BIODEEP MEETING (Venice, October 13-15 2003)

Upload: stephen-whitehead

Post on 05-Jan-2016

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

BIODEEP MEETING(Venice, October 13-15 2003)

Page 2: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

Problems experienced during 2001 cruise

• Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID umbilical cable some deployments aborted

• Failure of MODUS thrusters detailed surveys made with extreme difficulty

• Failure to some components STAND-BY

• Insufficient quality of the video documentation system bad images taken

Page 3: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

Remedial actions

• New SCIPACK/SCISKID umbilical cables manufactured and tested

• 3 lengths now available: 10, 25 and 200 m

Page 4: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

Remedial actions

• All failed components repaired and/or replaced

•SCIPACK TV camera

•SCIPACK altimeter

Page 5: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

Thrusters

The electronics of all thrusters have been updated by the manufacturer Tecnadyne and became more reliable.The entire MODUS system has been tested before conducting the SN-1 observatory recovery in May 2003 successfully. Nevertheless 2 thrusters showed problems during the GNDT recovery, without harming the mission.

For BIODEEP cruise the configuration shall be:•2 thruster mounted on MODUS•2 thruster available as spare

For the BIODEEP mission we don’t see a risk, as a wide range of operation is not necessary.

Page 6: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

Comparison between ‘old’ and improved Video-System

Component 2001 cruise Improvements

Cameras Needed: 4 at MODUSavailable 4: 2x col, 2x b/w

Needed: 4 at MODUSavailable 6: - 3x b/w (incl. 1x Hi-Res),- 3x col (incl 1x Zoom)Control-Racks 1x Video (=2

Monitors), 1x Steering, 1x Sonar

2x Video (=4 Monitors), 1x Steering, 1x Sonar

Video-Line One VGA signal in-line for two Monitors

One VGA signal splitted for four Monitors=better quality images

Video-Recording Two Recorder for two Monitors

Four Recorder for four Monitors

 

Page 7: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

left: 2001 cruise equipment for MODUS steering and control units

right: new configuration with additional second 19” Video-System rack

Video documentation system

Page 8: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

New Zoom-Camera from DeepSea-Power&Light: Super SeaCam 6000, 12xZoom, autofocus

Comparison between ‘old’ and improved Video-System

 

Page 9: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

Configurations for 2003 cruise

 

200 m

• sw/brine interface• body brines + HP5l

survey10 m 15 m

Page 10: BIODEEP MEETING (Venice, October 13-15 2003). Problems experienced during 2001 cruise Unreliable performance in high pressure (>2500 mwd) of SCIPACK/SCISKID

System upgrades

 

• more sensors transmissometer added to SCIPACK CTD. Integration of other sensors possible (CH4, pH, Eh, O2, etc.), depends on budget

• possibility to explore the second interface of Urania basin long cable provided

• sensors at two levels (e.g. at two ends of the Niskin bottles) for a more accurate sampling at the interface no sensor provided by CONISMA not implemented

• Additional TV camera on SCIPACK no budget for that in BIODEEP

• Integration of IMBC multicorer TUB and IMBC to coordinate