Page 1: Blast Management Plan 2016 - Holcim

  

Strength. Performance. Passion       

                                   

Lynwood Quarry Blast Management Plan

November 2016

Page 2: Blast Management Plan 2016 - Holcim

Lynwood Q

 1.0

 2.0

 3.0

 4.0

 5.0

 6.0

 7.0

 8.0

 9.0

 10.0

  

Quarry Blast Man

Introduct

Purpose a

Baseline d

Blast asse

Blast Man

  Desc5.1

  Ope5.2

5.2.1

Blast Mon

  Mon6.1

  Mon6.2

Reporting

Exceedan

Complain

Continuou

nagement Plan 

ion ............

and Scope ..

data ..........

essment crit

nagement ..

cription of B

erational Con

  Blast Fum1

nitoring .....

nitoring Equi

nitoring loca

g ................

ces and inc

ts ..............

us Improve

TABLE

..................

..................

..................

teria ..........

..................

Blasting Activ

ntrols ..........

me Manageme

..................

ipment .......

tions ..........

..................

cidents .......

..................

ement ........

 

E OF CON 

..................

..................

..................

..................

..................

vities for Site

...................

ent Protocol ..

..................

...................

...................

..................

..................

..................

..................

NTENTS 

..................

..................

..................

..................

..................

e .................

...................

.....................

..................

...................

...................

..................

..................

..................

..................

..................

..................

..................

..................

..................

...................

...................

.....................

..................

...................

...................

..................

..................

..................

..................

.................

.................

.................

.................

.................

...................

...................

......................

.................

...................

...................

.................

.................

.................

.................

 

........... 3 

........... 3 

........... 3 

........... 4 

........... 5 

............ 5 

............ 6 

.............. 6 

........... 7 

............ 7 

............ 7 

........... 8 

........... 8 

........... 9 

......... 10 

Page 3: Blast Management Plan 2016 - Holcim

Lynwood Q

1.0Lynwoograntedoperatiofrom the LynwooSydneyfrom exa substSouthetonnes The targ

2.0 This BlaQuarry.(DA 128specificwhich s The Apsatisfacmanage

This BMcompliain the Erelevan Holcim BMP co

3.0 The blaenvironat all re The infignimbrthe first

Quarry Blast Man

Introduod Quarry id developmon. A modie existing, a

od Quarry wy, regional axisting quarrtantial, highrn Railway per annumget resourc

Purpos

ast Monitori. The progr8-5-2005) a

cally satisfiestates:

pplicant mction of theement plan(a) be suotherwise a(b) descriwith the bl(c) includthe blasting(d) includ

MP has beance with thEPL. It alsot blast impa

has approvovers blastin

Baselin

ast assessmmental ass

esidences, in

formation inrite pit. Mont year of b

nagement Plan 

uction is owned aent consenfication to approved, ig

will provide and local mries that areh quality, hand Hume

m (Mtpa) of ce has an ex

se and S

ing Plan is tram addressand the Enves Condition

ust prepare Secretar

ns (see conubmitted to agreed by thibe the melast criteria

de a monitog criteria in

de a protoco

en designehe blasting provides a

act assessm

val to extracng operatio

ne data

ment undertaessments innfrastructur

n Table 1 nitoring locablasting with

and operatet on 21 Dethe consengnimbrite ex

a long-termmarkets. The nearing thhard rock rHighway. saleable quxpected life

Scope

to ensure coses the req

vironment Pn 11, Sched

re a Blastry. In ndition 2 o

the Secrehe Secretareasures thand operati

oring prograthis consen

ol for investi

ed in a manand vibratio

a mechanismment criteria

ct from two ns in both p

aken for thendicate blasre locations

shows the ations are shin this pit.

ed by Holcicember 20

nt was apprxtraction are

m supply of he supply the end of thresource wThe quarryuarry produ of over 90

ompliance wuirements crotection Li

dule 3, of the

Managemaddition

of Scheduleetary for apry; at would bing conditio

am for evalunt; and igating and

nner that eon criteria sm for asses

a as per the

distinct respits.

e granite ansting operatand heritag

results of shown in Fig. Results s

im (Australi05 (DA-128roved on 18ea to a gran

high qualityo the Sydn

heir resourcwith ready ty is approveuct for an in

years.

with statutocontained incence (EPLe Lynwood

ment Planto the

e 5) this planpproval by

be implemons of this cuating and

responding

enables Lynspecified in ssing blast developme

ources – th

d ignimbritetions will mege sites.

the baseligure 1. Bas

show no ex

ia) Pty Ltd 8-5-2005) fo8 May 201nite extracti

y constructioney market ces. The prtransport aced to producnitial 30 yea

ory requiremn the develoL: XXXX). TQuarry Dev

for the destandard n must:

y 30 Novem

ented to econsent;

reporting o

g to complai

nwood Quathe developmonitoring

ent consent

he ignimbrite

e pits withineet complia

ne monitorseline data xceedances

(Holcim) aor construct5 for the trion area.

on material will replace

roject area cccess to thce up to fivear quarrying

ments at Lynopment conThis Plan alsvelopment C

evelopment requiremen

mber 2016,

ensure com

on complian

ints.

rry to dempment consresults aga

t.

e and grani

n their respeance require

ring results was under

s of the crit

 

and was tion and ransition

into the e supply contains he main e million g period.

nwood nsent so Consent

t to the nts for

, unless

mpliance

nce with

onstrate sent and ainst the

te. This

ective ements

for the rtaken in teria. At

Page 4: Blast Management Plan 2016 - Holcim
Page 5: Blast Management Plan 2016 - Holcim

Lynwood Q

Novemof blastcollecte

Table 1

Dat

04/07/14/07/12/12/17/12/19/01/27/01/05/02/09/02/23/02/30/03/05/05/14/05/25/05/21/05/03/06/29/05/05/06/12/06/26/06/17/06/

Compli

 

4.0 Scheduoverpre4).

Table 2

Airbla

Quarry Blast Man

ber 2016, bting monito

ed.

: Baseline d

te B

v

/2014 /2014 /2014 /2014 /2015 2015 /2015 /2015 2015 2015 /2015 /2015 2015 2015 /2015 2015 /2015 /2015 2015 /2015

ance

Blast a

ule 3, Condiessure and g

2: Airblast O

ast OverpreP

nagement Plan 

baseline infooring for the

data for the

B1- Pipeline Ground vibration (mm/s)

1.5 1.35 4.61 4.3 7.96 2.18 5.35 2.69 1.96 2.8

4.74 0 0 0 0

0.89 1.09

0 0

1.6

<100

assessm

tions 7 andground vibr

Overpressur

essure LevPeak))

115

120

ormation wae granite p

e ignimbrite

B2-DamGround

vibratio(mm/s

0.670.690.630.390.47

0 0.340.46

0 0.460.67

0 0 0 0 0 0 0 0

2.88

<25

ment crit

8 of the deration impac

re Impact As

vel (dB (Lin

as only avapit will be u

pit

Monitom d on s)

G r

<5mmper a

eria

evelopment ct assessme

ssessment

n

5% of th

ailable for thused for ba

ring Points

round vibra(mm/s)

0.47 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

m/s for 5% annum Not

10mm/s

consent spent criteria

Criteria

Allowa

he total num1

he ignimbritaseline info

s B3-House

ation A

of totalabove

<1t

No

pecify the ai(Table 2, Ta

ble Exceed

mber of blas12 months

0%

te pit. The formation on

e

Air overpres(dB)

106.80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

15mm/s fototal per ant above 12

rblast able 3 and T

dance

sts over a pe

 

first year nce it is

ssure

8

or 5% of nnum 20mm/s

Table

eriod of

Page 6: Blast Management Plan 2016 - Holcim

Lynwood Q

Table 3

Peak P

Table 4

Peak P

A summEPL bla

Table 5

Privat

Main

Gas n

Water*Note: tmonitor Table 6

Table 6

5.0

5.1

Typical overburoperatio Blasts t

Quarry Blast Man

3: Ground vi

Particle Velo

5

10

4: Ground vi

Particle Velo

25

100

mary of the asting criter

5 Summary

Loc

te residence

Southern R

natural pipe

r reservoir* the water rering is unde

6 shows the

6: Blasting d

Blast M

Descrip

drill and rden, inter-bonal require

typically exp

nagement Plan 

ibration for

ocity (mm/

ibration for

ocity (mm/

criteria to bria is synony

of Blast Em

cation

es

Railway Line

line

eservoir hasertaken at th

days and t

day and time

Managem

ption of B

blast activburden, andements.

pected at Ly

Activity

Blasting

residences

/s)

5% of th

public infas

/s)

be used at eymous with

mission Crite

e

s not been his location.

imes blastin

e restriction

ment

lasting A

vities at Lyd primary r

ynwood Qu

MondSunday an

A

he total num

structure

Mai

.

each monitothe consen

eria

Vibration C(mm/

5/10

25

100

25built by Go

ng is restric

ns

Activities f

ynwood Qraw feed (P

arry are det

Day ay - Saturd

nd Public H

Allowable E

mber of blas

0%

Infrastr

in Southern

Rese

Gas Pi

oring point isnt requireme

Criterias)

0

0

oulburn Mulw

cted for all b

for Site

uarry are PRF) from t

tailed in Ta

ay 9aolidays

Exceedance

sts over a pe

%

ructure

n Railway Li

ervoir

ipeline

s included ients.

Airbla

1

waree Coun

blasting at L

for the puthe active p

ble 7.

Time am to 5pm

None

e

eriod of 12 m

ine

n Table 5. T

ast Criteria(dBL)

15/120

n/a

n/a

n/a ncil. As a re

Lynwood Qu

urpose of pit area to

 

months

The

a

esult, no

uarry.

blasting achieve

Page 7: Blast Management Plan 2016 - Holcim

Lynwood Q

Table 7

Blast tyProductContou

Final wa

Ramp

Pre-splSecond

5.2

Holcim impact are detaguides In the edevelopDepartmon the b Holcim

5.2.1

In accoconsenfumes ewill be u

Quarry Blast Man

7: Blasting ty

ype Detion Blar Bla

maall Bla

aidCablasom

its Spdary Dri

Operatio

Australia ismitigation mailed thorouthe manag

event blastinpment consment of Minblast hotline

Australia w

Blasting wconsent u

Detailed ddust, fumeensure co

An excluspersonne

Blast monthe increa

All blasts

Blast Fum

ordance witt, Holcim Aemanating undertaken

Use of appcontractor i

nagement Plan 

ypes typica

escription asting on deasting on naterial is typasting desigd of pre-splitan mean driast from flametimes ref

pecialised blill and blast

onal Con

s committedmeasures aughly in the gement prac

ng is requireent hours, H

nes and the e will also b

will impleme

will only occunless it is u

design for ees, ground

ompliance w

sion zone wl and assets

nitoring will ase of detai

will be vide

me Manage

th the requAustralia are

from the Ly:

ropriately qis appropria

l for Lynwoo

efined bencnatural topopically overbgned to assts) ill and blast

at level to ferred to aslasting techactivities fo

trols

d to implemet Lynwood Qsite operat

ctices imple

ed to be undHolcim will EPA prior te notified. A

nt the follow

cur betweenunsafe.

each blast invibration an

with site spe

will be estabs.

inform futurled site info

eo recorded

ement Pro

uirements oe required toynwood Qu

ualified perately trained

od Quarry

h levels witographic sburden with ist in achiev

ting on a hachieve a

s a drop cutnique desig

or oversize,

enting reasoQuarry. Theional blast m

emented at e

dertaken fonotify the Dto undertakAn investiga

wing blast m

n the hours

n order to mnd air blast,ecific blastin

lished for ea

re designs sormation.

.

otocol

of Scheduleo implemen

uarry operat

rsonnel. Thid to underta

hin the piturfaces. Vacap rock

ving final wa

aul road raramp desi

) or for sumgned to con toe within a

onable and e relevant bmanagemeeach stage

r safety reaDepartment ing the blasation into th

managemen

permitted th

maximise the the potenti

ng condition

ach blast to

so that they

e 3 Conditnt a blast fution. The fo

s includes aake the drill

ariable drill

all designs

amp (i.e. at gn (varying

mp developmtrol final waa bench.

feasible beblast controlnt documenof drill and

asons outsidof Planning

st. Those ree incident w

nt practices:

hrough the

e blast efficial for fly roc

ns will be co

o protect the

y can be opt

tion 9(c) ofume protocoollowing ma

an assessmor blast wo

l hole dep

(with or wit

grade) or g drill holement all design

est practice ls for the opnt. This docblast activit

de the g and Enviroesidents regwill be cond

:

developme

ciency, minimck as well a

ompleted.

e safety of

timised bas

f the deveol to minimianagement

ment of wherks;

 

ths and

hout the

drill and depths

blast peration cument ties.

onment, gistered ucted.

nt

mise as to

sed on

lopment ise blast controls

ether the

Page 8: Blast Management Plan 2016 - Holcim

Lynwood Q

6.0

6.1

Monitorfor GuidInstrum

Table 8

S

Samp

Frequ

Resol

Range

Accur

Comm

Recor

6.2

Blast mbe mon

Table 9

 

Quarry Blast Man

Use of app

Prior to blasundertakenthe Pit Manweather co

All blasts wgenerated. of the blast

Blast M

Monitor

ring will be delines to M

mentation wi

8: Blast Mon

pecificatio

ple Rate

uency Resp

lution

e

racy

munications

rding Mode

Monitor

monitoring wnitored for th

9: Blast loca

Bla

Ig

G

nagement Plan 

ropriate bla

sting, a visun by the Pit nager will lianditions are

will be video In the even

t fume will b

Monitori

ring Equip

undertakenMinimise Anll meet Aus

nitoring Equ

n

onse

s Link

ring locat

will be underhe ignimbrit

ations for ign

ast Locatio

gnimbrite Pit

ranite Pit

ast design a

ual weatherManager. If

aise with thee not condu

recorded tont that blast be undertak

ng

pment

n in accordannoyance dstralian Stan

uipment Spe

S

Minim

0.0

0.1 mm/s

3%

F

tions

rtaken at thee and grani

nimbrite and

on Required

t

s approved

r assessmef weather coe site Enviroucive to fum

o confirm wfume is geen.

ance with thue to Blast

ndards and

ecifications

eismic

mum 1024 s

2 Hz to

16 mm/s

s to 254 mm

at 15 Hz

Key

Full Wavefor

e locations ite pits are s

d granite pit

d Monitorin

d by the Pit

nt of meteoonditions reonmental ree migration

whether any nerated, an

he ANZECCing Overprethe specific

samples per

o 250 Hz (3

m/s

yboard and

rm Recordin

shown in Fsummarised

t

ng Site (ref

1 - 3

4 - 6

Manager or

orological coequire furtheepresentativn;

blast fume n investigati

C Guidelineessure and cations in Ta

A

r second pe

dB points)

88 dB

0.2 d

Modem

ng and Arch

igure 1. Thed in Table 9

fer to Figur

r delegate.

onditions wier considerave to confirm

has been on into the

es “TechnicGround Vib

able 8

Air Blast

er channel

0.1dB

B to 148 dB

dB at 30 Hz

hiving

e points req9.

re 1)

 

ll be ation, m that

cause

cal Basis bration”.

B

quired to

Page 9: Blast Management Plan 2016 - Holcim

Lynwood Q

As per t

The foll

7.0 All blasScheduresults Holcim Reviewthrough

8.0 Should the sitewithin s

Quarry Blast Man

the EPL, al

in a legible

kept for at l

produced in

owing reco

date

time

monitoring

the name o

measured v

measured o

maximum i

number of h

blast type

meteorolog

environmen

video recor

Report

t monitoringule 5, Condias required

will report bw to the Deph the EPL A

Exceed

any exceee Environmeseven days

nagement Plan 

l monitoring

form, or in

least four ye

n a legible f

rds will also

point/locatio

of the perso

vibration

overpressur

nstantaneo

holes and e

gical conditio

ntal aspects

rding of eac

ting

g results wiltion 13 of th

d.

blasting datpartment of Annual Retu

dances a

dance of thental represof becomin

g records w

a form that

ears; and

form to any

o be kept fo

on

n who unde

re

us charge

estimated ro

ons

s (dust plum

ch blast

ll be publiclyhe Develop

a annually,Planning. Arn.

and inci

he limits besentative, og aware of

ill be:

can readily

authorised

or each blas

ertook the m

ock tonnage

me extent an

y available ment Conse

including aAnnual repo

idents

e identifiedor their delethe exceed

y be reduce

officer of E

st:

monitoring

e

nd direction

on Holcimsent and EP

a historical crting to the

or any incidegate, will

dance or inc

d to a legib

EPA who as

n)

s website in L. Holcim w

comparisonEPA will be

dent regardreport to th

cident.

le form;

ks to see th

accordancwill update t

, in the Anne completed

ding blastinghe DP&E a

 

hem.

e with hese

nual d

g occur, and EPA

Page 10: Blast Management Plan 2016 - Holcim

Lynwood Q

Lynwoo

9.0 Holcim respectregister Should for up tomonitorcommu Holcim will be i Table 1correcti

Table 1

Exceedconditioground

Commu

Private as a resoperatio

Quarry Blast Man

od Quarry wTake all reaincident do

Consider a

Implement directed.

Compl

maintains at. This hotlinr and be not

a complaino six due diring will be anity membe

will maintainvestigated

0 summarisve action to

0: Correctiv

Problem

dance of ons for airblvibration cr

unity compla

property dasult of blastons

nagement Plan 

will also: asonable anes not reoc

ll reasonab

reasonable

aints

a blast hotline also allowtified of blas

nt or concerligence moassessed, rer.

in a centralid.

ses the poteo be taken.

ve Actions

ast or riteria

InvefuturEPA

aints Inveapplto seprod

amage ing

InveScheappr If reqpropcond

nd feasible ccur.

le and feas

e and feasib

ne that allowws membersting activit

n be raisednitoring everecorded an

ised locatio

ential blasti

estigation ofre blasting w

A and senior

estigation oflicable and enior managduction pers

estigation ofedule 4, Coropriate. Re

quested, anperty may bducted in ac

measures t

ible options

ble remediat

ws the comrs of the comies.

by a membents to occund discusse

n to mainta

ng related i

Co

f exceedancwhere applir managem

f complaint, provide feegement. Prsonnel wher

f issue, and onditions 2 teport issue t

n independee undertakeccordance w

to ensure th

s for remedi

tion measur

mmunity to cmmunity wi

ber of the cour at or neared with the Q

ain commun

ssues that

orrective A

ce, undertakicable. Rep

ment as requ

undertakeedback to corovide feedbre relevant.

initiation ofto 5 of the dto senior m

ent review oen. The indwith the dev

he exceeda

ation where

res where a

contact Lynwthin a two k

ommunity, Hr the premisQuarry Man

ication reco

may arise a

Action

ke mitigatioport exceeduired.

mitigation momplainant.back to qua

f measures developmenanagement

of the blast dependent rvelopment c

nce or caus

e required.

appropriate

wood Quarrkilometre ra

Holcim will ses. Data frnager and

ords. All com

and the app

on measuresance to DP

measures w Report co

arry plannin

detailed in nt consent wt.

impacts at treview will bconsent.

 

se of the

or as

ry with dius to

arrange rom the

mplaints

propriate

s for P&E,

where omplaint g and

where

the be

Page 11: Blast Management Plan 2016 - Holcim

Lynwood Q

10.0 InformaAnnual upon hitake pla

Quarry Blast Man

Contin

ation from mReview to storical dat

ace. 

nagement Plan 

uous Im

monitoring wdetermine c

ta and blast

mprovem

will be reviecompliancet methodolo

ment

ewed after e against theogies in orde

each blast e criteria. Ter to allow f

and assessThe latter wfor continuo

sed annualill include re

ous improve

 

10 

ly in the eflection ement to