block 10 superpave agg requirements 13

15
Aggregate Superpave Aggregates 1 Superpave Aggregate Properties Currently Required for HMA Senior/Graduate HMA Course

Upload: chris-yarnell

Post on 27-Jun-2015

319 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 1

Superpave Aggregate PropertiesCurrently Required for HMA

Senior/GraduateHMA Course

Page 2: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 2

Coarse Aggregate Angularity Criteria

Traffic Depth from SurfaceMillions of ESALs < 100 mm (4”) > 100 mm

< 0.3< 1< 3< 10< 30< 100> 100

55/--65/--75/--85/8095/90

100/100100/100

--/----/--50/--60/--80/7595/90

100/100

First number denotes % with one or more fractured facesSecond number denotes % with two or more fractured faces

Page 3: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 3

Flat and Elongated Criteria

TrafficMillions of ESALs Maximum, Percent

< 0.3< 1< 3< 10< 30< 100> 100

----1010101010

Page 4: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 4

Fine Aggregate Angularity Criteria

Traffic Depth from SurfaceMillions of ESALs < 100 mm (4”) > 100mm

< 0.3< 1< 3< 10< 30< 100>100

--404045454545

----4040404545

Page 5: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 5

Clay Content Criteria

Traffic Sand EquivalentMillions of ESALs Minimum, Percent

< 0.3< 1< 3< 10< 30< 100> 100

40404045455050

Page 6: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 6

Aggregate Size Definitions

• Nominal Maximum Aggregate Size– one size larger than the first sieve

to retain more than 10%

• Maximum Aggregate Size– one size larger than nominal

maximum size

1001009072654836221594

100998972654836221594

Page 7: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 7

100

0 .075 .3 2.36 4.75 9.5 12.5 19.0

Percent Passing

control point

restricted zone

max density line

maxsize

nommaxsize

Sieve Size (mm) Raised to 0.45 Power

Page 8: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 8

Superpave Aggregate Gradation

100

0 .075 .3 2.36 12.5 19.0

Percent Passing

Design Aggregate Structure

Sieve Size (mm) Raised to 0.45 Power

Page 9: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 9

Superpave Mix Size Designations

Superpave Nom Max Size Max SizeDesignation (mm) (mm)

37.5 mm 37.5 (1.5”) 50 (2”) 25 mm 25 (1”) 37.5 19 mm 19 (3/4”) 25 12.5 mm 12.5 (1/2”) 19 9.5 mm 9.5 (3/8”) 12.5 04.8 mm 04.8 (3/16”) 9.5

Page 10: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 10

37.5 mm Superpave GradationSieve Size % Pass. Restricted Zone mm Control Points Min Max

50 100 37.5 90.0 100.025 19 12.5 9.5 4.75 34.7 34.72.36 15.0 41.0 23.3 27.31.18 15.5 21.50.6 11.7 15.70.3 10 100.150.075 0.0 6.0

Page 11: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 11

25 mm Superpave GradationSieve Size % Pass. Restricted Zone mm Control Points Min

Max37.5 10025 90.0 100.019 12.5 9.5 4.75 39.5 39.52.36 19.0 45.0 26.8 30.81.18 18.1 24.10.6 13.6 17.60.3 11.4 11.40.150.075 1.0 7.0

Page 12: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 12

19 mm Superpave GradationSieve Size % Pass. Restricted Zone mm Control Points Min Max

25 10019 90.0 100.012.5 9.5 4.75 2.36 23.0 49.0 34.6 34.61.18 22.3 28.30.6 16.7 20.70.3 13.7 13.70.150.075 2.0 8.0

Page 13: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 13

12.5 mm Superpave Gradation

Sieve Size % Pass. Restricted Zone mm Control Points Min Max

19 10012.5 90.0 100.09.5 4.75 2.36 28.0 58.0 39.1 39.11.18 25.6 31.60.6 19.1 23.10.3 15.5 15.50.150.075 2.0 10.0

Page 14: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 14

9.5 mm Superpave Gradation

Sieve Size % Pass. Restricted Zone mm Control Points Min

Max

12.5 1009.5 90.0 100.04.75 2.36 32.0 67.0 47.2 47.21.18 31.6 37.60.6 23.5 27.50.3 18.7 18.70.150.075 2.0 10.0

Page 15: Block 10 superpave agg requirements 13

Aggregate Superpave Aggregates 15

QUESTIONS ?