Page 1: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Boddington Gold

Blasthole Sampling at Newmont Boddington Gold

Sampling 2013 – Brisbane May 2013

Page 2: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 2

Newmont Boddington Gold

Page 3: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 3

Geological Setting

Page 4: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Boddington Open Pit

00/00/00 Place title of presentation here 4

North Pit

South Pit

Waste Dump

Page 5: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 5

Ultimate Pit

If notes are needed they are Arial 10pt.

Ultimate Pit Dimensions Length: ~4,000 m Width: ~1,000 m Depth: ~700 m

Image of the skyscraper, Burj Khalifa Dubai, to depict the future depth of the Boddington pit.

Page 6: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 6

Pit Geology

If notes are needed they are Arial 10pt.

Page 7: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Mining Fleet

Placeholder for Rope shovel

Page 8: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 8

Shovel Dipper

Page 9: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 9

Drill and Blast Fleet

Needs decent picture with dust skirts

If notes are needed they are Arial 10pt.

Page 10: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 10

Boddington Mill

Text starts here, Arial 20pt.Level 2, Arial 20pt

Level 3, Arial 14ptLevel 4, Arial 14pt

Level 5, Arial 14pt

If notes are needed they are Arial 10pt.

Page 11: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 11

Grade Control Requirements

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Tonn

es

Month

ROM

MG

Waste

55% of 2014 total movement is Ore

Page 12: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Key Challenges for Sampling

• Safe – Minimise Exposure to High risks

• Costs – High Volume Low Cost

• Accuracy – Low Head Grade, requires Accurate, Precise Sampling. 1-2% increase in mill head grade delivers big benefits

• Fast – Keep the Pit working.

00/00/00 Place title of presentation here 12

• Auger Sampling Selected

Page 13: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 13

Blasthole Spacing and Minimum Mining Size

Blasthole Spacing 5m x 6.2m

Kriged Blocks 5m x 5m x 6m

Minimum Mining Size 20m x 20m x 12m Bench Height

Page 14: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 14

Blasthole Sampling Systems Considered

Page 15: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 15

Auger Sampling - Augers

Page 16: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Auger Sampling - Technique

00/00/00 Place title of presentation here 16

Page 17: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 17

Auger Sampling - Theory

Text starts here, Arial 20pt.Level 2, Arial 20pt

Level 3, Arial 14ptLevel 4, Arial 14pt

Level 5, Arial 14pt

If notes are needed they are Arial 10pt.

Page 18: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Electronic Data Capture

00/00/00 Place title of presentation here 18

Page 19: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 19

Sample Protocol Testing

• Hole drilled through Tarpaulin to prevent contamination.

• 5 Auger Samples taken (1 for Production, 4 for test work)

• 2 Spear Samples for comparison

• Remainder Alternate Shovelled to 5 piles

• 1 Pile Selected at random (post shovelling) and dispatched for rotary splitting.

• 11 sub samples split and assayed.

• Remainder of pile reserved for CRM generation

Page 20: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 20

Sample Protocol Testing

If notes are needed they are Arial 10pt.

0.10

1.00

10.00

0.10 1.00 10.00

Rota

ry S

plit

Au (g

/t)

Auger Sample Au (g/t)

Sample Protocol Test Results

• Auger Possibly Biased low at low grades (<0.2g/t)• Generally within the variability of the lot

Page 21: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 21

Ongoing QAQC - Field Duplicates

Text starts here, Arial 20pt.Level 2, Arial 20pt

Level 3, Arial 14ptLevel 4, Arial 14pt

Level 5, Arial 14pt

If notes are needed they are Arial 10pt.

• 2,434 Field Duplicates in 2012 (~8% of samples duplicated)

• Between 0.1g/t and 1g/t Au • 85% of Samples <0.1g/t error• 95% of Samples <0.2g/t error

0.01

0.1

1

10

100

0.01 0.10 1.00 10.00 100.00

Log

of F

ield

Dup

licat

e

Log of Primary Sample

Log-Log Chart of Field Duplicate Results 2012

Page 22: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Particle Size Sensitivity

00/00/00 Place title of presentation here 22

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

12.59.56.74.753.352.360.850.425<0.425

Au G

rade

(ppm

)

Size Fraction (mm)

Au Grade by Size Fraction

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

50.00%

12.59.56.74.753.352.360.850.425<0.425

Au M

etal

(%)

Size Fraction (mm)

% Au Metal by Size Fraction

Page 23: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 23

Mill Reconciliation

90%

95%

100%

105%

110%

Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12

Delivered to Mill/Recieved at Mill 3 Month Rolling

Oz 5% Lines 5% Lines

Page 24: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 24

Boddington and RC drilling

• Rock Strength – 150-250Mpa

• Historic Low Penetration rates (>15 years experience on site with multiple contractors)

• Diamond almost same meterage cost for Resource Definition drilling.

If notes are needed they are Arial 10pt.

Page 25: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 25

RC – Blasthole Comparison pattern

• Tight spaced RC drilling on 10m Centres(Green) with 2m Samples

• Blastholes Sampled (Red)

Page 26: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 26

RC – Blasthole Comparison - Nearest Hole

0.1

1

10

100

0.1 1 10 100

14m

Com

posi

te R

C Au

(g/t

)

Blasthole Au (g/t)

RC 14m Composite vs. nearest BH

Note: No Change of Support conducted

Page 27: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 27

RC – Blasthole Comparison Complete Blast

Note: No Change of Support conducted

Page 28: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 28

RC vs. BH Drilling Business Case

Technical Excellence is not a Business Case(Dunham 2012)

If notes are needed they are Arial 10pt.

Estimated Cost increase requires ~3-5% mill head grade increase to cover.

Operational Impact of 4-5 Grade Control RC rigs

Is there an issue to resolve?

Page 29: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Blasthole Sampling Delivery

00/00/00 Place title of presentation here 29

  Total Percentage

Assayed 303,919 95.06%

Safety or Loaded 956 0.30%

Trashed 3,430 1.07%

Contaminated 999 0.31%

Sampling Issues 4,745 1.48%

Not Sampled 5,680 1.78%

Total 319,729  

• 95% of blastholes with sampling assigned sampled project to date.

• Minimal Sampling issues (Wet holes/Small collars)

• Minimal Shovel downtime “Waiting for Markup” (<30hrs in 2012)

• Good Reconciliation

Page 30: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 30

Blasthole Sampling Summary

• Blasthole Sampling can work given;• The Right Deposit• The Right Sampling System – tested and verified at

that site• Ongoing test work and evaluation

• Ensure it is supported by RC drilling where required

• Management Buy-In.If notes are needed they are Arial 10pt.

Page 31: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

00/00/00 Place title of presentation here 31

Are Augers the answer?

• Potential Overextension Injuries in Samplers/Technicians if poor techniques employed.

• Experienced at 3 mines where system is used.

• Can be managed but limits time in role and recruiting pool.

Page 32: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Globally the Industry needs an automated, reliable

blasthole sampling system.

00/00/00 Place title of presentation here 32

Page 33: Boddington Gold Blasthole Sampling at Newmont Boddington Gold Sampling 2013 – Brisbane May 2013

Thanks and Acknowledgements

• Dominique François-Bongarçon  .

• Newmont Boddington Gold Ore Control Team, past and present, especially Letitia Scott, Alison Compton and Jodie Gray.

• Newmont Boddington Gold Drill and Blast department.

00/00/00 Place title of presentation here 33