)6C p 491)792)5.20

    9 PEKERJAAN INSTALASI LISTRIK 4.003C p 293329500.00

    9I PEKERJAAN INSTALASI AIR BERSIH & KOTOR ).413C p 49029010.009II PEKERJAAN LAIN 0.)02C p 4679220.75

    TOTAL 100C  R? 5' TTA  p 64906965).10

    P  p 649069700.00

    HARGA BORONGAN  R? 2713;755;;

    Terbilang :

    B"*+(F(7

    'ia#ukanKn$rak$r 'ia#ukanKn$rak$r 'ia#ukanKn$rak$r  'is$u#ui'Ilpr