bm wengl ceeng lost foam
DESCRIPTION
Lost Foam Casting Technology Process. Cermak Lostfoam ConsultantsTRANSCRIPT
BMW´S LOST FOAM BMW´S LOST FOAM FOUNDRY FOUNDRY
WITH WIDE OPEN WITH WIDE OPEN THROTTLE THROTTLE
FOR THE NEW CENTURYFOR THE NEW CENTURY Presented by
Karel Cermak, Vulcan Engineering Co.Represented by Framewell International Ltd., Beijing
L/F CASTING
FOAM C´HEAD PRODUCT
2,0 l / 110 kW
2,5 l / 125 kW
2,8 l / 142 kW
3,0 l / 172 kW
Cylinder Head for Engines:
DECISION CRITERIADECISION CRITERIAREDUCTION OF
MACHINING STEPS
IMPROVEMENT OF ENVIRONMENT
POSITIVE COST ADVANTAGE
FLOOR SPACE REDUCTION
MODIFICATION FRIENDLY
POTENTIAL FOR FURTHER WEIGHT
REDUCTION
INNOVATIVE COMPONENT
DESIGN
PROJECT PHASES
2000
1998
1995
1993
1993
1992
1992 1994 1996 1998 2000 2002
1500 Castings per day
Production Start
Technology Qualification
First Casting
Pilot Plant
Green Light
INTEGRATION OF ALL INTEGRATION OF ALL
FOR PROJECT FOR PROJECT
MANDATORY DISCIPLINES MANDATORY DISCIPLINES
FROM VERY BEGINNINGFROM VERY BEGINNING
FACTORS OF SUCCESS
IDENTIFICATION AND IDENTIFICATION AND
CLASSIFICATION OF ALL CLASSIFICATION OF ALL
PROCESS RELEVANT STEPS PROCESS RELEVANT STEPS
IN THE LOST FOAMIN THE LOST FOAM
FACTORS OF SUCCESS
TO FURNISH NECESSARYTO FURNISH NECESSARY
RESOURCESRESOURCES
FACTORS OF SUCCESS
MANAGEMENT MANAGEMENT
OF RISK OF RISK
AND TRUSTAND TRUST
FACTORS OF SUCCESS
VULCAN ENGINEERING AND VULCAN ENGINEERING AND
MANUFACTURING COMPANY - MANUFACTURING COMPANY -
THE LEADER IN REALISATION OF THE LEADER IN REALISATION OF
LOST FOAM SYSTEMS WAS LOST FOAM SYSTEMS WAS
INVOLVED FROM THE PILOT INVOLVED FROM THE PILOT
THROUGH TO PRODUCTION THROUGH TO PRODUCTION
PHASEPHASE
PARTNERS SELECTION
Headquarters: HelenaAlabma, USA
uropean Manufactring: Leicester, UK
Worldwide Representation
150 Engineers
Of 79 Lost Foam lines in the Wold, 47 built by us
Cmplete foundry systems
FROM BEAD´S EXPANSIONFROM BEAD´S EXPANSIONTHROUGHTHROUGH
CASTING EXTRACTIONCASTING EXTRACTION
JOB DESCRIPTION
THE BMW LOST FOAM FLOWTHE BMW LOST FOAM FLOW
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Raw material with blowing agentSteam heat appliedEPS expanded factor ca. 30Density control critical
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
EPS beads filled into Al toolSteam heated to expand and fuseCooled to avoid distorsionAutomatic removal
-0,5
-0,4
-0,3
-0,2
-0,1
0
0,1
0,2
0 100 200 300 400
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Controlled shrinkageAccelerated processingRepeatability
time (mins)
With Stabilisation OvenWithout Stabilisation Oven
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Hot melt glueShort “open time”RepeatabilityAccuracy
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Coating developed for lost foamRepeatabilityCeramic slurryPrecise viscosity/solids
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Removal of all moistureTemperature/humidity controlled
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Dry unbonded sandRain-fillUniformRate controllable
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
Fluidisation - CompactionPrecise control
ms0 25 50 75 100
5,0
2,5
0,0
-2,5
-5,0
Hz0 25 50 75 100
5
4
3
2
1
0
-1
Vibration Analysis FFT Analysis
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
EPS liquified and volatisedMetal replaces foamAll details reproduced
Preexpansion
Moulding
Stabilisation
Glueing
Coating
Drying
Cluster Insertion
Sand Fill
Compaction
Metal Pouring
Extraction
No shakeoutSand dry and looseSand easily recycled
CONSEQUENTIAL IN PROJECT, PROCESS
MANAGEMENT&TOTALCOMMITMENT
RESULTS
PROJECTED CAPACITY OF 1.500 CASTINGS ARE
PRODUCED IN 3 SHIFTS NOW
RESULTS
OVERALL EQUIPMENT EFFECTIVENESS
OEE > 0.75 ! !
RESULTS
26 % COST SAVINGS ! !
RESULTS
MORE THAN 400.000
„LOST FOAM“ BMW´S ARE ON THE ROAD TODAY
FACTS
VULCAN ENGINEERING´SEXPERIENCE , EXPERTISE & TOTAL SYSTEM APROACH WAS INSTRUMENTAL TO
BMW SUCCESS.
FACTS