boeing ch-47 chinook - apex industries · the ch-47 has two power distribution panels, or pdps,...

1
The CH-47 has two power distribution panels, or PDPs, behind the pilots in the cockpit. Apex manufacturers and assembles the entire 35” tall structure. This part is extraordinarily complex and includes the following: 8 machined parts 36 sheet metal parts 76 helicoils 270 nut plates 810 rivets & screws full secondary processing (in-house) This is just one of many projects that we’ve done since 1989 in our Aerospace Group. How can we help you with your next project? Contact us to find out more information! Brian Melanson Business Development Manager T: 1.506.857.1633 C: 1.506.875.6794 E: [email protected] apexindustries.com Boeing CH-47 Chinook Power Distribution Panel

Upload: others

Post on 24-Jan-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Boeing CH-47 Chinook - Apex Industries · The CH-47 has two power distribution panels, or PDPs, behind the pilots in the cockpit. Apex manufacturers and assembles the entire 35”

The CH-47 has two power distribution panels, or PDPs,

behind the pilots in the cockpit. Apex manufacturers and

assembles the entire 35” tall structure.

This part is extraordinarily complex and includes the following:

• 8 machined parts

• 36 sheet metal parts

• 76 helicoils

• 270 nut plates

• 810 rivets & screws

• full secondary processing (in-house)

This is just one of many projects that we’ve done since 1989 in our Aerospace Group.

How can we help you with your next project?

Contact us to find out more information!

Brian MelansonBusiness Development Manager

T: 1.506.857.1633C: 1.506.875.6794

E: [email protected]

apexindustries.com

Boeing CH-47 ChinookPower Distribution Panel