  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    1/25

    BLD 520 BUILDERS FUNCTION

    & PROCEDURES

    PREPARED BY :NORAIBAH BINTI RAZALI 2009711737NURULHIDAYU BINTI NARUZAMAN 2009229733

    NOR HIDAYAH BINTI IBRAHIM 2009799373NUR AZUWANIZA BINTI ISMAIL 2009349793NUR KHAFIZAH BINTI AZMAN 2009367503

    GROUP: AP226/3D

    PREPARED FOR : CIK ZARINA ALIAS

    INTERNATIONAL CONTRACTING

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    2/25

    CASE STUDY : IJM HOLDING BERHAD

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    3/25

    I - IGB Construction Sdn Bhd was incorporatedin 1981.

    J - Jurutama Sdn Bhd was incorporated in 1970as Soon Tat Construction Sdn Bhd.

    M - Mudajaya Construction Sdn Bhd wasincorporated in 1965 as Chye Hin Construction

    Co Ltd.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    4/25

    LOGORATIONALE

    The logo depicts IJMsglobal outlook as

    symbolized by the circle andsolid horizontal lines at thebottom. This symbolrepresents a globe showingIJMs links with itsinternational partners.

    The rich blue backgroundreflects the Companyscorporate colour. The bold white letteringemphasizes IJMs clarity ofpurposes in its corporatevision and mission.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    5/25

    VISION

    To be an internationally competitive Malaysianbuilder of world class infrastructure andbuildings.

    MISSION To deliver the highest standards of performance

    in all our ventures with the IJM Mark ofExcellence.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    6/25

    CORE BUSINESS (CONSTRUCTION)CIVIL ENGINEERING Highway, Roads and Bridges Airports, Railways & Monorails Foundation, Water Supply & Marine Work Power, Oil & Gas

    Projects undertaken and successfully completed include: The North Klang Valley Expresswaay Several sections of the North-Sourth Expressway The Jelutong Expressway in Penang, The U4 Expressway in Putrajaya,

    The Kuala Lumpur International Airport Runway 2 and MASCargo Terminal The Kuala Lumpur Light Rail Transit KTM Double Tracking, Pelabuhan Tanjung Pelepas Rail Link Petronas Gas Processing Plant 5 and 6 in Terengganu Port Klang Power Station

    The Kuala Terengganu Water Treatment Plant

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    7/25

    BUILDING CONSTRUCTION

    Resort, Hotel & Clubs Condominium & Housing Commercial & Cultural Complexes Hospitals, Clinics & Medical Centres Preservation and Refurbishment IJM has built:-

    The world-class Mid Valley Megamall in Kuala Lumpur Hamsphire Park, Riana Green and Sri Pangkor Condominium Renaissance and New World hotels in Kuala Lumpur, the Pan

    Pacific Resort in Pulau Pangkor, the Berjaya Hotel and BeachResort in Mauritius and the Riviera Bay Resort

    The Putrajaya Convention Centre The National Heart Centre The Ministry of Works Office Complex The National Theatre in Kuala Lumpur The Putrajaya Clinic and Hospital The Putrajaya Library

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    8/25

    CORE BUSINESS(INFRASTRUCTURE)MALAYSIAi. Highway Toll Concessions

    The6-lane Sungai Besi Highway The New Pantai Expressway

    ii. Port Operations Kuantan Port and Kemaman Port

    OVERSEAS

    i. Western Access Tollway Project in Buenos Aires,Argentinaii. Swarna Tollway in Andra Pradesh, Rewa Tollway

    in Madya Pradesh, Jaipur-Mahua Tollway inRajasthan and Trichy Tollway in Tamil Nadu

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    9/25

    MCDCIV

    ICCENTREBU

    ILDINGPROJE

    CT Value : Rs.545.54 Crores.

    Client : Municipal Corporation Of

    Delhi.

    Description : Construction ofCivic Centre for MunicipalCorporation of Delhi at JawaharlalNehru Marg, Minto Road, NewDelhi.

    Built up Area : 2,14,260 Sqm(Including Basement area 3 levels)

    Number of Floors : 4 Blocks ofG+5 One Block of G+27 and 3Basement Levels.

    Commencement: May-2005.

    Expected Completion : June-2011

    Status : Under Progress

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    10/25

    PRESTIG

    ESHANTINIKETAN,

    BANGALO

    RE

    Value : Rs. 120.21 Crores

    Value : Rs.120.21 Crores

    Client : Prestige Estates ProjectsPvt. Ltd.

    Description : Construction ofcivil and architectural works forhigh rise commercial blocks cum

    multi level car park developmentat Prestige Shantiniketan Whitefield Road Bangalore.

    Built Up Area : 4.13 Million Sqft.

    Commencement : April 2006

    Expected Completion : March2011

    Status : Under Progress

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    11/25

    PREST

    IGESHANTINIKETANTOWNSHIP

    ,

    BANGALORE

    Value : Rs 208.77 Crores

    Client : Prestige Estates ProjectsPvt. Ltd.

    Description : Construction ofResidential Township comprisingof 23 Towers along with associatedpodium works at PrestigeShantiniketan Whitefield Road,

    Bangalore.

    Built Up Area : 6.5 Million Sq.Ft

    Commencement : December -2005.

    Expected Completion : March-2010

    Status : Completed

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    12/25

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    13/25

    RAINTREEPARK-INTEG

    RATEDTOWNSH

    IP

    PROJECTH

    YDERABAD

    Value : Rs.241.26 Crores

    SPV: Swarnandhra-IJMII Integrated

    Township Development CompanyPrivate Limited, A Joint VentureCompany between APHB & IJM(India) Infrastructure Limited

    EPC Contractor : IJM (India)Infrastructure Limited

    Description : Construction and

    development of Integrated Townshipon turn key basis at Kukutpally,Hyderabad

    Built up Area : Approx 32,00,000sq. ft.

    No. of units : 1,800 (950 sq. ft to3000 sq. ft.)

    Commencement :February 2004

    Completed : August 2006

    Status : Open for Public

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    14/25

    TCSITPARK,

    GACHIBO

    WLI,HYDERABAD

    Value : Rs. 38.25 Crores

    Client : TATA Consultancy

    Services Ltd.

    Description: Construction ofGeneral Civil Works, Road worksand site development for proposedoffice at IT Park, CMC Campus,Old Mumbai Highway,Gachibowli, Hyderabad.

    Built Up area : 4,76,691/- Sq ft

    Commencement: December2005

    Completed : November 2006

    Status : Open for Public

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    15/25

    G

    AUTAMIPOWE

    RPVT.LTD

    Gautami power Pvt Ltd is ajoint Venture Company

    promoted byIJM,Maytas,NCC and GVKpower.Gautami is setting upa 464 MW Natural gasbased Combined CyclePower Plant in IDAPeddapuram in Andhra

    Pradesh with a total capitaloutlay of about Rs.1300Crores.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    16/25

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    17/25

    DELHIMETRORAILCORPORATIONLIMIT

    ED-

    CONTRACT3C21R

    Value: Rs.154 Crores.

    Client: DMRC

    Description: Constructionof elevated viaduct betweenConnaught place andKirtinagar.

    Length: 8 KM

    Started: April 2003

    Status: Completed.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    18/25

    RAINTREEPARK-DWA

    RAKAKRISHNA

    VIJAYAW

    ADA

    Value:586 Crores(approx)Client:IJM-LINGAMNENITownship Pvt.Ltd.Description: Raintree Park

    Dwaraka Krishna is a way of lifethe people truly deserve. In a lushlandscape of 100 acres, risemajestic blocks that offer 3000stunningly designed apartments.The two and three bedroom unitscater to every individualrequirement. Open, sunlit and

    breezy, your home gives you justthe elegance, tranquility andsecurity one needs for a qualitylifestyle. The fittings and finish,the space planning and design areso impressive that even yourmorning cup of tea becomes amagical experience!.

    No. of units: 3,324Apartments,274 BungalowsBuilt up Area: 70,39,000 Sq.FtCommencement:April 2007Contract Period:60 MonthsExpected Completion: March2012

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    19/25

    Raintree Park Dwaraka Krishna is a way of life the people

    truly deserve. In a lush landscape of 100 acres, rise majesticblocks that offer 3000 stunningly designed apartments. Thetwo and three bedroom units cater to every individualrequirement. Open, sunlit and breezy, your home gives youjust the elegance, tranquility and security one needs for aquality lifestyle. The fittings and finish, the space planning

    and design are so impressive that even your morning cup oftea becomes a magical experience!.

    For those looking for a wonderful reason to celebrate life,independent villas at Raintree Park is a great answer.Designed to usher in a new lifestyle in the business cities ofVijayawada and Guntur, each of the villa is a masterpiece.Abundant open spaces, state-of-the-art finishes andinternational-class styling mark this beauty spot. Surroundedby beautiful landscaping and round-the-clock security, thegated community is truly an abode of peace and tranquility.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    20/25

    Location

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    21/25

    MASTER PLAN

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    22/25

    Villas

    Type Facing Area inSQY.

    Type ATriplex

    East 336 SQY.

    Type ATriplex

    West 357 SQY

    Type BTriplex

    East 244 SQY.

    Type B

    Triplex

    West 260 SQY.

    Type CDuplex

    East 198 SQY.

    Type CDuplex

    West 198 SQY.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    23/25

    ApartmentsType Facing Area in

    Sft.

    2Bedroom

    East, West 1279 Sft.

    2Bedroom

    North,South

    1199 Sft.

    2Bedroom

    North,South

    1411 Sft.

    3Bedroom

    East, west,North

    1744 Sft.

    3BedroomDuplex

    East, West1941 Sft.

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    24/25

    IJMII has got the ISO 9001:2000accreditations in January 2003

  • 7/31/2019 BLD 520 BUILDER'S FUNCTION & PROCEDURES

    25/25

    THE END