Page 1: Block 18   Placement 13

Construction Placement 1

Placement of HMA Mixes

Senior/GraduateHMA Course

Page 2: Block 18   Placement 13

Construction Placement 2

Safety - First, Last and Always...

Don’t depend on drivers to avoid you. Play it safe.

Watch your back and your buddies.

Page 3: Block 18   Placement 13

Construction Placement 3

Push Rollers

Tractor

Hopper

Tow Point

Side ArmsConveyors

Screed

Depth Crank

Augers

Page 5: Block 18   Placement 13

Construction Placement 5

Tractor Unit

Page 6: Block 18   Placement 13

Construction Placement 6

Page 7: Block 18   Placement 13

Construction Placement 7

Push Roller

Truck Hitch

Page 8: Block 18   Placement 13

Construction Placement 8

Truck hitch engaged

Page 9: Block 18   Placement 13

Construction Placement 9

Page 10: Block 18   Placement 13

Construction Placement 10

Page 11: Block 18   Placement 13

Construction Placement 11

Page 12: Block 18   Placement 13

Construction Placement 12

Page 13: Block 18   Placement 13

Construction Placement 13

Page 14: Block 18   Placement 13

Construction Placement 14

Page 15: Block 18   Placement 13

Construction Placement 15

Page 16: Block 18   Placement 13

Construction Placement 16

Page 17: Block 18   Placement 13

Construction Placement 17

Hopper Wings

Slat ConveyorsHopper GatesAugers

Screed Plate

ProportionalFeed Control

Material Flow

Page 18: Block 18   Placement 13

Construction Placement 18

Operational Principles of the Operational Principles of the ScreedScreed

• Self-leveling Concepts Self-leveling Concepts • Screed Response versus Distance Screed Response versus Distance • Forces Acting on a ScreedForces Acting on a Screed

Page 19: Block 18   Placement 13

Construction Placement 19

Self Leveling - Rubber Tired Paver

Rear Drive Tires Front Bogie Wheels

Line of Pull

Page 20: Block 18   Placement 13

Construction Placement 20

Detail of Screed PathDetail of Screed Path

Tow Point PathTow Point PathStep Amplitude = 100%Step Amplitude = 100%

L = Leveling Arm LengthL = Leveling Arm Length

Screed PathScreed PathDirection of PavingDirection of Paving

63%63% 87%87%

6L6L5L5L4L4L3L3L2L2L1L1L00

96%96% 98%98% 99%99%

L

Page 21: Block 18   Placement 13

Construction Placement 21

1 inch movement at Tow Point

1/8 inch movement at Leading Edge of Screed

Page 22: Block 18   Placement 13

Construction Placement 22

Main Forces Acting on Screed Main Forces Acting on Screed

1. Speed of Paver1. Speed of Paver

2. Head of Material2. Head of Material

- - Shear resistanceShear resistance

3. Angle of Attack 3. Angle of Attack

4. Other Forces 4. Other Forces – Pre-compaction Pre-compaction – Screed WeightScreed Weight

Page 23: Block 18   Placement 13

Construction Placement 23

Tow Point

Screed DepthCrank

Pivot Point

F1

F2

F3

Page 24: Block 18   Placement 13

Construction Placement 24

Constant Head of Material Volume

Head of Material Volume Too High

Head of Material Volume Too Low

Correct Depth ofMat Maintained

Screed Rises Due toExcess Material ForcedUnder Nose of Screed

Screed Settles Due toInadequate Supporting

Material

Page 25: Block 18   Placement 13

Construction Placement 25

Correct Correct ElevationElevation

Auger Auger OverloadedOverloaded

Auger Auger UnderloadeUnderloade

dd

Page 26: Block 18   Placement 13

Construction Placement 26

Travel

Angle of Attack

Page 27: Block 18   Placement 13

Construction Placement 27

Page 28: Block 18   Placement 13

Construction Placement 28

HOT STOP ConceptHOT STOP Concept

• If constant material flow cannot be If constant material flow cannot be maintained, before HMA mix drops in maintained, before HMA mix drops in hopper below gates...hopper below gates...

• ““Hot Stop” the paver as quickly as Hot Stop” the paver as quickly as possiblepossible

• Wait for next truckWait for next truck• Pick up truck on run and resume speed as Pick up truck on run and resume speed as

quickly as possible.quickly as possible.

Page 29: Block 18   Placement 13

Construction Placement 29

Screed Control SystemsScreed Control Systems

• Who’s Responsible for Changes Who’s Responsible for Changes • Sticking the Mat Sticking the Mat • Manual Controls Manual Controls • Automatic Controls Automatic Controls

Page 30: Block 18   Placement 13

Construction Placement 30

Page 31: Block 18   Placement 13

Construction Placement 31

Pavement ProfilePavement Profile

Direction of PavingDirection of Paving

Page 32: Block 18   Placement 13

Construction Placement 32

Detail of Screed PathDetail of Screed Path

Tow Point PathTow Point PathStep Amplitude = 100%Step Amplitude = 100%

L = Leveling Arm LengthL = Leveling Arm Length

Screed PathScreed PathDirection of PavingDirection of Paving

63%63% 87%87%

6L6L5L5L4L4L3L3L2L2L1L1L00

96%96% 98%98% 99%99%

L

Page 33: Block 18   Placement 13

Construction Placement 33

Page 34: Block 18   Placement 13

Construction Placement 34

Page 35: Block 18   Placement 13

Construction Placement 35

Types of Grade Reference Types of Grade Reference

• Stringline Stringline • Mobile referenceMobile reference• Joint matching shoe Joint matching shoe • Sonic sensorSonic sensor• LaserLaser

Page 36: Block 18   Placement 13

Construction Placement 36

Page 37: Block 18   Placement 13

Construction Placement 37

Page 38: Block 18   Placement 13

Construction Placement 38

Page 39: Block 18   Placement 13

Construction Placement 39

Page 40: Block 18   Placement 13

Construction Placement 40

Page 41: Block 18   Placement 13

Construction Placement 41

Page 42: Block 18   Placement 13

Construction Placement 42

Grade Sensor - Side Arm Mount

Page 43: Block 18   Placement 13

Construction Placement 43

Grade Sensor - Screed End Mount

Page 44: Block 18   Placement 13

Construction Placement 44

Page 45: Block 18   Placement 13

Construction Placement 45

Ultrasonic Grade SensorUltrasonic Grade Sensor

Page 46: Block 18   Placement 13

Construction Placement 46

Balancing ProductionBalancing Production

TruckingTrucking CompactionCompaction

PavingPavingHMA HMA FacilityFacility

Page 47: Block 18   Placement 13

Construction Placement 47

QUESTIONS ?