bim project execution planning

21
BIM PROJECT EXECUTION PLANNING Thursday, January 13, 2011 Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University

Upload: malaya

Post on 25-Feb-2016

98 views

Category:

Documents


10 download

DESCRIPTION

Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University. BIM Project Execution Planning. Thursday, January 13, 2011. BIM Project Execution Planning Procedure. Identifying BIM Goals and Uses. “Begin with the end in mind.”. BIM Goals. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: BIM Project  Execution  Planning

BIM PROJECT EXECUTION PLANNING

Thursday, January 13, 2011

Ralph KreiderGraduate Research AssistantCIC Research ProgramPenn State University

Page 2: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GBIM Project Execution Planning Procedure

Page 3: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

“Begin with the end in mind.”

Identifying BIM Goals and Uses

Page 4: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GBIM Goals

Page 5: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GIdentifying BIM Goals and Uses

Page 6: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GIdentifying BIM Goals and Uses

Page 7: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GFrequency and Benefit of Uses

3D Coordination

Design Reviews

Design Authorin

g

Constructi

on Syste

m Design

Existi

ng Conditions M

odeling

3D Control a

nd Planning

Programming

Phase Plan

ning (4D M

odeling)

Record M

odeling

Site Utiliza

tion Planning

Site Analysis

Structu

ral Analys

is

Energy

Analysis

Cost Esti

mation

Susta

inability LE

ED Evaluation

Building Syst

em Analysis

Space

Manage

ment / Tr

acking

Mechanica

l Analysis

Code Validati

on

Lighting A

nalysis

Other Eng. A

nalysis

Digital F

abric

ation

Asset M

anag

ement

Building M

aintenance

Schedulin

g

Disaste

r Plan

ning 0%5%

10%15%20%25%30%35%40%45%50%55%60%65%

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6FrequencyBenefit

Page 8: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GBIM Use Selection Worksheet

Proceed?

Value

Responsible Party

Capabilities & Resources

BIM Use

Page 9: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GDesign BIM Project Execution Process

Page 10: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GLevel Two Process Maps

Page 11: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GDevelop Information Exchanges

INFOEXCHANGE

INFO

EXCHANGE

Page 12: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GInformation Exchange Worksheet

= Output Inadequacy (Revise Information) OR= Input Inadequacy (Revise Responsible Party)

Page 13: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GSupporting Infrastructure

Page 14: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GPlan Template

Page 15: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

SurveysCase Studies

Project (7)Organizational (3)Academic (2)

Focus GroupsIndustry and User Feedback

Validating the Planning Procedure

Page 16: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

OrganizationalUS Army Corps of EngineersPenn State UniversityLos Angeles Community College District (Draft)

University Health Systems - San AntonioMillennium Science BuildingPoff Courthouse2nd Data Center ProjectMoore Building RenovationHenderson Bridge

Projects

AcademicIntegrated BIM Design StudioIntegrated BIM ThesisBIM Project Execution Planning

Case Study Implementation

Page 17: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

Need BIM Champion(s)Owner Involvement is CriticalNeed team Buy-in and TransparencyThe Planning Procedure should allow for Adaptations

by the Project TeamThe Project Execution Plan must be considered a

Living DocumentPlanning takes Resources and it is Critical that

Resources are Available

Lessons Learned

Page 18: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

GSponsors: The Charles Pankow Foundation The Construction Industry Institute (CII) Penn State Office of Physical Plant The Partnership for Achieving Construction Excellence (PACE) Industry Partners:

LACCD USACE Balfour Beatty

Whiting Turner Clark Construction Group Jacobs

Barton Malow GSA MA DCAM

Dana ‘Deke’ Smith Mark Butler Derek Cunz Mark Falzarano

Ed Gannon Greg Gidez Francois Grobler Steve Hagan

Steve Hutsell Mark Konchar Soad Kousheshi Rob Leicht

Kurt Maldovan Victor Sanvido Alexander Zolotov

Craig Dubler Shane Goodman Colleen Kasprzak

Ralph Kreider Eric Nulton

Chitwan Saluja Nevena Zikic

Chimay Anumba Sam Hunter John Messner

Advisory Board Members

PSU Research Team Students:

Faculty:

ACKNOWLEDGEMENTS

Page 19: BIM Project  Execution  Planning

BIM PROJECT EXECUTION PLANNING

Download the Guide at:www.engr.psu.edu/

bim? Ralph KreiderGraduate Research AssistantCIC Research ProgramPenn State University

Page 20: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

Create a PxP TemplateAdd sections on decision makingMap BIM Process

Level 1 and Level 2Map Design Process

Level 1 – Project TeamLevel 2 – Individual Process

Information ExchangesWhat information is required

What to do for this class

Page 21: BIM Project  Execution  Planning

BIM PRO

JECT EXECUTIO

N PLAN

NIN

G

http://www.youtube.com/watch?v=24pvMspaSCE

http://www.youtube.com/user/BentleySystems

Projectwise