    NAME OF PROJECT : CONSTRUCTION OF FARM TO MARKET ROAD,BOALAN, ZAMBOANGA CITY 

    LOCATION : BOALAN, ZAMBONGA CITY

    APPROPRIATION : Php 2,970,000.00

    DURATION : 56 CALENDAR DAYS

    UNDERTAKEN : BY CONTRACT

    3 0 31 1 2 3 4 5 6 7 8 9 1 0 1 1 12 1 3 1 4 # 16 1 7 1 8 19 2 0 2 1 22 2 3 2 4 25 2 6 2 7 28 2 9 3 0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 13 1 4 1 5 16 1 7 1 8 19 2 0 2 1 22 2 3 2 4 2 5 26 2 7 2 8 29 3 0 3 1 1 2 3 4 5 6 7 8

    1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 13 1 4 1 5 1 6 # 1 8 1 9 2 0 21 2 2 2 3 2 4 2 5 2 6 27 2 8 2 9 3 0 3 1 32 3 3 3 4 3 5 3 6 3 7 38 3 9 4 0 4 1 4 2 4 3 44 4 5 4 6 4 7 4 8 4 9 50 5 1 5 2 5 3 5 4 5 5 56 5 7 5 8 5 9 6 0 56 5 7 5 8 5 9 6 0 6 1 62 6 3 6 4 6 5 6 6

    PART A.1.1 Construction of Low Cost Bunkhouse (Type 1) 6M.P.

    SPL1 Mobil ization & Demoblization

    SPL2 Pro ject Bil lboard 4 M.P.

    PART B.2 Construction Safety and Health 4 M.P.

    PART B.4 Construction Survey and Staking 6 M.P.

    101(3) Removal of actual Structures/ Obstruction (Existing Pavement) 8 M.P.

    102(2) Surplus Common Excavation 8 M.P.

    105(1) Subgrade Preparation 8 M.P.

    200 Aggregate Subbase Course 10 M.P.

    311(1)a PCC Pavement(Plain)- Conventional Method, 200 mm thk. 25 M.P.

    (with 14 dyas Curing Period) 1-Phase 3-m width

    2-Phase 3-m width

    as er Scheduleas per Actual

    CONSTRUCTION SCHEDULE

    ITEM

    DESCRIPTIONNO.

    6010 20 30 40

    14 days curing period

    14 days curing period

    14 days curing period

     JuneMayMANPOWER SCHEDULE

    AprilMarch

    50

  • 8/18/2019 Boalan Construction Schedule With Manpower With Sundays

    2/4

  • 8/18/2019 Boalan Construction Schedule With Manpower With Sundays

    3/4

  • 8/18/2019 Boalan Construction Schedule With Manpower With Sundays

    4/4