Page 1: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Biofuel Project Permitting in Hawaii

Jeff Overton, Group 70 International

Asia Pacific Clean Energy Summit and Expo

September 14, 2011

1

Page 2: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

The 10‐minute Primer

• Biofuels in Hawaii: Reaching for 40% • Crops, Target Fuels & Processing• Impacts of Biofuels Projects • Permitting Biofuels Projects

2

Page 3: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

3

Seeking 40% with Biofuels

3Source: HECO

Page 4: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Biofuels Market & Potential Partners

4

US Military Electric Utilities Fuel Companies

Growing Interest in Serving Hawaii Biofuels Demand

Page 5: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Biofuels: The New Plantation?• Land Committed to grow Feedstock

‐Will require large contiguous farmlands 

• Biofuels Processor = yesterday’s Sugar Mill‐ Try permitting a new Sugar Mill today!

‐ Not just a Farm…it’s an Energy Facility

• Permitting and Approvals:‐ Site Footprint, Facilities, Process Inputs/Outputs

‐ Water, Wastes, Co‐Products, Cogeneration

‐ Product Storage, Transport (land and sea)

5

Page 6: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Biomass Crops & Fuel Targets• Feedstocks Range from Familiar to Exotic• Combustion of Biomass Crops• Conversion to Utility Generator Fuels• Complex Processing to Transportation Fuels• Methane, Soil Amend, Animal Feed• Cogeneration

Energy Cane Jatropha Eucalyptus

Sweet Sorghum Algae Cassava

6

Page 7: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Integrated BioRefinery

Source: Hawaii BioEnergy

7

Page 8: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Farm, Facilities & Impacts

• Water Use & Water Resources (groundwater)• Wastewater, Air Emissions, Noise, Visual• Cultural Resources (physical, spiritual)• Agricultural Land Use (food crop exclusion)• Endangered Species, Importation, GMO• Infrastructure (water, roads, power)• Hazardous Materials • Product Transport (truck, pipeline, barge)

8

Page 9: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Location + Potential Impacts = Permit Pathway

Select sites best suited for Processing & quasi‐Industrial Functions:

• Former Plantation Mill Sites

• Industrial‐zoned Districts

• Distance from Sensitive Resources

• Distance from Community 

9

Page 10: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Locating Biofuels Processing Facilities

• Urban Industrial sites 

• Redevelop Former Sugar Mill sites

• Greenfield Locations ‐more Complicated

• Proximity to Crops & Infrastructure

10

Page 11: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Processing Facilities

11

Page 12: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Transport & Storage

12

Page 13: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Regulatory Process Levels• Federal Approvals ‐ Site or Funding

– NEPA, Sec. 106, Sec. 7, Environmental Justice, Others– Agency: DOE/NREL, EPA, NRCS, FWS, USACE, NOAA/CZM

• State of Hawaii Approvals– Land Use: HRS 343, LUC, OP, DLNR, SHPD, CWRM– Ministerial: DOH, DOT, DOA

• County Approvals– Land Use: Planning Dept, Planning Commission, Council – Ministerial: Public Works, Water Supply, Building

• Community (Advisory) Involvement– Neighborhood Board, Community Association, Advisory Group/Task 

Force, Environmental Groups & Individuals

13

Page 14: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Biofuels Projects in Hawaii: Potential Permits & Approvals

Source: DBEDT 14

Page 15: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Actual Project Permit Roster (50+)Land Use Permit and Regulatory Compliance Coastal Zone Management Program, Federal Consistency Conditional Use Permit (CUP) CountyEnvironmental Impact Statement (EIS) State & NEPAEndangered Species Act, Section 7 Consultation/PermitHistorical Site ReviewHistorical Preservation Act, Section 106 ConsultationUse Permit (County)Plan Review (County Land Use Regulations)Special Management Area Use PermitState Incidental Take LicenseState Special Use PermitZoning Compliance, Zoning PermitZoning Waivers, Public Uses and Public Utilities

Construction/Operation Permits and Regulations Aboveground Storage Tank (AST) PermitBoiler (pressure vessel) PermitBuilding PermitBurn Permit (agricultural burning)Covered Source PermitMajor Construction PermitMinor Source Operating PermitCombustible and Flammable Liquids Tank Installation Community Noise PermitConstruction Noise Permit

Construction/Operation Permits and Regulations Construction Dewatering PermitCounty Roadway Right‐of‐Way Permit (Street Usage)Discharge Effluent PermitDriveway PermitsElectrical PermitEnergy Corridor PermitFAA Notice of Construction (Navigable Airspace)Grading PermitGrubbing and StockpilingHazardous Waste; Storage, Treatment and DisposalIndustrial Wastewater Discharge PermitGeneral NPDES permitsMaritime Transportation Security Act (MTSA)Oversize and Overweight Vehicle Permit, County & StatePesticides and Chemigation; Storage, Transport, ApplicationPlumbing PermitsRenewable Fuel Standard ProgramSewer System, Connection to County Sewer SystemSewer Connection, Modification and ExpansionSign PermitSolid Waste Management PermitState Highway Work Permit, State Highways Right‐of‐EntrySurface Water Use PermitTrenching PermitUtility ServiceWastewater Treatment System Permit

15

Page 16: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

HRS 201NRenewable Energy Facility Siting Process

Complete EA/EIS Process…Receive Permits in 18 months

• Project Plan: Scope Elements and Define Impacts

• Technical Studies and EA/EIS Process 

• County Planning Department & Public Works

• Community Engagement 

• Planning Commission Use Permit (Major Project)

• Ministerial Permit Applications & Agency Reviews

16

Page 17: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Permit Process = People Process

17

Page 18: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Bring Biofuel…

18

Page 19: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

“Fast‐Track” Permitting

• Strategic Plan & Execute with Local Team‐ Planners, Engineers, Environ. Consults. & Advisors

• Engage the Community‐ Local and Regional scales, Seek Benefits

• Streamline Your Project‐ DBEDT Team, Tools, 201N (as applicable)

• State and County Agencies‐ Build Relationships, Key Process Facilitators

• Start Early & Expect Complications

19

Page 20: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

One Day at a Time

20

Page 21: Biofuel Project Permitting in Hawaiienergy.hawaii.gov/.../2011/09/Jeff-Overton-Group-70... · Biofuel Project Permitting in Hawaii Jeff Overton, Group 70 International Asia Pacific

Group 70 International, Inc.925 Bethel Street, Fifth Floor, Honolulu, HI 96813

www.Group70int.com

Land Planning and Environmental ConsultingProject Planning, Design, EIS & Permitting 

Community InvolvementCivil Engineering

Jeffrey H. Overton, AICP, LEED‐[email protected]‐441‐2104