binh hung waste water treatment (ho chi minh city)
TRANSCRIPT
INTRODUCING
BINH HUNG - WATER TREATMENT PLANT
HCMC, October 4, 2011
Advisor: Prof. Marion MartienssenSpeaker: Vo My Y
Nguyen Dinh Khoa
OUTLINE
• WASTE WATER IN HOCHIMINH CITY
• DONG DIEU PUMPING
• BÌNH HƯNG TREATMENT PLANT
OVERVIEWS OF WASTE WATER IN HOCHIMINH CITY
• Water consumption per capita: 150 l/day (source: JICA project for sewage planning in Hanoi)
• Total discharge in Ho Chi Minh city: 876,170 m3/day• 83 hospitals, 26 medical centres - Discharge: 17,000 – 20,000 m3/day• Total discharge from industrial zones/parks: 400,000 – 500,000 m3/day• From Domestic: 300,000 m3/day.
(source: 2009, PCD project for building the wastewater pollution control action plan in Ho Chi Minh city)
• Wide range of wastewater . (Industry, domestic, hospital)• Seprate and combine waste water system.
OVERVIEWS OF WASTE WATER IN HOCHIMINH CITY
• Domestic wastewater treated: less than 10%• Only 30% of the industrial zones/parks have centralized wastewater
treatment systems.• Can only treat certain pollutants at certain concentration limits. Eg: pH,
BOD, COD, SS, colority, nutrients. (satisfy column A and B of TCVN 5945:2005)
• Planning a system of 9 wastewater treatment plants (one has already been in operation, 3 are being prepared for construction).
• Building wastewater treatment systems in large hospitals• Improving centralized wastewater treatment systems of industrial parks
(equipping automatic monitoring system)
Tôn Đức Thắng St.
D300mm
Dis.5
Tàu Hủ Channel
Đôi Channel
D2200mm
Dis.10Trần Hưng Đạo St.
D1500mm
Đồng Diều\ Pumping Station
Dis.1Dis.3
Main sewage 6.5km
H=-15m Dis.8
Nguyễn Văn Linh St.
Loading sewage 3km
H=-15mTreatment Plant 141.000m3/day
MAP OF COLLECTING SEWAGE ROUTE
OVERVIEWS OF WASTE WATER IN HOCHIMINH CITY
ĐỒNG DIỀU PUMPING STATION
• Pumping waste water from main sewage at Tàu Hủ - Bến Nghé - Đôi - Tẻ Channel to Bình Hưng Waste Water Treatment Plant
• Capacity: - Phase 1: 133.3 m3/minute (192,000 m3/day) by three
underground pumps- Phase 2: 400 m3/minute (576,000 m3/day) (will be
installed three more underground pumps)
BÌNH HƯNG TREATMENT PLANT OVERVIEW
Phase 1- Capacity: 141,000 m3/day- Technology: Activated Sludge- Location: Bình Hưng Ward, Bình Chánh District, Hồ Chí
Minh City- Square: 14 ha- ODA funding from Japan: 100 millions USD- Started at 11/2004- Finished at 12/2008
DESIGN PARAMETERS
Year Square Area (ha)
Population Capacity (m3/day)
Effluent Quality
Phase 1 2008 824.8 425,830 141,000 BOD ≤ 50mg/LSS ≤ 100mg/L
Phase 2 2015 2,791.6 1,421,778 469,000 BOD ≤ 50mg/LSS ≤ 100mg/L
Phase 3 2020 2,791.6 1,390,282 512,000 BOD ≤ 20mg/LSS ≤ 50mg/L
Discharge standardPhase 1 & 2: TCVN 5945:2005, level B (BOD ≤ 50mg/L; SS ≤ 100mg/L)Phase 3: TCVN 5945:2005, level A (BOD ≤ 20mg/L; SS ≤ 50mg/L)
PERSPECTIVE OF BINH HUNG TREATMENT PLANT
Composting
Storage
Booster pump
Effluent
Aerobic tank
Influent
Sludge treatment
Sedimentation
Disinfection
Compress air
Office
Screening
Effluent
Disinfection
Secondary ClarifierPrimary Sedimentation
Recycled sludge 25%
Aerated tank
Centrifugal Thickening
Gravity Thickening
Dewatering
Sludge tankComposting
Exceeding sludge
Mixed Sludge Sludge blocks
Influent
TECHNOLOGY PROCESS
Booster Pump stationPrimary sedimentation Aerated tank Secondary SedimentationDisinfection tank
Gravity Thinkenning Sludge pump Compress air pipes Water filtering system for reuse
Polime Supplier Centrifugal dewatering
EQUIPMENTS AND DEVICES
140,000
128,936
120,000
100,000
80,000
60,000
40,000
20,000
-
48,3754,169
31,643
13,387
91,688
83,408
56,821
108,242
88,89084,526
77,034
110,457
99,937
89,727 90,068
79,064
72,185 69,740
5 6 7 8 9 10 11 12 1/10 2 3 4 5 6 7 8 9 10 11
MonthWaste Water (m3)
Parameter Unit Influent Effluent
Date: 23/06/2010
1 SS Mg/L 200 81
2 BOD Mg/L 53 41
3 Total N Mg/L 12.9 6.7
4 Total P Mg/L 1.6 1.4
Date: 25/08/2010
1 SS Mg/L 472 85
2 BOD Mg/L 46 43
3 Total N Mg/L 22.4 6.2
4 Total P Mg/L 4.9 1.5
WATER ANALYSIS RESULTWASTE WATER FLOW
MAIN RESULTS
• 100 personnel: 50% of bachelor, 30% of engineers, 3 foreign experts.
• Quality of effluent meets design standard (TCVN, level B)• In good condition: remove 23.265 kg BOD/day
Operating and monitoring
Take sample and analysing Maintaining
OPERATING AND MAINTAIN
OVERVIEW OF TREATMENT SYSTEM
PRIMARY SEDIMENTATION
AEROBIC TANK (ACTIVATED SLUDGE)
SECONDARY CLARIFIER
DISINFECTION TANK
DISINFECTION TANK
COMPOSTING, THICKENING SLUDGE