blue grass chemical agent-destruction pilot plant quarterly update march 12, 2013

7
Blue Grass Chemical Agent- Destruction Pilot Plant Quarterly Update March 12, 2013 Presented to: Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board Presented by: Jeff Brubaker Site Project Manager

DESCRIPTION

Presented to: Kentucky Chemical Demilitarization Citizens’ Advisory Commission and Kentucky Chemical Destruction Community Advisory Board Presented by: Jeff Brubaker Site Project Manager

TRANSCRIPT

Page 1: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update

March 12, 2013

Presented to:

Kentucky Chemical Demilitarization Citizens’ Advisory Commission and

Kentucky Chemical Destruction Community Advisory Board

Presented by:

Jeff Brubaker

Site Project Manager

Page 2: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

A Partnership for Safe Chemical Weapons Destruction

Construction now more than 65 percent complete

Systemization activities now more than 9 percent complete

Completion of the structural steel on the Munitions Demilitarization Building (MDB)

Delivery of the Munitions Washout System and Rocket Shear Machine equipment

Completion and delivery of the first of two MDB filter bank Clean-Air Exhaust Stacks

Blue Grass Chemical Agent-Destruction Pilot Plant Update

3

One half of the first 120-foot Clean-Air Exhaust Stack is offloaded for temporary storage in the Hwy. 52 lay-down yard. It will be installed in accordance with the construction schedule.

Page 3: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

A Partnership for Safe Chemical Weapons Destruction

Final Munitions Demilitarization Building Filter Bank Concrete Placement video on Facebook

Blue Grass Chemical Agent-Destruction Pilot Plant Update (cont’d)

4

The workers spent approximately eight hours placing 540 cubic yards of concrete to complete the second half of the east filter bank foundation.

Page 4: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

A Partnership for Safe Chemical Weapons Destruction

4

Northwestern Corner - Observation Point

1 2

1

3

5

2

6

Hydrolysate Storage Area

Control and Support Building

Munitions Demilitarization Building (MDB) Filter Banks

MDB

Utility Building

Supercritical Water Oxidation Building (not visible in photo)

Laboratory Building (not visible in photo)

7 65

4

3

7

4

Blue Grass Chemical Agent-Destruction Pilot Plant Construction Site (March 2013)

Page 5: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

A Partnership for Safe Chemical Weapons Destruction

5

Blue Grass Hot Topics

The BGCAPP project team continues to focus on successful construction and is working with the headquarters team to determine potential funding impacts

The project team is looking forward to installing the Munitions Washout System and rocket motor disassembly equipment in the upcoming months

The National Research Council is currently conducting a study on the systemization phase for Supercritical Water Oxidation and reverse osmosis system

In the upcoming months, the project team will be asking the Secondary Waste Working Group to consider options for disposal of rocket motors

Page 6: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

A Partnership for Safe Chemical Weapons Destruction

Explosive Destruction Technologies (EDT)

6

National Environmental Policy Act (NEPA) process is continuing

– ACWA is well into the NEPA Environmental Assessment (EA)

– BGCAPP continues to communicate with the Kentucky Department for Environmental Protection on the potential permitting process

– The public comment period for the EA is currently scheduled for the June timeframe

Pueblo has Finding of No Significant Impact

– No significant environmental impacts to result from installation and operation of EDT at Pueblo Chemical Depot

– A EDT technology decision for Pueblo is pending

Page 7: Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12, 2013

A Partnership for Safe Chemical Weapons Destruction

Questions/Discussion

7

For more information about the Blue Grass Chemical Agent-Destruction Pilot Plant project, please contact the Blue Grass Chemical Stockpile Outreach Office at (859) 626-8944