Page 1: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

BOLIN CREEK PROJECT

By: Hunter HagyFriday, April 21, 2023

Page 2: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Overview

Background Information

Current Conditions Conceptual Planning Recommendations

Page 3: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Background Information

Page 4: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Location

Page 5: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Primary Uses

Page 6: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Current Conditions

Page 7: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Erosion and Soil

Signs of erosion , such as exposed tree roots, can be seen where the creek encroaches on the trail.

Page 8: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Erosion and Soil

After heavy rains, streams created by runoff flow across the trail and into Bolin Creek.

Current Conditions

Page 9: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Conceptual Planning

Page 10: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Funding

1.) Surface Transportation Program-Direct Allocation (STF-DA) -The STF-DA funds will account for 80% of the funding needed.

2.) Town Funds-The remaining 20% will come from a citizen-approved bond referendum from 2003, which allocated funding for the Bolin Creek Project.

3.) Transportation Investment Generating Economic Recovery (TIGER) -will provide additional funding for updating cost estimates and refining trail designs.

Page 11: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Greenway Surfaces

What is the anticipated use of the trail?How important are aesthetics?How much money is available?How long should the surface last?

Page 12: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Potential Surfaces

These surfaces were chosen based on functionality. They all allow for walking as well as biking use. In addition, it is important to note that the majority of these surfaces also allow for wheelchair use.

Page 13: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Recommendations

Page 14: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Recommendations

Concrete

Page 15: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Recommendations

Porous Concrete

http://www.tececo.com/technical.permecocrete.php

Page 16: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Summary

Environmental Facts:

-concrete conserves resources by reducing the need for reconstruction. Its ingredients are cement and readily available natural materials: water, aggregate (sand and gravel or crushed stone).

-concrete absorbs CO2 throughout its lifetime through carbonation, helping reduce its carbon footprint.

Of the before mentioned surfaces, concrete and permeable concrete are the most durable.

Although more expensive at the outset, concrete will not break up like asphalt over time and will not have to be resurfaced, resulting in additional costs.

Bolin Creek Trail is located in a low area, where water will often run over it. So therefore it is important to chose a material that is not as susceptible to deterioration.

Concrete needs little maintenance Over time concrete will keep the same look

as the day it was poured. Concrete enables Bolin Creek Trail to

preserve its recreational use, as well as making it wheelchair friendly.

Page 17: BOLIN CREEK PROJECT By: Hunter Hagy Wednesday, April 29, 2015

Bibliography

http://atfiles.org/files/pdf/AltaTrailSurface.pdf

http://www.ci.carrboro.nc.us/AdvBoards/Greenways/pdf/greenways_summary.pdf

http://blog.ashtonparkcamapts.com/around-town/hit-the-trails-in-grand-prairie-for-national-trails-day/

http://www.tececo.com/technical.permecocrete.php