![Page 1: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/1.jpg)
![Page 2: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/2.jpg)
Black Lagoon SiteBlack Lagoon Site Trenton, MITrenton, MI
First Great Lakes Legacy ActFirst Great Lakes Legacy Act Sediment CleanSediment Clean--up Projectup Project
![Page 3: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/3.jpg)
•
Refuge•
McLouth S• A
•
Black Lagoon Site
Approximately 2-acre exposed cove on Trenton Channel of Detroit River
Part of Detroit River Area of Concern & Detroit River International Wildlife
Located immediately downstream of former teel plant (closed in 1995)
cted as settling basin for past 50 years
![Page 4: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/4.jpg)
![Page 5: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/5.jpg)
• Multiple joint historical
• ver 400,000 cy contaminated sediments in Trenton Channel
Black Lagoon Site Contamination
sampling efforts
• One of six major contaminated areas of Trenton ChannelO
![Page 6: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/6.jpg)
•
– O– Total PCBs: 1.12 mg/kg– Mercury: 1.40 mg/kg– Lead: 146 mg/kg
Black Lagoon Site Contamination
Site contributed approximately 115,000 cy of contaminated sediments Average contaminant thickness was 8-15 feet Average contaminant concentrations:
il & Grease: 6,280 mg/kg
• •
![Page 7: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/7.jpg)
Great Lakes Legacy Act of 2002…
Great Lakes sediment remediation toolbox
…a new “tool” in the
![Page 8: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/8.jpg)
• The Legacy Act authorizes $50M per year from FY2004 through FY2008 for contaminated sediment projects in the Great Lakes
• Funds can be used for clean-ups, research, and public outreach in AOCs
• $10 Million appropriated in FY2004• $22 Million appropriated in FY 2005• Black Lagoon Site submitted by MDEQ
Great Lakes Legacy Act
![Page 9: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/9.jpg)
– G
–
– D– Grand Haven Area Office– Pointe Mouillee Confined Disposal Facilty
•
Multi-Agency Cooperative Effort
U.S. EPA Region V reat Lakes National Program Office
– Superfund Division (Emergency Response Contract)
Surface Water Quality Section • Michigan Department of Environmental Quality
• US Army Corps of Engineers etroit District & Detroit Area Office
![Page 10: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/10.jpg)
Multi-Agency Cooperative Effort
• American Heritage River Initiative
• •
Greater Detroit
City of Trenton Private land-owners
![Page 11: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/11.jpg)
•
Primary Objectives
Reduce risks to human health, wildlife, and aquatic life in Detroit River AOC
Restore the aquatic habitat in Black Lagoon • • Prepare for recreational and economic
redevelopment of Black Lagoon
![Page 12: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/12.jpg)
•
•• Truck Transport to CDF• Final Sediment Placement at CDF
Black Lagoon Clean-up Plans
Lagoon Isolation/Silt Curtain Installation
• Environmental Controls
Mechanical Dredging• • Barge Transport to Pointe Mouillee CDF
Sediment Solidification at CDF
![Page 13: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/13.jpg)
•
” x 8”
intervals • F
steel beam support at bottom
Lagoon Isolation/Silt Curtain
Approximately 2,000 ft long and 24 ft deep• Fifty foot sections of laminated vinyl-
• polyester fabric with heat-treated seams
8 x 48” EPS foam block floats • Initially connected to pipe piles at 50 ft
inal connection at 10-15 ft intervals with
![Page 14: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/14.jpg)
Lagoon Isolation/Silt Curtain
![Page 15: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/15.jpg)
Lagoon Isolation/Silt Curtain
![Page 16: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/16.jpg)
H– A– Shoreline – Work Barges
Environmental Controls
• Equipment at Lagoon – arbor Boom
bsorbent Boom
Oil Spill Protection
![Page 17: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/17.jpg)
1– 2
– C
– Repeat throughout shift
– Continuous feed units
Environmental Controls
• – Station Upstream
Stations Downstream
ollect data 2 hours after start of shift
Turbidity Monitoring
– Handheld readings
![Page 18: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/18.jpg)
S
CDF– R
and particulates– Biweekly Sampling
for PCBs, Lead and Mercury
Environmental Controls
• Sampling – everal locations at
both Lagoon &
eal-time VOCs
Air Monitoring &
![Page 19: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/19.jpg)
•
• M• W
Mechanical Dredging
Two work barges with steel hoppers• CAT 235DL excavator with environmental
clamshell for top sediment Long-reach 320L excavator for finer
sediments aterial transferred to transport barges
•
eekly soundings conducted for volume measurements (GPS/total station)
![Page 20: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/20.jpg)
Mechanical Dredging
![Page 21: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/21.jpg)
•
•
Barge Transport to Pointe Mouillee Confined Disposal Facility (CDF)
Sediments loaded over silt curtain into transport barges
• Barges hold approximately 1800 cy
• Spill prevention steel plate used for transferTransport barges travel down Detroit River
Channel to CDF in Lake Erie
![Page 22: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/22.jpg)
Barge Transport to Pointe Mouillee CDF
![Page 23: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/23.jpg)
•
•• U
and Harbor Act of 1970
Pointe Mouillee CDF
Designed to contain 18 million cy of contaminated dredged sediments from the Detroit and Rouge Rivers
• 700-acre crescent-shape dike in Lake Erie• Structure is 3.5 miles long and 1,400 ft wide
Constructed in sections from 1976 – 1981 SACE authorized to manage under River
![Page 24: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/24.jpg)
• on
• S
Sediment Solidification at CDF
Sediments solidified with Calciment transport barge at CDF
• Solidified sediments off-loaded into off-road dump trucks
• Silt curtain in place around barges
ediments off-loaded into either temporary storage pit or directly into CDF cell
![Page 25: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/25.jpg)
Sediment Solidification at CDF
![Page 26: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/26.jpg)
Sediment Solidification at CDF
![Page 27: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/27.jpg)
•
•remainder of project
Truck Transport to CDF
Project delays due to increased volume and inclement weather conditions
Transport by barge no longer possible • • Initiated solidification at Lagoon with
transport by truck to CDF
Continued truck transportation for
![Page 28: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/28.jpg)
Truck Transport to CDF
![Page 29: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/29.jpg)
•
D– L– S
• I
Other Weather Considerations
Turbidity monitoring in River• Silt curtain inspection and repairs
– iver assisted inspections onger sections of impermeable silt curtain econd layer of permeable silt curtain added
ce management in excavation area
![Page 30: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/30.jpg)
Winter at the Black Lagoon
![Page 31: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/31.jpg)
Two Layers of Silt Curtain
![Page 32: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/32.jpg)
•
•• T• Sediments compacted and graded
Final Sediment Placement at CDF
Cross dike constructed to isolate Black Lagoon sediments
• Outer CDF walls lined with geotextile
• Overflow weir installed to manage oil/waterSolidified sediments placed in 12 inch lifts
wo foot cover material placed on top
![Page 33: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/33.jpg)
Final Placement at CDF
![Page 34: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/34.jpg)
Final Sediment Placement at CDF
![Page 35: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/35.jpg)
• C
• S• C
shoreline restoration
Black Lagoon Site Summary
ooperative Multi-Agency Effort• Dredging occurred over 13 months• Approximately 115,000 cy of contaminated
sediments removed • Excavated area covered with 6 inches of sand and
3 inches of stone and bar area created with stone riprap ity of Trenton received $113,000 grant for
![Page 36: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/36.jpg)
140,000Zinc
38,000Lead
Oil and Grease
Black Lagoon Contamination • 115,000 cy of contaminated sediment removed
300,000
360Mercury
160PCBs
AMOUNT (in lbs.)CONTAMINANT
![Page 37: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/37.jpg)
••
Black Lagoon Project Costs• Total cost approximately $9.3 million
$6 million Legacy Act funds $3.3 Clean Michigan Initiative funds
(The Clean Michigan Initiative is a(The Clean Michigan Initiative is a $675 million bond used to clean up,$675 million bond used to clean up,
protect and enhance Michigan’sprotect and enhance Michigan’s environmental quality and naturalenvironmental quality and natural
resources).resources).
![Page 38: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/38.jpg)
M
– M
– Michelle Jaster (– [email protected]
Black Lagoon Site Contacts
• U.S. EPA Region V GLNPO– arc Tuchman (312) 353-1369
• MDEQ ike Alexander (517) 335-4189
• U.S. EPA Region V Superfund Division734) 692-7683
![Page 39: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/39.jpg)
Human Error or Equipment Failure?
![Page 40: Black Lagoon Site - US EPA · 2016-02-20 · Black Lagoon Project Costs • Total cost approximately $9.3 million $6 million Legacy Act funds $3.3 Clean Michigan Initiative funds](https://reader034.vdocuments.mx/reader034/viewer/2022050507/5f98cfbe200dd321f50a16c7/html5/thumbnails/40.jpg)
The Resulting Multifaceted Response