boeing ch-47 chinook - apex industries · the ch-47 has two power distribution panels, or pdps,...
TRANSCRIPT
The CH-47 has two power distribution panels, or PDPs,
behind the pilots in the cockpit. Apex manufacturers and
assembles the entire 35” tall structure.
This part is extraordinarily complex and includes the following:
• 8 machined parts
• 36 sheet metal parts
• 76 helicoils
• 270 nut plates
• 810 rivets & screws
• full secondary processing (in-house)
This is just one of many projects that we’ve done since 1989 in our Aerospace Group.
How can we help you with your next project?
Contact us to find out more information!
Brian MelansonBusiness Development Manager
T: 1.506.857.1633C: 1.506.875.6794
apexindustries.com
Boeing CH-47 ChinookPower Distribution Panel