Bond Construction Bond Construction UpdateUpdate

Facilities Advisory Facilities Advisory CommitteeCommittee

Bond Construction Bond Construction UpdateUpdate

Facilities Advisory Facilities Advisory CommitteeCommittee

Long Beach Community College District November 9, 2011

EDUCATE ENGAGE EMPOWER 1

Agenda

Completed Construction Projects LAC W Trailers Demo PCC Tech 1 (Sheet Metal)

Current Construction Projects LAC Building A – Student Services Retrofit LAC Building I (Bookstore) LAC Master Landscape LAC Stadium Parking Lot Lights and Veterans Stadium Lights PCC MDAB (Multi-Disciplinary Academic Building) LAC PCC Building CC Retrofit

Upcoming Construction Projects LAC Math Technology Building PCC Building GG LAC Building C Retrofit

Q & A

2

Completed Construction Projects

3

Project addressed storm run off issues with bio swales Site converted to a parking lot Project completed Summer 2011

LAC W Trailers Demo - Measure E 2008LAC W Trailers Demo - Measure E 2008

Completed Construction Projects

4

Construction started Summer 2011 Equipment and utilities installed Projected completed before start of Fall semester 2011

PCC Tech 1 (Sheet Metal) - Measure E 2008PCC Tech 1 (Sheet Metal) - Measure E 2008

Current Construction ProjectsLAC Building A – Student Services RetrofitLAC Building A – Student Services Retrofit

Measure E 2008Measure E 2008

5

New home for A&R, Counseling, Health Services, Cashier, Transfer Center

Project currently in structural upgrade New contractor in place End of construction anticipated Summer 2012

Current Construction Projects

6

Adds additional 4,000 square feet to existing building Architecture to match LAC Mediterranean Theme Work on framing and utilities underway End of construction anticipated Fall 2011 Move in planned for late January or early Feburary

LAC Building I - Measure E 2008LAC Building I - Measure E 2008

Current Construction Projects

7

Currently in Design Phase(Finalizing design) Plans to be submitted to DSA November 2nd

Quad areas North and South of Bldg. A will bid Fall 2011 Remaining areas designed at 25% Scope includes new hardscape/landscape and pedestrian

pathways

LAC Master Landscape - Measure E 2008LAC Master Landscape - Measure E 2008

8

Stadium Parking Lot Lights and Stadium Lighting Stadium Parking Lot Lights and Stadium Lighting Measure E 2008Measure E 2008

Current Construction Projects

Stadium parking lot lights Construction commenced 9/12 All bases have been installed Currently in the process of installing light poles/fixtures Install energy efficient lights with controls capabilities

Stadium lighting retrofit Awaiting final DSA approval

Current Construction ProjectsPCC MDAB PCC MDAB

(Multi-Disciplinary Academic Building)(Multi-Disciplinary Academic Building)Measure E 2008Measure E 2008

9

MDAB building remodel project Phase 1 of 2 currently under construction Project currently in demolition and structural reinforcement Phase 1 Project to be completed Summer 2012

Upcoming Construction ProjectsPCC Building CC Retrofit - Measure E 2008PCC Building CC Retrofit - Measure E 2008

10

Houses the Fitness Center, Gymnasium, Weight Room, and Faculty and Staff Offices

Swing space located on PCC Campus (Bldg. GG) Approved by DSA on 1/27/11 Bid process complete. Awarded to Angeles To be completed concurrently with MDAB project phase 1 Anticipated end of construction Fall 2012

Upcoming Construction Projects

Will house Math and Culinary Arts instructional program as well as Reprographics

Design Build delivery method Requesting Qualifications (RFQ) –

was due 8/3 Shortlisted and interviewed 10

respondents (9/7-9/9) Selected 3 and are currently

requesting for proposals Pre-RFP meeting with contractors to

take place on 10/27 Anticipated start of construction

2013

LAC Math Technology Building – Measure E 2008LAC Math Technology Building – Measure E 2008

11

Upcoming Construction ProjectsPCC Building GG - Measure E 2008PCC Building GG - Measure E 2008

12

Design Build delivery method Request for Qualifications (RFQ)

Start in November and due mid December Building to house Health Services, EOPS, DSPS, Financial Aid, Cashier, A&R,

and Counseling Estimated start of construction December 2013

Upcoming Construction ProjectsLAC Building C Retrofit - Measure E 2008LAC Building C Retrofit - Measure E 2008

13

Hired Architect to do design work Currently in schematic phase Work includes modernization of structure, classrooms spaces, and

office areas

l i b

e r

a l

a r

t s

Liberal Arts CampusSite Plan

p a

c i f

i c

c

o a

s t

Pacific Coast CampusSite Plan

QUESTIONS&

ANSWERS