BOLIN CreeK Project. By: Hunter Hagy. Overview. Background Information Current Conditions Conceptual Planning Recommendations. Background Information. Location. Background Information. Primary Uses. Background Information. Current Conditions. Erosion and Soil. Current Conditions. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BOLIN  CreeK  Project

BOLIN CREEK PROJECT

By: Hunter HagySaturday, April 22, 2023

Page 2: BOLIN  CreeK  Project

Overview

Background Information

Current Conditions Conceptual Planning Recommendations

Page 3: BOLIN  CreeK  Project

Background Information

Page 4: BOLIN  CreeK  Project

Location

Page 5: BOLIN  CreeK  Project

Primary Uses

Page 6: BOLIN  CreeK  Project

Current Conditions

Page 7: BOLIN  CreeK  Project

Erosion and Soil

Signs of erosion , such as exposed tree roots, can be seen where the creek encroaches on the trail.

Page 8: BOLIN  CreeK  Project

Erosion and Soil

After heavy rains, streams created by runoff flow across the trail and into Bolin Creek.

Current Conditions

Page 9: BOLIN  CreeK  Project

Conceptual Planning

Page 10: BOLIN  CreeK  Project

Funding

1.) Surface Transportation Program-Direct Allocation (STF-DA) -The STF-DA funds will account for 80% of the funding needed.

2.) Town Funds-The remaining 20% will come from a citizen-approved bond referendum from 2003, which allocated funding for the Bolin Creek Project.

3.) Transportation Investment Generating Economic Recovery (TIGER) -will provide additional funding for updating cost estimates and refining trail designs.

Page 11: BOLIN  CreeK  Project

Greenway Surfaces

What is the anticipated use of the trail?How important are aesthetics?How much money is available?How long should the surface last?

Page 12: BOLIN  CreeK  Project

Potential Surfaces

These surfaces were chosen based on functionality. They all allow for walking as well as biking use. In addition, it is important to note that the majority of these surfaces also allow for wheelchair use.

Page 13: BOLIN  CreeK  Project

Recommendations

Page 14: BOLIN  CreeK  Project

Recommendations

Concrete

Page 15: BOLIN  CreeK  Project

Recommendations

Porous Concrete

http://www.tececo.com/technical.permecocrete.php

Page 16: BOLIN  CreeK  Project

Summary

Environmental Facts:

-concrete conserves resources by reducing the need for reconstruction. Its ingredients are cement and readily available natural materials: water, aggregate (sand and gravel or crushed stone).

-concrete absorbs CO2 throughout its lifetime through carbonation, helping reduce its carbon footprint.

Of the before mentioned surfaces, concrete and permeable concrete are the most durable.

Although more expensive at the outset, concrete will not break up like asphalt over time and will not have to be resurfaced, resulting in additional costs.

Bolin Creek Trail is located in a low area, where water will often run over it. So therefore it is important to chose a material that is not as susceptible to deterioration.

Concrete needs little maintenance Over time concrete will keep the same look

as the day it was poured. Concrete enables Bolin Creek Trail to

preserve its recreational use, as well as making it wheelchair friendly.

Page 17: BOLIN  CreeK  Project

Bibliography

http://atfiles.org/files/pdf/AltaTrailSurface.pdf

http://www.ci.carrboro.nc.us/AdvBoards/Greenways/pdf/greenways_summary.pdf

http://blog.ashtonparkcamapts.com/around-town/hit-the-trails-in-grand-prairie-for-national-trails-day/

http://www.tececo.com/technical.permecocrete.php