bmvit - shaping the future federal ministry of transport, innovation and technology pan-european...
TRANSCRIPT
![Page 1: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/1.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
PAN-EUROPEAN TRANSPORT CORRIDOR XSTEERING COMMITTEE MEETING
Belgrade, January 22, 2010
Status Report
for Austrian sections
of Corridor X
Roman KirnbauerFederal Ministry of Transport, Innovation and Technology
![Page 2: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/2.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Road sections
![Page 3: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/3.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
MOTORWAYS AND EXPRESSWAYS IN AUSTRIA
Tauern - Axis
Phyrn - Axis
![Page 4: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/4.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Salzburg
Stateborder AT / SLO
Tauerntunnel
Katschbergtunnel
Tunnelkette Werfen,
Ofenauertunnel, Hieflertunnel
Wolfsbergtunnel
Karawankentunnel
Tunnel Projects
(A10 Tauernautobahn)
Additionally, environmental measures (noise protection, etc.) are taken along the entire route within a long term programme (2004 – 2020).
![Page 5: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/5.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Rail sections
![Page 6: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/6.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Angertalbrücke (New Bridge)
Start of construction works: Sept. 2006Oct. 2008: Construction works suspended for legal reasons(newly required environmental impact assessment - „Umweltverträglichkeitsprüfung“).
Completion of works expected in 2010.Construction cost: 18,5 Mio. €
Section Type Status Construction
Cost
Kolbnitz –Mühldorf
Upgrade
(Doubletrack)
Completed 2006
49,7 Mio. €
Mühldorf – Pusarnitz
Upgrade
(Doubletrack)
Completed 2009
48,7 Mio. €
The 80 km long „Tauernbahn“ from Schwarzach-St.Veit to Spital-Millstättersee is
the transport backbone for cross alpine transit.
With the completion of the Kolbnitz-Pusarnitz section in 2009 a total of 85% (69 of 80 km)
of the „Tauernbahn“ is now in double track configuration.
Salzburg
State border AT / SLO
AngertalbrückeKolbnitz - Pusarnitz
Kolbnitz – Pusarnitz (Doubletrack configuration)
Start of construction works: 2002
Tauern-Axis
Rosenbach (Remodelling of Station, Removal of low speed sections)
Start of construction works: March 2009Completion of works expected for Dec. 2010.Construction cost: 11,9 Mio. €
Rosenbach (Station)
![Page 7: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/7.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
„Tauernbahn“ - Construction works
![Page 8: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/8.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
Phyrn – Axis
Graz Werndorf – Spielfeld (State border)
under construction
planning phase
completed
![Page 9: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/9.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
„Graz/Werndorf“ - Construction works and completed sections
![Page 10: BMVIT - Shaping the Future Federal Ministry of Transport, Innovation and Technology PAN-EUROPEAN TRANSPORT CORRIDOR X STEERING COMMITTEE MEETING Belgrade,](https://reader036.vdocuments.mx/reader036/viewer/2022062313/56649f465503460f94c681fd/html5/thumbnails/10.jpg)
BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology
THANK YOUFOR YOUR KIND ATTENTION!
Roman [email protected]