BJs Brand Marketing Workflow Process
workflowbydesign BJs Brand Marketing ERA Approval Process 2
Table of Contents
System Access .................................................................................................... 3
User Profile .......................................................................................................... 3
Dashboard ........................................................................................................... 4
New Projects ....................................................................................................... 4
Traffic Manager ................................................................................................. 5
Active Project – Traffic ................................................................................... 6
Related Projects ................................................................................................. 7
Artwork Approval States ............................................................................... 8
Create Approval ................................................................................................. 8
Traffic (Coordinator) – Pre-Review ......................................................... 10
Routing Files .................................................................................................... 12
vProof .................................................................................................................. 13
ERA Dashboard ............................................................................................... 15
Post-Review ...................................................................................................... 15
Initiator Revisions or Complete .............................................................. 16
Releasing Files ................................................................................................ 16
Completing the Project ................................................................................ 18
Assets ................................................................................................................. 18
About the Status Notes Tab ...................................................................... 18
Project States ................................................................................................... 20
Dashboard – Project Status ....................................................................... 20
Support ............................................................................................................... 21
workflowbydesign BJs Brand Marketing ERA Approval Process 3
System Access
The workflow system can be accessed via the web using the following URL:
http://bjs.wbdhost.com
Username: full email address
Password: system generated or provided by an administrator
If you are not a current user and need to request an account, or have forgotten
your password, go to the main login page and use the links provided under the
login button.
User Profile
Once logged in, first action should be to update user profile. To edit profile,
click link at the very bottom of the application screen.
This link will access your user information. We ask that you enter all fields as
well as change your password for future log in.
Click SAVE CHANGES to proceed.
workflowbydesign BJs Brand Marketing ERA Approval Process 4
Dashboard
The main landing page is the Dashboard Welcome Screen. This is where all
general system communication for both Workflow by Design and BJs will be
posted.
All user guides and workflow process related documentation will be posted on
the Dashboard Welcome screen.
New Projects
Project Managers will submit a new project.
To start a new project, click the New Project link from the Tracker main menu.
A pop-up will appear asking for Project Type and Title.
Project Type will be NEW or PICKUP.
Project Title will be a short description of the job.
Naming convention to be determined.
Select Advanced mode. This will enable features specifically configured for the
Marketing Brands team.
Then click Continue.
A DRAFT project will be created. This new project now records a new project ID,
date created, and the user initiating the project. The project details are
essentially the green sheet – with certain required fields highlighted in RED.
workflowbydesign BJs Brand Marketing ERA Approval Process 5
All required fields must contain proper information before submission. Once the
project details are filled out and all data is provided, the project can be
submitted to Traffic for review.
Traffic Manager
The Traffic Manager will get an email notification once Project Manager has
submitted the project. The link from that email will take you directly to the
project details. Project details will be reviewed, teams assigned, and milestones
added.
Teams – These are users that play a key role in the project. Any user listed can
be notified and is able to access/keep track of the project from Tracker and
Dashabord Status views. The teams tab is specific to the project level
information so the users shown may differ from those listed for artwork
approvals.
workflowbydesign BJs Brand Marketing ERA Approval Process 6
Milestones – The milestones or key dates are based on the type of job chosen at
initiation. These can be updated or managed at any stage of the project.
If rejected, the Project Manager will be notified to resubmit again.
If approved, the project can move forward.
The Traffic Manager will use the NOTES tab to manage the project activation.
Active Project – Traffic
Once a project has been activated, work will officially begin. All project team
members can keep track by referencing the NOTES tab or directly from the
Dashboard – Project Status view.
workflowbydesign BJs Brand Marketing ERA Approval Process 7
The Traffic Manager will maintain the current state of the job from the project
details view. This state allows users to filter results on the dashboard. See
Dashboard – Project Status for more details.
This field will make is easier to locate and “pick up” projects.
Example: In Studio Queue = the folder is located in the bin outside of Studio
cube. Traffic will manage this field so users can filer from Dashboard.
This is a trial process and may change with more system use.
Related Projects
Some projects will need to be related. This will help users manage and quickly
reference jobs.
Traffic will be responsible for relating projects. All projects are related by
searching, selecting, and clicking Relate Projects.
Once projects are related, they can be quickly referenced from the Related
Projects dropdown menu. This menu is located on the top right of your project
view.
workflowbydesign BJs Brand Marketing ERA Approval Process 8
Artwork Approval States
The following is a very brief outline of the steps for approval.
*Notes: Design starts routing, studio (group) to queue. Studio will change to
individual that works on the file. No notifications tied to change.
1. PENDING ROUTING – Studio (Initiator) navigates to the project. Creates
Routing.
2. PRE-REVIEW – Traffic (Coordinator) gets notified. Previews file and if
approved, can BEGIN ROUTING.
3. ACTIVE – Reviewers are notified that proof is ready for their review.
4. ON HOLD – approval is locked by Traffic (Coordinator) and all reviews on
hold.
5. PENDING COMPLETION – All reviewers have completed signoff and
Traffic (Coordinator) is notified for next steps.
6. POST-REVIEW – Traffic (Coordinator) has final look at file and
annotations, decides what happens next.
7. COMPLETED – Studio (Initiator) is notified to either load a new revisions
or archive the job.
8. ARCHIVE – Approval is complete and files have been released.
Create Approval
To start an approval, the studio will navigate to the Tracker project from the
Dashboard Project Status. On the ERA Routing tab, click Create Approval.
workflowbydesign BJs Brand Marketing ERA Approval Process 9
ERA Tab will open to the New Approval Form. First fill in the basics about the
approval.
Due Date - Traffic will define this date before clicking “Begin Routing”
Form Type - This is just the type of file you are uploading for approval.
Code and Title - The name of the file for approval – this is the link that
will appear in both the project and ERA Dashboard views.
Description - Something about the job or instructions.
*All fields can be edited/updated by Traffic Manager.
You will notice that this approval is now linked back to the Tracker project for
reference.
Next, you will choose a routing file.
workflowbydesign BJs Brand Marketing ERA Approval Process 10
Once a file has been chosen, you will select the Coordinator, aka Traffic Manager
for this approval.
*Initiator is the user that has the ability to upload files. Coordinator is the user
that is managing the entire approval process.
Initiator can ignore the options available for the approval.
Click SAVE to notify the Coordinator/Traffic Manager listed that a new approval
is ready for Pre-Review.
Traffic (Coordinator) – Pre-Review
When the initiator has started a new approval, the coordinator listed will get an
email notification that contains a link to pre-review the file.
This link will direct the coordinator to the approval form where they can verify
the details about the job, assign the team, be the first to review the file, and
begin the routing process.
workflowbydesign BJs Brand Marketing ERA Approval Process 11
At the bottom of the New Approval Form, there is a link to pre-review. This link
will launch vProof.
Clicking the link will launch vProof.
• If Approved – close vProof window. (Do NOT mark approved. Save
coordinator approval for post-review.)
• Need changes? – choose REJECTED from vProof Approval options.
Once rejected is chosen, an email notification will go out to the Initiator –
or user that uploaded the file. This alerts them to make the noted
changes and upload a new file for another pre-review.
Once approved, you can then assign users to review the file.
Simply locate users from the address book and add them to the approval
team. You also have options to assign certain groups of people or to a
certain role.
Groups – Select the group name. Once added, it will display all users
listed in that group. All will need to signoff on the routing.
Roles – Select this option and all users in the group get the notification
but only ONE user is required to signoff.
Next, Decide the options for the Routing.
Options will enable other features/notifications to this approval.
Sequentially Route Job – will route the approval to users in the order
they appear in the team members box.
workflowbydesign BJs Brand Marketing ERA Approval Process 12
Notify User if job if advanced – if you choose to skip a user, this option
will send the skipped user an email notification
Notify before Due Date – enter # of days and check the users to notify
before the due date.
Notify on Comment – this option will send an email each time a user
changes their approval status. (Recommended only for high priority
items.)
Click SAVE to come back later. Click Begin Routing to notify team of new
approval.
Routing Files
Once the coordinator clicks Begin Routing, the users listed in the team will
receive an email notification. This email will contain a direct link to the approval
feedback page.
This page will feature some details about the routing.
workflowbydesign BJs Brand Marketing ERA Approval Process 13
This includes - Icon Preview, Download Original File Link, Details about the job,
the Coordinator, and the initiator for this routing.
Approval Team will be listed below. This page tracks and records actions by
each team member. This includes any files they choose to share, date/time they
reviewed the file, their status, Name, Company/Department (if needed),
Comments left with their approval, and if there are notes on the routing file.
Click the blue Review Routing File to launch vProof for approval.
vProof
The vProof application will launch within your browser window. Artwork will
open to full view in center of window.
You will have a simple set of tools featured at the top; zoom, pan, annotation,
measure, and print options.
workflowbydesign BJs Brand Marketing ERA Approval Process 14
The left menu contains details about the routing. This includes specifics about
the file, recorded approvals, annotation list, and separations.
The bottom set of tools are for proof/page navigation.
Refer to the vProof user guide for more information.
All approvals must be recorded within the vProof window. This option is a blue
set approval button on the left menu.
A window will pop-up with options to choose your approval state.
Approved – No changes needed. Proceed.
Approved with Changes – Changes needed but you do not need to see
again.
Rejected – Revisions needed. Assign to next round.
Each approval state allows you to enter a general comment. This comment is
shown directly on the feedback page.
workflowbydesign BJs Brand Marketing ERA Approval Process 15
Once the entire team has chosen an approval state, the coordinator will get an
email notification.
ERA Dashboard
In addition to tracking approvals from Tracker, you also have an ERA dashboard.
This view, much like Project Status, allows you to search and sort approvals. By
default, this view will show only jobs where you are assigned.
Approvals will show in a grid view.
This grid will show the Due Date, Approval Icon, Approval Details, Revisions,
Status, Initiator/Coordinator, Approval Team Members, and Actions for the
approval.
The actions column features options for this approval. You can Invite Another
Reviewer or Sign-off.
If you have been assigned as a role. The ACCEPT link will appear in the teams
position.
Once you ACCEPT, your approval will be required on the routing.
Reference the ERA User Guide, for more information about approvals.
Post-Review
The coordinator will get an email once all users have signed off. This email will
contain a link to post-review the file.
workflowbydesign BJs Brand Marketing ERA Approval Process 16
The coordinator will need to mark their final approval within vProof for this file
to proceed to next steps.
Initiator Revisions or Complete
Revisions – if the coordinator Rejects the file in post-review, the initiator will get
a notification to start a new round.
Complete – if the coordinator Approves the file in post-review, the initiator will
get a notification to complete the routing process by archiving the approval.
NOTE HERE THAT ARCHIVE MEANS THE FILES HAVE BEEN RELEASED.
Releasing Files
Files will be released using FileSharing.
1. Start on the FileSharing tab within the Tracker Project.
2. Click Add Files to upload. *Files should be prepared and zipped for
single transfer.
3. Click Edit/View to Assign Users to download.
workflowbydesign BJs Brand Marketing ERA Approval Process 17
Choose users from the list or add a public email address.
*All users will get a link that immediately downloads the file.
4. Edit the options.
Expiration Date – This is when the file will automatically be removed
from the system. Users must download by this date.
Reference # - enter a reference number if needed.
Notes – Any directions to the team.
workflowbydesign BJs Brand Marketing ERA Approval Process 18
Reference File – If a ZIP is loaded, a PDF may be added as a preview of
what is contained in the ZIP. Also helpful for users that cannot open
certain file formats.
Click SAVE & SEND to notify the chosen team that a file is available.
Completing the Project
Once all milestones are complete, Traffic Manager can complete the project.
Assets
To Be Determined.
About the Status Notes Tab
The history and current status of a project will be stored in the NOTES tab.
Any and all communication for a project will be exchanged here.
workflowbydesign BJs Brand Marketing ERA Approval Process 19
Key Elements to adding notes are as follows:
SUBJECT – Choose an option if this note applies to a particular milestone.
UPDATE PROJECT STATUS – You may change the state of a job at the same time
you are sending a note. *Most useful for projects being rejected.
TITLE – Used only when a subject is not chosen.
COMMENTS – Body of your note.
ATTACHMENTS – Optional.
ACCESS CONTROL – Select only if this note should be seen by users you notify.
ADD TO DASHBOARD – Will push the note to the Dashboard Project Status view.
NOTIFY – Select users that may need a email in addition to posting to the
project.
CUSTOM – If user is not listed, you can select or enter a custom individual to
notify.
SAVE – Will add your note to the thread below and send an email to any user
selected in the notify area.
*It is recommended that each REJECTED project status change is recorded on the
NOTES tab. Here is a sample note for REJECTION:
*Any project team member can reference, add, or reply to a note at any stage
of the project.
workflowbydesign BJs Brand Marketing ERA Approval Process 20
Project States
The following is a very brief outline of the steps for approval.
1. DRAFT – Project Manager creates new project –Submits to Traffic for
review.
2. PENDING – Traffic Manager gets email. Reviews project details.
3. REJECTED – Project Manager gets email to review and re-submit to
Traffic for approval.
4. ACTIVE – Traffic assigns team and milestones. Team is notified project is
active.
5. ON HOLD – Project is placed on hold – reason noted in Notes Tab.
6. CANCELED
7. COMPLETED – All milestones have been completed and project is closed
by Traffic Manager
8. ARCHIVE – Process to be determined with Asset Manager
Dashboard – Project Status
The Dashboard Project Status will allow users a snapshot view of what is going
on with each project where they are assigned. It is the primary location for
getting a high-level update on each job where you are assigned.
Dashboard Project Status can be accessed from the Dashboard header menu.
The Project Status is an interactive view of your jobs. This screen is broken
down by Filters, Sorts, and Project Grid.
Filters – to be determined.
Sort Options – to be determined.
Project Grid
workflowbydesign BJs Brand Marketing ERA Approval Process 21
Each project will display the following:
Project Link – Active link to access the project for more information
Project Basics – Details displayed under project link
Assigned Team – Key users assigned to the project
Milestones – Target dates for this project. Green = on time; Red = late; Grey =
future date. *Any item with a check is completed.
Recent Status – Notes can be added to the project and selected to display on the
dashboard view.
Once Filters and Sorts have been applied, the project status view can be printed
as a collective list. If you choose, the print view can be opened in a new tab. All
project links are still active in browser print view.
Support
Questions about the workflow process? Please contact BJs Brand Marketing
BJs Workflow Support
Kim Wachter
Manager of Traffic, Production and Financial Control
774-512-6330
If you experience any system related issues or have questions about
functionality, please reach out to:
Workflow By Design
Technical & General System Support
978-998-6635